SOW.pdf
PDF 65 KB Posted
- Attached to
- Technical Order page changes for Electronic Propeller Control System Federal contract opportunity
- Solicitation number
- FA8504-12-R-31532
About this file
Statement of Work
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| signed_J A.pdf_-__-_03-23-2012.pdf | ||
| A002.pdf | ||
| A001.pdf | ||
| FA8504-12-R-31532.pdf | ||
| A003.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FD2060-12-31532
STATEMENT OF WORK
FOR
LC-130H ELECTRONIC PROPELLER CONTROL SYSTEM
TECHNICAL MANUAL CONTRACT REQUIREMENTS
PR: FD2060-12-31532
Basic: 03/08/2012
Prepared by:
Warner Robins Air Logistics Center
Robins Air Force Base, Georgia
Program Manager:
Barry King
WR-ALC/GRBCCB
235 Byron Street, Suite 19A
Robins AFB, GA 31098-1670
Phone: (478) 926-3645
Fax: (478) 926-0970
Distribution Statement C: Distribution authorized to U.S. Government agencies and their contractors (Administrative or Operational Use; 01-11-27). Other requests for this document shall be referenced to WR-ALC/GRBA, Robins AFB, GA 31098.
SECTION I: SCOPE
This Statement of Work (SOW) establishes the requirement for the procurement of
Technical Order (TO) page changes for the Electronic Propeller Control System (EPCS) modification on Air National Guard (ANG) LC-130H aircraft. The TO change pages are needed to sustain the LC-130H fleet after EPCS modification. Part of the Air Force
Technical Manual Contract Requirements (TMCR) were accomplished under separate contract. This effort is to complete and deliver the remaining technical order changes described in TMCR 0383 and TMCR 0371, including travel in support of conferences and technical reviews.
SECTION II: TECHNICAL DOCUMENTS
Most of the documents referenced in this SOW or in the TMCR documents are available in the Acquisition Streamlining and Standardization Information System (ASSIST), or other available locations identified in the TMCRs. Documents not available for download will made available by the contracting activity.
Number Title Date
TO 00-5-1 AF Technical Order System 15 AUG 2009
TO 00-5-3 AF Technical Order Life Cycle Management 31 DEC 2009
TM-86-01N Technical Manual Contract Requirements TMCR 0383, 19 Jan 12
TM-86-01N Technical Manual Contract Requirements TMCR 0371
10 Aug 11
DI-ADMN-81250A Conference Minutes 01 OCT 1993
SECTION III: REQUIREMENTS
3.1 Technical Manual Contract Requirements
3.1.1 TMCR 0383. The contractor shall identify, develop, and deliver the technical order changes required for the maintenance and operation of the EPCS according to document TM-86-01N, Air Force Technical Manual Contract Requirements 0383.
Technical reviews will be according to TMCR 0383 and Section 3.2 of this SOW, and may be combined with other meetings when possible. The Government shall provide all technical data and source data to accomplish these requirements. (CDRL A001, TMCR 0383)
3.1.2 TMCR 0371. The contractor shall identify, develop, and deliver the technical order changes required for the maintenance and operation of the EPCS according to document TM-86-01N, Air Force Technical Manual Contract Requirements 0371.
Technical reviews will be according to TMCR 0371 and Section 3.2 of this SOW, and may be combined with other meetings when possible. The Government shall provide all technical data and source data to accomplish these requirements. (CDRL A002, TMCR 0371)
3.2 Conferences and Technical Reviews
Requirements for conferences and technical reviews are described in the TMCRs. An initial Guidance Conference or Technical Interchange Meeting (TIM) is not required.
The contractor shall host, co-chair, and support periodic In Process Reviews (IPRs) according to the TMCR. IPRs may be scheduled when data has reached the completion points specified in the TMCRs and shall be held in conjunction with other reviews when able. The contractor shall notify the contracting officer, program manager, and WR-ALC/GRUEF a minimum of 30 days before the anticipated IPR.
The contractor shall support and provide the necessary resources; i.e., facilities, applicable data, appropriate personnel to perform the meeting or IPR effectively, and minutes. The IPR shall be conducted only after the contractor's quality assurance review to assure that data are of sufficient quality that the Government’s time will be effectively utilized. All contractor/subcontractor/vendor data shall be made available for review. The contractor shall provide discrepancies or comments on an AFTO
FORM 258. The contractor may attach copies of any redline discrepancies to the
AFTO Form 158 in lieu of individual AFTO Form 158 comments. The contractor shall correct all discrepancies identified in the IPR. Any comments or exceptions to incorporating the discrepancies will be individually annotated on the AFTO Form 158.
WR-ALC/GRUEF will provide official notification of acceptance of the IPR to the program manager and contractor by electronic communication. As a minimum, the following IPRs will be held: 40% and 80%. Meetings and IPRs shall be held at BAE
Systems offices in Warner Robins, GA. Approval of the verification is after the contractor incorporates all Verification redline discrepancies, and Government signature of the AFTO Form 82, TCTO Verification Certificate.
3.3 Reports and Deliverables
Conference Minutes. The contractor shall provide Minutes for conferences and technical reviews listed in Section 3.2 and in the TMCRs. The contractor shall provide the Minutes no later than ten calendar days after the event. The contractor shall combine conferences/meetings to fullest extent possible. The contractor shall attach a copy of the AFTO Form 158 to the Minutes. (CDRL A003, DI-ADMN-81250A)
3.4 Travel
Travel may be required to support meetings and reviews. All meetings and reviews shall be held at the BAE Systems offices in Warner Robins, GA. Travel costs shall be according to FAR Subpart 31.205-46, Travel Costs. Travel rates and regulations referenced in the FAR are found at the Defense Travel Management Office (DTMO) online. The contractor is responsible to account for costs appropriately and to maintain adequate records. The contractor shall submit travel requests to the contracting officer not less than five (5) business days in advance of travel.
SECTION IV: GENERAL INFORMATION
4.1 GPP is a mandatory federal acquisition program that focuses on the purchase and use of environmentally preferable products and services. GPP requirements apply to all acquisitions using appropriated funds, including services and new requirements. FAR
Subpart 23.404(b) applies and states the GPP requires 100% of Environmental
Protection Agency designated product purchases that are included in the
Comprehensive Procurement Guidelines list that contains recovered materials, unless the item cannot be acquired: a) competitively within a reasonable timeframe, b) meet appropriate performance standards, or c) at a reasonable price. The prime contractor is responsible for ensuring that all subcontractors comply with this requirement.
4.2 Data Rights
Rights in technical data apply and are further described in the TMCRs and the contract documents.
4.3 Relationship of Contractor with Subcontractors/Vendors
The contractor shall levy on sub-contractors and sub-vendors the same requirements for technical data as are levied on them by this contract. This requirement shall apply at all tiers of sub-contractor/vendor levels associated with the program.
https://www.acquisition.gov/far/current/html/Subpart%2031_2.html http://www.defensetravel.dod.mil/ https://www.acquisition.gov/far/current/html/Subpart%2023_4.html
File details come from the government source that posted it. Updated .