FA851912R00516_4Jan13.pdf
PDF 279 KB Posted
- Attached to
- 463L Cargo Pallet Federal contract opportunity
- Solicitation number
- FA8519-12-R-00516
About this file
463L Cargo Pallet Solicitation FA8519-12-R-00516
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| FA851912R00516_0004.pdf | ||
| FA851912R00516_0003.pdf | ||
| FA851912R00516_0002.pdf | ||
| FA851912R00516_0001.pdf | ||
| ATTACHMENT1_FactSheet.pdf | ||
| Form158.pdf | ||
| ATTACHMENT6_QuantityRanges.pdf | ||
| PWS_11Dec12.pdf | ||
| Form807.pdf | ||
| CDRLs.pdf | ||
| ATTACHMENT5_PastPresentPerformanceQuestionnaire.pdf | ||
| MultipleQuantityRanges.pdf | ||
| VendorPackagingInstructions.pdf | ||
| ATTACHMENT2_ClientAuthLetter.pdf | ||
| ATTACHMENT4_TeamingConsentForm.pdf | ||
| ATTACHMENT3_TransmittalLetter.pdf | ||
| Form1653.pdf |
Show all 17
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STANDARD FORM 1447 (2/2012)
Prescribed by GSA FAR (48 CFR) 53.215-1(d)
4. SOLICITATION NUMBER
FA8519-12-R-00516
X
6.SOLICITATION ISSUE DATE
8. THIS ACQUISITION IS UNRESTRICTED OR SET ASIDE: % FOR
SMALL BUSINESS WOMEN-OWNED SMALL BUSINESS (WOSB)
ELIGIBLE UNDER THE WOSB PROGRAM
HUBZONE SMALL
BUSINESS EDWOSB
SERVICE-DISABLED VETERAN-
OWNED SMALL BUSINESS NAICS CODE: 321920
8(A) SIZE STANDARD: 500
DATE SIGNED
28. UNITED STATES OF AMERICA (SIGNATURE OF CONTRACTING OFFICER)
26. AWARD OF CONTRACT: YOUR OFFER ON SOLICITATION NUMBER
SHOWN IN BLOCK 4 INCLUDING ANY ADDITIONS OR CHANGES WHICH
ARE SET FORTH HEREIN, IS ACCEPTED AS TO ITEMS:
ROUTINE
Subject to the terms and conditions stated herein, the Contractor agrees to hold its offered prices firm for 400 days.
This acquisition will utilize Tradeoff Source Selection procedures (see information in provisions L-900 and M-900).
Volume II, Present/Past Performance Information is requested 10 calendar days prior to the date specified in block 9.
SEE LINE ITEM SCHEDULE
22.
AMOUNT
16. AUTHORITY FOR USING OTHER THAN 10 USC 2304 41 USC 253
FULL AND OPEN COMPETITION (c) ( ) (c) ( )
DATE SIGNED
27. SIGNATURE OF OFFEROR/CONTRACTOR
20.
UNIT
21.
UNIT PRICE
19.
QUANTITY
13. CONTRACTOR OFFEROR CODE FACILITY CODE
11. IF OFFER IS ACCEPTED BY THE GOVERNMENT WITHIN * ___ CALENDAR DAYS (60 CALENDAR DAYS UNLESS OFFEROR
INSERTS A DIFFERENT PERIOD) FROM THE DATE SET FORTH IN BLK 9 ABOVE, THE CONTRACTOR AGREES TO HOLD ITS
OFFERED PRICES FIRM FOR THE ITEMS SOLICITED HEREIN AND TO ACCEPT ANY RESULTING CONTRACT SUBJECT TO
THE TERMS AND CONDITIONS STATED HEREIN. *400
RATING
DO: C9
3. AWARD/EFFECTIVE DATE
FA8519
2. CONTRACT NO.
X
CHECK IF REMITTANCE IS DIFFERENT
AND PUT SUCH ADDRESS IN OFFER
17.
ITEM NO.
12. ADMINISTERED BY CODE
Total
SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK: 14 EFT:T
SCD:B
NAME AND TITLE OF SIGNER (TYPE OR PRINT) NAME OF CONTRACTING OFFICER
24. AWARD AMOUNT (FOR GOVT USE ONLY)
23. ACCOUNTING AND APPROPRIATION DATA
SEE SCHEDULE
5. SOLICITATION TYPE
SEALED BIDS NEGOTIATED
(IFB) (RFP)
15. PROMPT PAY DISCOUNT
25. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN 1
COPIES TO ISSUING OFFICE. CONTRACTOR AGREES TO FURNISH AND DELIVER ALL ITEMS SETFORTH OR OTHERWISE
IDENTIFIED ABOVE AND ON ANY CONTINUATION SHEETS SUBJECT
THE TERMS AND CONDITIONS SPECIFIED HEREIN.
10. ITEMS TO BE PURCHASED (BRIEF DESCRIPTION)
SUPPLIES SERVICES Wood Container and Pallet Manufacturing
9.
Offers will be received at the issuing office until the date and time specified below. All official United States Postal Service mail and classified material will be delivered to the address shown in block 7. Deliver all parcels to: 542 CBSG, ATTN: Buyer named above, 295 BYRON ST, BLDG 300 WW SOUTH END, BAY D DOOR 27A, ROBINS AFB GA 31098-1670.
19-FEB-2013 4:00PM
18.
SCHEDULE OF SUPPLIES/SERVICES
14. PAYMENT WILL BE MADE BY CODE
(SEE ESP CLAUSE 252.232-7003.)
X
7. ISSUED BY CODE
WR ALC GRVKBA, SERVICES
235 BYRON ST STE 19A
BLDG 300 CP 478 222 1901
ROBINS AFB GA 31098-1670
BUYER: Donna C. Pallini/WNKBBA donna.pallini@robins.af.mil Phone: (478) 222- 1892 Fax: (478) 222-1854 No Collect Calls
X
1. THIS CONTRACT IS A RATED ORDER UNDER DPAS
(15 CFR 350)SOLICITATION/CONTRACT
BIDDER/OFFEROR TO COMPLETE BLOCKS 11, 13, 15, 21, 22, & 27.
J
SF 1447 (rev 2/2012) BACK
NO RESPONSE FOR THE REASONS CHECKED
TYPE OR PRINT NAME AND TITLE OF SIGNER
SIGNATURENAME AND ADDRESS OF FIRM (Include Zip Code)
WE DO NOT DESIRE TO BE RETAINED ON THE MAILING LIST FOR FUTURE PROCUREMENT OF THE TYPE OF
ITEMS INVOLVED
WE DO
OTHER (Specify)
CANNOT COMPLY WITH SPECIFICATIONS
CANNOT COMPLY WITH SPECIFICATIONS CANNOT MEET DELIVERY REQUIREMENT
FOLD
FOLD
FOLD FOLD
SOLICITATION NO. FA851912R00516
DUE: 19 FEB 2013 4:00 PM
FROM: AFFIX
STAMP
HERE
TO:
ATTN: Donna C Pallini/WNKBBA
WR ALC GRVKBA, SERVICES
235 BYRON ST STE 19A
BLDG 300 CP 478 222 1901
ROBINS AFB GA 31098-1670
Request for Proposal FA8519-12-R-00516
PART I - THE SCHEDULE
SECTION B
SUPPLIES OR SERVICES AND PRICES/COSTS
Notice to Offeror:
Funds are not presently available for this effort. No award will be made under this solicitation until funds are available. The Government reserves the right to cancel this solicitation, either before or after the closing date. In the event the Government cancels this solicitation, the Government has no obligation to reimburse an offeror for any costs.
NOTES TO SCHEDULE:
1. The Government intends to award a five-year Indefinite Delivery/Indefinite Quantity (IDIQ) type contract in accordance with FAR Part 16. This is also an Insurance Policy Acquisition in accordance with (IAW) AFMCI123-102, Chapter 10(explanation of procedures is provided in provisions L-900 and M-900). Offerors' attention is drawn to provision L-900 for instruction on how to complete the solicitation and submit proposals and to provision M-900 for information as to how the proposals will be evaluated. All work to be performed shall be accomplished using a Firm-fixed price contract arrangement.
2. The Basic contract period of performance is for 24 months with three 12 month options.
3. The contract maximum and minimum are identififed as follows:
The Government may order the maximum quantity under each line item as identified by the "To Quantity".
For the purpose of meeting the minimum quantity IAW FAR 52.216-22, the Government is obligated during the total contract including options to order a minimum of the first articles for Alternative 1, Proposal A and Alternative 2, Proposal C, and a minimum of 6 each for Alternative 1, Proposal B and Alternative 2, Proposal D. In accordance with AFFARS MP5316.504, this minimum guarantee will be satisfied via delivery order upon execution of the contract(s).
4. The quantities set forth in the schedule below for CLINs 0004, 0009, 0017, 0019, 1001, 2001, and 3001 are the composite total quantity for any combination of items under corresponding SubCLINs AA-BC. Pallets input for repair shall be categorized in accordance with the repair methods listed in the SubCLINs below and the applicable unit prices shall apply.
(See Clause H-901, Limitation of Government's Obligation.)
5. Option: An option is considered to be exercised at the time the Government issues written notification to the contractor via mail or other electronic means of notification.
6. The contractor shall provide at least the same express warranty terms, including offers of extended warranties, offered to the general public in the customary commercial marketplace, and will conform with all requirements of the contract for a period of not less than 365 days from the date of delivery of each unit to its destination IAW contract terms and conditions.
7. The contractor shall furnish all parts and materials, tools, and equipment necessary to repair and produce the 463L cargo pallet IAW the requirements set forth in the Performance Work Statement (PWS).
8. ACRN is to be cited on individual orders issued hereafter.
9. A proven source is defined as a source from whom the requirement for first articles will be waived and an unproven source is one from whom first articles will be required to pass first article testing.
Conditions for first article waiver are as follows: offerors who have previously furnished production quantities of the article to the prime contractor for delivery to the Air Force and not more than 72 months have elapsed since the completion of that contract; and currently in production of the article for an Air Force contract and who have received first article approval under the existing contract; and who have previously furnished production quantities of the articles to the Air Force, provided articles thus furnished have exhibited satisfactory performance in service in the opinion of the Air Force and not more than 72 months have elapsed since the completion of that contract.. Provision L-409 states criteria for an offeror to be dertermined qualified.
Unproven (unqualified) offerors shall propose on Proposal A under Alternative 1 (CLINs 0001- 0008) and Proposal C under Alternative 2 (CLINs 0011 - 0018). Proven (qualified) offerors shall propose on Proposal B under Alternative 1 (CLINs 0009 - 0010) and Proposal D under Alternative 2 (CLINs 0019 - 0020). All offerors shall propose on CLIN 0023 and Options I, II, III.
10. Attached PWS includes the repair and production of pallets.
11. The Service Contract Act applies to CLINs 0001, 0002, 0003, 0004, 0009, 0011, 0012, 0013, 0017, 0019, 0023, 1001, 1023, 2001, 2023, 3001, and 3023. The Walsh Healy Act applies to CLINs 0005, 0006, 0007, 0008, 0010, 0014, 0015, 0016, 0018, 0020, 1002, 2002, and 3002.
ALTERNATIVE 1
COMPLETE AWARD
PROPOSAL A
FIRST ARTICLE REQUIRED
BASIC CONTRACT PERIOD - Effective date of Award through 24 months
Bid A - First Article Required Item No.
Firm Fixed Price Quantity U/I Unit Price Amount
6 EA
FA 167000820
FIRST ARTICLE- Repair IAW PWS Part Number MIL-DTL-27443 TYPE 1 Associated Document(s) Line Item(s)
FD20601200516 0001
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring
ISO 9001-2008 2000
Type / Ship To Quantity (U/I) *ARO Notice to
Proceed _ Req No / Pri
Required Delivery
5 EA *150 Calendar Days
1 EA *150 Calendar Days
Proposed Delivery
5 EA
1 EA
Notice to Proceed is Approval of First Article Test Procedure, CLIN 0002.
Inspection/Acceptance for CLIN 0001 will be accomplished by FA8519 - AFLCMC/WNZEB. Acceptance will be upon approval of First Article Test Report, CLIN 0003.
Bid A - First Article Required Item No.
Bid A - First Article Required Firm Fixed Price Quantity U/I Unit Price Amount
1 LO
FIRST ARTICLE TEST PROCEDURES - Repair Data IAW Attached DD Form 1423, ELIN A007 Associated Document(s) Line Item(s)
FD20601200516 0002
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: IAW DD 1423 and PWS
Transportation From Continental United States CONUS (CONUS) Sources
TYPE / SHIP TO CODE F.O.B.
+ IAW1423 DESTINATION
Class I ODS Substance Application/Use Quantity
NONE
None Type / Ship To Quantity (U/I) *ARO Contract _ Req No / Pri
Required Delivery
+ IAW1423 1 LO *60 Calendar Days
Proposed Delivery
+ IAW1423 1 LO
Government written notice of approval/disapproval due 15 days after receipt of contractor's plan, CLIN 0002.
Firm Fixed Price Quantity U/I Unit Price Amount
1 LO
FIRST ARTICLE TEST REPORT - Repair Data IAW Attached DD Form 1423, ELIN A008 Associated Document(s) Line Item(s)
FD20601200516 0003
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: IAW DD 1423 and PWS
Transportation From Continental United States CONUS (CONUS) Sources
TYPE / SHIP TO CODE F.O.B.
Bid A - First Article Required
+ IAW1423 DESTINATION
Class I ODS Substance Application/Use Quantity
NONE
None Type / Ship To Quantity (U/I) *ARO Submittal of
First Article _ Req No / Pri
Required Delivery
+ IAW1423 1 LO *150 Calendar Days
Proposed Delivery
+ IAW1423 1 LO
Government written notice of approval/disapproval due 15 days after receipt of contractor's report, CLIN 0003.
Firm Fixed Price From Quantity U/I To Quantity U/I See SubCLIN breakout
1 EA 95,994 EA
NSN: 1670-00-820-4896
PALLET, AIR CARGO, TYPE I, HCU 6/E
Repair of 463L Pallet IAW PWS and specifications Manufacturer Part Number
00000 MIL-DTL-27443
Associated Document(s) Line Item(s)
FD20601200516 0004
Limitations of Liability: Other Than High Value Item
Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Buy American Act/Balance of Payments Program
Transportation From Continental United States CONUS (CONUS) Sources
TYPE / SHIP TO CODE F.O.B.
+ TBD ORIGIN
Type / Ship To PACRN Mark For
+ TBD PAA
Place of Perf Quantity (U/I) *ARO See Delivery Note Below
_ Req No / Pri
Required Period of Performance
+ TBD 1 EA
95,994
Proposed Period of Performance
+ TBD 1 EA
95,994
DELIVERY NOTE:
Deliveries shall begin 30 days After Receipt of (ARO) funded order or reparable asset, whichever is later.
The Government's minimum required delivery output is 3,500 pallets per month.
The following ramp-up schedule shall be applicable: 1,000 pallets per month 30 days ARO 1,500 pallets per month 60 days ARO 2,000 pallets per month 90 days ARO 2,500 pallets per month 120 days ARO 3,000 pallets per month 150 days ARO 3,500 pallets per month 180 days ARO
SHIP TO NOTE:
TBD - The contractor shall contact the Item Manager for shipping instructions. POC information to be cited on each individual order.
0004AA
Firm Fixed Price Unit Price
Same as 0004 Above REPAIR METHOD #1 - General Inspection Without Repair Associated Document(s) Line Item(s)
FD20601200516 0004
Item No.
0004AB
Firm Fixed Price Unit Price
Same as 0004 Above REPAIR METHOD #2 - Reuse Top & Bottom Skins. New Complete Core Associated Document(s) Line Item(s)
FD20601200516 0005
Item No.
0004AC
Firm Fixed Price Unit Price
Same as 0004 Above REPAIR METHOD #2 - Reuse Top & Bottom Skins. New Complete Core Plus Replace ONE Short Rail.
Associated Document(s) Line Item(s)
FD20601200516 0006
Item No.
0004AD
Firm Fixed Price Unit Price
Same as 0004 Above REPAIR METHOD #2 - Reuse Top & Bottom Skins. New Complete Core Plus Replace ONE Long Rail.
Associated Document(s) Line Item(s)
FD20601200516 0007
Item No.
0004AE
Firm Fixed Price Unit Price
Same as 0004 Above REPAIR METHOD #2 - Reuse Top & Bottom Skins. New Complete Core Plus Replace TWO Short Rails.
Associated Document(s) Line Item(s)
FD20601200516 0008
Item No.
0004AF
Same as 0004 Above REPAIR METHOD #2 - Reuse Top & Bottom Skins. New Complete Core Plus Replace ONE Short Rail and ONE Long Rail.
Associated Document(s) Line Item(s)
FD20601200516 0009
Item No.
0004AG
Firm Fixed Price Unit Price
Same as 0004 Above REPAIR METHOD #2 - Reuse Top & Bottom Skins. New Complete Core Plus Replace TWO Long Rails.
Associated Document(s) Line Item(s)
FD20601200516 0010
Item No.
0004AH
Firm Fixed Price Unit Price
Same as 0004 Above REPAIR METHOD #3 - Reuse Bottom Skin. New Top Skin and Complete Core.
Associated Document(s) Line Item(s)
FD20601200516 0011
Item No.
0004AJ
Firm Fixed Price Unit Price
Same as 0004 Above REPAIR METHOD #3 - Reuse Bottom Skin. New Top Skin and Complete Core Plus Replace ONE Short Rail.
Associated Document(s) Line Item(s)
FD20601200516 0012
Item No.
0004AK
Unit Price
Same as 0004 Above REPAIR METHOD #3 - Reuse Bottom Skin. New Top Skin and Complete Core Plus Replace ONE Long Rail.
Associated Document(s) Line Item(s)
FD20601200516 0013
Item No.
0004AL
Firm Fixed Price Unit Price
Same as 0004 Above REPAIR METHOD #3 - Reuse Bottom Skin. New Top Skin and Complete Core Plus Replace TWO Short Rails.
Associated Document(s) Line Item(s)
FD20601200516 0014
Item No.
0004AM
Firm Fixed Price Unit Price
Same as 0004 Above REPAIR METHOD #3 - Reuse Bottom Skin. New Top Skin and Complete Core Plus Replace ONE Short Rail and ONE Long Rail.
Associated Document(s) Line Item(s)
FD20601200516 0015
Item No.
0004AN
Firm Fixed Price Unit Price
Same as 0004 Above REPAIR METHOD #3 - Reuse Bottom Skin. New Top Skin and Complete Core Plus Replace TWO Long Rails.
Associated Document(s) Line Item(s)
FD20601200516 0016
0004AP
Firm Fixed Price Unit Price
Same as 0004 Above REPAIR METHOD #4 - Reuse Top Skin. New Bottom Skin and Complete Core.
Associated Document(s) Line Item(s)
FD20601200516 0017
Item No.
0004AQ
Firm Fixed Price Unit Price
Same as 0004 Above REPAIR METHOD #4 - Reuse Top Skin. New Bottom Skin and Complete Core plus Replace ONE Short Rail.
Associated Document(s) Line Item(s)
FD20601200516 0018
Item No.
0004AR
Firm Fixed Price Unit Price
Same as 0004 Above REPAIR METHOD #4 - Reuse Top Skin. New Bottom Skin and Complete Core plus Replace ONE Long Rail.
Associated Document(s) Line Item(s)
FD20601200516 0019
Item No.
0004AS
Firm Fixed Price Unit Price
Same as 0004 Above REPAIR METHOD #4 - Reuse Top Skin. New Bottom Skin and Complete Core plus Replace TWO Short Rails.
Associated Document(s) Line Item(s)
FD20601200516 0020
Item No.
0004AT
Firm Fixed Price Unit Price
Same as 0004 Above REPAIR METHOD #4 - Reuse Top Skin. New Bottom Skin and Complete Core plus Replace ONE Short Rail and ONE Long Rail.
Associated Document(s) Line Item(s)
FD20601200516 0021
Item No.
0004AU
Firm Fixed Price Unit Price
Same as 0004 Above REPAIR METHOD #4 - Reuse Top Skin. New Bottom Skin and Complete Core plus Replace TWO Long Rails.
Associated Document(s) Line Item(s)
FD20601200516 0022
Item No.
0004AV
Firm Fixed Price Unit Price
Same as 0004 Above REPAIR METHOD #5 - New Top and Bottom Skins and Complete Core.
Associated Document(s) Line Item(s)
FD20601200516 0023
Item No.
0004AW
Firm Fixed Price Unit Price
Same as 0004 Above REPAIR METHOD #5 - New Top and Bottom Skins and Complete Core Plus ONE Short Rail.
FD20601200516 0024
Item No.
0004AX
Firm Fixed Price Unit Price
Same as 0004 Above REPAIR METHOD #5 - New Top and Bottom Skins and Complete Core Plus ONE Long Rail.
Associated Document(s) Line Item(s)
FD20601200516 0025
Item No.
0004AY
Firm Fixed Price Unit Price
Same as 0004 Above REPAIR METHOD #5 - New Top and Bottom Skins and Complete Core Plus TWO Short Rails.
Associated Document(s) Line Item(s)
FD20601200516 0026
Item No.
0004AZ
Firm Fixed Price Unit Price
Same as 0004 Above REPAIR METHOD #5 - New Top and Bottom Skins and Complete Core Plus ONE Short Rail and ONE Long Rail.
Associated Document(s) Line Item(s)
FD20601200516 0027
Item No.
0004BA
Firm Fixed Price Unit Price
Same as 0004 Above REPAIR METHOD #5 - New Top and Bottom Skins and Complete Core Plus TWO Long Rails.
FD20601200516 0028
Item No.
0004BB
Firm Fixed Price Unit Price
Same as 0004 Above Replacement of Ring Assemblies Associated Document(s) Line Item(s)
FD20601200516 0029
Item No.
0004BC
Firm Fixed Price Unit Price
Same as 0004 Above Replacement of Corner Straps (Brackets) Associated Document(s) Line Item(s)
FD20601200516 0030
Bid A - First Article Required Item No.
Firm Fixed Price Quantity U/I Unit Price Amount
6 EA
FA 167000820
FIRST ARTICLE- Production Part Number MIL-DTL-27443 TYPE 1 Associated Document(s) Line Item(s)
FD20601200522 0003
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Proceed _ Req No / Pri
Bid A - First Article Required Required Delivery
5 EA *150 Calendar Days
1 EA *150 Calendar Days
Proposed Delivery
5 EA
1 EA
Notice to Proceed is Approval of First Article Test Procedure, CLIN 0006.
Inspection/Acceptance of CLIN 0005 will be accomplished by FA8519 - AFLCMC/WNZEB.
Acceptance will be upon approval of First Article Test Report, CLIN 0007.
Firm Fixed Price Quantity U/I Unit Price Amount
1 LO
FIRST ARTICLE TEST PROCEDURES - Production Data IAW Attached DD Form 1423, ELIN A007 Associated Document(s) Line Item(s)
FD20601200522 0004
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Standard Inspection
Transportation From Continental United States CONUS (CONUS) Sources
TYPE / SHIP TO CODE F.O.B.
+ IAW1423 DESTINATION
Class I ODS Substance Application/Use Quantity
NONE
None Type / Ship To Quantity (U/I) *ARO Contract _ Req No / Pri
Required Delivery
+ IAW1423 1 LO *60 Calendar Days
Proposed Delivery
+ IAW1423 1 LO
Government written notice of approval/disapproval due 15 days after receipt of contractor's plan, CLIN 0006.
Firm Fixed Price Quantity U/I Unit Price Amount
1 LO
FIRST ARTICLE TEST REPORT - Production Data IAW Attached DD Form 1423, ELIN A008 Associated Document(s) Line Item(s)
FD20601200522 0005
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Standard Inspection
Transportation From Continental United States CONUS (CONUS) Sources
TYPE / SHIP TO CODE F.O.B.
+ IAW1423 DESTINATION
Class I ODS Substance Application/Use Quantity
NONE
None Type / Ship To Quantity (U/I) *ARO Submittal of
First Article _ Req No / Pri
Required Delivery
+ IAW1423 1 LO *150 Calendar Days
Proposed Delivery
+ IAW1423 1 LO
CLIN 0007.
Firm Fixed Price From Quantity U/I To Quantity U/I Total Price
1 EA 27,994 EA
NSN: 1670-00-820-4896
PALLET, AIR CARGO, TYPE I, HCU 6/E
Production of 463L Pallet IAW PWS and specifications Manufacturer Part Number
00000 MIL-DTL-27443
FD20601200522 0001
Limitations of Liability: Other Than High Value Item
Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Transportation From Continental United States CONUS (CONUS) Sources
TYPE / SHIP TO CODE F.O.B.
+ TBD ORIGIN
Type / Ship To PACRN Mark For
+ TBD PAA
Place of Perf Quantity (U/I) *ARO See Delivery
Note Below _ Req No / Pri
Required Period of Performance
+ TBD 1 EA
27,994
Proposed Period of Performance
+ TBD 1 EA
27,994
DELIVERY NOTE:
Deliveries shall begin no later than 30 days After Receipt of (ARO) funded order. The Government's minimum required delivery output is 1,167 pallets per month after six (6) months ramp-up period.
The following ramp-up schedule shall be applicable: 200 pallets per month 30 days ARO 400 pallets per month 60 days ARO 500 pallets per month 90 days ARO 700 pallets per month 120 days ARO 950 pallets per month 150 days ARO 1167 pallets per month 180 days ARO
SHIP TO NOTE:
TBD - The contractor shall contact the Item Manager for shipping instructions. POC information to be cited on each individual order.
ALTERNATIVE 1
COMPLETE AWARD
PROPOSAL B
FIRST ARTICLE NOT REQUIRED
BASIC CONTRACT PERIOD - Effective date of Award through 24 months
Bid B - First Article NOT Required Item No.
Firm Fixed Price From Quantity U/I To Quantity U/I See SubCLIN breakout
1 EA 96,000 EA
NSN: 1670-00-820-4896
PALLET, AIR CARGO, TYPE I, HCU 6/E
Repair of 463L Pallet IAW PWS and specifications Manufacturer Part Number
00000 MIL-DTL-27443
Associated Document(s) Line Item(s)
FD20601200516 0004
Limitations of Liability: Other Than High Value Item
Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Transportation From Continental United States CONUS (CONUS) Sources
TYPE / SHIP TO CODE F.O.B.
+ TBD ORIGIN
Type / Ship To PACRN Mark For
+ TBD PAA
Place of Perf Quantity (U/I) *ARO See Delivery
Note Below _ Req No / Pri
Required Period of Performance
+ TBD 1 EA
96,000
Proposed Period of Performance
+ TBD 1 EA
96,000
DELIVERY NOTE:
Deliveries shall begin 30 days After Receipt of (ARO) funded order or reparable asset, whichever is later.
The Government's minimum required delivery output is 3,500 pallets per month.
The following ramp-up schedule shall be applicable: 1,000 pallets per month 30 days ARO 1,500 pallets per month 60 days ARO 2,000 pallets per month 90 days ARO 2,500 pallets per month 120 days ARO 3,000 pallets per month 150 days ARO 3,500 pallets per month 180 days ARO
SHIP TO NOTE:
TBD - The contractor shall contact the Item Manager for shipping instructions. POC information to be
0009AA
Firm Fixed Price Unit Price
Same as 0009 Above REPAIR METHOD #1 - General Inspection Without Repair Associated Document(s) Line Item(s)
FD20601200516 0004
Item No.
0009AB
Firm Fixed Price Unit Price
Same as 0009 Above REPAIR METHOD #2 - Reuse Top & Bottom Skins. New Complete Core Associated Document(s) Line Item(s)
FD20601200516 0005
Item No.
0009AC
Firm Fixed Price
Same as 0009 Above
REPAIR METHOD #2 - Reuse Top & Bottom Skins. New Complete Core Plus Replace ONE Short Rail.
Associated Document(s) Line Item(s)
FD20601200516 0006
Item No.
0009AD
Firm Fixed Price Unit Price
Same as 0009 Above REPAIR METHOD #2 - Reuse Top & Bottom Skins. New Complete Core Plus Replace ONE Long Rail.
Associated Document(s) Line Item(s)
FD20601200516 0007
Item No.
0009AE
Firm Fixed Price Unit Price
Same as 0009 Above REPAIR METHOD #2 - Reuse Top & Bottom Skins. New Complete Core Plus Replace TWO Short Rails.
Associated Document(s) Line Item(s)
FD20601200516 0008
Item No.
0009AF
Firm Fixed Price Unit Price
Same as 0009 Above REPAIR METHOD #2 - Reuse Top & Bottom Skins. New Complete Core Plus Replace ONE Short Rail and ONE Long Rail.
Associated Document(s) Line Item(s)
FD20601200516 0009
Item No.
0009AG
Same as 0009 Above REPAIR METHOD #2 - Reuse Top & Bottom Skins. New Complete Core Plus Replace TWO Long Rails.
Associated Document(s) Line Item(s)
FD20601200516 0010
Item No.
0009AH
Firm Fixed Price Unit Price
Same as 0009 Above REPAIR METHOD #3 - Reuse Bottom Skin. New Top Skin and Complete Core.
Associated Document(s) Line Item(s)
FD20601200516 0011
Item No.
0009AJ
Firm Fixed Price Unit Price
Same as 0009 Above REPAIR METHOD #3 - Reuse Bottom Skin. New Top Skin and Complete Core Plus Replace ONE Short Rail.
Associated Document(s) Line Item(s)
FD20601200516 0012
Item No.
0009AK
Firm Fixed Price Unit Price
Same as 0009 Above REPAIR METHOD #3 - Reuse Bottom Skin. New Top Skin and Complete Core Plus Replace ONE Long Rail.
Associated Document(s) Line Item(s)
FD20601200516 0013
Item No.
0009AL
Same as 0009 Above REPAIR METHOD #3 - Reuse Bottom Skin. New Top Skin and Complete Core Plus Replace TWO Short Rails.
Associated Document(s) Line Item(s)
FD20601200516 0014
Item No.
0009AM
Firm Fixed Price Unit Price
Same as 0009 Above REPAIR METHOD #3 - Reuse Bottom Skin. New Top Skin and Complete Core Plus Replace ONE Short Rail and ONE Long Rail.
Associated Document(s) Line Item(s)
FD20601200516 0015
Item No.
0009AN
Firm Fixed Price Unit Price
Same as 0009 Above REPAIR METHOD #3 - Reuse Bottom Skin. New Top Skin and Complete Core Plus Replace TWO Long Rails.
Associated Document(s) Line Item(s)
FD20601200516 0016
Item No.
0009AP
Firm Fixed Price Unit Price
Same as 0009 Above REPAIR METHOD #4 - Reuse Top Skin. New Bottom Skin and Complete Core.
Associated Document(s) Line Item(s)
FD20601200516 0017
Item No.
0009AQ
Unit Price
Same as 0009 Above REPAIR METHOD #4 - Reuse Top Skin. New Bottom Skin and Complete Core plus Replace ONE Short Rail.
Associated Document(s) Line Item(s)
FD20601200516 0018
Item No.
0009AR
Firm Fixed Price Unit Price
Same as 0009 Above REPAIR METHOD #4 - Reuse Top Skin. New Bottom Skin and Complete Core plus Replace ONE Long Rail.
Associated Document(s) Line Item(s)
FD20601200516 0019
Item No.
0009AS
Firm Fixed Price Unit Price
Same as 0009 Above REPAIR METHOD #4 - Reuse Top Skin. New Bottom Skin and Complete Core plus Replace TWO Short Rails.
Associated Document(s) Line Item(s)
FD20601200516 0020
Item No.
0009AT
Firm Fixed Price Unit Price
Same as 0009 Above REPAIR METHOD #4 - Reuse Top Skin. New Bottom Skin and Complete Core plus Replace ONE Short Rail and ONE Long Rail.
Associated Document(s) Line Item(s)
FD20601200516 0021
0009AU
Firm Fixed Price Unit Price
Same as 0009 Above REPAIR METHOD #4 - Reuse Top Skin. New Bottom Skin and Complete Core plus Replace TWO Long Rails.
Associated Document(s) Line Item(s)
FD20601200516 0022
Item No.
0009AV
Firm Fixed Price Unit Price
Same as 0009 Above REPAIR METHOD #5 - New Top and Bottom Skins and Complete Core.
Associated Document(s) Line Item(s)
FD20601200516 0023
Item No.
0009AW
Firm Fixed Price Unit Price
Same as 0009 Above REPAIR METHOD #5 - New Top and Bottom Skins and Complete Core Plus ONE Short Rail.
Associated Document(s) Line Item(s)
FD20601200516 0024
Item No.
0009AX
Firm Fixed Price Unit Price
Same as 0009 Above REPAIR METHOD #5 - New Top and Bottom Skins and Complete Core Plus ONE Long Rail.
FD20601200516 0025
Item No.
0009AY
Firm Fixed Price Unit Price
Same as 0009 Above REPAIR METHOD #5 - New Top and Bottom Skins and Complete Core Plus TWO Short Rails.
Associated Document(s) Line Item(s)
FD20601200516 0026
Item No.
0009AZ
Firm Fixed Price Unit Price
Same as 0009 Above REPAIR METHOD #5 - New Top and Bottom Skins and Complete Core Plus ONE Short Rail and ONE Long Rail.
Associated Document(s) Line Item(s)
FD20601200516 0027
Item No.
0009BA
Firm Fixed Price Unit Price
Same as 0009 Above REPAIR METHOD #5 - New Top and Bottom Skins and Complete Core Plus TWO Long Rails.
Associated Document(s) Line Item(s)
FD20601200516 0028
Item No.
0009BB
Firm Fixed Price Unit Price
Same as 0009 Above Replacement of Ring Assemblies
FD20601200516 0029
Item No.
0009BC
Firm Fixed Price Unit Price
Same as 0009 Above Replacement of Corner Straps (Brackets) Associated Document(s) Line Item(s)
FD20601200516 0030
Bid B - First Article NOT Required Item No.
Firm Fixed Price From Quantity U/I To Quantity U/I Total Price
1 EA 28,000 EA
NSN: 1670-00-820-4896
PALLET, AIR CARGO, TYPE I, HCU 6/E
Production of 463L Pallet Manufacturer Part Number
00000 MIL-DTL-27443
Associated Document(s) Line Item(s)
FD20601200522 0001
Limitations of Liability: Other Than High Value Item
Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Transportation From Continental United States CONUS (CONUS) Sources
TYPE / SHIP TO CODE F.O.B.
+ TBD ORIGIN
Type / Ship To PACRN Mark For
+ TBD PAA
Place of Perf Quantity (U/I) *ARO See Delivery
Note Below _ Req No / Pri
Required Period of Performance
+ TBD 1 EA
28,000
Proposed Period of Performance
+ TBD 1 EA
28,000
DELIVERY NOTE:
Deliveries shall begin no later than 30 days After Receipt of (ARO) funded order. The Government's minimum required delivery output is 1,167 pallets per month after six (6) months ramp-up period.
The following ramp-up schedule shall be applicable: 200 pallets per month 30 days ARO 400 pallets per month 60 days ARO 500 pallets per month 90 days ARO 700 pallets per month 120 days ARO 950 pallets per month 150 days ARO 1167 pallets per month 180 days ARO
SHIP TO NOTE:
TBD - The contractor shall contact the Item Manager for shipping instructions. POC information to be cited on each individual order.
ALTERNATIVE 2
INSURANCE POLICY BUY
PROPOSAL C
FIRST ARTICLE REQUIRED
BASIC CONTRACT PERIOD - Effective date of Award through 24 months
Bid C/First Article Required/Insurance Policy Item No.
Firm Fixed Price Quantity U/I Unit Price Amount
6 EA
FA 167000820
FIRST ARTICLE- Repair Part Number MIL-DTL-27443 TYPE 1 Associated Document(s) Line Item(s)
FD20601200516 0001
Limitations of Liability: Other Than High Value Item
Bid C/First Article Required/Insurance Policy
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Proceed _ Req No / Pri
Required Delivery
+ SHIP IN PLACE 5 EA *150 Calendar Days
+ WNZEB 1 EA *150 Calendar Days
Proposed Delivery
+ SHIP IN PLACE 5 EA
+ WNZEB 1 EA
Notice to Proceed is Approval of First Article Test Procedure, CLIN 0012.
Inspection/Acceptance of CLIN 0011will be accomplished by FA8519 - AFLCMC/WNZEB. Acceptance will be upon approval of First Article Test Report, CLIN 0013.
Bid C/First Article Required/Insurance Policy
Firm Fixed Price Quantity U/I Unit Price Amount
1 LO
FIRST ARTICLE TEST PROCEDURES - Repair Data IAW Attached DD Form 1423, ELIN A007 Associated Document(s) Line Item(s)
FD20601200516 0002
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Standard Inspection
Transportation From Continental United States CONUS (CONUS) Sources
TYPE / SHIP TO CODE F.O.B.
+ IAW1423 DESTINATION
Class I ODS Substance Application/Use Quantity
NONE
None
Bid C/First Article Required/Insurance Policy Type / Ship To Quantity (U/I) *ARO Contract _ Req No / Pri
Required Delivery
+ IAW1423 1 LO *60 Calendar Days
Proposed Delivery
+ IAW1423 1 LO
Government written notice of approval/disapproval due 15 days after receipt of contractor's plan, CLIN 0012.
Firm Fixed Price Quantity U/I Unit Price Amount
1 LO
FIRST ARTICLE TEST REPORT - Repair Data IAW Attached DD Form 1423, ELIN A008 Associated Document(s) Line Item(s)
FD20601200516 0003
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Standard Inspection
Transportation From Continental United States CONUS (CONUS) Sources
TYPE / SHIP TO CODE F.O.B.
+ IAW1423 DESTINATION
Class I ODS Substance Application/Use Quantity
NONE
None Type / Ship To Quantity (U/I) *ARO Submittal of
First Article _ Req No / Pri
Required Delivery
+ IAW1423 1 LO *150 Calendar Days
Proposed Delivery
+ IAW1423 1 LO
CLIN 0013.
Bid C/First Article Required/Insurance Policy Item No.
Firm Fixed Price Quantity U/I Unit Price Amount
6 EA
FA 167000820
FIRST ARTICLE- Production Part Number MIL-DTL-27443 TYPE 1 Associated Document(s) Line Item(s)
FD20601200522 0003
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Proceed _ Req No / Pri
Required Delivery
+ SHIP IN PLACE 5 EA *150 Calendar Days
+ WNZEB 1 EA *150 Calendar Days
Proposed Delivery
+ SHIP IN PLACE 5 EA
+ WNZEB 1 EA
Notice to Proceed is Approval of First Article Test Procedure, CLIN 0015.
Inspection/Acceptance of CLIN 0014 will be accomplished by FA8519 - AFLCMC/WNZEB. Acceptance will be upon approval of First Article Test Report, CLIN 0016.
Firm Fixed Price Quantity U/I Unit Price Amount
1 LO
FIRST ARTICLE TEST PROCEDURES - Production Data IAW Attached DD Form 1423, ELIN A007
FD20601200522 0004
Bid C/First Article Required/Insurance Policy
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Standard Inspection
Transportation From Continental United States CONUS (CONUS) Sources
TYPE / SHIP TO CODE F.O.B.
+ IAW1423 DESTINATION
Class I ODS Substance Application/Use Quantity
NONE
None Type / Ship To Quantity (U/I) *ARO Contract _ Req No / Pri
Required Delivery
+ IAW1423 1 LO *60 Calendar Days
Proposed Delivery
+ IAW1423 1 LO
Government written notice of approval/disapproval due 15 days after receipt of contractor's plan, CLIN 0015.
Firm Fixed Price Quantity U/I Unit Price Amount
1 LO
FIRST ARTICLE TEST REPORT - Production Data IAW Attached DD Form 1423, ELIN A008 Associated Document(s) Line Item(s)
FD20601200522 0005
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Standard Inspection
Transportation From Continental United States CONUS (CONUS) Sources
TYPE / SHIP TO CODE F.O.B.
+ IAW1423 DESTINATION
Class I ODS Substance Application/Use Quantity
NONE
None Type / Ship To Quantity (U/I) *ARO Submittal of
First Article _ Req No / Pri
Required Delivery
Bid C/First Article Required/Insurance Policy + IAW1423 1 LO *150 Calendar Days
Proposed Delivery
+ IAW1423 1 LO
CLIN 0016.
Firm Fixed Price From Quantity U/I To Quantity U/I See SubCLIN breakout
1 EA 13,500 EA
NSN: 1670-00-820-4896
PALLET, AIR CARGO, TYPE I, HCU 6/E
Ramp-Up Repairs of 463L Pallet IAW PWS and specifications Manufacturer Part Number
00000 MIL-DTL-27443
Associated Document(s) Line Item(s)
FD20601200516 0004
Limitations of Liability: Other Than High Value Item
Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Transportation From Continental United States CONUS (CONUS) Sources
TYPE / SHIP TO CODE F.O.B.
+ TBD ORIGIN
Place of Perf Quantity (U/I) *ARO See Delivery
Note Below _ Req No / Pri
Required Period of Performance
+ TBD 1 EA
13,500
Proposed Period of Performance
+ TBD 1 EA
13,500
DELIVERY NOTE:
Deliveries shall begin 30 days After Receipt of (ARO) funded order or reparable asset, whichever is later.
The Government's minimum required delivery output is 3,500 pallets per month.
The following ramp-up schedule shall be applicable: 1,000 pallets per month 30 days ARO 1,500 pallets per month 60 days ARO 2,000 pallets per month 90 days ARO 2,500 pallets per month 120 days ARO 3,000 pallets per month 150 days ARO 3,500 pallets per month 180 days ARO
SHIP TO NOTE:
TBD - The contractor shall contact the Item Manager for shipping instructions. POC information to be
0017AA
Firm Fixed Price Unit Price
Same as 0017 Above REPAIR METHOD #1 - General Inspection Without Repair Associated Document(s) Line Item(s)
FD20601200516 0004
Item No.
0017AB
Firm Fixed Price Unit Price
Same as 0017 Above REPAIR METHOD #2 - Reuse Top & Bottom Skins. New Complete Core Associated Document(s) Line Item(s)
FD20601200516 0005
Item No.
0017AC
Same as 0017 Above REPAIR METHOD #2 - Reuse Top & Bottom Skins. New Complete Core Plus Replace ONE Short Rail.
Associated Document(s) Line Item(s)
FD20601200516 0006
Item No.
0017AD
Firm Fixed Price Unit Price
Same as 0017 Above REPAIR METHOD #2 - Reuse Top & Bottom Skins. New Complete Core Plus Replace ONE Long Rail.
Associated Document(s) Line Item(s)
FD20601200516 0007
Item No.
0017AE
Firm Fixed Price Unit Price
Same as 0017 Above REPAIR METHOD #2 - Reuse Top & Bottom Skins. New Complete Core Plus Replace TWO Short Rails.
Associated Document(s) Line Item(s)
FD20601200516 0008
Item No.
0017AF
Firm Fixed Price Unit Price
Same as 0017 Above REPAIR METHOD #2 - Reuse Top & Bottom Skins. New Complete Core Plus Replace ONE Short Rail and ONE Long Rail.
Associated Document(s) Line Item(s)
FD20601200516 0009
Item No.
0017AG
Unit Price
Same as 0017 Above REPAIR METHOD #2 - Reuse Top & Bottom Skins. New Complete Core Plus Replace TWO Long Rails.
Associated Document(s) Line Item(s)
FD20601200516 0010
Item No.
0017AH
Firm Fixed Price Unit Price
Same as 0017 Above REPAIR METHOD #3 - Reuse Bottom Skin. New Top Skin and Complete Core.
Associated Document(s) Line Item(s)
FD20601200516 0011
Item No.
0017AJ
Firm Fixed Price Unit Price
Same as 0017 Above REPAIR METHOD #3 - Reuse Bottom Skin. New Top Skin and Complete Core Plus Replace ONE Short Rail.
Associated Document(s) Line Item(s)
FD20601200516 0012
Item No.
0017AK
Firm Fixed Price Unit Price
Same as 0017 Above REPAIR METHOD #3 - Reuse Bottom Skin. New Top Skin and Complete Core Plus Replace ONE Long Rail.
Associated Document(s) Line Item(s)
FD20601200516 0013
0017AL
Firm Fixed Price Unit Price
Same as 0017 Above REPAIR METHOD #3 - Reuse Bottom Skin. New Top Skin and Complete Core Plus Replace TWO Short Rails.
Associated Document(s) Line Item(s)
FD20601200516 0014
Item No.
0017AM
Firm Fixed Price Unit Price
Same as 0017 Above REPAIR METHOD #3 - Reuse Bottom Skin. New Top Skin and Complete Core Plus Replace ONE Short Rail and ONE Long Rail.
Associated Document(s) Line Item(s)
FD20601200516 0015
Item No.
0017AN
Firm Fixed Price Unit Price
Same as 0017 Above REPAIR METHOD #3 - Reuse Bottom Skin. New Top Skin and Complete Core Plus Replace TWO Long Rails.
Associated Document(s) Line Item(s)
FD20601200516 0016
Item No.
0017AP
Firm Fixed Price Unit Price
Same as 0017 Above REPAIR METHOD #4 - Reuse Top Skin. New Bottom Skin and Complete Core.
FD20601200516 0017
Item No.
0017AQ
Firm Fixed Price Unit Price
Same as 0017 Above REPAIR METHOD #4 - Reuse Top Skin. New Bottom Skin and Complete Core plus Replace ONE Short Rail.
Associated Document(s) Line Item(s)
FD20601200516 0018
Item No.
0017AR
Firm Fixed Price Unit Price
Same as 0017 Above REPAIR METHOD #4 - Reuse Top Skin. New Bottom Skin and Complete Core plus Replace ONE Long Rail.
Associated Document(s) Line Item(s)
FD20601200516 0019
Item No.
0017AS
Firm Fixed Price Unit Price
Same as 0017 Above REPAIR METHOD #4 - Reuse Top Skin. New Bottom Skin and Complete Core plus Replace TWO Short Rails.
Associated Document(s) Line Item(s)
FD20601200516 0020
Item No.
0017AT
Firm Fixed Price Unit Price
Same as 0017 Above REPAIR METHOD #4 - Reuse Top Skin. New Bottom Skin and Complete Core plus Replace ONE Short Rail and ONE Long Rail.
FD20601200516 0021
Item No.
0017AU
Firm Fixed Price Unit Price
Same as 0017 Above REPAIR METHOD #4 - Reuse Top Skin. New Bottom Skin and Complete Core plus Replace TWO Long Rails.
Associated Document(s) Line Item(s)
FD20601200516 0022
Item No.
0017AV
Firm Fixed Price Unit Price
Same as 0017 Above REPAIR METHOD #5 - New Top and Bottom Skins and Complete Core.
Associated Document(s) Line Item(s)
FD20601200516 0023
Item No.
0017AW
Firm Fixed Price Unit Price
Same as 0017 Above REPAIR METHOD #5 - New Top and Bottom Skins and Complete Core Plus ONE Short Rail.
Associated Document(s) Line Item(s)
FD20601200516 0024
Item No.
0017AX
Firm Fixed Price Unit Price
Same as 0017 Above REPAIR METHOD #5 - New Top and Bottom Skins and Complete Core Plus ONE Long Rail.
FD20601200516 0025
Item No.
0017AY
Firm Fixed Price Unit Price
Same as 0017 Above REPAIR METHOD #5 - New Top and Bottom Skins and Complete Core Plus TWO Short Rails.
Associated Document(s) Line Item(s)
FD20601200516 0026
Item No.
0017AZ
Firm Fixed Price Unit Price
Same as 0017 Above REPAIR METHOD #5 - New Top and Bottom Skins and Complete Core Plus ONE Short Rail and ONE Long Rail.
Associated Document(s) Line Item(s)
FD20601200516 0027
Item No.
0017BA
Firm Fixed Price Unit Price
Same as 0017 Above REPAIR METHOD #5 - New Top and Bottom Skins and Complete Core Plus TWO Long Rails.
Associated Document(s) Line Item(s)
FD20601200516 0028
Item No.
0017BB
Firm Fixed Price Unit Price
Same as 0017 Above Replacement of Ring Assemblies
FD20601200516 0029
Item No.
0017BC
Firm Fixed Price Unit Price
Same as 0017 Above Replacement of Corner Straps (Brackets) Associated Document(s) Line Item(s)
FD20601200516 0030
Bid C/First Article Required/Insurance Policy Item No.
Firm Fixed Price From Quantity U/I To Quantity U/I Total Price
1 EA 3,715 EA
NSN: 1670-00-820-4896
PALLET, AIR CARGO, TYPE I, HCU 6/E
Ramp-Up Production of 463L Pallet IAW PWS and specifications Manufacturer Part Number
00000 MIL-DTL-27443
Associated Document(s) Line Item(s)
FD20601200522 0001
Limitations of Liability: Other Than High Value Item
Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Transportation From Continental United States CONUS (CONUS) Sources
TYPE / SHIP TO CODE F.O.B.
+ TBD ORIGIN
Place of Perf Quantity (U/I) *ARO See Delivery
Note Below _ Req No / Pri
Required Period of Performance
+ TBD 1 EA
3,715
Proposed Period of Performance
+ TBD 1 EA
3,715
DELIVERY NOTE:
Deliveries shall begin no later than 30 days After Receipt of (ARO) funded order. The Government's minimum required delivery output is 1,167 pallets per month after six (6) months ramp-up period.
The following ramp-up schedule shall be applicable: 200 pallets per month 30 days ARO 400 pallets per month 60 days ARO 500 pallets per month 90 days ARO 700 pallets per month 120 days ARO 950 pallets per month 150 days ARO 1167 pallets per month 180 days ARO
SHIP TO NOTE:
TBD - The contractor shall contact the Item Manager for shipping instructions. POC information to be cited on each individual order.
ALTERNATIVE 2
INSURANCE POLICY
PROPOSAL D
MISSION ESSENTIAL QUANTITY (MEQ)
Bid D/Insurance Policy Item No.
Firm Fixed Price From Quantity U/I To Quantity U/I See SubCLIN breakout
1 EA 96,000 EA
NSN: 1670-00-820-4896
PALLET, AIR CARGO, TYPE I, HCU 6/E
MEQ Repairs of 463L Pallet IAW PWS and specifications Manufacturer Part Number
00000 MIL-DTL-27443
Associated Document(s) Line Item(s)
FD20601200516 0004
Limitations of Liability: Other Than High Value Item
Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Transportation From Continental United States CONUS (CONUS) Sources
TYPE / SHIP TO CODE F.O.B.
+ TBD ORIGIN
Place of Perf Quantity (U/I) *ARO See Delivery
Note Below _ Req No / Pri
Required Period of Performance
+ TBD 1 EA
96,000
Proposed Period of Performance
+ TBD 1 EA
96,000
DELIVERY NOTE:
Deliveries shall begin 30 days After Receipt of (ARO) funded order or reparable asset, whichever is later.
The Government's minimum required delivery output is 3,500 pallets per month.
The following ramp-up schedule shall be applicable: 1,000 pallets per month 30 days ARO 1,500 pallets per month 60 days ARO 2,000 pallets per month 90 days ARO 2,500 pallets per month 120 days ARO 3,000 pallets per month 150 days ARO 3,500 pallets per month 180 days ARO
SHIP TO NOTE:
TBD - The contractor shall contact the Item Manager for shipping instructions. POC information to be
0019AA
Firm Fixed Price Unit Price
Same as 0019 Above REPAIR METHOD #1 - General Inspection Without Repair
Associated Document(s) Line Item(s)
FD20601200516 0004
Item No.
0019AB
Firm Fixed Price Unit Price
Same as 0019 Above REPAIR METHOD #2 - Reuse Top & Bottom Skins. New Complete Core Associated Document(s) Line Item(s)
FD20601200516 0005
Item No.
0019AC
Firm Fixed Price Unit Price
Same as 0019 Above REPAIR METHOD #2 - Reuse Top & Bottom Skins. New Complete Core Plus Replace ONE Short Rail.
Associated Document(s) Line Item(s)
FD20601200516 0006
Item No.
0019AD
Firm Fixed Price Unit Price
Same as 0019 Above REPAIR METHOD #2 - Reuse Top & Bottom Skins. New Complete Core Plus Replace ONE Long Rail.
Associated Document(s) Line Item(s)
FD20601200516 0007
Item No.
0019AE
Firm Fixed Price
Same as 0019 Above
REPAIR METHOD #2 - Reuse Top & Bottom Skins. New Complete Core Plus Replace TWO Short Rails.
Associated Document(s) Line Item(s)
FD20601200516 0008
Item No.
0019AF
Firm Fixed Price Unit Price
Same as 0019 Above REPAIR METHOD #2 - Reuse Top & Bottom Skins. New Complete Core Plus Replace ONE Short Rail and ONE Long Rail.
Associated Document(s) Line Item(s)
FD20601200516 0009
Item No.
0019AG
Firm Fixed Price Unit Price
Same as 0019 Above REPAIR METHOD #2 - Reuse Top & Bottom Skins. New Complete Core Plus Replace TWO Long Rails.
Associated Document(s) Line Item(s)
FD20601200516 0010
Item No.
0019AH
Firm Fixed Price Unit Price
Same as 0019 Above REPAIR METHOD #3 - Reuse Bottom Skin. New Top Skin and Complete Core.
Associated Document(s) Line Item(s)
FD20601200516 0011
Item No.
0019AJ
Same as 0019 Above REPAIR METHOD #3 - Reuse Bottom Skin. New Top Skin and Complete Core Plus Replace ONE Short Rail.
Associated Document(s) Line Item(s)
FD20601200516 0012
Item No.
0019AK
Firm Fixed Price Unit Price
Same as 0019 Above REPAIR METHOD #3 - Reuse Bottom Skin. New Top Skin and Complete Core Plus Replace ONE Long Rail.
Associated Document(s) Line Item(s)
FD20601200516 0013
Item No.
0019AL
Firm Fixed Price Unit Price
Same as 0019 Above REPAIR METHOD #3 - Reuse Bottom Skin. New Top Skin and Complete Core Plus Replace TWO Short Rails.
Associated Document(s) Line Item(s)
FD20601200516 0014
Item No.
0019AM
Firm Fixed Price Unit Price
Same as 0019 Above REPAIR METHOD #3 - Reuse Bottom Skin. New Top Skin and Complete Core Plus Replace ONE Short Rail and ONE Long Rail.
Associated Document(s) Line Item(s)
FD20601200516 0015
Item No.
0019AN
Same as 0019 Above REPAIR METHOD #3 - Reuse Bottom Skin. New Top Skin and Complete Core Plus Replace TWO Long Rails.
Associated Document(s) Line Item(s)
FD20601200516 0016
Item No.
0019AP
Firm Fixed Price Unit Price
Same as 0019 Above REPAIR METHOD #4 - Reuse Top Skin. New Bottom Skin and Complete Core.
Associated Document(s) Line Item(s)
FD20601200516 0017
Item No.
0019AQ
Firm Fixed Price Unit Price
Same as 0019 Above REPAIR METHOD #4 - Reuse Top Skin. New Bottom Skin and Complete Core plus Replace ONE Short Rail.
Associated Document(s) Line Item(s)
FD20601200516 0018
Item No.
0019AR
Firm Fixed Price Unit Price
Same as 0019 Above REPAIR METHOD #4 - Reuse Top Skin. New Bottom Skin and Complete Core plus Replace ONE Long Rail.
Associated Document(s) Line Item(s)
FD20601200516 0019
Item No.
0019AS
Unit Price
Same as 0019 Above REPAIR METHOD #4 - Reuse Top Skin. New Bottom Skin and Complete Core plus Replace TWO Short Rails.
Associated Document(s) Line Item(s)
FD20601200516 0020
Item No.
0019AT
Firm Fixed Price Unit Price
Same as 0019 Above REPAIR METHOD #4 - Reuse Top Skin. New Bottom Skin and Complete Core plus Replace ONE Short Rail and ONE Long Rail.
Associated Document(s) Line Item(s)
FD20601200516 0021
Item No.
0019AU
Firm Fixed Price Unit Price
Same as 0019 Above REPAIR METHOD #4 - Reuse Top Skin. New Bottom Skin and Complete Core plus Replace TWO Long Rails.
Associated Document(s) Line Item(s)
FD20601200516 0022
Item No.
0019AV
Firm Fixed Price Unit Price
Same as 0019 Above REPAIR METHOD #5 - New Top and Bottom Skins and Complete Core.
Associated Document(s) Line Item(s)
FD20601200516 0023
0019AW
Firm Fixed Price Unit Price
Same as 0019 Above REPAIR METHOD #5 - New Top and Bottom Skins and Complete Core Plus ONE Short Rail.
Associated Document(s) Line Item(s)
FD20601200516 0024
Item No.
0019AX
Firm Fixed Price Unit Price
Same as 0019 Above REPAIR METHOD #5 - New Top and Bottom Skins and Complete Core Plus ONE Long Rail.
Associated Document(s) Line Item(s)
FD20601200516 0025
Item No.
0019AY
Firm Fixed Price Unit Price
Same as 0019 Above REPAIR METHOD #5 - New Top and Bottom Skins and Complete Core Plus TWO Short Rails.
Associated Document(s) Line Item(s)
FD20601200516 0026
Item No.
0019AZ
Firm Fixed Price Unit Price
Same as 0019 Above REPAIR METHOD #5 - New Top and Bottom Skins and Complete Core Plus ONE Short Rail and ONE Long Rail.
FD20601200516 0027
Item No.
0019BA
Firm Fixed Price Unit Price
Same as 0019 Above REPAIR METHOD #5 - New Top and Bottom Skins and Complete Core Plus TWO Long Rails.
Associated Document(s) Line Item(s)
FD20601200516 0028
Item No.
0019BB
Firm Fixed Price Unit Price
Same as 0019 Above Replacement of Ring Assemblies Associated Document(s) Line Item(s)
FD20601200516 0029
Item No.
0019BC
Firm Fixed Price Unit Price
Same as 0019…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .