FA853821R0003 QandA.pdf
PDF 116 KB Posted
- Attached to
- C-5 Hydraulic Valve Repair Federal contract opportunity
- Solicitation number
- FA8538-21-R-0003
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| FA853821R0003 QandA 2.pdf | ||
| FA853821R0003 Attachments.pdf | ||
| FA853821R0003.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FA8538-21-R-0003 C-5 Hydraulic Valve Repair Q&A
14 Jun 2021
1.) Reference: 4.3.1 Special Tooling and Test Equipment. The Technical Manuals identify special tooling and test equipment requirements for all items to be repaired under this effort. It shall be the responsibility of the contractor to provide all necessary special tooling and test equipment to perform necessary repairs IAW technical manuals.
a.) Question: the reference indicates that special tooling and test equipment will be provide IAW technical manuals. Is there a list of test equipment and supporting technical manuals available?
Answer: All available Technical Manuals have been provided to the entities that have requested, whose certification in JCP has been documented by the PCO and Buyer as directed in Section L of the Solicitation. These technical manuals list the special tooling and test equipment.
b.) Question: Any substitute tools must be pre-approved, is this approval required as part of the RFP submission and review or prior to award?
Answer: Please See Section L, Proposal Submission, Technical Perusal, Sub Factor 2
– Provide documentation as to whether or not your company possesses the identified special tooling and test equipment, has the ability to obtain, or has substitutions for tooling or test equipment. Please note that any substitutions will have to be approved in writing by Air Force C5 System Engineers Prior to use under a contract. Offeror shall:
(1) Provide a list that identifies the source of the required special tooling and test equipment (e.g. currently in-house, sub-contractor owned, lease, purchase, etc.).
(2) If applicable, a listing of substitute or modified tooling and/or equipment to be used as an alternate to what is listed in the technical manual. The listing shall include their plan for accomplishing work with alternate tooling including but not limited to drawings, part number identification, source of supply and other identifying information for the tooling.
(3) Identify risks, if any, associated with the approach, and
(4) Provide a mitigation plan for those risks.