PWS_19_00116.pdf

PDF 196 KB Posted

Attached to
REPAIR: CONSOLE, POWER DISTR Federal contract opportunity
Solicitation number
FA8517-19-Q-0116
Issued by
Department of the Air Force Materiel Command Lifecycle Management Center Robins Air Force Base

About this file

Performance Work Statement

View the file

Other files for this federal contract opportunity

Other files attached to REPAIR: CONSOLE, POWER DISTR, newest first.
File Type Posted
FA851719Q0116_______0001.pdf PDF
DD2875CAVAF.pdf PDF
FA851719Q0116.pdf PDF
GFP.pdf PDF
CDRLS.pdf PDF
Wage_Detemination.pdf PDF
Packaging_Rqmts.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PR: FD2060-19-00116 PWS REVISION: 0 1

Distribution Statement: D

Performance Work Statement

For

F-15 Tactical Electronic Warfare System (TEWS) Intermediate Support System (TISS) Repair/Sustainment

Purchase Request: FD2060-19-00116

25 July 2018

Distribution Statement D:

PR: FD2060-19-00116 PWS REVISION: 0 2

1.0 Description of Services

1.1 Objective(s): This PWS establishes the minimum depot level repair requirements of F-15 Tactical Electronic Warfare System (TEWS) Intermediate Support System (TISS) Components.

The contractor shall provide quality repair to ensure a serviceable “A” condition item that efficiently serves its intended purpose, by the required disassembly, test, bench check, inspection and repair. The contractor shall provide timely and accurate reporting in Commercial Asset Visibility AF (CAVAF), meet Turnaround Time for delivery of MICAPs requisitions per PWS instructions, and reduce frequency of Product Quality deficiency Reports (PQDRs). The contractor is responsible for ensuring that all Line Replaceable Units (LRUs) and Test Replaceable Units (TRUs) are returned to service or delivered in compliance with OEM performance standards/specifications. The Contractor shall repair submitted hardware, utilizing repair components that are equal to, or superior to, Original Equipment Manufacturer (OEM) components, which meet applicable drawings, handbooks, manuals, and/or specification established by OEM and which will perform in next higher assemblies.

1.2 Benefit to United States Air Force (USAF): This acquisition will benefit the USAF by sustaining the F-15 TISS which will enable the warfighter to continue to test and fault isolate deficiencies in F15 TEWS Line Replaceable Units (LRUs). These actions shall ensure proper operation of TISS components, resulting in less MICAP requisitions.

1.3 Background: TISS is the standard intermediate level tester for the F-15 Electronic Warfare Suite TEWS. TEWS suite uses its Built-In-Test (BIT) capability to detect malfunctions and isolate failures to Line Replaceable Units (LRUs). Failed LRUs are removed from the aircraft and sent to the intermediate level of maintenance for test, repair, and re-test. Test and repair of a LRU is accomplished by fault isolation to a Shop Replaceable Unit (SRU). At the intermediate level of maintenance, extensive use will be made of the F-15 TEWS Intermediate Support System (TISS). TISS consist of Automatic Test Equipment (ATE), a Test Program Set (TPS) for each unit under test (UUT) and a Storage Equipment Set (SES).

2.0 Services Summary:

Performance Objective PWS Reference

Performance Threshold

Quality of repair

4.4.2 Assets shall be repaired in accordance with T.O. 00-

25-234.

Repaired assets shall pass inspection with no more than one failure per Contract year.

At a minimum, 95% of repaired assets shall pass initial screening/test/inspection. Remaining 5% (or less) of failed assets shall pass on the second attempt.

This metric will be calculated per contract year.

PR: FD2060-19-00116 PWS REVISION: 0 3

There shall be no more than one PQDRs per contract year

Delivery of repair

(TAT)

4.4.5 Repaired assets shall be delivered in accordance with

the schedule (TAT) defined by the contract.

There shall be no more than one late delivery per contract year. The Contractor shall notify the Government if the delivery of any asset will not meet the scheduled delivery date (TAT) and negotiate a revised delivery date. The late asset shall be delivered by the revised delivery date acceptable to the Government.

CAV-AF reporting 4.3.3 The Contractor shall report production in CAV-AF.

The Contractor shall provide data on the actions conducted for each unit. The Contractor shall report as actions occur.

Quality of CDRL deliverable

4.2.1 There shall be no more than one rejection of any

deliverable. There shall be no more than two total rejection(s) of deliverables per Quarter. The Government will reject a deliverable if 2 or more technical errors or 10 or more minor errors are found within the deliverable. The rejected deliverable shall be corrected and resubmitted within 10 business days of notification of Government rejection.

Receipt of CDRL deliverable

4.2.2 There shall be no more than 2 late submission(s) of

deliverables per quarter. The Contractor shall notify the Government if the delivery of any data/document will not meet the scheduled delivery date and negotiate a revised delivery date. The data/document shall be delivered by the revised delivery date acceptable to the Government.

3.0 Government Property and Services:

3.1 Contractor Responsibility: The Contractor shall be responsible for Government property in their possession in accordance with the Federal Acquisition Regulation (FAR) and applicable supplements including, but not limited to, FAR Part 45, Government Property; FAR 52.245-1, Government Property; and Defense Federal Acquisition Regulation Supplement (DFARS) Part 245, Government Property. The FAR and applicable supplements can be accessed at the site below.

http://farsite.hill.af.mil

3.2 Government Property to be Provided: Government property will be provided.

3.3 Government System(s): The Government will provide Contractor personnel access to system(s) necessary to perform tasks under the contract/order. Upon completion/termination of the contract/order or transfer/termination of Contractor personnel, the system account(s) will be closed.

PR: FD2060-19-00116 PWS REVISION: 0 4

3.4 Loss of Government Property

3.4.1 Definition of Loss of Government Property: “Loss of Government property” means unintended loss of or damage to Government property including property that cannot be found after a reasonable search, loss due to inadequate storage, loss due to lack of security, theft, damage requiring repair to restore the item to usable condition, or damage that renders the property useless for its intended purpose or Beyond Economical Repair (BER). Loss of Government property does not include manufacturing defects, obsolescence, normal wear and tear, or purposeful destructive testing. Unless otherwise stated in the contract/order, loss of Government property does not include normal and reasonable inventory adjustments, i.e., losses of low priority consumable material, such as common hardware, as agreed to by the Contractor and the Government Property Administrator.

3.4.2 Reporting Loss of Government Property: The Contractor shall report loss of Government property using Defense Contract Management Agency (DCMA) / Access To eTools.

3.5 Return or Retention of Government Property: All property provided by the Government remains the property of the Government and shall be returned to the Government as directed, but no later than completion of the contract/order, unless the Procuring Contracting Officer (PCO) directs the Contractor to retain the property for continued use under a successor contract. All Government property shall be returned to the Government in the condition provided unless approved in advance by the PCO. All material generated under the contract/order becomes the property of the Government and shall be returned to the Government as directed, but no later than completion of the contract/order, unless the PCO directs the Contractor to retain the material for continued use under a successor contract.

4.0 Technical Requirements:

4.1 Period and Place of Performance:

4.1.1 Contract Period of Performance: The period of performance will be a basic plus 4 "ordering periods”.

4.1.2 Place of Performance: These services will be performed at Contractor’s facility.

4.2 Contract Data Requirements List(s) (CDRL)

Document Identifier

DID Title PWS Reference(s)

A001 DI-MGMT-81803 Item Unique Identification (IUID) Marking Plan

4.3.1.1

A002 DI-MGMT-81804A Item Unique Identification (IUID) Marking Activity Validation and Verification Report

4.3.1.2

PR: FD2060-19-00116 PWS REVISION: 0 5

A003 DI-MGMT-81634C Commercial Asset Visibility-Air Force (CAV-AF)

/ Government Furnished Material Report]

4.3.3

A004 DI-MISC-81832 Counterfeit Prevention Plan 4.3.4

A005 DI-MGMT 81838 CAV AF CFM End Item Reporting

A006 DI-MGMT 81995 CDM Production Monthly Status Report 4.3.3

A007 DI-MGMT 80441C

Annual Government Property Physical Inventory Report

4.2.1 Quality of CDRL Deliverable: There shall be no more than one rejection of any deliverable. There shall be no more than 1 total rejection(s) of deliverables per Quarter. The Government will reject a deliverable if 2 or more technical errors or 10 or more minor errors are found within the deliverable. A technical error is defined as the format not being in accordance with the CDRL or the content not being accurate and complete in accordance with the CDRL, PWS or contract. A minor error is exemplified by a typographical error, a grammatical error, etc. The rejected deliverable shall be corrected and resubmitted within 15 business days of notification of Government rejection.

4.2.2 Receipt of CDRL Deliverable: CDRL deliverables may be submitted via Wide Area Work Flow e-Business Suite / Invoicing, Receipt, Acceptance, and Property Transfer (iRAPT) or be submitted directly to the MFT member identified on the CDRL. There shall be no more than 2 late submission(s) of deliverables per Quarter. The Contractor shall notify the Government if the delivery of any data/document will not meet the scheduled delivery date and negotiate a revised delivery date. The data/document shall be delivered by the revised delivery date acceptable to the Government.

4.3 Repair

4.3.1 Item Unique Identification: Item Identification and Valuation, unique item identification is a method of marking items with unique item identifiers which have machine-readable data elements. Unique item identification is required for all items to be delivered to the DoD that meet the criteria established in accordance with the FAR and applicable supplements and shall be in compliance with all applicable guidance and clauses listed in the contract.

4.3.1.1 Marking Requirement: Unique Item Identification is required for all items to be delivered to the Department of Defense (DoD) that meet the criteria established by the FAR.

The Contractor shall mark items in accordance with contract clauses, and Military Standard (MIL-STD)-130N, Department of Defense Standard Practice / Identification Marking of U.S.

PR: FD2060-19-00116 PWS REVISION: 0 6

Military Property. [CDRL A001, DI-MGMT-81803, Item Unique Identification (IUID) Marking Plan]

4.3.1.2 Reporting in IUID Registry: In accordance with the Department of Defense Guide to Uniquely Identifying Items Assuring Valuation, Accountability and Control of Government Property, the Government agent or Contractor representative responsible for causing “life cycle events” (i.e., abandoned, consumed, destroyed by accident, destroyed by combat, donated, exchanged – repair, exchanged – sold, exchanged – warranty, expended – experimental/target, expended – normal use, leased, loaned, lost, reintroduced, retired, scrapped, sold – foreign government, sold – historic, sold – nongovernment, sold – other federal, sold – state/local, and stolen) will update applicable item record(s) in the IUID Registry. [CDRL A002, DI-MGMT- 81804A, Item Unique Identification (IUID) Marking Activity Validation and Verification Report]

4.3.2 Packaging: The Contractor shall package and mark material in accordance with the contract/order Air Force Materiel Command (AFMC) Form 158, Packaging Requirements, and applicable Government regulations. The Contractor shall ensure that classified material is packaged, marked and delivered in accordance with DoD 5220.22-M, National Industrial Security Program Operating Manual (NISPOM).

4.3.3 Commercial Asset Visibility-Air Force (CAV-AF): The Contractor shall report production using CAV-AF. The Contractor shall provide data on the actions conducted for each unit. The Contractor shall report daily or as actions occur. The following metrics will be monitored: GFM In-Transit, Repairable GFM Accountability and Assets Not on Contract. If CAV-AF training is required, Contractor personnel may send an email to:

406scms.cav.af.ar@us.af.mil.

A003, Commercial Asset Visibility-Air Force (CAV-AF) / Government Furnished Material Report CDRL DI-MGMT-81634C

A005, CAV AF CFM End Item Reporting DI-MGMT 81838 A006, CDM Production Monthly Status Report DI-MGMT 81995 A007, Annual Government Property Physical Inventory Report DI-MGMT 80441C

4.3.4 Contractors that supply electronic parts or systems that contain electronic parts shall establish policies and procedures to avoid, detect, mitigate and dispose of counterfeit electronic parts to prevent such parts from entering the USAF/DoD supply chain. These policies and procedures shall be documented in a CPP for submission and approval in accordance with Data Item Description (DID) DI-MISC-81832 and accomplished for all specified contract items. DI- MISC-81832 is applicable to Parts, Material and Processes Selection (PMPS) associated with delivery of systems and assemblies to the USAF and DoD. The requirements established by DI- MISC-81832 also apply to electronics components procured in sustainment of such systems and assemblies. The requirements of the recently DoD-adopted SAE AS 5553A, Fraudulent/Counterfeit Electronics Parts; Avoidance, Detection, Mitigation, and Disposition shall also apply. [CDRL A004, DI-MISC-81832, Counterfeit Prevention Plan]

PR: FD2060-19-00116 PWS REVISION: 0 7

4.4 Specific Technical Requirements

4.4.1 The information contained in this section is not intended to be all inclusive or to detract from procedures outlined in the specifications, technical orders, and other directives listed in this work statement, except where specifically noted herein.

4.4.2 Workmanship shall be in accordance with T.O. 00-25-234, General Shop Practice requirements for repair, MIL-PRF-23377J(2), Primer Coating Epoxy, High Solids and MIL-PRF-19500N, General Specification for Semi-Conductor Devices.

4.4.3 Contractor furnished material or parts used for replacement shall equal or exceed those specified by the Original Equipment Manufacturer (OEM). The material or parts shall be entirely suitable for restoration of the reparable item for its intended purposes, and shall be completely interchangeable without alteration of either the parts or the end item. If there is a need to use parts other than the OEM specified parts or the latest government furnished baseline, the standard parts approval procedures through the Defense Electronic Supply Center (DESC) or the Defense Industrial Supply Center (DISC) shall be followed. If a part is disapproved by DESC or DISC, the Procuring Contracting Officer (PCO) has approval authority with engineering concurrence.

4.4.4 Original design of the reparable item and parts thereof, or the design functional capabilities of the item, shall not be changed, modified or altered unless such changes are documented, reported and approved by the Government. The contractor will certify that these items are tested and inspected to the Original Equipment Manufacturer (OEM) or equivalent commercial standards.

4.4.5 The Contractor shall complete production and ship serviceable assets IAW the delivery turnaround time (TAT) established in the contract schedule, after receipt of asset, for routine, SURGE, and MICAP requirements. The desired TAT for SURGE requirements is 15 calendar days, and MICAP requirements 30 calendar days. Any order issued for SURGE or MICAPs requirements will specify the routine delivery TAT with the expectation that the Contractor will attempt to meet the accelerated delivery as specified above.

The contractor shall forward any production problems (including delays in delivery) to AFSC/PZAAC PCO and the 410th SCMS/GULA Production Management Specialist (PMS) and Logistics Manager (LM). Delivery Performance: There shall be no more than one late delivery per quarter. If the delivery date of any asset will not meet the required delivery date the contractor shall notify the Government of the cause and propose a delivery date. Any extension of the required date will be concurred on by the Program Office and negotiated with the PCO.

4.4.6 Contractor shall ensure early Contractor identification and reporting of Government repairable items which are misidentified, misdirected, or missing recoverable modules/subassemblies.

PR: FD2060-19-00116 PWS REVISION: 0 8

4.4.7 NFF (No Fault Found): Any item found to be serviceable on initial test and evaluation and deemed by the Contractor as a serviceable item shall be reported to the PCO immediately for disposition. Billing for assets determined as No Fault Found/RETOK will only incur fees for

TT&E."

4.4.8 Over and Above CLIN: Non-repair related discrepancies discovered that are not caused as a result of Contractor actions shall be reported to 410 SCMS/GULA immediately for disposition and/or engineering evaluation. Routine discrepancies shall be reported via email to the Program Manager, 410 SCMS/GULA, Robins AFB, GA 31098, commercial phone (478) 222-2267, with a detailed description of the issue, photos if necessary, recommended course of action or options, and estimated hours to complete repair. Repair of an item that is beyond normal repair issues and requires additional funding will be placed on an “Over & Above” contract line item

4.4.9 BER (Beyond Economical Repair): Requests for condemnations shall be submitted in writing to the Government PCO within five workdays of the intent to condemn. Condemnation authority shall be requested when the cost to Repair the asset exceeds 75 percent of the unit’s replacement cost. The contractor shall not charge the full repair cost, but only the firm fixed price associated with negotiated BERs CLIN. The PCO retains the right to request enlarged color photographs of any proposed condemned end item. These photographs shall clearly portray the extent of damage to the end item and/or effects of overheating. One photograph shall be of the entire end item showing the part number and serial number. The results of any electrical testing performed on the end item shall also be submitted for review. The contractor may be required to submit the proposed condemned end item to Government technical representative for evaluation, confirmation, and/or disposition instructions.

4.4.10 Beyond Physical Repair (BPR) and Condemnation: Upon receipt of an item for repair the contractor shall first determine if the item shall be inducted for repair. Request for condemnation shall be submitted to the PCO for approval/disapproval if the unit falls into one of the criteria specified below:

a. Physical damage destroys 75% of the physical and/or electrical integrity of the unit (i.e.

crushed).

b. Overheating and subsequent destructions of 80% of the internal electrical components and electrical connections.

If an item is initially determined to be Beyond Physical Repair (BPR), in accordance with A and/or B above, the contractor shall utilize the BPR form, attached hereto as Appendix B, for the purpose of requesting direction from the Government. The contractor’s determination of BPR shall be verified by the Government Multifunctional Team (MFT) and ACO. Once determination that the item(s) are BPR and to be destroyed (scrapped), the contractor shall demilitarize the item in accordance with (IAW) DoD 4160.21-M-1, Defense Demilitarization

PR: FD2060-19-00116 PWS REVISION: 0 9

Manual, Appendix 3, DEMIL Code B, USML Item - mutilation to the point of scrap required worldwide. All items condemned that contain precious metals, silver, gold, platinum, rhodium, iridium, and ruthenium, scrap bearing such metals, and items containing recoverable quantities thereof shall be reported via Inventory Schedule to the DCMA Plant Clearance Office for disposition instructions.

4.4.11 When requested, the Contractor shall assist the Contract Administration Office in evaluating product quality deficiency reports and exhibits for defects reported on items repaired under this contract to determine the root cause for deficiencies IAW T.O. 00-35D-54, USAF Material Deficiency Reporting and Investigation System. These defects may be reported from field or depot organizations. Corrective action to prevent repeat discrepancies in workmanship shall be an integral part of the Contractor’s Quality Program at no additional cost to the government.

4.4.12 Cannibalization: Prior to the destruction of items determined BPR/BER the contractor may retain any components that may be utilized for future repair efforts under this contract. The contractor may cannibalize from the LRU/SRU to accomplish timely repair of SURGE and MICAP requirements. All cannibalized components will be returned to pre-cannibalized condition. Parts removed for this reason shall not be cause for condemnation of assets.

5.0 General Information:

5.1.1 Definition of Mission-Essential Services: In accordance with DFARS 252.237- 7023(a)(1), Continuation of Essential Contractor Services, “ ‘Essential contractor service’ means a service provided by a firm or individual under contract to DoD to support mission-essential functions, such as support of vital systems, … associated support activities, … and similar services provided to foreign military sales customers under the Security Assistance Program.

Services are essential if the effectiveness of defense systems or operations has the potential to be seriously impaired by the interruption of these services, as determined by the appropriate functional commander or civilian equivalent.”

5.1.2 Designation of Services as Mission-Essential: In accordance with DFARS 237.7602(a), The Continuation of Essential Contractor Services / Policy, DFARS 252.237-7023(a)(2), and Air Force Instruction (AFI) 10-403, Deployment Planning and Execution, paragraph 1.9.1.33.2, the Functional Commander (FC) or civilian equivalent has determined these services are not mission-essential and will not continue in the event of a crisis.

5.1.2.2 If the Contractor anticipates not being able to perform the mission-essential services, they shall notify the PCO as soon as possible and fully cooperate with the Government’s efforts to maintain continuity of operations.

5.2 Security Requirements: Actual knowledge and/or generation of classified information and/or Controlled Unclassified Information (CUI) are not expected to be necessary for performance of the contract/order. Contractor personnel are required to comply with security requirements to preclude potential security incidents or violations. If a change in the security

PR: FD2060-19-00116 PWS REVISION: 0 10

classification of the contract/order becomes necessary after contract/order award, the Contractor shall make a reasonable effort to continue performance of tasks under the contract/order in compliance with the change in security classification in accordance with FAR 52.204-2, Security Requirements.

5.2.1 Security Regulations: The Contractor shall ensure personnel, information, system, property, facility and security requirements are met. The Contractor shall comply with Government security regulations including, but not limited to, Department of Defense (DoD) 5200.2-R, Personnel Security Program; DoD 5220.22-M, National Industrial Security Program Operating Manual (NISPOM); DoD Directive (DoDD) 5205.02E, DoD Operations Security (OPSEC) Program; DoD Manual 5205.02-M, DoD Operations Security (OPSEC) Program Manual; and Robins Air Force Base Integrated Defense Plan (RAFB IDP) 31-101.

5.2.2 Operations Security (OPSEC): The purpose of OPSEC is to reduce the vulnerability of USAF missions to adversary collection and exploitation of critical information. The Contractor shall comply with DoDD 5205.02E and DoD Manual 5205.02-M to protect United States (U.S.)

Government interests. The Contractor shall ensure Contractor personnel who perform work on a Government facility comply with the OPSEC procedures of the facility.

5.2.3 Communications Security (COMSEC): The Contractor shall use only secure communications methods and/or equipment to transmit or otherwise transfer classified information and/or Controlled Unclassified Information (CUI) in accordance with DoD 5220.22- M. Applicable equipment shall be safeguarded, maintained and operated in accordance with DoD 5220.22-M.

5.2.4 Security Clearance: The Contractor shall ensure applicable contractor/subcontractor personnel have security clearance(s) at the secret level for proper accomplishment of contract/order requirements. The security clearance(s) shall be obtained in accordance with the Department of Defense (DD) Form 254, Department of Defense Contract Security Classification Specification.

5.2.5 Security Incident or Violation: The Contractor shall immediately notify the Government Security Office of any potential or actual security incident or violation including potential or actual unauthorized disclosure or compromise of classified information and/or CUI.

5.2.6 Access to Government System(s): The Government will provide contractor/subcontractor personnel access to system(s) necessary to perform tasks under the contract/order. The Contractor shall ensure contractor/subcontractor personnel who require access to an unclassified or classified Government Automated Information System (AIS) have the respective background check or security investigation conducted. At a minimum, the Contractor shall ensure contractor/subcontractor personnel who require access to an unclassified AIS have a National Agency Check with Inquiries (NACI) conducted. Upon completion/termination of the contract/order or transfer/termination of contractor/subcontractor personnel, the Contractor shall ensure the system account(s) are closed.

PR: FD2060-19-00116 PWS REVISION: 0 11

5.2.7 Access to Government Facility or Military Installation: The Contractor shall ensure contractor/subcontractor personnel who require access to a Government facility or military installation comply with the security requirements of the facility or installation.

5.2.8 Invoicing/Payment and Receipt/Acceptance: The Contractor shall submit/process payment requests and receipt/acceptance documents via iRAPT.

5.2.9 Trafficking in Persons: The Contractor shall comply in accordance with the FAR and applicable supplements and shall be in compliance with all applicable guidance and clauses listed in the contract as it relates to Trafficking in Persons. Additional information about Trafficking in Persons is available at the site for the Department of State’s Office to Monitor and Combat Trafficking in Persons. http://www.state.gov/j/tip

5.2.10 Green Procurement Program (GPP): Under Secretary of Defense (USD) Memorandum, Establishment of the DoD Green Procurement Program, dated August 27 2004, establishes the requirement for a GPP. Green procurement is the purchase of environmentally preferable products and services and shall be managed in accordance with the FAR and applicable supplements and shall be in compliance with all applicable guidance and clauses listed in the contract.

PR: FD2060-19-00116 PWS REVISION: 0 12

6.0 Appendices

6.1 Appendix A: Reference(s)

Publication Number Publication Title Publication Date Specific Paragraph Reference

AFI 10-403

Deployment Planning and Execution

20 Sep 12 1.9.1.33

DFARS 252.237-

Continuation of Essential Contractor Services and

Oct 2010 Entire

SAF/AQ Memo 11 Jun 13 and SAF/AQ Memo, 13 Nov 12

Implementation of FY11 NDAA 8108, Contractor Inventory

11 Jun 13 and 13 Nov 12

Entire

MIL-STD-130N(1),

With Change 1

DoD Standard Practice Identification Marking of US Military Property

16 Nov 12 Entire

DFARS 252.211–7003

Item Identification and Valuation

Jun 2013 Entire

MIL-STD-2073-1d Standard Practice for Military Packaging

10 May 02 Entire

MIL-STD-129P With Change 4

Military Marking for Shipment and Storage

Sep 2007 Entire

FAR 52.246-4

Inspection of Services- Fixed Price

August 1996 Entire

DoD 4100.39-M Federal Logistics Information System

May 2010 and Change Letter Oct

Entire

SAF/AQ Memo Contractor Inventory Requirements

13 Nov 12 Entire

PR: FD2060-19-00116 PWS REVISION: 0 13

Paragraph Reference

DoD 5220.22-M National Industrial Security Program Operating Manual

(NISPOM)

28 Mar 13 Entire

AFI 31-101 Integrated Defense 2 Aug 04 Entire

RAFBI 31-101

Robins Integrated Defense Plan 31-101

Jan 2012 Para 8.8.2.1

IAW AFI 91-204

Safety Investigations and Reports

9 Aug 12 http://www.e-publishing.af.mil

Paragraph 2.12

Public Law 91-596 Occupational Safety and Health Act (OSHA)

1 Jan 04 Sec 5-6

(DODD 4715.1E)

Environmental, Safety, and Occupational Health (ESOH)

19 Mar 05 http://www.dtic.mil/ whs/directives/corres/ pub1.html

Entire

DoDD 5205.02E

DoD Operations Security 20 Jun 12 Entire

DoD Manual 5205.02-M

DoD Operations Security (OPSEC) Program Manual

3 Nov 08 Entire

DoD 5200.2-R Personnel Security Program 23 Feb 96 Entire

RAFB 01560 Environmental Requirements Feb 2013 See Part 1

T.O. 00-35D-54 (for Product Quality Deficiency Report (PQDRs)

USAF Deficiency Reporting, Investigation, and Resolution

1 Nov 11 Entire

PR: FD2060-19-00116 PWS REVISION: 0 14

Paragraph Reference

T.O. 00-25-234

General Shop Practice Requirement for the Repair Maintenance and Test of Electrical Equipment

Aug 1998; Chg 39, 21 Jul 11

Entire

6.2 Appendix B: Government Furnished Material

NSN Noun Part Number

6130-01-567-4294KV A/C Power Supply 68B0449364

File details come from the government source that posted it.