Attachments_Package.pdf
PDF 591 KB Posted
- Attached to
- C-130 Ground Collision Avoidance Computer Repair Federal contract opportunity
- Solicitation number
- FA8538-18-R-0011
About this file
Solicitation Attachments
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| FA8538-18-R-00110001.pdf | ||
| Attachments.zip | ZIP file | |
| SGFP.pdf | ||
| FA8538-18-R-0011.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CONTRACT DATA REQUIREMENTS LIST Form Approved OMB No. 0704-0188(1 Data Item)
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to Department of Defense, Executive Services Directorate (0704-0188).
Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT
A
C. CATEGORY
TDP TM OTHER X
D. SYSTEM / ITEM
C-130 Ground Collision Avoidance Computer
E. CONTRACT / PR NO.
FD20601800195
F. CONTRACTOR
1. DATA ITEM NO.
A001
2. TITLE OF DATA ITEM
Commercial Asset Visibility Air Force End Item Reporting
3. SUBTITLE
CAV AF
4. AUTHORITY
DI-MGMT-81634c
(Data Acquisition Document No.) 5. CONTRACT REFERENCE
PWS Paragraph 4.7
6. REQUIRING OFFICE
FA8538
7. DD 250 REQ
LT
8. APP CODE
N/A
9. DIST STATEMENT
REQUIRED
A
10. FREQUENCY
See Block 16
11. AS OF DATE
See Block 16
12. DATE OF FIRST
SUBMISSION
See Block 16
13. DATE OF SUBSEQUENT
SUBMISSION
See Block 16
a. ADDRESSEE
Draft Final
ReproReg
b. COPIES
14. DISTRIBUTION
16. REMARKS
Himes, Amy LNAME: 08 JAN 2018DATE:
1. The contractor shall report End Item transactional data through electronic submission in CAV AF using the CAV AF web site or CICA XML IAW the referenced DID IAW and/or CAV AF CFM SOW. This information will be accessed by the program office PMS and by 420 SCMS/GUNAB-Robins in order to ascertain production status.
2. Transactions and data will be submitted by the contractor daily IAW CAV AF User Guide, Version 8.0.1 or higher.
The Contractor shall obtain a valid DOD PKI certificate to log into CAV AF. Each user shall be required to have an Identity Certificate only; an encryption certificate is not required.
3. Training will be provided by 420 SCMS/GUNAB-Robins, (478) 327-6603 or 6602.
4. This DD Form 1423-1 applies to Contractor Furnished Materiel (CFM) type contracts.
Block 7: Enter the applicable code as listed in DOD 5010.12-M, Chapter 3. (Enter LT for Letter of Transmittal if not separately priced or DD if separately priced.)
Block 10:
a. Contractor reporting requirements to CAV AF shall be accomplished daily and/or within 24 hours of a supply or maintenance action occurrence IAW Contractor Users Guide.
b. The method of communication from the contractor to the funding base will be mechanized using the CAV AF Online web site IAW CAV AF Contractor Users Guide.
Block 11: Data shall be current within 24 hours of last End Item maintenance occurrence.
Block 12: Date of first submission shall be within 24 hours following a supply or maintenance transaction after the contract award date and government training as specified in IAW CAV AF Users Guide.
Block 13: Same as remarks regarding Block 10 above.
COORDINATORS:
Kirkland, Ruth H 409 C130 / ENA 478-926-6379 / 468-6379 18 JAN 2018
15. TOTAL
G. PREPARED BY
Allen, Carl B
409 SCMS / GUMBB
478-327-3603
H. DATE
26 FEB 2018
I. APPROVED BY
//DIGITALLY SIGNED//
ROWLAND.LANCE.K.1229955680
407 SCMS / GULAD 478-926-3810 / 468-3810
J. DATE
18 JAN 2018
Page 1 of 8DD FORM 1423-1, FEB 2001 Version 1Generated by PRPS using Jasper Reports on 27 Feb 2018
PREVIOUS EDITION MAY BE USED.
A. CONTRACT LINE ITEM NO. B. EXHIBIT
A
C. CATEGORY
TDP TM OTHER X
D. SYSTEM / ITEM
C-130 Ground Collision Avoidance Computer
E. CONTRACT / PR NO.
FD20601800195
F. CONTRACTOR
1. DATA ITEM NO.
A002
2. TITLE OF DATA ITEM
Item Unique Identification (IUID) Marking Plan
3. SUBTITLE
Marking Plan
4. AUTHORITY
DI-MGMT-81803
(Data Acquisition Document No.) 5. CONTRACT REFERENCE
PWS 4.5.1
6. REQUIRING OFFICE
409 SCMS/GUMBB
7. DD 250 REQ
N/A
8. APP CODE
N/A
9. DIST STATEMENT
REQUIRED
N/A
10. FREQUENCY
See Block 16
11. AS OF DATE
See Block 16
12. DATE OF FIRST
SUBMISSION
See Block 16
13. DATE OF SUBSEQUENT
SUBMISSION
See Block 16
a. ADDRESSEE
Draft Final
ReproReg
b. COPIES
14. DISTRIBUTION
16. REMARKS
Warren, Michele ANAME: 04 JAN 2018DATE:
The Item Unique Identification (IUID) Marking Plan fully documents the scope of meeting MIL-STD-130 DoD Standard Practice Identification Marking of U.S. Military Property, with the Contractor's marking requirements, marking methodology/strategy, data management, quality assurance, facilities and marking equipment, technical data package requirements, data carrier symbols and print quality and the master schedule to help the government manage marking activities in a cost effective and timely manner.
1. Reference documents: The applicable issue of the documents cited herein, including their approval dates and dates of any applicable amendments, notices and revisions will be as cited online at Acquisition Streamlining and Standardization Information System (ASSIST) Update at the time of the solicitation.
2. Format. Contractor's format is acceptable.
3. Content. The Marking Plan will cover the following elements:
3.1 Describe the minimum item marking requirements
3.2 List/Detail items/assets to be marked within the scope of the plan
3.3 Marking Methodology/Strategy
3.3.1 Describe which type of marking methodology will be used
3.3.2 Describe the Imprint Method/Type of Label/Nameplate
3.3.3 Marking Specifications
3.3.3.1Identify applicable engineering drawings requiring IUID marking
3.3.3.2 Machine Readable Mark Generation Instructions
3.3.3.2.1 Define the construct method
3.3.3.2.2 Determine the Enterprise Identifier (EID)
3.3.3.2.3 Determine the level of serialization
3.3.3.2.4 If using Construct 1-I8S, identify the sequence number generation process
3.3.3.2.5 Determine other data elements required in the data matrix symbol
3.3.3.3 Determine the Human Readable Mark Generation elements to be included on the label
3.3.3.4 For labels/nameplates, identify which type of material will be used for the creation of the Mark
3.3.3.5 Describe the overall layout of the Mark including
3.3.3.5.1 Size
3.3.3.5.2 Shape
COORDINATORS:
Kirkland, Ruth H 409 C130 / ENA 478-926-6379 / 468-6379 18 JAN 2018
409 SCMS/GUMBB
Attn: Program Manager 235 Byron Street, Suite 19A Robins AFB, GA 31098
0 1 0
0 1 015. TOTAL
G. PREPARED BY
Allen, Carl B
409 SCMS / GUMBB
478-327-3603
H. DATE
26 FEB 2018
I. APPROVED BY
//DIGITALLY SIGNED//
ROWLAND.LANCE.K.1229955680
407 SCMS / GULAD 478-926-3810 / 468-3810
J. DATE
18 JAN 2018
Page 2 of 8DD FORM 1423-1, FEB 2001 Version 1Generated by PRPS using Jasper Reports on 27 Feb 2018
A. CONTRACT LINE ITEM NO. B. EXHIBIT
A
C. CATEGORY
TDP TM OTHER X
D. SYSTEM / ITEM
C-130 Ground Collision Avoidance Computer
E. CONTRACT / PR NO.
FD20601800195
F. CONTRACTOR
1. DATA ITEM NO.
A003
2. TITLE OF DATA ITEM
Item Unique Identification (IUID) Marking Activity and Verification Report
3. SUBTITLE
Marking Activity and Verification Report
4. AUTHORITY
DI-MGMT-81804
(Data Acquisition Document No.) 5. CONTRACT REFERENCE
PWS 4.5.2.2
6. REQUIRING OFFICE
409 SCMS/GUMBB
7. DD 250 REQ
N/A
8. APP CODE
N/A
9. DIST STATEMENT
REQUIRED
N/A
10. FREQUENCY
See Block 16
11. AS OF DATE
See Block 16
12. DATE OF FIRST
SUBMISSION
See Block 16
13. DATE OF SUBSEQUENT
SUBMISSION
See Block 16
a. ADDRESSEE
Draft Final
ReproReg
b. COPIES
14. DISTRIBUTION
16. REMARKS
Warren, Michele ANAME: 04 JAN 2018DATE:
The Item Unique Identification (IUID) Marking Activity and Verification Report as a tabular list providing IUID marking activities data such as physical asset marking, registration, verification, inventory audits, quality audits and other asset life cycle activities. A "Pass" value will be assigned to records whose data matrix symbol(s) meet or exceed MIL-STD-130 DoD Standard Practice Identification Marking of U.S. Military Property, Data Matrix Symbol Quality.
1. Reference documents: MIL-STD-130. The applicable issue of the documents cited herein, including their approval dates and dates of any applicable amendments, notice and revisions, shall be as cited at Acquisition Streamlining and Standardization Information System (ASSIST)Update, at the time of the solicitation.
2. The Contractor's format is acceptable.
3. The tabular report shall include the following alphanumeric fields:
3.1 Unique Item Identifier (UII)
3.2 UII Type (Construct)
3.3 Enterprise Identifier (EID)
3.4 EID Type
3.5 Original Equipment Manufacturer (OEM) Part Number
3.6 Serial Number
3.7 Equipment Nomenclature
3.8 National Stock Number
3.9 Activity/Event
3.10 Activity/Event Date
3.11 Verification (Pass/Fail)
3.12 For part that "Fail" IUID verification, identify if item will be re-marked or scrapped
4. The Contractor shall ensure machine-readable IUID marks required under this contract are permanently placed on the items subjected to contractually-required performance testing; and further shall include all mark serviceability problems in the subject's test report(s).
5. End of DI-MGMT-81804
COORDINATORS:
Kirkland, Ruth H 409 C130 / ENA 478-926-6379 / 468-6379 18 JAN 2018
409 SCMS/GUMBB
Attn: Program Manager 235 Bryon Street, Suite 19A Robins AFB, GA 31098
0 1 0
0 1 015. TOTAL
G. PREPARED BY
Allen, Carl B
409 SCMS / GUMBB
478-327-3603
H. DATE
26 FEB 2018
I. APPROVED BY
//DIGITALLY SIGNED//
ROWLAND.LANCE.K.1229955680
407 SCMS / GULAD 478-926-3810 / 468-3810
J. DATE
18 JAN 2018
Page 3 of 8DD FORM 1423-1, FEB 2001 Version 1Generated by PRPS using Jasper Reports on 27 Feb 2018
A. CONTRACT LINE ITEM NO. B. EXHIBIT
A
C. CATEGORY
TDP TM OTHER X
D. SYSTEM / ITEM
C-130 Ground Collision Avoidance Computer
E. CONTRACT / PR NO.
FD20601800195
F. CONTRACTOR
1. DATA ITEM NO.
A004
2. TITLE OF DATA ITEM
Government Industry Data Exchange Program (GIDEP) Alert/Safe-Alert Report
3. SUBTITLE
Alert/Safe-Alert Report
4. AUTHORITY
DI-QCIC-80125B
(Data Acquisition Document No.) 5. CONTRACT REFERENCE
PWS 4.9.2
6. REQUIRING OFFICE
409 SCMS/GUMBB
7. DD 250 REQ
N/A
8. APP CODE
N/A
9. DIST STATEMENT
REQUIRED
A
10. FREQUENCY
See Block 16
11. AS OF DATE
See Block 16
12. DATE OF FIRST
SUBMISSION
See Block 16
13. DATE OF SUBSEQUENT
SUBMISSION
See Block 16
a. ADDRESSEE
Draft Final
ReproReg
b. COPIES
14. DISTRIBUTION
16. REMARKS
Warren, Michele ANAME: 04 JAN 2018DATE:
1. The applicable issue of the documents cited herein, including their approval dates and dates of any applicable amendment and revision, shall be as reflected in the contract.
2. The Alert/Safe Alert shall be presented on DD Form 1938 or electronically.
3. The Alert/Safe Alert Report shall contain all data specified on DD Form 1938 electronic template in accordance with instructions cited on back side of the form and/or the guidance of S0300-BT-PRO-010, Chapter 7.
4. An paper or electronic copy of the report must be provided to the addressee/Program Manager.
5. Distribution Statement A: Approved for public release; distribution is unlimited.
6. End of DI-QCIC-80125B
COORDINATORS:
Kirkland, Ruth H 409 C130 / ENA 478-926-6379 / 468-6379 18 JAN 2018
409 SCMS/GUMBB
Attn: Program Manager 235 Bryon Street, Suite 19A Robins AFB, GA 31098
0 1 0
0 1 015. TOTAL
G. PREPARED BY
Allen, Carl B
409 SCMS / GUMBB
478-327-3603
H. DATE
26 FEB 2018
I. APPROVED BY
//DIGITALLY SIGNED//
ROWLAND.LANCE.K.1229955680
407 SCMS / GULAD 478-926-3810 / 468-3810
J. DATE
18 JAN 2018
Page 4 of 8DD FORM 1423-1, FEB 2001 Version 1Generated by PRPS using Jasper Reports on 27 Feb 2018
A. CONTRACT LINE ITEM NO. B. EXHIBIT
A
C. CATEGORY
TDP TM OTHER X
D. SYSTEM / ITEM
C-130 Ground Collision Avoidance Computer
E. CONTRACT / PR NO.
FD20601800195
F. CONTRACTOR
1. DATA ITEM NO.
A005
2. TITLE OF DATA ITEM
Government Industry Data Exchange Program (GIDEP) Alert/Safe-Alert Response
3. SUBTITLE
Alert/Safe Alert Response
4. AUTHORITY
DI-QCIC-80126B
(Data Acquisition Document No.) 5. CONTRACT REFERENCE
PWS 4.9.2
6. REQUIRING OFFICE
409 SCMS/GUMBB
7. DD 250 REQ
N/A
8. APP CODE
See Block 16
9. DIST STATEMENT
REQUIRED
A
10. FREQUENCY
See Block 16
11. AS OF DATE
See Block 16
12. DATE OF FIRST
SUBMISSION
See Block 16
13. DATE OF SUBSEQUENT
SUBMISSION
See Block 16
a. ADDRESSEE
Draft Final
ReproReg
b. COPIES
14. DISTRIBUTION
16. REMARKS
Warren, Michele ANAME: 04 JAN 2018DATE:
1. The GIDEP Response format shall be at the Contractor's discretion.
2. The Response to a failure experience report shall contain the following information, complete to the extent by usage of the part, component, material, process or equipment or to the extent dictated by the safety condition.
2.1 For nonconforming part or service, the response shall identify the contract number, specific lots, manufacturing dates and locations.
2.2 The effect of the failure on systems/equipment function, mission or process
2.3 Identification of date, destination, serial number(s), etc., of any units shipped containing the identified supplies part or service.
2.4 Identification of any inspection or failure records of the identified supplies or services and whether they were encountered in the use of these supplies or services.
2.5 Reports of any analyses that may have been accomplished on these supplies or services.
2.6 Recommendations as to corrective action or disposition of the identified supplies or services.
2.7 Identification of the contractor/manufacturer's contact point and organization.
2.8 Distribution Statement A: Approved for public release; distribution is unlimited.
3. End of DI-QCIC-80126B
COORDINATORS:
Kirkland, Ruth H 409 C130 / ENA 478-926-6379 / 468-6379 18 JAN 2018
409 SCMS/GUMBB
Attn: Program Manager 325 Bryon Street, Suite 19A Robins AFB, GA 31098
0 1 0
0 1 015. TOTAL
G. PREPARED BY
Allen, Carl B
409 SCMS / GUMBB
478-327-3603
H. DATE
26 FEB 2018
I. APPROVED BY
//DIGITALLY SIGNED//
ROWLAND.LANCE.K.1229955680
407 SCMS / GULAD 478-926-3810 / 468-3810
J. DATE
18 JAN 2018
Page 5 of 8DD FORM 1423-1, FEB 2001 Version 1Generated by PRPS using Jasper Reports on 27 Feb 2018
A. CONTRACT LINE ITEM NO. B. EXHIBIT
A
C. CATEGORY
TDP TM OTHER X
D. SYSTEM / ITEM
C-130 Ground Collision Avoidance Computer
E. CONTRACT / PR NO.
FD20601800195
F. CONTRACTOR
1. DATA ITEM NO.
A006
2. TITLE OF DATA ITEM
Status Report
3. SUBTITLE
Monthly Status Report
4. AUTHORITY
DI-MGMT-80368/T
(Data Acquisition Document No.) 5. CONTRACT REFERENCE
PWS 4.10
6. REQUIRING OFFICE
409 SCMS/GUMBB
7. DD 250 REQ
LT
8. APP CODE
N/A
9. DIST STATEMENT
REQUIRED
N/A
10. FREQUENCY
MTHLY
11. AS OF DATE
See Block 16
12. DATE OF FIRST
SUBMISSION
See Block 16
13. DATE OF SUBSEQUENT
SUBMISSION
Monthly
a. ADDRESSEE
Draft Final
ReproReg
b. COPIES
14. DISTRIBUTION
16. REMARKS
Warren, Michele ANAME: 04 JAN 2018DATE:
BLOCK 7: Contractor shall submit final status report with a DD Form 250 to collectively account for data previously delivered by letter of transmittal. The Government will approve or disapprove the DD Form 250 within 45 days of receipt.
BLOCK 10 and 13: The Contractor shall provide the first monthly status report 10 days after the completion of the first calendar month after receipt of order. Subsequent reports are due at the end of the month.
BLOCK 14: Electronic media delivery is preferred and shall be in MS Word format compatible with Microsoft Windows 7 or higher. Delivery shall be provided via CD/DVD ROM or on-line access such as e-mail. When electronic submittal is not possible, hard copies of the report shall be submitted.
Report shall include the following as a minimum:
a) Identify each reparable item by contract number, delivery order number and CLIN
b) Identify each reparable item by National Stock Number (NSN)
c) Identify each reparable item by nomenclature
d) Quantity of each reparable item in-work
e) Quantity of each reparable item on-hand awaiting to be inducted for maintenance
f) Quantity repaired per NSN on contract
g) Number of Deficiency Reports received for each reparable item
h) Quantity of Beyond Economical Repair (BER) for each reparable item on contract
i) Quantity of condemnations for each reparable item on contract
BLOCK 14A: michele.warren@us.af.mil
COORDINATORS:
Kirkland, Ruth H 409 C130 / ENA 478-926-6379 / 468-6379 18 JAN 2018
409 SCMS/GUMBB
Attn: Program Manager 235 Bryon Street, Suite 19A Robins AFB, GA 31098
0 1 0
0 1 015. TOTAL
G. PREPARED BY
Allen, Carl B
409 SCMS / GUMBB
478-327-3603
H. DATE
26 FEB 2018
I. APPROVED BY
//DIGITALLY SIGNED//
ROWLAND.LANCE.K.1229955680
407 SCMS / GULAD 478-926-3810 / 468-3810
J. DATE
18 JAN 2018
Page 6 of 8DD FORM 1423-1, FEB 2001 Version 1Generated by PRPS using Jasper Reports on 27 Feb 2018
A. CONTRACT LINE ITEM NO. B. EXHIBIT
A
C. CATEGORY
TDP TM OTHER X
D. SYSTEM / ITEM
C-130 Ground Collision Avoidance Computer
E. CONTRACT / PR NO.
FD20601800195
F. CONTRACTOR
1. DATA ITEM NO.
A007
2. TITLE OF DATA ITEM
Failure Summary and Analysis Report
3. SUBTITLE
Failure Analysis Report
4. AUTHORITY
DI-SESS-80255
(Data Acquisition Document No.) 5. CONTRACT REFERENCE
PWS 4.11
6. REQUIRING OFFICE
409 SCMS/GUMBB
7. DD 250 REQ
LT
8. APP CODE
N/A
9. DIST STATEMENT
REQUIRED
A
10. FREQUENCY
QRTLY
11. AS OF DATE
See Block 16
12. DATE OF FIRST
SUBMISSION
See Block 16
13. DATE OF SUBSEQUENT
SUBMISSION
See Block 16
a. ADDRESSEE
Draft Final
ReproReg
b. COPIES
14. DISTRIBUTION
16. REMARKS
Warren, Michele ANAME: 04 JAN 2018DATE:
In accordance with Performance-Based Work Statement (PWS), this report shall identify the summary of analysis and the repair action(s) taken. The report shall be provided quarterly. Contractor electronic format is acceptable.
An electronic copy shall be provided to the Program Manager. A paper copy of the report must also be provided to the address in Block 14a. However, the Contractor may forgo the provision of paper copy of this report by obtaining a waiver from the Program Manager. The waiver can be obtained via email with a statement that exempts the Contractor from providing a paper copy.
BLOCK 12. The first submission of this report is due 30 days after the first quarter of performance. The performance period begins on the date of award of the order against the basic contract.
BLOCK 13: Subsequent reports are due 30 days after the end of the quarter.
BLOCK 14a: michele.warren@us.af.mil
End of DI-SESS-80255
COORDINATORS:
Kirkland, Ruth H 409 C130 / ENA 478-926-6379 / 468-6379 18 JAN 2018
409 SCMS/GUMBB
Attn: Program Manager 235 Bryon Street, Suite 19A Robins AFB, GA 31098
0 1 0
0 1 015. TOTAL
G. PREPARED BY
Allen, Carl B
409 SCMS / GUMBB
478-327-3603
H. DATE
26 FEB 2018
I. APPROVED BY
//DIGITALLY SIGNED//
ROWLAND.LANCE.K.1229955680
407 SCMS / GULAD 478-926-3810 / 468-3810
J. DATE
18 JAN 2018
Page 7 of 8DD FORM 1423-1, FEB 2001 Version 1Generated by PRPS using Jasper Reports on 27 Feb 2018
A. CONTRACT LINE ITEM NO. B. EXHIBIT
A
C. CATEGORY
TDP TM OTHER X
D. SYSTEM / ITEM
C-130 Ground Collision Avoidance Computer
E. CONTRACT / PR NO.
FD20601800195
F. CONTRACTOR
1. DATA ITEM NO.
A008
2. TITLE OF DATA ITEM
Programmatic Environmental Safety and Health Evaulation (PESHE) Plan
3. SUBTITLE
Safety and Health Eval Plan
4. AUTHORITY
DI-ENVR-81375
(Data Acquisition Document No.) 5. CONTRACT REFERENCE
PWS 5.6.2
6. REQUIRING OFFICE
78 ABW/SEG
7. DD 250 REQ
DD
8. APP CODE
A
9. DIST STATEMENT
REQUIRED
A
10. FREQUENCY
See Block 16
11. AS OF DATE
See Block 16
12. DATE OF FIRST
SUBMISSION
See Block 16
13. DATE OF SUBSEQUENT
SUBMISSION
See Block 16
a. ADDRESSEE
Draft Final
ReproReg
b. COPIES
14. DISTRIBUTION
16. REMARKS
Warren, Michele ANAME: 04 JAN 2018DATE:
Contractor shall submit a Safety and Health Plan to the Procuring Contracting Officer (PCO) and the Safety Office, 78 ABW/SEG within thirty (30) days after contract award. Written Government acceptance/rejection will be within ten (10) working days after receipt of Plan from the Contractor. Contractor final submission shall be submitted within ten (10) working days of receiving Government comments. Acceptance by the Government is required prior to formal distribution.
BLOCK 9: Distribution authorized to the Department of Defense (DoD) and U.S. DoD contractors only. Other requests shall be referred to the contract management team, AFSC/PZAAB, 235 Bryon Street, Suite 19A, Robins AFB, GA 31098.
BLOCK 13: If during the performance of this contract, changes to the Safety and Health Plan are required, submit the revised Safety and Health Plan to AFSC/PZAAB and the Safety Office, 78 ABW/SEG.
BLOCK 14: An electronic media delivery is preferred and shall be in MS Word format compatible with Microsoft Windows 7 or higher. Delivery shall be provided via CD/DVD ROM or on-line access such as e-mail. When electronic submittal is not possible hard copies of the report shall be submitted.
BLOCK 14a: michele.warren@us.af.mil
COORDINATORS:
Kirkland, Ruth H 409 C130 / ENA 478-926-6379 / 468-6379 18 JAN 2018
78 ABW/SEG
675 Seventh Street, Bldg 707 Robins AFB, GA 31098
0 1 0
AFSC/PZAAB
Attn: PCO 235 Bryon Street, Suite 19A Robins AFB, GA 31098
0 1 0
0 2 015. TOTAL
G. PREPARED BY
Allen, Carl B
409 SCMS / GUMBB
478-327-3603
H. DATE
26 FEB 2018
I. APPROVED BY
//DIGITALLY SIGNED//
ROWLAND.LANCE.K.1229955680
407 SCMS / GULAD 478-926-3810 / 468-3810
J. DATE
18 JAN 2018
Page 8 of 8DD FORM 1423-1, FEB 2001 Version 1Generated by PRPS using Jasper Reports on 27 Feb 2018
CAVAF CFM SOW v18, December 8, 2014
CAV AF CFM
STATEMENT OF WORK
The purpose of this statement of work (SOW) is to provide Contract Depot Maintenance (CDM) guidance for contractor technical responsibilities and reporting requirements of the Commercial
Asset Visibility Air Force (CAV AF) system. CAV AF shall be the primary system of record for providing daily status of all Government owned assets located at contractor repair facilities.
Reporting within CAV AF shall not be limited to end items subject to repair but are to include assets stored as an inventory control point (ICP). System down times to the CAV AF system will be identified on the CAV AF home web page banner. Contractors are responsible for ensuring current User Guides are utilized by their respective facility.
HOW DOES CONTRACTOR REPORTING IMPACT AF STRATEGIC GOALS?
The attached CAVAF brochure is provided to suppliers at such venues as; supplier summits, prime supplier meetings, supplier relation management meetings, etc. Targeted audience at such venues is supplier upper management level positions, with the AF strategic goal placing emphasis on timely and accurate reporting within 24 hours of maintenance or supply occurrence.
The information is provided here for the CAVAF reporter to better understand how reporting impacts Weapon System supportabilty and the supplier by minimizing variability of future contract delivery order requirements.
CAV AF Brochure.dot
CAV AF FORMAL TRAINING AND EDUCATION BRIEFING:
1. Training for CAV AF reporting will be requested by the contractor by contacting the applicable ICP CAV AF system administrator (SA). For assistance, guidance or questions to specific contract transactionsl reporting requirements may be addressed to the CAV AF contract monitor (CM). For ICP CAV AF (SA and/or CM) points of contact are identified in this document, Attachment 1, under Submission Requirements for CAV AF Access, para 5.
2. A CAV AF Requirement Lifecycle Educational Brief will be provided on all awarded contracts by the contracting ICP CAV AF System Administrator (SA). All repair contractors shall be presented the CAV AF Requirements Lifecycle Education Briefing within the initial 3 months of contract award, but no less than once during repair contract duration. The intent of the briefing places importance on timely and accurate contractor reporting within 24 hours of maintenance occurrence.
a. A briefing shall be facilitated by a government repair requirements representative or other designee to the contractor and government attendees. Mandatory contractor attendance for the briefing shall consist of the CAV AF reporter and their immediate program manager/supervisor.
b. An exclusion from the CAV AF Requirement Lifecycle Educational Brief may be granted if the contractor has received the briefing within the past 12 months and has been awarded one or more contracts thereafter, provided the following criterias have been met;
the same supplier/location (DoDAAC TAC2 address) with no CAV AF contractor reporter changes, there are no reporting failures and/or findings uncovered. A contractor may submit an exclusion request to the PMS for consideration.
c. Additional briefing(s) may be warranted when the contractor CAV AF reporting displays a poor performance as a result in untimely and/or inaccurate reporting. Deficiencies shall be documented and reported by the PMS to the government procurement contracting officer
(PCO) for contractual actions to correct untimely and/or inaccurate reporting, or noncompliance of contractual CAV AF reporting requirements. NOTE: During Program
Management Review(s) (PMR) or separate meeting(s) issues addressing supplier
CAV AF reporting performance shall be discussed. This is to rectify inadequate and contractual noncompliance of CAV AF reporting as follows but not limited to; untimely reporting, consistent 1 day repair-turn-around-time (RTAT) reporting, failure to report “all” assets in CAV AF or personnel changes impacting supplier reporting performance.
CONTRACTOR RESPONSIBILITY:
1. Contractor reporting requirements to CAV AF shall be accomplished daily and/or within 24-hours of a maintenance action occurrence IAW the applicable CAV AF CDRL, CAV AF version 8.0.1 or higher. Accurate and timely reporting of maintenance transactions into
CAV AF is critical to the management of repair requirements and the management of world-wide asset distribution. CAV AF transmits daily to Air Force internal data systems for financial and asset tracking. Air Force Expeditionary Logistics for the 21st Century (eLog21) requires total asset visbility; therefore, inaccurate or lack of CAV AF reporting will cause significant loss to the Air Force. Contractor shall ensure asset record in CAV AF is an accurate reflection of physical asset on hand at all times.
2. Each CAV AF user shall submit a completed System Authorization Access Request, DD
Form 2875, per instructions outlined in Attachment 1, Submission Requirements For CAV AF
Access section, within 10 days after contract award date. All DD Form 2875(s) shall be digitally signed. There “must be two CAV AF reporters” for the contractual reporting requirements to ensure there is no possibility of a lapse in reporting coverage. It is imperative the following requirements be met to successfully process the DD Form 2875 in a timely manner to maintain contractual compliance authorization for CAV AF system access:
a. In blocks 28 and 28a on the DD Form 2875, users shall identify the valid PK certification supplier and date of investigation. For CAV AF system access users shall require an active PKI certificate be maintained. Each contractor employee accessing
CAV AF will need an Identity Certificate only; an Encryption Certificate is not required.
NOTE: For contracts awarded to foreign contractor repair facilities (outside the US), see within this document Attachment 1, under Technical Considerations, para 1.b., which may add additional process time to acquire a PKI certificate.
b. User(s) shall complete initial DoD Information Assurance (IA) Cyberawareness Challenge training and submit a course completion certificate with the DD Form 2875. IA
Cyberawareness Challenge course completion certification shall be accomplished annually.
Users shall access IA training on the CyberAwareness Challenge website, under the
Department of Defense Employees section, click hyperlink; “Launch New CyberAwareness
Challenge Department of Defense Version” using the following website:
http://iase.disa.mil/eta/cyberchallenge/launchPage.htm
i. First time CAV AF users will email initial IA Cycberawareness Challenge course completion certificates, AF Form 4394, AF User Agreement Statement and completed
DD Form 2875 to applicable ICP (see Attach 1, para 1.2) and hqafmc.a4nl@us.af.mil
ii. All following annual course completion certificates shall be completed before lapse in certification occurs and will be emailed to: hqafmc.a4nl@us.af.mil
iii. Product Functionality Caution: To meet technical functionality requirements, this awareness product was developed to function with Windows operating systems
(Windows 7, VISTA, and XP, when configured correctly) using either the Internet
Explorer (IE) or Firefox browsers. Users employing another OS or browser may experience difficulties and may not be able to complete the training or print the certificate of completion. The Cyberawareness Challenge course completions is a contractual requirement and must be complied with.
3. Utilizing subcontractors in the repair of government assets in partnership by the awarded prime contractor shall conform to all applicable CAV AF reporting requirements contained within this contract. Inherently, the awarded prime contractor shall bear sole responsibility for all reporting actions.
4. In order to successfully access CAV AF system, contractor and subcontractor reporters shall closely follow “initial log-in procedures” as prescribed within the following attachment:
CAVAF Initial Log-In
Procedures.docx
5. Contractor shall ensure accountability of all government furnished property (GFP) within their enterprise resource planning (ERP) or commercial off-the-shelf (COTS) system, which must be reported accurately for same GFP records within CAVAF at all times.
6. Contractual Induction-at-Risk of end items is prohibited on all repair contracts.
7. Contract/Delivery Order Closure Level Disposition Instructions – Government will provide disposition instructions to contractor. Contractor shall begin shipping assets within 10 days of receiving government disposition instructions and have completed all shipping actions 30 days http://iase.disa.mil/eta/cyberchallenge/launchPage.htm mailto:hqafmc.a4nl@us.af.mil file:///E:/Contractual%20Documents/hqafmc.a4nl@us.af.mil thereafter. Contractor shall be fully responsible to ensure all corresponding CAV AF reporting actions associated with disposition instructions occur within 24 hrs of related shipment action.
8. All NSNs identified as Nuclear Weapon Related Material (NWRM) shall require contractor reporting utilizing CAV AF for production management, to track and report NWRM end items in repair to the Serial Number level. Contractors shall capture each NWRM assets Serial Number when reparable is received. NWRM assets received shall be receipted in CAV AF, with Serial
Number identification within 24-hours for asset visibility and serial number tracking.
Contractors shall follow all NWRM management requirements outlined in AFI 20-110, NWRM
Management, to include, but not limited to packaging, marking, labeling, storage, transportation and receipt of all NWRM assets, with emphasis on positive inventory control (PIC) and records management by the contractor and government to assure compliance. The successful application of these procedures requires the full cooperation of all personnel associated with the storage, shipping, transshipping and receiving of all NWRM assets.
SPECIFIC CAV AF CONTRACTOR TRANSACTIONAL REPORTING
REQUIREMENTS:
1. “Not-on-Contract” receipt transactions shall be utilized for assets which are not repair end items. Not-on-contract assets are associated to a contractor facility DoDAAC and not an active contract delivery order. Regardless of asset condition code status, Not-on-contract shall be used for the following reporting actions:
a. Discrepancy Items – Are identified as misrouted, shipments, misidentified shipments or damaged end items. Contractor will address discrepancy issues weekly to acquire resolution to discrepancy within 30-days of receipt transaction. The contractor shall comply with disposition instructions provided by the Government within 10-days and complete all associated reporting actions within same period. Contractor reporting actions shall be resolved using reversals of individual record document control numbers (RCDN) or may be accomplished utilizing a ‘bulk’ shipment action of RCDN.
b. Inventory Control Point Items – are identified as assets stored at contractor facility and are not repair end items or discrepancies items. Movement of assets from “Not-on-
Contract” category shall be resolved using reversals of individual record document control numbers (RCDN) or may be accomplished utilizing a ‘bulk’ shipment action of
RCDN.
NOTE: Contractor is responsible for all “Not-on-Contract” assets ensuring physical asset balances are reflected and CAV AF reporting actions occur within 24 hr of occurrence.
2. CAV AF receipt or reporting actions will not be utilized for quality deficiency report (QDR) items, as there is a separate process and tracking mechanism for them.
3. All contract contract line item number (CLIN) repairable assets shall be receipted in CAV
AF under Receipt Type: On Contract (F). CAV AF generates a record control document number
(RCDN) for each unit receipted and allows the reporter to assign a reference or serialization number for tracking purposes. Where no reference or serialization numbers are utilized for tracking purposes, the oldest RCDNs (listed first) shall always be processed first in the reporting selection of units. Any reversal actions shall be accomplished using the last RCDNs processed in reporting actions.
4. Contractor must have government or self-certified approval of repair action based on DD
Form 250 signature or Wide Area Workflow (WAWF) entry before Condition Code A status is entered into CAV AF. The “Complete Date” entered into CAV AF cannot be dated prior to the
DD250 date entered in the same screen. Contractor will validate that the DD250 shipment number and date entered into CAV AF are accurate. This requirement is also applicable to
Condition Code H (Condemned) only when specifically directed by the contract.
5. Proper usage of DD Form 1348-1A, Issue Release/Receipt Document in relation to CAV AF reporting requirements.
a. Receipt Actions: Contractor will use government issued shipment document numbers for
CAV AF end item receipt transaction reporting only in the absence of missing DD Form
1348-1A or shipment document number. Contractors are not authorized to generate pseudo shipment document numbers for receipt transactions because this creates disconnects in shipment tracking within government inventory systems. NOTE: If the
DD Form 1348-1A is missing or no shipment document number is available, contractors are to immediately contact Production Management Specialist (PMS), who will acquire government issued shipment document number from the Inventory Management
Specialist (IMS).
b. Shipping Actions: DD Form 1348-1A shall be used as the shipping document for shipment transactions of all end items. A DD Form 1348-1A is also applicable to all
Consolidated Serviceable Inventory/Consolidated Reparable Inventory (CSI/CRI) assets regardless of tracking or reporting purposes. A Material Inspection and Receiving
Report, DD Form 250 or Requisition and Invoice/Shipping Document, DD Form 1149 are not acceptable or authorized as a shipment document, and shall not accompany any material shipments on repair contracts. CAV AF provides a DD Form 1348-1A in a
Portable Document Format (PDF). It is recommended the PDF be saved at the contractor’s facility prior to printing the two copies as required for shipping. DD Form
1348-1A shipping documents will be prepared for each NSN shipment from contractor’s facility, regardless of destination. The entire form, complete with bar coding, will be printed on a laser printer as specified under technical considerations. Place one copy on the outside of the shipment container and one copy inside the shipment container. For end item shipments the DD Form 1348-1A shipment document number shall be comprised as one of the following actions:
i. Back to Depot Shipments:
(1) For a “single” unit NSN shipment, the default shipment document number will be the CAV AF record control document number (RCDN) of item being shipped.
(2) For “multiple” quantity shipments, it is recommended the CAV AF RCDN of the lead item of the shipment be used as the shipment document number.
ii. Ammended Shipping Instructions (ASI): Are used to divert material that is due-in from a contractor to a requisitioner. Government disposition instructions will provide a shipment document number to the contractor to be utilized for CAV AF shipment transaction reporting and the DD Form 1348-1A.
c. In the event CAV AF system is inoperable or is on a scheduled downtime:
i. The DD Form 1348-1A shall be manually completed and generated (printed) by contractor, using the attached PDF file and instructions below.
Manual Instructions for DD Form 1348-1A.docx dd13481a.pdf
NOTE: When using the manual DD 13481A PDF file, use the cursor when navigating to specific record positions or blocks, as the computer keyboard tab key function will not work.
ii. When CAV AF is again operational, the contractor shall resume with transactional reporting actions in a timely and accurate manner, including completing a DD Form 1348-1A (printing not required if manual DD1348-1A
PDF file utilized) and the shipment process in CAV AF.
6. Upon contract expiration and/or becoming production complete, the contractor will complete a 100% physical inventory inspection. Any assets remaining at the facility within 30-days must be noted in an email request to the contracting officer (CO) and PMS for disposition instructions by the government. If none is provided, assets are to be returned to the depot and reported within
CAV AF, shipping to the following addresses according to each national stock number (NSN) inventory management location by source of supply (SOS) code:
a. FHZ – Tinker AFB, the ship for disposition address to SW3211:
TYPE/CODE: A SW3211
DEF DISTRIBUTION DEPOT OF OKLAHOMA
CEN REC 3301 F AVE
BLDG 506, DR 22
TINKER AFB, OK, 73145-8000
b. FGZ – Ogden AFB, the ship for disposition address to SW3210:
TYPE/CODE: A SW3210
DLA DISTRIBUTION DEPOT HILL
7537 WARDLEIGH RD
BLDG 849W
HILL AFB, UT 84056-5734
c. FLZ – Robins AFB, the ship for disposition address to XXXXXX:
CAUTIONARY AREAS OF CONTRACTOR CAV AF REPORTING:
1. Systemic data problems created by contractor’s failure to report data accurately or in a timely manner are subject to immediate Program Management Review (PMR). Examples of documented system data problems include but are not limited to:
a. Timely reporting means compliance with 24 hour requirement for all contractor CAV AF reporting of maintenance transactions. Actual date information is required for all reporting actions. Contractor’s are not authorized to report all receipt, induction, complete and ship transactions the same day to ‘catch-up’ due to periodic reporting. This affects government inventory management systems and balances creating D035 Stock
Control Supply System (SCSS) controlled exceptions (associated with same day reporting issue).
b. Contractors not using government issued DD Form 1348-1A document numbers on CAV
AF contractor reporting on end item receipt transactions. This creates a data variance disconnect with government inventory D035 Stock Control System (SCS). Contractors are required to use DD Form 1348-1A document numbers for end item receipt transactions. NOTE: If the DD Form 1348-1A is missing or no shipment document number is available, contractors are to immediately contact Production Management
Specialist (PMS) and acquire government issued shipment document number from
Inventory Management Specialist (IMS).
c. Overages and shortages, for items which are part of this contract shall be reported by the contractor into CAV AF as received “On-Contract” with actual quantities received. Any items which are not part of this contract shall be receipted as “Not-on-Contract”, which represents misdirected or misidentified assets.
2. RCDNs are systemically generated in CAV AF and should not be duplicated or fabricated with a suffix for shipment document numbers. RCDN is comprised of the CAV AF Contractors
DoDAAC, the Julian date the RCDN was produced, and a four digit serial number (begins with
0001 each day). This affects government inventory management systems D035 SCSS controlled exceptions.
DISCREPANCIES INCIDENT TO SHIPMENT:
1. There are transportation and item discrepancies, each having different reporting requirements.
Detailed information for each report is in the pertinent service publications.
2. Discrepancies incident to shipment include misidentified items, variations in quantity, non-requisitioned items, lost or damaged parcel post, and items in dubious condition. These discrepancies shall be reported and resolved using the DoD web-based application WebSDR link is https://www2.transactionservices.dla.mil/websdr/home.asp This system of reporting a Supply
Discrepancy Report (SDR), formerly called Report of Discrepancy (ROD), has been developed in compliance with DoD regulations 4140.1-R and 4000.25-M Volume 2, which requires automated SDR processing. In those situations where the SDR initiator is unable to gain access https://www2.transactionservices.dla.mil/websdr/home.asp to the AF WebSDR, continued use of manual forms is permitted. A copy of the form will be forwarded through the CAO and Quality Assurance (QA) activity for corrective action.
3. Transportation discrepancies and item transaction discrepancies shall be coordinated with the
DCMA Property Administrator and ACO immediately upon discovery for corrective action in addition to AF WebSDR submittal.
4. Contract line items received with missing components (Missing On Induction, (MOI)) the contractor shall process a SDR (SF Form 364) immediately upon discovery in accordance with
AFJMAN 23-215 and provide a copy of submitted MOI SDR form to the ACO within 2 days of discovery.
5. All misdirected shipments of GFP shall be reported to the Production Management Specialist
(PMS) via email notification within three work days. The PMS will consult with issue appropriate disposition instructions for the misdirected items.
6. Overages, shortages, and misidentified items which are part of this contract and received by the contractor shall be reported into CAV AF with the actual received quantity and with the correct NSN. An SDR shall be processed in accordance with standard procedures identified above for these overages, shortages, and misidentified items.
ATTACHMENT 1
CONTRACTOR COMMUNICATIONS NETWORK (CCN)
GENERAL INFORMATION:
1. The purpose of this attachment is to provide the specific conditions, hardware specifications, and communications interface to support contractor End Item reporting requirements and supply requisitions. Through the CCN Air Force contractors, with aircraft, engine or equipment repair contracts, have the capability to electronically process End Item transactions.
2. Initial CAV AF training will be provided by the contracting ICP. Any follow up training will be the responsibility of the contractor. Training request and/or questions on CAV AF, please contact CAV AF System Administrators (SA) for contracts issued by respective ICP, from one of the following areas:
a. Robins AFB, GA, call (478) 327-6602 or 327-6603, or send email request to:
406scms.cav.af.ar@us.af.mil
b. Hill AFB, UT, call (801) (801) 586-3736, or send email request to:
420scms.cdm@us.af.mil
c. Tinker AFB, OK, call (405) 739-3229, or send email request to:
420.scms.tinker.cdm.workflow@us.af.mil
i. Tinker AFB, OK, Contractor furnished material (CFM) contracts call;
(405) 736-7171 or (405) 736-2046
ii. Tinker AFB, OK, Government furnished material (GFM) contracts call:
(405) 739-7329 or (405) 736-7362
NOTE: CAV AF Contractor’s reporting guide can be accessed via CAV AF main menu at bottom of screen.
WEB SITE CONNECTIVITY:
1. CAV AF web site accessed through the internet will be used to submit all End Item maintenance transactions.
2. The Web address for Online CAV AF access is: https://www.cavaf.com/
CICA XML CONNECTIVITY:
1. Commercial vendors with XML capability on their in-house systems will be able to transmit
XML batch files via a DLA/DLMSO format known as CICA XML. CAV AF XML files are transmitted via the Defense Automatic Addressing System Center (DAASC) network. DAASC receives, edits, and routes logistics transactions for the Military Services and Federal Agencies.
There is only one way to access DAASC:
a. Use the services of a Value Added Network (VAN), with a current access/connectivity
DAASC license agreement.
file:///E:/Contractual%20Documents/406scms.cav.af.ar@us.af.mil file:///E:/Contractual%20Documents/420scms.cdm@us.af.mil mailto:420.scms.tinker.cdm.workflow@us.af.mil https://www.cavaf.com/
b. Establishing an access/connectivity license agreement with a VAN/DAASC is an initial and essential action requiring execution at the earliest opportunity. Once this has been accomplished, DAASC will need to know the ISA/GS addressing id’s for each contractor so the information can be setup. Depending on the VAN selected, DAASC main ISA id is
DTDN.
VAN https://www.transactionservices.dla.mil/daashome/edi-vanlist-dla.asp
DAASC https://www.transactionservices.dla.mil/sar/gex_sar.asp
VAN/DAASC connectivity related information is located on a DLA dot mil domain and contractors will require ICP CDM personnel assistance to gain access to the site. This coordinated effort is required with either VAN or DAASC access the contractor pursues.
Contractor sponsorship requirements exist where contractors requesting DAASC access must be sponsored by their U.S. Government Contracting Officer or Contracting Officer's
Representative. Close coordination between the ICP CAV AF System Administrator (SA) and the contractor's programmer is required.
2. Contractors will report their repair transactions to CAV AF either by CAV Web or CAV
XML. Both methods cannot be utilized at the same time. When the AL's CAV AF System
Administrator loads the Contractor's Profile into CAV AF a reporting decision is made whether a contractor uses CAV Web or CAV XML reporting.
3. Contractor shall contact CAV AF CM (listed above; under General Information para 2.) to obtain most recent XML lessons learned document. Document contains recorded issues/problems and may alleviate anticipated problem areas associated to XML.
TECHNICAL CONSIDERATIONS:
1. Contractors accessing CAV AF shall present a valid DoD PKI certificate to log into CAV AF.
Contractor’s working at DoD facilities that have a common access card (CAC), should already have a PKI certificate. Contractors working outside of DoD facilities can purchase a valid DoD
PKI certificate through one of three External Certificate Authorities (ECAs). A listing of ECAs and additional information on purchasing a valid DoD PKI can be found at the following web site: http://iase.disa.mil/pki/eca/ . Each contractor employee accessing CAV AF will need an
Identity Certificate only; an Encryption Certificate is not required.
a. Companies with internally developed external interoperability PKI certificates having met the Category II: Non-Federal Agency PKI criteria shall complete DD Form 2875, block 28 with their company name and 28a date of investigation.
b. For contracts awarded to foreign contractor repair facilities (outside the US), identity proofing must be done in-person, but can be performed by an ECA Registration
Authority, Trusted Agent, Notary, or Authorized DoD Employee. CAV AF contractor reporters shall contact the Defense Contract Management Agency (DCMA) for assistance in identifying the local or regional Trusted Agent. NOTE: Identify proofing process may impede DD Form 2875 submission timeline by 10 days, foreign contractors are to inform applicable ICP CAV AF SA OPR identified in para 5 below.
https://www.transactionservices.dla.mil/daashome/edi-vanlist-dla.asp https://www.transactionservices.dla.mil/sar/gex_sar.asp http://iase.disa.mil/pki/eca/
2. The CAV AF program is designed to be accessible using Microsoft Internet Explorer (IE6) v6.0 or higher or Netscape 4.75 or higher on a Windows 2000 or newer platform. The IE6 is suggested and contains the required 128-bit encryption capability, and DoD certification. The following hardware is suggested as a minimum to adequately support CAV AF reporting with a minimum system requirement using Windows 2000 or newer platform: IBM compatible PC (1.5
GHZ Pentium), 512 MB RAM, 20 GB hard drive, 56 K BPS or faster data transmission modem, or connection to WAN/LAN, Laser Printer with 300 DPI resolution, (must support true type font).
a. The following software is required to accomplish CAV AF Web-based reporting:
Operating System: Windows 2000 or Windows XP, Web Browser: Internet Explorer, version 6.0 (preferred), or Netscape version 4.75 (or higher) is also compatible.
b. CAV AF Web-based software will reside on the AF mid-tier server. CAV AF software changes will be made at the mid-tier server and they will be available to the repair vendor upon log-on to the CAV AF system. Changes to CAV AF software by the commercial repair vendors are not authorized.
a. To ensure connectivity to the CAV AF website the contractor must allow ports 443 and
4443 open in both directions. Both of these ports are secure ports and although most companies have 443 open they don’t usually have 4443 open as it is a standard port. If the contractor is running a proxy server on their network they must also include the https://www.cavaf.com web site in their trusted sites.
CONTRACTOR RESPONSIBILITY:
1. The contractor shall be responsible for the maintenance of the hardware and supplies (paper, ink, ribbons, extra disks, etc) to keep the PC system operational and compatible with the host computer.
2. The contractor shall use the CCN/CAV AF Reporting System to report all end item transactions. These transactions shall be entered into CAV AF on a real time basis or as changes generate, but not later than 24 hours from the date of occurrence.
3. System failures that cannot be corrected within 24 hours shall be reported to the contracting
ICP by fastest means possible. If contractor experiences connectivity or reporting issues exceeding a 24 hour period, they are responsible for contacting their contract ICP listed below under Submission Requirments for CAV AF Access below, para 5.
4. It is the responsibility of each CAV AF contract reporter to maintain an active User ID once it is assigned.