CMBRE_JA_(redacted_for_FBO_posting)_Redactedv1.pdf

PDF 263 KB Posted

Attached to
Common Munitions BIT Reprogramming Equipment (CMBRE) System Production Federal contract opportunity
Solicitation number
FA8533-18-R-0020
Issued by
Department of the Air Force Materiel Command Lifecycle Management Center Robins Air Force Base

About this file

This document contains a justification and approval for other than full and open competition for the Common Munitions Built-In-Test (BIT) Reprogramming Equipment (CMBRE) system production contract. The contract is for the production of CMBRE systems, which are joint service testers used to initiate munitions built-in-tests, provide munitions test status, and reprogram munitions. The systems include the CMBRE Plus unit along with associated adapter units ADU-890 and ADU-891, cables, cases, and initial spares kits. The sole source justification is provided under FAR 6.302-1 for there being only one responsible source and no other supplies or services meeting agency requirements. The contractor is Northrop Grumman Innovation Systems, CAGE 3EFM9. The Department of the Air Force Materiel Command Lifecycle Management Center awarded the $38,950,511 firm-fixed-price contract on June 17, 2019.

Justification and Approval Other Than Full and Open Competition - CMBRE

View the file

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

for

NOTE: If a Justification and Approval was approved for the preceding acquisition, a copy of the approved J&A for the predecessor action must be included in the staff package for approval of the instant J&A. This applies to J&A staff packages that are submitted for review and approval at a level above the contracting officer. The predecessor J&A will be used as a reference document by the approving official.

Is this a new or amended J&A Document? New Amended ( Prior to Award Only! )

Is this a Bridge Action as defined in the AF Bridge Action Reduction Plan? Yes No

Funding level for this acquisition:

Contracting Activity: AFLCMC/WNKAB

Purchase Request / Local ID Number: FD2060-18-31666

Program / Project (and PE, if applicable): Common Munitions Built-In-Test (BIT) /Reprogramming Equipment (CMBRE)

Program Type (PEO or Other Contracting): PEO

Authority: 6.302-1 – 10 USC 2304(c)(1), Only One Responsible Source and No Other Supplies or Services Will Satisfy Agency Requirements

Estimated Contract Cost (including options): J&A Type: Class Individual

COORDINATION (AFFARS 5306.304(a) )

Date

19 Jun 2018

Project Lead / Program Mgr / Requiring Activity

Signature

Date

18 Jun 2018

Contracting Officer

18 Jun 2018

Local Legal Reviewer

22 Jun 2018

Requirements Cognizance

26 Jun 2018

APPROVAL (AFFARS 5306.304(a) )

Date

27 Jun 2018

Head of Procuring Activity / Designated Alternate

I. Contracting Activity.

II. Nature and/or description of the action being processed.

III. Description of supplies/services required to meet agency needs.

Designation Period BEQ Unit Cost Total Cost AN/GYQ-79A CMBRE Plus

Total

ADU-890/E

Total

ADU-891(V)1/E

Total

ADU-891(V)3/E

Total $1,545,450.00

CMBRE Initial Spares Kit

Total

ADU-891 Conversion Kit (V3) to (V1)

Total

W23 Cables Assembles

Total

Power Supply

Circuit Card Assembly (A1)

Circuit Card Assembly (A3)

PCMCIA Card Reader

Disk On Module

(DOM)

W6 Cable Assembly

W3 Cable Assembly 3004799

Total

Case, Box 1 3000196-1

Total

Case, Box 2 300197-1

Total

Production PMR Cost

Total

W-17 Cable Assembly 300646-2

IV. Statutory authority permitting other than full and open competition.

V. Demonstration that the contractor's unique qualifications or nature of the acquisition requires the use of the authority cited above (applicability of authority).

VI. Description of efforts made to ensure that offers are solicited from as many potential sources as practicable.

VII. Determination by the Contracting Officer that the anticipated cost to the Government will be fair and reasonable.

VIII. Description of the market research conducted and the results, or a statement of the reasons market research was not conducted.

IX. Any other facts supporting the use of Other Than Full and Open Competition.

X. List of any sources that expressed, in writing, an interest in the acquisition.

XI. A statement of the actions, if any, the agency may take to remove or overcome any barriers to competition before making subsequent acquisitions for the supplies or services required.

XII. Certification by the Contracting Officer.

XIII. Certification by the technical/requirements personnel.

File details come from the government source that posted it. Updated .