Atch-4_CDRLS_CY17_CLS.pdf
PDF 1 MB Posted
- Attached to
- MQ-1/MQ-9 (Predator/Reaper) Contractor Logistics Support (CLS) CY17 Federal contract opportunity
- Solicitation number
- FA8528-17-R-0001
About this file
Atch-4 CDRLS
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| FA852817R0001.pdf | ||
| Atch-7_AFMC-158_CY17_CLS.pdf | ||
| Atch-5_Exhibit-C-D-E-F_FSR_Tables_CY17_CLS.xlsx | XLSX spreadsheet | |
| Atch-6_DD1653_Transportation_CY17_CLS.doc | DOC document | |
| Atch-1_PWS_CY17_CLS_20151023.pdf | ||
| Atch-8_WageDeterminations.pdf | ||
| Atch-3_DD254_CY17_CLS.pdf | ||
| Atch-2_App_C_CY17_CLS.docx | DOCX document |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item)
Form Approved OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
TDP TM OTHER
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE
7. DD 250 REQ
8. APP CODE
16. REMARKS
9. DIST STATEMENT
REQUIRED
10. FREQUENCY
11. AS OF DATE
12. DATE OF FIRST SUBMISSION
13. DATE OF SUBSEQUENT
SUBMISSION
14. DISTRIBUTION
a. ADDRESSEE Draft
b. COPIES
Final
Reg Repro
15. TOTAL
G. PREPARED BY H. DATE I. APPROVED BY J. DATE
DD FORM 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED. Page of Pages Adobe Professional 7.0
17. PRICE GROUP
18. ESTIMATED
TOTAL PRICE
MGMT
CONTRACTOR LOGISTIC SUPPORT CY17 FX2399-17-00101 GENERAL ATOMICS-ASI
A001 STATUS OF GOVERNMENT FURNISHED EQUIPMENT
REPORT (GFE) GFE/ GFP
DI-MGMT-80269 PWS para. 3.2.3 AFLCMC/WIILR
SD
N/A D Annually
BLK 16
BLK 16
BLK 16
AFLCMC/WIILR
AFLCMC/WIIL
GFP Manager
Joshua H. Lee
AFLCMC/WIILR
Block 7: Submit DD Form 250 to AFLCMC/WIILR
Block 9: Distribution statement “D”: Distribution authorized to the Department of Defense (DOD) and U.S. DOD Contractors only (Critical Technology) (01 January 2011). Other requests shall be referred to AFLCMC/WIIK, 2530 Loop Road West, Wright-Patterson AFB, OH 45433-7101.
Block 12: Initial report shall be delivered no later than 25 calendar days after first full month following contract award.
Blocks 11, 13: Subsequent reports shall be delivered 15 days after changes occur with a final report or annual report 1 Dec 2017, 18, and 19.
Block 14:
a. The contractor shall submit digital copy in a Microsoft® Office® compatible format or Adobe® Portable Document Format for all reports
b. The contractor shall submit via the current Enterprise Data system.
0 2 0
Winfield F. Tufts
AFLCMC/WIILR
A
1 1
Form Approved OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
TDP TM OTHER
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE
7. DD 250 REQ
8. APP CODE
16. REMARKS
9. DIST STATEMENT
REQUIRED
10. FREQUENCY
11. AS OF DATE
12. DATE OF FIRST SUBMISSION
13. DATE OF SUBSEQUENT
SUBMISSION
14. DISTRIBUTION
a. ADDRESSEE Draft
b. COPIES
Final
Reg Repro
15. TOTAL
G. PREPARED BY H. DATE I. APPROVED BY J. DATE
DD FORM 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED. Page of Pages Adobe Professional 7.0
17. PRICE GROUP
18. ESTIMATED
TOTAL PRICE
A MGMT
CONTRACTOR LOGISTIC SUPPORT CY17 FX2399-17-00101 GENERAL ATOMICS-ASI
A002 MANAGEMENT PLAN PROGRAM MANAGEMENT PLAN
DI-MGMT-80004A PWS para. 4.7.1 AFLCMC/WIILR
SD
A D
R/ASR
BLK 16
60 DAC
R/ASR
DCARC 1 1
Joshua H. Lee
AFLCMC/WIILR
Block 7: Submit DD Form 250 to AFLCMC/WIILR
Block 8: Government comments/approval will be provided 45 days after delivery from contractor and contractor will submit updated document 45 days after receiving Government comments.
Block 9: Distribution statement “D”: Distribution authorized to the Department of Defense (DOD) and U.S. DOD Contractors only (Critical Technology) (01 January 2011). Other requests shall be referred to AFLCMC/WIIK, 2530 Loop Road West, Wright-Patterson AFB, OH 45433-7101.
Block 10: Revisions/updates to this document may occur as this contract effort progresses.
Block 14:
a. The contractor shall submit digital copy in a Microsoft® Office® compatible format or Adobe® Portable Document Format for all reports.
b. The contractor shall submit via the current Enterprise Data system.
1 1 0
Winfield F. Tufts
AFLCMC/WIILR
Form Approved OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
TDP TM OTHER
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE
7. DD 250 REQ
8. APP CODE
16. REMARKS
9. DIST STATEMENT
REQUIRED
10. FREQUENCY
11. AS OF DATE
12. DATE OF FIRST SUBMISSION
13. DATE OF SUBSEQUENT
SUBMISSION
14. DISTRIBUTION
a. ADDRESSEE Draft
b. COPIES
Final
Reg Repro
15. TOTAL
G. PREPARED BY H. DATE I. APPROVED BY J. DATE
DD FORM 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED. Page of Pages Adobe Professional 7.0
17. PRICE GROUP
18. ESTIMATED
TOTAL PRICE
A MGMT
CONTRACTOR LOGISTIC SUPPORT CY17 FX2399-17-00101 GENERAL ATOMICS-ASI
A003 CONTRACT WORK BREAKDOWN STRUCTURE (CWBS)
DI-MGMT-81334D PWS para. 4.7.1 AFLCMC/WIILR
SD
A D
ONE/R
N/A
60 DAC
BLK 16
DCARC 1 1
Joshua H. Lee
AFLCMC/WIILR
Block 4: Contractor format is acceptable.
Block 7: Submit DD Form 250 to AFLCMC/WIILR
Block 8: Approval or comments will be provided 30 days after receipt of document by the Government.
Block 9: Distribution statement “D”: Distribution authorized to the Department of Defense (DOD) and U.S. DOD Contractors only (Critical Technology) (01 January 2011). Other requests shall be referred to AFLCMC/WIIK, 2530 Loop Road West, Wright-Patterson AFB, OH 45433-7101.
Blocks 10 through 13:
a. Subsequent CWBS submissions shall be submitted 30 days after revisions/updates to the CWBS.
b. CWBS dictionary shall be submitted IAW A006
DI-FNCL-81565C
Block 14:
c. The contractor shall submit digital copy in a Microsoft® Office® compatible format or Adobe® Portable Document Format for all reports
d. The Contractor shall submit via the current Enterprise Data system
1 1 0
Form Approved OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
TDP TM OTHER
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE
7. DD 250 REQ
8. APP CODE
16. REMARKS
9. DIST STATEMENT
REQUIRED
10. FREQUENCY
11. AS OF DATE
12. DATE OF FIRST SUBMISSION
13. DATE OF SUBSEQUENT
SUBMISSION
14. DISTRIBUTION
a. ADDRESSEE Draft
b. COPIES
Final
Reg Repro
15. TOTAL
G. PREPARED BY H. DATE I. APPROVED BY J. DATE
DD FORM 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED. Page of Pages Adobe Professional 7.0
17. PRICE GROUP
18. ESTIMATED
TOTAL PRICE
A MGMT
CONTRACTOR LOGISTIC SUPPORT CY17 FX2399-17-00101 GENERAL ATOMICS-ASI
A004 CONTRACTOR PERFORMANCE REPORT (CPR)
DI-MGMT-81466A/T PWS para. 4.7.1 AFLCMC/WIILR
LT*
N/A D
MONTHLY
BLK 16
BLK 16
BLK 16
AFLCMC/WIILR *1
Joshua H. Lee
AFLCMC/WIILR
Per DOD Earned Value Management Implementation Guide October 2006. Earned Value is not appropriate to this contract.
Block 4: Contractor format is acceptable. Delete first sentence of paragraph b.
Delete any mention of Earned Value verbiage.
Block 7: Contractor shall submit final letter of transmittal along with the Receiving Report upon final delivery to account for all previous submissions.
Block 9: Distribution statement “D”: Distribution authorized to the Department of Defense (DOD) and U.S. DOD Contractors only (Critical Technology) (01 January 2011). Other requests shall be referred to AFLCMC/WIIK, 2530 Loop Road West, Wright-Patterson AFB, OH 45433-7101.
Block 12: Initial report shall be delivered no later than 25 calendar days after first full month following contract award.
Blocks 11, 13: Delivered on the 25th day of each subsequent month.
Block 14:
a. The contractor shall submit digital copy in a Microsoft® Office® compatible format or Adobe® Portable Document Format for all reports
b. The contractor shall submit via the current Enterprise Data system.
c. Submit via electronic media using Microsoft Office format. Separate information for both MQ-1 and MQ-9. Govt requires that contractor provide CPR in the same format and same level of detail as the product currently provided during CLS CY15. Format should include, but is not limited to the monthly expenditure details.
0 1 0
Form Approved OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
TDP TM OTHER
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE
7. DD 250 REQ
8. APP CODE
16. REMARKS
9. DIST STATEMENT
REQUIRED
10. FREQUENCY
11. AS OF DATE
12. DATE OF FIRST SUBMISSION
13. DATE OF SUBSEQUENT
SUBMISSION
14. DISTRIBUTION
a. ADDRESSEE Draft
b. COPIES
Final
Reg Repro
15. TOTAL
G. PREPARED BY H. DATE I. APPROVED BY J. DATE
DD FORM 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED. Page of Pages Adobe Professional 7.0
17. PRICE GROUP
18. ESTIMATED
TOTAL PRICE
A MGMT
CONTRACTOR LOGISTIC SUPPORT CY17 FX2399-17-00101 GENERAL ATOMICS-ASI
A005 PERFORMANCE AND COST REPORT ANNUAL CONTRACTOR LOGISTIC SUPPORT
COST REPORT
DI-FNCL-80912 PWS para. 4.7.1 AFLCMC/WIILR
SD
N/A D
ANNUALLY
BLK 16
16 Dec 2017
BLK 16
AFLCMC/WIILR 1
Joshua H. Lee
AFLCMC/WIILR
Block 7: Submit DD Form 250 to AFLCMC/WIILR
Block 9: Distribution statement “D”: Distribution authorized to the Department of Defense (DOD) and U.S. DOD Contractors only (Critical Technology) (01 January 2011). Other requests shall be referred to AFLCMC/WIIK, 2530 Loop Road West, Wright-Patterson AFB, OH 45433-7101.
Blocks 11, 13:
a. Reporting period of performance will be 01 Jan thru 30 Sep to align with FY 2017, 18, and 19.
b. Report shall be submitted no later than 16 Dec 2017, 18, and 19 after the report cutoff period.
Block 14:
a. The contractor shall submit digital copy in a Microsoft® Office® compatible format or Adobe® Portable Document Format for all reports
b. The contractor shall submit via the current Enterprise Data system.
0 1 0
Form Approved OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
TDP TM OTHER
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE
7. DD 250 REQ
8. APP CODE
16. REMARKS
9. DIST STATEMENT
REQUIRED
10. FREQUENCY
11. AS OF DATE
12. DATE OF FIRST SUBMISSION
13. DATE OF SUBSEQUENT
SUBMISSION
14. DISTRIBUTION
a. ADDRESSEE Draft
b. COPIES
Final
Reg Repro
15. TOTAL
G. PREPARED BY H. DATE I. APPROVED BY J. DATE
DD FORM 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED. Page of Pages Adobe Professional 7.0
17. PRICE GROUP
18. ESTIMATED
TOTAL PRICE
A FNCL
CONTRACTOR LOGISTIC SUPPORT CY17 FX2399-17-00101 GENERAL ATOMICS-ASI
A006 COST DATA SUMMARY REPORT (DD FORM 1921)
DI-FNCL-81565C PWS para. 4.7.2.1 AFLCMC/WIILR
NO
N/A D
ANNUALLY
BLK 16
BLK 16
BLK 16
DCARC 1
Joshua H. Lee
AFLCMC/WIILR
Block 9: Distribution statement “D”: Distribution authorized to the Department of Defense (DOD) and U.S. DOD Contractors only (Critical Technology) (01 January 2011). Other requests shall be referred to AFLCMC/WIIK, 2530 Loop Road West, Wright-Patterson AFB, OH 45433-7101.
Blocks 10 through 13 were prepared in accordance with the OSD Deputy Director, Cost Assessment (DDCA)-approved Cost and Software Data Reporting (CSDR) Plan provisions, the WBS Data Dictionary, and the CSDR Manual (DoDM 5000.04-M-1). The CSDR Plan is included as contract attachment 1. The CSDR Manual is available from the Defense Cost and Resource Center (DCARC) Web site at http://dcarc.cape.osd.mil.
Contractors shall be required to submit CCD reports at frequencies specified in the OSD DDCA-approved CSDR plan and in the contract. All CCD reports shall be submitted electronically using the CSDR Submit-Review System. The required file format for each CCD report is specified in its Data Item Description (DID). The CWBS Index and Dictionary must be submitted in Microsoft Word-compatible files. Data submitters must register through the DCARC website and possess a DoD-issued CAC or DoD-approved ECA digital certificate to obtain a DCARC Portal account and be authorized to upload CSDR content. Users can obtain access by submitting user information about themselves and their organizations to the DCARC Portal and requesting a CSDR submitter user role. After the registration information has been verified, the DCARC shall authorize the user account and requested roles. DCARC Portal users with a DoD-issued CAC shall be able to register their CAC with their DCARC Portal account, enabling CAC login. All DCARC Portal accounts need to be renewed at least annually.. Prime contractors are responsible for flowing down CCDR requirements contained in their prime contracts to all subcontractors who meet the reporting thresholds. This includes requiring subcontractors to electronically report directly to the DCARC.
Subcontractor Reporting. The prime contractor shall be required to flow-down CSDR requirements to all subcontractors at all tiers that meet reporting thresholds. Depending upon the specific contractual relationship, prime contracts and subcontracts may have similar requirements regarding report type, frequency, and method of transmission. The prime contractor shall be required to work with the CWIPT and all appropriate subcontractors to prepare separate subcontract CSDR plans for submission to the DCARC for DDCA approval using the CSDR Submit-Review System.
0 1 0
Form Approved OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
TDP TM OTHER
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE
7. DD 250 REQ
8. APP CODE
16. REMARKS
9. DIST STATEMENT
REQUIRED
10. FREQUENCY
11. AS OF DATE
12. DATE OF FIRST SUBMISSION
13. DATE OF SUBSEQUENT
SUBMISSION
14. DISTRIBUTION
a. ADDRESSEE Draft
b. COPIES
Final
Reg Repro
15. TOTAL
G. PREPARED BY H. DATE I. APPROVED BY J. DATE
DD FORM 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED. Page of Pages Adobe Professional 7.0
17. PRICE GROUP
18. ESTIMATED
TOTAL PRICE
A FNCL
CONTRACTOR LOGISTIC SUPPORT CY17 FX2399-17-00101 GENERAL ATOMICS-ASI
A007 CONTRACTOR SUSTAINMENT REPORT (DD Form 1921-4)
DI-FNCL-81831 PWS para. 4.7.2.1 AFLCMC/WIILR
NO
N/A D
BLK 16
N/A
BLK 16
BLK 16
DCARC 1
Joshua H. Lee
AFLCMC/WIILR
1 1
Prepare Blocks 10 through 13 in accordance with the OSD Deputy Director, Cost Assessment (DDCA)-approved Cost and Software Data Reporting (CSDR) Plan provisions, the WBS Data Dictionary, and the CSDR Manual (DoDM 5000.04-M-1). The CSDR Plan is included as contract attachment 1.
The CSDR Manual is available from the Defense Cost and Resource Center (DCARC) Web site at http://dcarc.cape.osd.mil.
Contractors shall be required to submit CCD reports at frequencies specified in the OSD DDCA-approved CSDR plan and in the contract. All CCD reports shall be submitted electronically using the CSDR Submit-Review System. The required file format for each CCD report is specified in its Data Item Description (DID). The CWBS Index and Dictionary must be submitted in Microsoft Word-compatible files. Data submitters must register through the DCARC website and possess a DoD-issued CAC or DoD-approved ECA digital certificate to obtain a DCARC Portal account and be authorized to upload CSDR content. Users can obtain access by submitting user information about themselves and their organizations to the DCARC Portal and requesting a CSDR submitter user role. After the registration information has been verified, the DCARC shall authorize the user account and requested roles. DCARC Portal users with a DoD-issued CAC shall be able to register their CAC with their DCARC Portal account, enabling CAC login. All DCARC Portal accounts need to be renewed at least annually.. Prime contractors are responsible for flowing down CCDR requirements contained in their prime contracts to all subcontractors who meet the reporting thresholds. This includes requiring subcontractors to electronically report directly to the
DCARC.
Subcontractor Reporting. The prime contractor shall be required to flow-down CSDR requirements to all subcontractors at all tiers that meet reporting thresholds. Depending upon the specific contractual relationship, prime contracts and subcontracts may have similar requirements regarding report type, frequency, and method of transmission. The prime contractor shall be required to work with the CWIPT and all appropriate subcontractors to prepare separate subcontract CSDR plans for submission to the DCARC for DDCA approval using the CSDR Submit-Review System.
CSDR Plan is attached at the end of this document.
0 1 0
Form Approved OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
TDP TM OTHER
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE
7. DD 250 REQ
8. APP CODE
16. REMARKS
9. DIST STATEMENT
REQUIRED
10. FREQUENCY
11. AS OF DATE
12. DATE OF FIRST SUBMISSION
13. DATE OF SUBSEQUENT
SUBMISSION
14. DISTRIBUTION
a. ADDRESSEE Draft
b. COPIES
Final
Reg Repro
15. TOTAL
G. PREPARED BY H. DATE I. APPROVED BY J. DATE
DD FORM 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED. Page of Pages Adobe Professional 7.0
17. PRICE GROUP
18. ESTIMATED
TOTAL PRICE
A ADMN
CONTRACTOR LOGISTIC SUPPORT CY17 FX2399-17-00101 GENERAL ATOMICS-ASI
A008 CONFERENCE MINUTES
DI-ADMN-81250A PWS paras. 4.7.3.1, 4.7.3.2, 4.7.11, 4.8.4 AFLCMC/WIILR
LT*
A D Quarterly
ASREQ
ASREQ
ASREQ
AFLCMC/WIILR 1 *1
Joshua H. Lee
AFLCMC/WIILR
1 1
Block 4: Contractor format is acceptable
Block 7: Contractor shall submit final letter of transmittal along with the Receiving Report upon final delivery to account for all previous submissions.
Blocks 11, 12, 13: Contractor shall submit draft copies of Executive-level conference minutes (EMR/PMR) within 10 days after each conference to the Government for review/comments. Contractor shall submit final minutes for approval/distribution. Minutes for all other meetings for which the Contractor is the meeting agenda creator/co-creator will be delivered directly to attendees within 10 days.
Block 9: Distribution statement “D”: Distribution authorized to the Department of Defense (DOD) and U.S. DOD Contractors only (Critical Technology) (01 January 2011). Other requests shall be referred to AFLCMC/WIIK, 2530 Loop Road West, Wright-Patterson AFB, OH 45433-7101.
Block 14:
a. Submit digital copy in a Microsoft® Office® compatible format or Adobe® Portable Document Format for all reports
b. The contractor shall submit via the current Enterprise Data system.
1 1 0
Form Approved OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
TDP TM OTHER
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE
7. DD 250 REQ
8. APP CODE
16. REMARKS
9. DIST STATEMENT
REQUIRED
10. FREQUENCY
11. AS OF DATE
12. DATE OF FIRST SUBMISSION
13. DATE OF SUBSEQUENT
SUBMISSION
14. DISTRIBUTION
a. ADDRESSEE Draft
b. COPIES
Final
Reg Repro
15. TOTAL
G. PREPARED BY H. DATE I. APPROVED BY J. DATE
DD FORM 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED. Page of Pages Adobe Professional 7.0
17. PRICE GROUP
18. ESTIMATED
TOTAL PRICE
A ADMN
CONTRACTOR LOGISTIC SUPPORT CY17 FX2399-17-00101 GENERAL ATOMICS-ASI
A009 CONFERENCE AGENDA
DI-ADMN-81249A PWS paras. 4.7.3.1, 4.7.3.2, 4.8.4 AFLCMC/WIILR
LT*
A D
ASREQ
N/A
ASREQ
ASREQ
AFLCMC/WIILR 1 *1
Joshua H. Lee
AFLCMC/WIILR
1 1
Block 4: Contractor format is acceptable
Block 7: Contractor shall submit final letter of transmittal along with the Receiving Report upon final delivery to account for all previous submissions.
Blocks 8, 10, 12, 13: Draft agendas for CLS EMR/PMR shall be provided 30 days before conference/meeting for review.
The Government will review agendas and provide comments within 10 days from receipt. Final agendas shall be provided by Contractor 15 days before CLS EMR/PMR for approval. All other agendas for non-CLS EMR/PMR conferences/meetings shall be submitted informally 15 days prior to conferences/meetings.
Block 9: Distribution statement “D”: Distribution authorized to the Department of Defense (DOD) and U.S. DOD Contractors only (Critical Technology) (01 January 2011). Other requests shall be referred to AFLCMC/WIIK, 2530 Loop Road West, Wright-Patterson AFB, OH 45433-7101.
Block 14:
a. Submit digital copy in a Microsoft® Office® compatible format or Adobe® Portable Document Format for all reports
b. The contractor shall submit via the current Enterprise Data system.
1 1 0
Form Approved OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
TDP TM OTHER
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE
7. DD 250 REQ
8. APP CODE
16. REMARKS
9. DIST STATEMENT
REQUIRED
10. FREQUENCY
11. AS OF DATE
12. DATE OF FIRST SUBMISSION
13. DATE OF SUBSEQUENT
SUBMISSION
14. DISTRIBUTION
a. ADDRESSEE Draft
b. COPIES
Final
Reg Repro
15. TOTAL
G. PREPARED BY H. DATE I. APPROVED BY J. DATE
DD FORM 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED. Page of Pages Adobe Professional 7.0
17. PRICE GROUP
18. ESTIMATED
TOTAL PRICE
A ADMN
CONTRACTOR LOGISTIC SUPPORT CY17 FX2399-17-00101 GENERAL ATOMICS-ASI
A010 Request for Waiver (RFW)
DI-SESS-81732 PWS para. 4.7.8.1.1 AFLCMC/WIILR
LT*
A D
ASREQ
BLK 16
BLK 16
BLK 16
AFLCMC/WIILR 1 1
Joshua H. Lee
AFLCMC/WIILR
1 1
Block 4: Contractor format is acceptable.
Block 7: Contractor shall submit final letter of transmittal along with the Receiving Report upon final delivery to account for all previous submissions.
Block 8: Government comments/approval will be provided 30 days after receipt of documents.
Block 9: Distribution statement “D”: Distribution authorized to the Department of Defense (DOD) and U.S. DOD Contractors only (Critical Technology) (01 January 2011). Other requests shall be referred to AFLCMC/WIIK, 2530 Loop Road West, Wright-Patterson AFB, OH 45433-7101.
Blocks 10, 11, 12 & 13: An RFW shall be submitted to the Government within forty-five (45) calendar days from identification of a departure, deficiency, delinquency and/or non-conformity to contractual requirements.
Block 14:
a. The contractor shall submit digital copy in a Microsoft® Office® compatible format or Adobe® Portable Document Format for all reports
b. The contractor shall submit via the current Enterprise Data system.
1 1 0
Form Approved OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
TDP TM OTHER
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE
7. DD 250 REQ
8. APP CODE
16. REMARKS
9. DIST STATEMENT
REQUIRED
10. FREQUENCY
11. AS OF DATE
12. DATE OF FIRST SUBMISSION
13. DATE OF SUBSEQUENT
SUBMISSION
14. DISTRIBUTION
a. ADDRESSEE Draft
b. COPIES
Final
Reg Repro
15. TOTAL
G. PREPARED BY H. DATE I. APPROVED BY J. DATE
DD FORM 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED. Page of Pages Adobe Professional 7.0
17. PRICE GROUP
18. ESTIMATED
TOTAL PRICE
A ADMN
CONTRACTOR LOGISTIC SUPPORT CY17 FX2399-17-00101 GENERAL ATOMICS-ASI
A011 REQUEST FOR DEVIATION (RFD)
DI-CMAN-80640C PWS para. 4.7.8.1.1 AFLCMC/WIILR
LT*
A D
ASREQ
BLK 16
BLK 16
BLK 16
AFLCMC/WIILR 1 *1
Joshua H. Lee
AFLCMC/WIILR
1 1
Block 4: Contractor format is acceptable.
Block 7: Contractor shall submit final letter of transmittal along with the Receiving Report upon final delivery to account for all previous submissions.
Block 8: Government comments/approval will be provided 30 days after receipt of documents.
Block 9: Distribution statement “D”: Distribution authorized to the Department of Defense (DOD) and U.S. DOD Contractors only (Critical Technology) (01 January 2011). Other requests shall be referred to AFLCMC/WIIK, 2530 Loop Road West, Wright-Patterson AFB, OH 45433-7101.
Blocks 10, 11, 12 & 13: An RFD shall be submitted to the Government within forty-five (45) calendar days from identification of a departure, deficiency, delinquency and/or non-conformity to contractual requirements.
Block 14:
a. Submit digital copy in a Microsoft® Office® compatible format or Adobe® Portable Document Format for all reports
b. The contractor shall submit via the current Enterprise Data system.
1 1 0
Form Approved OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
TDP TM OTHER
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE
7. DD 250 REQ
8. APP CODE
16. REMARKS
9. DIST STATEMENT
REQUIRED
10. FREQUENCY
11. AS OF DATE
12. DATE OF FIRST SUBMISSION
13. DATE OF SUBSEQUENT
SUBMISSION
14. DISTRIBUTION
a. ADDRESSEE Draft
b. COPIES
Final
Reg Repro
15. TOTAL
G. PREPARED BY H. DATE I. APPROVED BY J. DATE
DD FORM 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED. Page of Pages Adobe Professional 7.0
17. PRICE GROUP
18. ESTIMATED
TOTAL PRICE
A ADMN
CONTRACTOR LOGISTIC SUPPORT CY17 FX2399-17-00101 GENERAL ATOMICS-ASI
A012 ENGINEERING CHANGE PROPOSAL (ECP)
DI-CMAN-80639C/T PWS para. 4.7.8.2 AFLCMC/WIILR
SD
A D
ASREQ
N/A
ASREQ
ASREQ
AFLCMC/WIILR 1
AFLCMC/WIIE
1AFLCMC/WIILDET3
Joshua H. Lee
AFLCMC/WIILR
1 1
Block 4: Contractor format is acceptable.
Block 7: Contractor shall submit final letter of transmittal along with the Receiving Report upon final delivery to account for all previous submissions.
Block 8: Government comments/approval will be provided 30 days after receipt of documents.
Block 9: Distribution statement “D”: Distribution authorized to the Department of Defense (DOD) and U.S. DOD Contractors only (Critical Technology) (01 January 2011). Other requests shall be referred to AFLCMC/WIIK, 2530 Loop Road West, Wright-Patterson AFB, OH 45433-7101.
Blocks 10, 11, 12 & 13: An RFD shall be submitted to the Government within forty-five (45) calendar days from identification of a departure, deficiency, delinquency and/or non-conformity to contractual requirements.
Block 14:
a. Contractor shall submit digital copy in a Microsoft® Office® compatible format or Adobe® Portable Document Format on a CD ROM to AFLCMC/WIILR with a cover letter through the Government contracting office that has oversight of this contract.
b. The contractor shall submit via the current Enterprise Data system
1 3 0
Form Approved OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
TDP TM OTHER
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE
7. DD 250 REQ
8. APP CODE
16. REMARKS
9. DIST STATEMENT
REQUIRED
10. FREQUENCY
11. AS OF DATE
12. DATE OF FIRST SUBMISSION
13. DATE OF SUBSEQUENT
SUBMISSION
14. DISTRIBUTION
a. ADDRESSEE Draft
b. COPIES
Final
Reg Repro
15. TOTAL
G. PREPARED BY H. DATE I. APPROVED BY J. DATE
DD FORM 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED. Page of Pages Adobe Professional 7.0
17. PRICE GROUP
18. ESTIMATED
TOTAL PRICE
A ADMN
CONTRACTOR LOGISTIC SUPPORT CY17 FX2399-17-00101 GENERAL ATOMICS-ASI
A013 CONTRACTOR CHANGE PROPOSAL (CCPs)
DI-ADMN-81401B PWS para. 4.7.8.2 AFLCMC/WIILR
SD
A D
ASREQ
N/A
ASREQ
ASREQ
AFLCMC/WIILR 1
AFLCMC/WIIE
1AFLCMC/WIILDET3
Joshua H. Lee
AFLCMC/WIILR
1 1
Block 4: Contractor shall submit a draft Contractor Change Proposal (CCP) and shall include is/was pages.
Block 7: Submit DD Form 250 to AFLCMC/WIILR
Block 8: Configuration Control Board (CCB) approval shall be provided via Procuring Contracting Officer Letter (PCOL) after disposition. Each CCP shall be incorporated by contract modification if approved by CCB. These actions shall be accomplished within 90 days of final document approval.
Block 9: Distribution statement “D”: Distribution authorized to the Department of Defense (DOD) and U.S. DOD Contractors only (Critical Technology) (01 January 2011). Other requests shall be referred to AFLCMC/WIIK, 2530 Loop Road West, Wright-Patterson AFB, OH 45433-7101.
Blocks 10,12,13: Contractor CCPs shall be submitted for review/approval by Government on as required basis.
Block 14:
a. Contractor shall submit digital copy in a Microsoft® Office® compatible format or Adobe® Portable Document Format on a CD ROM to AFLCMC/WIILR with a cover letter through the Government contracting office that has oversight of this contract.
b. The contractor shall submit via the current Enterprise Data system
1 3 0
Form Approved OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
TDP TM OTHER
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE
7. DD 250 REQ
8. APP CODE
16. REMARKS
9. DIST STATEMENT
REQUIRED
10. FREQUENCY
11. AS OF DATE
12. DATE OF FIRST SUBMISSION
13. DATE OF SUBSEQUENT
SUBMISSION
14. DISTRIBUTION
a. ADDRESSEE Draft
b. COPIES
Final
Reg Repro
15. TOTAL
G. PREPARED BY H. DATE I. APPROVED BY J. DATE
DD FORM 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED. Page of Pages Adobe Professional 7.0
17. PRICE GROUP
18. ESTIMATED
TOTAL PRICE
A ADMN
CONTRACTOR LOGISTIC SUPPORT CY17 FX2399-17-00101 GENERAL ATOMICS-ASI
A014 DATA ACCESSION LIST INTERNAL DATA
DI-MGMT-81453A PWS paras. 4.7.11.1, 4.7.11.2, 4.12 AFLCMC/WIILR
LT*
A D Quarterly
O
BLK 16
20AAOD
AFLCMC/WIILR 1 *1
Joshua H. Lee
AFLCMC/WIILR
1 1
Block 4: Contractor format is acceptable
Block 7: Contractor shall submit final letter of transmittal along with the Receiving Report upon final delivery to account for all previous submissions.
Block 9: Distribution statement “D”: Distribution authorized to the Department of Defense (DOD) and U.S. DOD Contractors only (Critical Technology) (01 January 2011). Other requests shall be referred to AFLCMC/WIIK, 2530 Loop Road West, Wright-Patterson AFB, OH 45433-7101.
Block 12 and 13: The initial submittal shall be due no later than 20 days after the end of the first calendar quarter following contract award. Subsequent submissions shall be quarterly and constitute the complete listing. Submittal shall be no later than 20 days after the end of each calendar quarter.
Block 14:
a. Submit digital copy in a Microsoft® Office® compatible format or Adobe® Portable Document Format for all reports
b. The contractor shall submit via the current Enterprise Data system.
1 1 0
Form Approved OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
TDP TM OTHER
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE
7. DD 250 REQ
8. APP CODE
16. REMARKS
9. DIST STATEMENT
REQUIRED
10. FREQUENCY
11. AS OF DATE
12. DATE OF FIRST SUBMISSION
13. DATE OF SUBSEQUENT
SUBMISSION
14. DISTRIBUTION
a. ADDRESSEE Draft
b. COPIES
Final
Reg Repro
15. TOTAL
G. PREPARED BY H. DATE I. APPROVED BY J. DATE
DD FORM 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED. Page of Pages Adobe Professional 7.0
17. PRICE GROUP
18. ESTIMATED
TOTAL PRICE
A MISC
CONTRACTOR LOGISTIC SUPPORT CY17 FX2399-17-00101 GENERAL ATOMICS-ASI
A015 ACCEPTANCE TEST PLAN
DI-QCIC-80553A PWS para. 4.7.9 AFLCMC/WIILR
SD
A D
ASREQ
N/A
BLK 16
BLK 16
AFLCMC/WIILR 1 1
Joshua H. Lee
AFLCMC/WIILR
1 1
Block 4: Contractor format is acceptable.
Block 7: Submit DD Form 250 to AFLCMC/WIILR
Block 9: Distribution statement “D”: Distribution authorized to the Department of Defense (DOD) and U.S. DOD Contractors only (Critical Technology) (01 January 2011). Other requests shall be referred to AFLCMC/WIIK, 2530 Loop Road West, Wright-Patterson AFB, OH 45433-7101.
Blocks 8,10,12,13:
a. The contractor shall submit new or revised Acceptance Test Plan’s (ATP)’s 30 days after development/changes/upgrades are made.
b. Government comments/approval will be 45 days after receipt of document.
c. Resubmission, if required, with Government comments incorporated, due in 30 days.
Block 14:
a. Contractor shall submit digital copy in a Microsoft® Office® compatible format or Adobe® Portable Document Format for all reports
b. The contractor shall submit via the current Enterprise Data system
1 1 0
Form Approved OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
TDP TM OTHER
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE
7. DD 250 REQ
8. APP CODE
16. REMARKS
9. DIST STATEMENT
REQUIRED
10. FREQUENCY
11. AS OF DATE
12. DATE OF FIRST SUBMISSION
13. DATE OF SUBSEQUENT
SUBMISSION
14. DISTRIBUTION
a. ADDRESSEE Draft
b. COPIES
Final
Reg Repro
15. TOTAL
G. PREPARED BY H. DATE I. APPROVED BY J. DATE
DD FORM 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED. Page of Pages Adobe Professional 7.0
17. PRICE GROUP
18. ESTIMATED
TOTAL PRICE
A MISC
CONTRACTOR LOGISTIC SUPPORT CY17 FX2399-17-00101 GENERAL ATOMICS-ASI
A016 TECHNICAL ORDERS/TECHNICAL ORDER UPDATES
TM-86-01N PWS para. 4.7.10 AFLCMC/WIILR
LT*
A D
ASREQ
BLK 16
BLK 16
BLK 16
AFLCMC/WIILDET3 1 1 1*
Joshua H. Lee
AFLCMC/WIILR
1 27
ATTACHMENT: TM-86-01N DTD 27 Aug 2014. Delivery of Technical Orders/manuals/TCTO's are in accordance with
TMCR.
Block 4: Technical Orders/Manuals/TCTOs shall be prepared in accordance with attached TM-86-01N.
Block 7: Contractor shall submit final letter of transmittal along with the Receiving Report upon final delivery to account for all previous submissions.
Block 9: Distribution statement “D”: Distribution authorized to the Department of Defense (DOD) and U.S. DOD Contractors only (Critical Technology) (01 January 2011). Other requests shall be referred to AFLCMC/WIIK, 2530 Loop Road West, Wright-Patterson AFB, OH 45433-7101.
Blocks 8,10,11,12,13,14,15:
a. See attached TM-86-01N.
b. Distribution/Delivery for all technical manuals shall be IAW Part B of TM-86-01N.
1 1 1
Winfield F. Tufts
AFLCMC/WIILR
Plac eh old er for C
Y17
Page | 1 FX2399-17-00101 (CY17)
TM-86-01N
Air Force Technical Manual Contract Requirements (TMCR) for Contractor Logistics Support (CY17)
Contract No: FX2399-17-00101 Date 22 January 2015
Technical Manual/Technical Order requirements contained herein have been cleared for use by OMB Paperwork Reduction Project No. 0704-0188.
SECTION 1. TECHNICAL ORDER (TO) PROGRAM REQUIREMENTS
1. TMCR Tailoring. This document including the associated tables, matrices and Specification/Standard Interface Requirements (SIRs) has been tailored by the AFLCMC/WIID Predator/Reaper Sustainment Program Office to support the sustaining maintenance of technical orders for the MQ-1B Predator, MQ-9A Reaper and all associated equipment (CLS) CY17 Program. This tailored TMCR is attached to the CDRL A017. Air Force TO Acquisition procedures are found in TO 00-5-3, located on the World Wide Web (WWW) at http://www.tinker.af.mil/shared/media/document/AFD-110505-045.pdf under the link to “Digital Technical Orders.” Any terms or procedures found in this document may be researched there.
2. TO Program Scope. As part of this effort the contractor shall provide support to sustain and update all MQ-1B, MQ-9A and all associated equipment technical orders, to include related Commercial- Off-The-Shelf (COTS) data and other operational and technical data submitted by contractors supporting the program. Affected TOs are listed in Section 2, Table 2 of this document. Support shall include preparing technical order changes, to include providing hard copy and electronic copy revisions and supplements as required and/or as requested by AFLCMC/WIILR Predator/Reaper Sustainment Program Office and AFLCMC/WIIL.
2.1 Management and Authorization. The Government Program Manager is AFLCMC/WIILR, the Technical Order Manager Agency (TOMA) is AFLCMC/WIIL. The Government Program Manager at AFLCMC/WIID is the office authorized to prepare and coordinate changes to the TO requirements and distribution specified by this contract.
2.2 Order of Precedence. In the event of a conflict between the text of this document and the references herein, the text of this document shall take precedence, except that the detail specification(s) as tailored in Section 3 of this document shall govern for TO preparation.
3. Commercial Manuals. The contractor may propose the use…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .