Exhibit A Contract Data Requirements List (CDRL) Rev 01.pdf

PDF 2 MB Posted

Attached to
AN/USM-670A Joint Service Electronic Combat Systems Tester (JSECST) Strategic Contract Federal contract opportunity
Solicitation number
FA853322R0007
Issued by
Department of the Air Force Materiel Command Lifecycle Management Center Robins Air Force Base

About this file

This Request for Proposal solicits repair and engineering services for the AN/USM-670A Joint Service Electronic Combat Systems Tester system. The services include system repair, sustaining engineering, cybersecurity, and program management. The Air Force Life Cycle Management Center intends to award a requirements-based indefinite delivery contract with a one-year base period and four one-year options to Textron Systems Corporation, the sole source and proprietary data owner. The government will not provide any technical data. Foreign participation is prohibited. Responses are due as specified in the solicitation, which will be posted to SAM. No hard copies or technical data will be provided.

View the file

Other files for this federal contract opportunity

Other files attached to AN/USM-670A Joint Service Electronic Combat Systems Tester (JSECST) Strategic Contract, newest first.
File Type Posted
FA853322R0007_______0001.pdf PDF
Exhibit A Contract Data Requirements List (CDRL).pdf PDF
Wage Determination 2015-4265 Rev 17 dtd 20Oct21.pdf PDF
Packaging Requirements.pdf PDF
Item Unique Identification (IUID) Specifications.pdf PDF
Government Furnished Property Listing.pdf PDF
Transportation Data.pdf PDF
FA853322R0007.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DD FORM 1423-1, FEB 2001

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item)

PREVIOUS EDITION MAY BE USED.

Form Approved OMB No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

TDP ________ TM _______ OTHER

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE

7. DD 250 REQ

8. APP CODE

9. DIST STATEMENT

REQUIRED

10. FREQUENCY

AS OF DATE

12. DATE OF FIRST SUBMISSION

13. DATE OF SUBSEQUENT

SUBMISSION

14. DISTRIBUTION

a. ADDRESSEE

b. COPIES

Draft Final

Reg Repro

15. TOTAL

16. REMARKS

17. PRICE GROUP

18. ESTIMATED

TOTAL PRICE

G. PREPARED BY H. DATE I. APPROVED BY J. DATE

Page of Pages

X010 A Engineering

AN/USM-670/A FD2060-22-30016 Textron Systems

A002 Government Industry Data Exchange Program (GIDEP) Alert/Safe Report

DI-QCIC-80125B 4.10 AFLCMC/WNA

LT

A

As Req

See Blk 16

See Blk 16

See Blk 16

AFLCMC/WNA

ATS Program Office 235 Byron St, Ste 19A Robins AFB, GA 31098-1670

Program Manager 1 Digital

Engineer 1 Digital

MEARS

0 2 0

Block 4: Format shall be presented on DD Form 1938 or electronically agreed upon with the government

Block 8: Approval/Disapproval will be provided within 20 days after receipt. Final submission shall be no more than 20 days after receipt of comments

Blk 14a: MEARS shall be delivered electronically via the following:

https://mears1.redstone.army.mil/mears/default.aspx

JONES.DAVID.D.1017856681 Digitally signed by JONES.DAVID.D.1017856681 Date: 2022.02.14 13:55:35 -05'00'

14 Feb 22

BAKER.LEA.D.1064408212

Digitally signed by

BAKER.LEA.D.1064408212

Date: 2022.02.17 21:29:41 -05'00'

17 Feb 22

1 2 Adobe Professional 8.0

(1 Data Item)

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

TDP ________ TM _______ OTHER

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

16. REMARKS (Continued)

DD FORM 1423-1, FEB 2001 Page of Pages

X010 A Engineering

AN/USM-670/A FD2060-22-30016 Textron Systems

2 2

(1 Data Item)

PREVIOUS EDITION MAY BE USED.

Form Approved OMB No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

TDP ________ TM _______ OTHER

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE

7. DD 250 REQ

8. APP CODE

9. DIST STATEMENT

REQUIRED

10. FREQUENCY

11. AS OF DATE

12. DATE OF FIRST SUBMISSION

13. DATE OF SUBSEQUENT

SUBMISSION

14. DISTRIBUTION

a. ADDRESSEE

b. COPIES

Draft Final

Reg Repro

15. TOTAL

16. REMARKS

17. PRICE GROUP

18. ESTIMATED

TOTAL PRICE

G. PREPARED BY H. DATE I. APPROVED BY J. DATE

Page of Pages

X010 A Engineering

AN/USM-670/A FD2060-22-30016 Textron Systems

A003 Government Industry Data Exchange Program (GIDEP) Alert Response

DI-QCIC-80126B 4.10 AFLCMC/WNA

LT

A D

As Req

See Blk 16

See Blk 16

See Blk 16

AFLCMC/WNA

ATS Program Office 235 Byron St, Ste 19A Robins AFB, GA 31098-1670

Program Manager 1 Digital

Engineer 1 Digital

MEARS

0 2 0

Block 4: Format shall be presented on DD Form 1938 or electronically agreed upon with the government

Block 8: Approval/Disapproval will be provided within 20 days after receipt. Final submission shall be no more than 20 days after receipt of comments

Blk 14a: MEARS shall be delivered electronically via the following:

https://mears1.redstone.army.mil/mears/default.aspx

JONES.DAVID.D.1017856681 Digitally signed by JONES.DAVID.D.1017856681 Date: 2022.02.14 13:59:20 -05'00'

14 Feb 22

BAKER.LEA.D.1064408212

Digitally signed by

BAKER.LEA.D.1064408212

Date: 2022.02.17 21:57:22 -05'00'

17 Feb 22

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

TDP ________ TM _______ OTHER

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

16. REMARKS (Continued)

DD FORM 1423-1, FEB 2001 Page of Pages

X010 A Engineering

(1 Data Item)

PREVIOUS EDITION MAY BE USED.

Form Approved OMB No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

TDP ________ TM _______ OTHER

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE

7. DD 250 REQ

8. APP CODE

9. DIST STATEMENT

REQUIRED

10. FREQUENCY

11. AS OF DATE

12. DATE OF FIRST SUBMISSION

13. DATE OF SUBSEQUENT

SUBMISSION

14. DISTRIBUTION

a. ADDRESSEE

b. COPIES

Draft Final

Reg Repro

15. TOTAL

16. REMARKS

17. PRICE GROUP

18. ESTIMATED

TOTAL PRICE

G. PREPARED BY H. DATE I. APPROVED BY J. DATE

Page of Pages

X010 A Engineering

AN/USM-670/A FD2060-22-30016 Textron Systems

A004 Notice of Revision (NOR) NOR

DI-SESS-80642D 4.3.3, 4.3.7 AFLCMC/WNA

DD

A D

As Req

See Blk 16

See Blk 16

See Blk 16

AFLCMC/WNA

ATS Program Office 235 Byron St, Ste 19A Robins AFB, GA 31098-1670

Program Manager 1 Digital

Engineer 1 Digital

MEARS 1

0 3 0

Block 4: Format shall be in either of the following formats: DD Form 1695 NOR or a format that is mutually agreed to by the government and contractor. Any format other than DD form 1695 shall be compatible with PC-based versions of Microsoft Office 2010 or

Block 10-13: Report shall be submitted to the Government for review and approval as required for any form fit or function change to the configuration NLT 30 days prior scheduled Configuration Control Board (CCB) meeting. The NOR shall be submitted in conjunction with the (ECP)

Blk 14a: MEARS shall be delivered electronically via the following:

https://mears1.redstone.army.mil/mears/default.aspx

JONES.DAVID.D.1017856681 Digitally signed by JONES.DAVID.D.1017856681 Date: 2022.02.14 13:56:47 -05'00'

14 Feb 22

BAKER.LEA.D.1064408212

Digitally signed by

BAKER.LEA.D.1064408212

Date: 2022.02.17 21:59:00 -05'00'

17 Feb 22

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

TDP ________ TM _______ OTHER

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

16. REMARKS (Continued)

DD FORM 1423-1, FEB 2001 Page of Pages

X010 A Engineering

(1 Data Item)

PREVIOUS EDITION MAY BE USED.

Form Approved OMB No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

TDP ________ TM _______ OTHER

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE

7. DD 250 REQ

8. APP CODE

9. DIST STATEMENT

REQUIRED

10. FREQUENCY

11. AS OF DATE

12. DATE OF FIRST SUBMISSION

13. DATE OF SUBSEQUENT

SUBMISSION

14. DISTRIBUTION

a. ADDRESSEE

b. COPIES

Draft Final

Reg Repro

15. TOTAL

16. REMARKS

17. PRICE GROUP

18. ESTIMATED

TOTAL PRICE

G. PREPARED BY H. DATE I. APPROVED BY J. DATE

Page of Pages

X010 A Configuration Mgmt

AN/USM-670A FD2060-22-30016 Textron Systems

A005 Technical Manual Contract Requirements (TMCR) TMCR

TM-86-01N 4.4.1, 4.6 AFLCMC/WNA

LT

A D

As Reqd

See Blk 16

See Blk 16

See Blk 16

AFLCMC/WNA

ATS Program Office 235 Byron St, Ste 19A Robins AFB, GA 31098-1670

Program Manager 1 Digital

Equipment Specialist 1 Digital

MEARS

0 2 0

Block 4: Contractor Format is acceptable

Block 8: Approval/Disapproval will be provided within 20 days after receipt. Final submission shall be no more than 20 days after receipt of comments

Blk 14a: MEARS shall be delivered electronically via the following:

https://mears1.redstone.army.mil/mears/default.aspx

JONES.DAVID.D.1017856681 Digitally signed by JONES.DAVID.D.1017856681 Date: 2022.02.14 14:03:28 -05'00'

14 Feb 22

BAKER.LEA.D.1064408212

Digitally signed by

BAKER.LEA.D.1064408212

Date: 2022.02.17 22:00:00 -05'00'

17 Feb 22

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

TDP ________ TM _______ OTHER

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

16. REMARKS (Continued)

DD FORM 1423-1, FEB 2001 Page of Pages

X010 A Configuration Mgmt

AN/USM-670A FD2060-22-30016 Textron Systems

(1 Data Item)

PREVIOUS EDITION MAY BE USED.

Form Approved OMB No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

TDP ________ TM _______ OTHER

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE

7. DD 250 REQ

8. APP CODE

9. DIST STATEMENT

REQUIRED

10. FREQUENCY

11. AS OF DATE

12. DATE OF FIRST SUBMISSION

13. DATE OF SUBSEQUENT

SUBMISSION

14. DISTRIBUTION

a. ADDRESSEE

b. COPIES

Draft Final

Reg Repro

15. TOTAL

16. REMARKS

17. PRICE GROUP

18. ESTIMATED

TOTAL PRICE

G. PREPARED BY H. DATE I. APPROVED BY J. DATE

Page of Pages

X010 A Engineering

AN/USM-670A FD2060-22-30016 Textron Systems

A006 Repairable Item Inspection Report

DI-ILSS-80386 4.3.3, 4.3.7 AFLCMC/WNA

LT

A D

As Reqd

See Blk 16

See Blk 16

See Blk 16

AFLCMC/WNA

ATS Program Office 235 Byron St, Ste 19A Robins AFB, GA 31098-1670

Program Manager 1 Digital

Contracting Officer 1 Digital

Engineer 1 Digital

Equipment Specialist 1 Digital

MEARS

0 4 0

Block 4: Contractor Format is acceptable

Block 8: Approval/Disapproval will be provided within 20 days after receipt. Final submission shall be no more than 20 days after receipt of comments

Block 10-13: Report shall be submitted to the Government for approval

Blk 14a: MEARS shall be delivered electronically via the following:

https://mears1.redstone.army.mil/mears/default.aspx

JONES.DAVID.D.1017856681 Digitally signed by JONES.DAVID.D.1017856681 Date: 2022.02.14 14:05:21 -05'00'

14 Feb 22

BAKER.LEA.D.1064408212

Digitally signed by

BAKER.LEA.D.1064408212

Date: 2022.02.17 22:01:33 -05'00'

17 Feb 22

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

TDP ________ TM _______ OTHER

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

16. REMARKS (Continued)

DD FORM 1423-1, FEB 2001 Page of Pages

X010 A Engineering

(1 Data Item)

PREVIOUS EDITION MAY BE USED.

Form Approved OMB No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

TDP ________ TM _______ OTHER

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE

7. DD 250 REQ

8. APP CODE

9. DIST STATEMENT

REQUIRED

10. FREQUENCY

11. AS OF DATE

12. DATE OF FIRST SUBMISSION

13. DATE OF SUBSEQUENT

SUBMISSION

14. DISTRIBUTION

a. ADDRESSEE

b. COPIES

Draft Final

Reg Repro

15. TOTAL

16. REMARKS

17. PRICE GROUP

18. ESTIMATED

TOTAL PRICE

G. PREPARED BY H. DATE I. APPROVED BY J. DATE

Page of Pages

X010 A Program Management

AN/USM-670A FD2060-22-30016 Textron Systems

A008 Monthly Status Report

DI-MGMT-80368A 4.3.3, 4.3.7, 4.4.2, 4.4.3, 4.4.7,4.5.1, AFLCMC/WNA

LT

A D

Monthly

See Blk 16

See Blk 16

See Blk 16

AFLCMC/WNA

ATS Program Office 235 Byron St, Ste 19A Robins AFB, GA 31098-1670

Program Manager 1 Enginerring 1 Equipment Specialist 1 Contracting Officer 1 Engineering 1 Digital

MEARS

0 5 0

Block 4: Contractor format is acceptable

Blocks 8, 11 ,12, 13 Due by the 20th of each full month on the contract. Government comments will be furnished within 10 days after submittal. Resubmit, if required, within 15 days after submittal

Blk 14a: MEARS shall be delivered electronically via the following:

https://mears1.redstone.army.mil/mears/default.aspx

JONES.DAVID.D.1017856681 Digitally signed by JONES.DAVID.D.1017856681 Date: 2022.02.14 14:07:49 -05'00'

14 Feb 22

BAKER.LEA.D.1064408212

Digitally signed by

BAKER.LEA.D.1064408212

Date: 2022.02.17 22:04:05 -05'00'

17 Feb 22

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

TDP ________ TM _______ OTHER

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

16. REMARKS (Continued)

DD FORM 1423-1, FEB 2001 Page of Pages

X010 A Program Management

G. PREPARED BY

(1 Data Item)

16. REMARKS

C. CATEGORY:

TDP ________ TM _______ OTHER

Form Approved OMB No. 0704-0188

15. TOTAL

A. CONTRACT LINE ITEM NO. B. EXHIBIT

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE

7. DD 250 REQ

8. APP CODE

9. STATEMENT

REQUIRED

10. FREQUENCY

11. AS OF DATE

12. DATE OF FIRST SUBMISSION

13. DATE OF SUBSEQUENT

SUBMISSION

14. DISTRIBUTION

a. ADDRESSEE

b. COPIES

Draft Final

Reg Repro

H. DATE J. DATEI. APPROVED BY

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports (0701-0188), 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please DO NOT RETURN your form to the above address. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

DIST

22202-4302.

17. PRICE GROUP

18. ESTIMATED

TOTAL PRICE

DD FORM 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED. Page of Pages

X010 A Engineering

AN/USM-670A FD2060-22-30016 Textron Systems

A009 Scientific and Technical Reports

DI-MISC-80711A 4.4.1, 4.4.2, 4.4.6 AFLCMC/WNA

LT

A D

ASREQ

See Block 16

See Block 16

See Block 16

AFLCMC/WNA

ATS Program Office 235 Byron Street Suite 19 Robins AFB, GA 31098-1813

Program Manager 1 Digital

Engineer 1 Digital

MEARS

0 0

Blk 4: Contractor format is acceptable

Blk 10-13: Submit each draft 15 days after completion of testing. Government comments/approval will be provided within 30 days after receipt. Revisions with comments incorporated shall be submitted no later than 15 days after receipt of Goverment comments

Blk 14a: MEARS shall be delivered electronically via the following:

https://mears1.redstone.army.mil/mears/default.aspx

JONES.DAVID.D.10

17856681

Digitally signed by

JONES.DAVID.D.1017856681

Date: 2022.02.14 14:08:51 -05'00'

14 Feb 22

BAKER.LEA.D.106

4408212

Digitally signed by

BAKER.LEA.D.1064408212

Date: 2022.02.17 22:05:19 -05'00'

17 Feb 22

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

TDP ________ TM _______ OTHER

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

16. REMARKS (Continued)

DD FORM 1423-1, FEB 2001 Page of Pages

X010 A Engineering

(1 Data Item)

PREVIOUS EDITION MAY BE USED.

Form Approved OMB No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

TDP ________ TM _______ OTHER

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE

7. DD 250 REQ

8. APP CODE

9. DIST STATEMENT

REQUIRED

10. FREQUENCY

11. AS OF DATE

12. DATE OF FIRST SUBMISSION

13. DATE OF SUBSEQUENT

SUBMISSION

14. DISTRIBUTION

a. ADDRESSEE

b. COPIES

Draft Final

Reg Repro

15. TOTAL

16. REMARKS

17. PRICE GROUP

18. ESTIMATED

TOTAL PRICE

G. PREPARED BY H. DATE I. APPROVED BY J. DATE

Page of Pages

X010 A X

AN/USM-670A FD2060-22-30016 Textron Sysems

A010 Technical Report - Study Services

DI-MISC-80508B 4.4.1, 4.4.6 AFLCMC/WNAAA

LT

A D

ASREQ

ASREQ

15DAQ

ASREQ

AFLCMC/WNA

ATS Program Office Byron St, Ste 19A Robins AFB, GA 31098-1670

Program Manger 1 Digital

Contracting Officer 1

AFLCMC/WNK

Digital

MEARS 1

0 3 0

Blk 10, 11, 12, 13: The contractor shall provide required documentation 15 business days after qualifying event. The Government shall review and provide approval or comments within 15 business days after receipt of documentation. The contractor shall have 10 business days to incorporate any Government comments and resubmit the documentation.

Blk 14: Data shall be submitted electronically in Microsoft Office format. All current email addresses for data submission will be provided via updated contact list, managed by the Government and provided to the contractor for submission requirements. Contractor format acceptable.

Blk 14a: MEARS shall be delivered electronically via the following:

https://mears1.redstone.army.mil/mears/default.aspx

JONES.DAVID.D.1017856681 Digitally signed by JONES.DAVID.D.1017856681 Date: 2022.02.14 14:13:44 -05'00'

14 Feb 22

BAKER.LEA.D.1064408212

Digitally signed by

BAKER.LEA.D.1064408212

Date: 2022.02.17 22:06:25 -05'00'

17 Feb 22

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

TDP ________ TM _______ OTHER

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

16. REMARKS (Continued)

DD FORM 1423-1, FEB 2001 Page of Pages

X010 A X

AN/USM-670A FD2060-22-30016 Textron Sysems

(1 Data Item)

PREVIOUS EDITION MAY BE USED.

Form Approved OMB No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

TDP ________ TM _______ OTHER

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE

7. DD 250 REQ

8. APP CODE

9. DIST STATEMENT

REQUIRED

10. FREQUENCY

11. AS OF DATE

12. DATE OF FIRST SUBMISSION

13. DATE OF SUBSEQUENT

SUBMISSION

14. DISTRIBUTION

a. ADDRESSEE

b. COPIES

Draft Final

Reg Repro

15. TOTAL

16. REMARKS

17. PRICE GROUP

18. ESTIMATED

TOTAL PRICE

G. PREPARED BY H. DATE I. APPROVED BY J. DATE

Page of Pages

X010 A Program Management

AN/USM-670A FD2060-22-30016 Textron Systems

A011 Warranty Performance Report

DI-SESS-81639A 4.7.2 AFLCMC/WNA

LT

N/A D

As Reqd

See Blk 16

As Reqd

As Reqd

AFLCMC/WNA

ATS Program Office 235 Byron St, Ste 19A Robins AFB, GA 31098-1670

Program Manager 1 Contracting Office 1 Equipment Specialist 1 Engineer 1 Digital

MEARS

0 4 0

Block 4: Contractor Format is acceptable

Block 11: Initial warranty reports shall be due by the 15th work day following shipment of a warranted item to the Government/User

Blk 14a: MEARS shall be delivered electronically via the following:

https://mears1.redstone.army.mil/mears/default.aspx

JONES.DAVID.D.1017856681 Digitally signed by JONES.DAVID.D.1017856681 Date: 2022.02.14 14:16:50 -05'00'

14 Feb 22

BAKER.LEA.D.1064408212

Digitally signed by

BAKER.LEA.D.1064408212

Date: 2022.02.17 22:07:48 -05'00'

17 Feb 22

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

TDP ________ TM _______ OTHER

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

16. REMARKS (Continued)

DD FORM 1423-1, FEB 2001 Page of Pages

X010 A Program Management

(1 Data Item)

PREVIOUS EDITION MAY BE USED.

Form Approved OMB No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

TDP ________ TM _______ OTHER

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE

7. DD 250 REQ

8. APP CODE

9. DIST STATEMENT

REQUIRED

10. FREQUENCY

11. AS OF DATE

12. DATE OF FIRST SUBMISSION

13. DATE OF SUBSEQUENT

SUBMISSION

14. DISTRIBUTION

a. ADDRESSEE

b. COPIES

Draft Final

Reg Repro

15. TOTAL

16. REMARKS

17. PRICE GROUP

18. ESTIMATED

TOTAL PRICE

G. PREPARED BY H. DATE I. APPROVED BY J. DATE

Page of Pages

X010 A Program Management

AN/USM-670A FD2060-22-30016 Textron Systems

A012 Counterfeit Prevention Plan

DI-MISC-81832 4.7.5 AFLCMC/WNA

LT

N/A D

As Reqd

See Blk 16

As Reqd

As Reqd

AFLCMC/WNA

ATS Program Office 235 Byron St, Ste 19A Robins AFB, GA 31098-1670

Program Manager 1 Engineer 1 Equipment Specialist 1 Digtal

MEARS

0 3 0

Block 4: The contractor shall follow Data Item Description (DID) DI-MISC-81832 requirements sections. Contractor format is acceptable

Block 11: Summary audits of suspected counterfeit parts are required periodically as directed by DFARS 252.246-7007 in the contract. Government comments or approval will be provided within 30 days after the receipt of the summary audits document. The contractor shall incorporate the Government comments/corrections into the final document due 15 days after receipt of the comments. The contractor shall immediately notify the Program Manager and Contracting Officer of all suspected counterfeit items

Blk 14a: MEARS shall be delivered electronically via the following:

https://mears1.redstone.army.mil/mears/default.aspx

JONES.DAVID.D.1017856681 Digitally signed by JONES.DAVID.D.1017856681 Date: 2022.02.14 14:20:30 -05'00'

14 Feb 22

BAKER.LEA.D.1064408212

Digitally signed by

BAKER.LEA.D.1064408212

Date: 2022.02.17 22:09:15 -05'00'

17 Feb 22

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

TDP ________ TM _______ OTHER

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

16. REMARKS (Continued)

DD FORM 1423-1, FEB 2001 Page of Pages

X010 A Program Management

(1 Data Item)

PREVIOUS EDITION MAY BE USED.

Form Approved OMB No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

TDP ________ TM _______ OTHER

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE

7. DD 250 REQ

8. APP CODE

9. DIST STATEMENT

REQUIRED

10. FREQUENCY

11. AS OF DATE

12. DATE OF FIRST SUBMISSION

13. DATE OF SUBSEQUENT

SUBMISSION

14. DISTRIBUTION

a. ADDRESSEE

b. COPIES

Draft Final

Reg Repro

15. TOTAL

16. REMARKS

17. PRICE GROUP

18. ESTIMATED

TOTAL PRICE

G. PREPARED BY H. DATE I. APPROVED BY J. DATE

Page of Pages

X010 A Engineering

AN/USM-670A FD2060-22-30016 Textron Systems

A013 Item Unique Identification (IUID) Marking Activity

DI-MGMT-81804A 4.7.2 AFLCMC/WNA

LT

N/A D

As Requested

See Blk 16

See Blk 16

See Blk 16

AFLCMC/WNA

ATS Program Office 235 Byron St, Ste 19A Robins AFB, GA 31098-1670

Program Manager 1 Digital

Engineer 1 Digital

MEARS

0 2 0

Block 4: Format shall be mutually agreed to by the government and contractor. Electronic format shall be compatible with PC-based versions of Microsoft Office 2010 or 2013

BLOCK 10, 11, 12: Report shall be submitted within 30 days of the beginning of the PoP

Blk 14a: MEARS shall be delivered electronically via the following:

https://mears1.redstone.army.mil/mears/default.aspx

JONES.DAVID.D.1017856681 Digitally signed by JONES.DAVID.D.1017856681 Date: 2022.02.14 14:21:25 -05'00'

14 Feb 22

BAKER.LEA.D.1064408212

Digitally signed by

BAKER.LEA.D.1064408212

Date: 2022.02.17 22:10:45 -05'00'

17 Feb 22

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

TDP ________ TM _______ OTHER

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

16. REMARKS (Continued)

DD FORM 1423-1, FEB 2001 Page of Pages

X010 A Engineering

(1 Data Item)

PREVIOUS EDITION MAY BE USED.

Form Approved OMB No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

TDP ________ TM _______ OTHER

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE

7. DD 250 REQ

8. APP CODE

9. DIST STATEMENT

REQUIRED

10. FREQUENCY

11. AS OF DATE

12. DATE OF FIRST SUBMISSION

13. DATE OF SUBSEQUENT

SUBMISSION

14. DISTRIBUTION

a. ADDRESSEE

b. COPIES

Draft Final

Reg Repro

15. TOTAL

16. REMARKS

17. PRICE GROUP

18. ESTIMATED

TOTAL PRICE

G. PREPARED BY H. DATE I. APPROVED BY J. DATE

Page of Pages

X010 A Program Management

AN/USM-670A FD2060-22-30016 Textron Systems

A015 Diminishing Manufacturing Sources and Material Shortages Management Plan (DMSMS)

DMSMS

DI-MGMT-81948 4.3.9, 4.4.6 AFLCMC/WNA

LT

N/A D

As Reqd

As Reqd

As Reqd

As Reqd

AFLCMC/WNA

ATS Program Office 235 Byron St, Ste 19A Robins AFB, GA 31098-1670

Program Manager 1 Contracting Office 1 Equipment Specialist 1 Engineer 1

MEARS

Digital (see block 16) 1

0 5 0

Block 4: Contractor Format is acceptable

Block 14: MEARS shall be delivered electronically via the following:

https://mears1.redstone.army.mil/mears/Default.aspx.

JONES.DAVID.D.1017856681 Digitally signed by JONES.DAVID.D.1017856681 Date: 2022.02.14 14:18:13 -05'00'

14 Feb 22

BAKER.LEA.D.1064408212

Digitally signed by

BAKER.LEA.D.1064408212

Date: 2022.02.17 22:13:36 -05'00'

17 Feb 22

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

TDP ________ TM _______ OTHER

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

16. REMARKS (Continued)

DD FORM 1423-1, FEB 2001 Page of Pages

X010 A Program Management

(1 Data Item)

PREVIOUS EDITION MAY BE USED.

Form Approved OMB No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

TDP ________ TM _______ OTHER

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE

7. DD 250 REQ

8. APP CODE

9. DIST STATEMENT

REQUIRED

10. FREQUENCY

11. AS OF DATE

12. DATE OF FIRST SUBMISSION

13. DATE OF SUBSEQUENT

SUBMISSION

14. DISTRIBUTION

a. ADDRESSEE

b. COPIES

Draft Final

Reg Repro

15. TOTAL

16. REMARKS

17. PRICE GROUP

18. ESTIMATED

TOTAL PRICE

G. PREPARED BY H. DATE I. APPROVED BY J. DATE

Page of Pages

X010 A Program Management

AN/USM-670A FD2060-22-30016 Textron Systems

A016 Software Test Report STR

DI-IPSC-81440A 4.4.3, 4.11.1 AFLCMC/WNA

LT

N/A D

As Reqd

As Reqd

As Reqd

As Reqd

AFLCMC/WNA

ATS Program Office 235 Byron St, Ste 19A Robins AFB, GA 31098-1670

Program Manager 1 Contracting Office 1 Equipment Specialist 1 Engineer 1

MEARS

Digital (see block 16) 1

0 5 0

Block 4: Contractor Format is acceptable

Block 14: MEARS shall be delivered electronically via the following:

https://mears1.redstone.army.mil/mears/Default.aspx.

JONES.DAVID.D.1017856681 Digitally signed by JONES.DAVID.D.1017856681 Date: 2022.02.14 14:22:26 -05'00'

14 Feb 22

BAKER.LEA.D.1064408212

Digitally signed by

BAKER.LEA.D.1064408212

Date: 2022.02.17 22:15:05 -05'00'

17 Feb 22

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

TDP ________ TM _______ OTHER

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

16. REMARKS (Continued)

DD FORM 1423-1, FEB 2001 Page of Pages

X010 A Program Management

(1 Data Item)

PREVIOUS EDITION MAY BE USED.

Form Approved OMB No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

TDP ________ TM _______ OTHER

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE

7. DD 250 REQ

8. APP CODE

9. DIST STATEMENT

REQUIRED

10. FREQUENCY

11. AS OF DATE

12. DATE OF FIRST SUBMISSION

13. DATE OF SUBSEQUENT

SUBMISSION

14. DISTRIBUTION

a. ADDRESSEE

b. COPIES

Draft Final

Reg Repro

15. TOTAL

16. REMARKS

17. PRICE GROUP

18. ESTIMATED

TOTAL PRICE

G. PREPARED BY H. DATE I. APPROVED BY J. DATE

Page of Pages

X010 A Program Management

AN/USM-670A FD2060-22-30016 Textron Systems

A017 Conference Agenda N/A

DI-ADMN-81249B 4.5.2 AFLCMC/WNA

LT

A D

As Required

Block 16

Block 16

As Required

AFLCMC/WNA

ATS Program Office Byron St, Ste 19A Robins AFB, GA 31098-1670

Program Manager 1 Digital

Contracting Officer 1

AFLCMC/WNK

Digital

MEARS 1

Digital

0 3 0

Block 4: Contractor format is acceptable

Block 11, 12: The agenda shall be delivered at least ten (10) working days prior to any meeting, conference. The Government will have five (5) days to review the agenda and make comments. The Contractor will incorporate Government comments and deliver updated agenda within five (5) working days.

Block 14: MEARS shall be delivered electronically via the following:

https://mears1.redstone.army.mil/mears/Default.aspx.

14 Feb 22

BAKER.LEA.D.1064408212

Digitally signed by

BAKER.LEA.D.1064408212

Date: 2022.02.17 22:16:47 -05'00'

17 Feb 22

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

TDP ________ TM _______ OTHER

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

16. REMARKS (Continued)

DD FORM 1423-1, FEB 2001 Page of Pages

X010 A Program Management

(1 Data Item)

PREVIOUS EDITION MAY BE USED.

Form Approved OMB No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

TDP ________ TM _______ OTHER

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE

7. DD 250 REQ

8. APP CODE

9. DIST STATEMENT

REQUIRED

10. FREQUENCY

11. AS OF DATE

12. DATE OF FIRST SUBMISSION

13. DATE OF SUBSEQUENT

SUBMISSION

14. DISTRIBUTION

a. ADDRESSEE

b. COPIES

Draft Final

Reg Repro

15. TOTAL

16. REMARKS

17. PRICE GROUP

18. ESTIMATED

TOTAL PRICE

G. PREPARED BY H. DATE I. APPROVED BY J. DATE

Page of Pages

X010 A Program Management

AN/USM-670A FD2060-22-30016 Textron Systems

A018 Conference Minutes N/A

DI-ADMN-81250B 4.5.2 AFLCMC/WNA

LT

A D

As Required

Block 16

Block 16

As Required

AFLCMC/WNA

ATS Program Office Byron St, Ste 19A Robins AFB, GA 31098-1670

Program Manager 1 Digital

Contracting Officer 1

AFLCMC/WNK

Digital

0 2 0

Block 4: Contractor format is acceptable

Block 11, 12: The minutes should be delivered at least ten (10) working days prior to any meeting, conference. The Government will have five (5) days to review the minutes and make comments. The Contractor will incorporate Government comments and deliver updated minutes within five (5) working days.

Block 14: MEARS shall be delivered electronically via the following:

https://mears1.redstone.army.mil/mears/Default.aspx.

JONES.DAVID.D.1017856681 Digitally signed by JONES.DAVID.D.1017856681 Date: 2022.02.14 14:27:21 -05'00'

14 Feb 22

BAKER.LEA.D.1064408212

Digitally signed by

BAKER.LEA.D.1064408212

Date: 2022.02.17 22:18:04 -05'00'

17 Feb 22

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

TDP ________ TM _______ OTHER

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

16. REMARKS (Continued)

DD FORM 1423-1, FEB 2001 Page of Pages

X010 A Program Management

(1 Data Item)

PREVIOUS EDITION MAY BE USED.

Form Approved OMB No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

TDP ________ TM _______ OTHER

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE

7. DD 250 REQ

8. APP CODE

9. DIST STATEMENT

REQUIRED

10. FREQUENCY

11. AS OF DATE

12. DATE OF FIRST SUBMISSION

13. DATE OF SUBSEQUENT

SUBMISSION

14. DISTRIBUTION

a. ADDRESSEE

b. COPIES

Draft Final

Reg Repro

15. TOTAL

16. REMARKS

17. PRICE GROUP

18. ESTIMATED

TOTAL PRICE

G. PREPARED BY H. DATE I. APPROVED BY J. DATE

Page of Pages

X010 A Program Management

AN/USM-670A FD2060-22-30016 Textron Systems

A019 Presentation Material

DI-ADMN-81373 4.5.2 AFLCMC/WNA

LT

A D

ASREQ

ASREQ

ASREQ

ASREQ

AFLCMC/WNA

ATS Program Office Byron St, Ste 19A Robins AFB, GA 31098-1670

Program Manager 1 Digital

Contracting Officer 1

AFLCMC/WNK

Digital

MEARS

0 2 0

Blk 10/11/12/13: The presentation materials shall be delivered a minimum of fifteen (15) working days prior to any conference, meeting, or review listed in the aforementioned PWS paragraphs. The Government shall have five (5) working days to review the presentation materials and provide comments. The contractor shall incorporate Government comments and deliver updated presentation materials within five (5) working days.

Blk 14: Data shall be submitted electronically in Microsoft Office format. All current email addresses for data submission will be provided via updated contact list, managed by the Government and provided to the contractor for submission requirements. Contractor format acceptable.

Blk 14a: MEARS shall be delivered electronically via the following:

https://mears1.redstone.army.mil/mears/default.aspx

JONES.DAVID.D.1017856681 Digitally signed by JONES.DAVID.D.1017856681 Date: 2022.02.14 14:28:43 -05'00'

14 Feb 22

BAKER.LEA.D.1064408212

Digitally signed by

BAKER.LEA.D.1064408212

Date: 2022.02.17 22:19:42 -05'00'

17 Feb 22

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

TDP ________ TM _______ OTHER

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

16. REMARKS (Continued)

DD FORM 1423-1, FEB 2001 Page of Pages

X010 A Program Management

(1 Data Item)

PREVIOUS EDITION MAY BE USED.

Form Approved OMB No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

TDP ________ TM _______ OTHER

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE

7. DD 250 REQ

8. APP CODE

9. DIST STATEMENT

REQUIRED

10. FREQUENCY

11. AS OF DATE

12. DATE OF FIRST SUBMISSION

13. DATE OF SUBSEQUENT

SUBMISSION

14. DISTRIBUTION

a. ADDRESSEE

b. COPIES

Draft Final

Reg Repro

15. TOTAL

16. REMARKS

17. PRICE GROUP

18. ESTIMATED

TOTAL PRICE

G. PREPARED BY H. DATE I. APPROVED BY J. DATE

Page of Pages

X010 A X

AN/USM-670A FD2060-22-30016 Textron Systems

A020 Product Engineering Design Data and Associated Lists

DI-SESS-81000F/T 4.4.1, 4.4.4 AFLCMC/WNA

DD

A D

ASREQ

ASREQ

ASREQ

ASREQ

AFLCMC/WNA

235 Byron St. Ste 19A Robins AFB, GA 31098-1670

Program Manager 1 Digital

Contracting Officer 1

AFLCMC/WNK

Digital

Engineer 1 Digital

MEARS

0 3 0

All data submittals shall contain a delivery letter and a shipping list. The letter shall contain at a minimum the contract number, delivery order, CLIN, and EDATS number (located on the bottom right corner of the DD Form 1423). The shipping list shall include as a minimum, the document number, revision level, and number of sheets/pages. The data delivered shall be in the same sequence as the shipping list. Shipments of data must be for a complete Technical Data Package (TDP) that accurately depicts the final product as defined in the tasking document (SOW, PWS, etc.). Shipping list shall specify whether the shipment is updates, final or make-up.

Blk 14a: MEARS shall be delivered electronically via the following:

https://mears1.redstone.army.mil/mears/default.aspx

JONES.DAVID.D.1017856681 Digitally signed by JONES.DAVID.D.1017856681 Date: 2022.02.14 14:30:21 -05'00'

14 Feb 22

BAKER.LEA.D.1064408212

Digitally signed by

BAKER.LEA.D.1064408212

Date: 2022.02.17 22:21:18 -05'00'

17 Feb 22

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

TDP ________ TM _______ OTHER

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

16. REMARKS (Continued)

DD FORM 1423-1, FEB 2001 Page of Pages

X010 A X

(1 Data Item)

PREVIOUS EDITION MAY BE USED.

Form Approved OMB No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

TDP ________ TM _______ OTHER

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE

7. DD 250 REQ

8. APP CODE

9. DIST STATEMENT

REQUIRED

10. FREQUENCY

11. AS OF DATE

12. DATE OF FIRST SUBMISSION

13. DATE OF SUBSEQUENT

SUBMISSION

14. DISTRIBUTION

a. ADDRESSEE

b. COPIES

Draft Final

Reg Repro

15. TOTAL

16. REMARKS

17. PRICE GROUP

18. ESTIMATED

TOTAL PRICE

G. PREPARED BY H. DATE I. APPROVED BY J. DATE

Page of Pages

X010 A Engineering

AN/USM-670A FD2060-22-30016 Textron Systems

A021 Engineering Drawing Tree

DI-DRPR-81961A 4.4.4 AFLCMC/WNA

DD

A D

ASREQ

ASREQ

ASREQ

ASREQ

AFLCMC/WNA

ATS Program Office 235 Byron St, Ste 19A Robins AFB, GA 31098-1670

Program Manager 1 Digital

Contracting Officer 1 Digital

Engineer 1 Digital

MEARS 1

Digital

0 4 0

Blk 14a: MEARS shall be delivered electronically via the following:

https://mears1.redstone.army.mil/mears/default.aspx

JONES.DAVID.D.1017856681 Digitally signed by JONES.DAVID.D.1017856681 Date: 2022.02.14 14:31:49 -05'00'

14 Feb 22

BAKER.LEA.D.1064408212

Digitally signed by

BAKER.LEA.D.1064408212

Date: 2022.02.17 22:22:39 -05'00'

17 Feb 22

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

TDP ________ TM _______ OTHER

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

16. REMARKS (Continued)

DD FORM 1423-1, FEB 2001 Page of Pages

X010 A Engineering

(1 Data Item)

PREVIOUS EDITION MAY BE USED.

Form Approved OMB No. 0704-0188

The public reporting burden for this collection of information…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .