Statement_of_Objectives_DR_Resolution_Rev_B10_8-30-17.pdf
PDF 60 KB Posted
- Attached to
- F-16 SCRIU DR Report Federal contract opportunity
- Solicitation number
- FA8251-17-Q-0056
About this file
This Statement of Objectives defines the Engineering services to be performed by Elbit Systems of America (EFW) Inc. on the SCRIU, based on recorded Deficiency Report (DR) failures.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| CDRL_A002_DMSMS.pdf | ||
| CDRL_A005_Accident_Incident_Report.pdf | ||
| FA825117Q0056_-_NEW.pdf | ||
| CDRL_A001_Contractors_Progress_Report.pdf | ||
| Wage_Determination_DOL.pdf | ||
| GFP.pdf | ||
| CDRL_A004_Counterfeit_Prevention_Plan.pdf | ||
| CDRL_A003_Critical_Defect_Investigation_Report.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DISTRIBUTION STATEMENT D. Distribution authorized to the Department of Defense and U.S. DoD contractors only: Administrative or Operational Use, Critical Technology and Export Controlled, 8 August 2017. Other requests for this document shall be deferred to the OO-ALC, 416 SCMS/GUMAC, Hill AFB, UT.
DISTRIBUTION STATEMENT D. Distribution authorized to the Department of Defense and U.S. DoD contractors only: Administrative or Operational Use, Critical Technology and Export Controlled, 8 August 2017. Other requests for this document shall be deferred to the OO-ALC, 416 SCMS/GUMAC, Hill AFB, UT.
Statement of Objectives: Special Carry Remote Interface Unit Investigation (SCRIU)
NSN: 5998-01-244-0696WZ Part Number: 16E10250-5
Purpose: This Statement of Objectives defines the Engineering services to be performed by Elbit Systems of America (EFW) Inc. on the SCRIU, based on recorded Deficiency Report (DR) failures. This effort shall determine what is/are the root cause failures, as well as to provide a solution to mitigate any future failures.
Scope/Mission: The mission of this Engineering service based on the DR, is to troubleshoot, validate and provide solutions to the failures of the SCRIU. For this DR investigation, USG will supply Government Furnished Property (GFP) consisting of: three serviceable and three unserviceable SCRIUs. In addition, USG will supply and have access to (and use of) Test Station, Digital Storage Oscilloscope during testing at facilities. Finally, USG will provide releasable documentation (as requested by the contractor) and DR for the performance of this task. All data should be protected in accordance to applicable laws and regulations. The information provided by the contractor (EFW) on this DR investigation, will assist the Government as to what action to take on future maintenance for the item. This as a whole will deliver reliability and sustainability for the field users.
Period and Place of Performance: The period of performance for this DR investigation is to be accomplished approximately within a six month period. The place of performance will take place within United States Government (USG) facilities.
Background: Within the last year, during Intermediate-level testing, the SCRIU has demonstrated intermittent differences between on-aircraft performance and off-aircraft testing. These intermittent failures generated a great amount of DR’s from the field.
Operating Constraints: None
Performance Objectives
1. The objective of this Engineering Project is to determine the root cause of the SCRIU/Test issues and identify recommended resolutions.
2. The contractor shall have access to and utilize suitable test equipment and processes to accomplish the failure analysis (e.g., functionally operate the LRU and SRUs).
3. The contractor shall provide a root-cause analysis [A003] to include both data reviews and Contractor-performed testing of USG provided assets.
4. The contractor shall provide a Diminishing Manufacturing Sources and Material Shortages (DMSMS) report [A002] outlining potential impacts of DMSMS on component-level repair (e.g., if Depot-level repair were to be performed) of the existing configuration.
5. The contractor shall procure necessary components to validate recommended DR root-cause and DMSMS impact resolutions. If electronics items are procured, the Contractor shall provide a Counterfeit Parts Prevention Plan [A004] and accomplish Counterfeit Parts Prevention in accordance with (IAW) Section 8.5 below.
6. The contractor shall recommend configuration changes if the DMSMS issues are discovered to resolve identified root cause(s). [A001]
7. This effort is considered a Non-mission Essential Service. According to Department of Defense Instruction (DoDI) 1100.22, it is determined that the contractor will not be required to provide services during crisis unless directed by an authorized government representative. The contractor will contact the Contracting officer for instructions concerning services if a crisis situation occurs.
DISTRIBUTION STATEMENT D. Distribution authorized to the Department of Defense and U.S. DoD contractors only: Administrative or Operational Use, Critical Technology and Export Controlled, 8 August 2017. Other requests for this document shall be deferred to the OO-ALC, DISTRIBUTION STATEMENT D. Distribution authorized to the Department of Defense and U.S. DoD contractors only: Administrative or Operational Use, Critical Technology and Export Controlled, 8 August 2017. Other requests for this document shall be deferred to the OO-ALC, 416 SCMS/GUMAC, Hill AFB, UT.
8. Deliverable Data Requirements
8.1. The Period of Performance (PoP) for this DR investigation is to be accomplished approximately within a six month period.
8.2. The contractor shall provide a draft Final Report within 60 days after contract award (ARO) with all findings/recommendation to date as well as CDRLs. Exceptions to the draft and Final Report, may be approved by the requirements owner through the Procuring Contracting Officer PCO. USG will take seven working days to review the draft Final Report and reply to the contractor with their feedback. The Final Report [A001] shall be delivered within 30 days after USG completes the review and provides feedback to the contractor from the draft Final Report. The Final Report [A001] shall include DMSMS analysis results [A002], Critical Defect Investigation Report [A003], and Mishaps notifications [A005]. The draft and Final Report should be in digital format (Adobe Acrobat or Microsoft Word) on CD/DVD, delivered to OO-ALC, 416 SCMS GUMAC, Hill AFB, UT. All reports delivered to USG shall be marked with FOUO, Distribution D and export control statements. The Government acknowledges that the draft and Final Report delivery date may be adjusted due to procurement lead-time if parts procurements to accomplish resolution validation/verification are required. IAW CDRL A001.
8.3. Diminishing Manufacturing Sources and Material Shortages (DMSMS). The contractor shall provide a DMSMS Management Plan, outlining potential impacts on the component level repair of the existing configuration. The DMSMS Management Plan shall be in contractor’s format and be
IAW CDRL A002.
8.4. Critical Defect Investigation Report (CDIR). The contractor shall provide a CDIR, to include root cause analysis results with all findings during the investigation, recommended mitigations/resolutions, and results of any resolution validation/verifications performed. The CDRI shall be IAW CDRL A003.
8.5. The contractor shall adhere to counterfeit mitigation program IAW CDRL A004. Specific guidance for Counterfeit Mitigation Plan is as follows:
8.5.1. Counterfeit Prevention Plan (CPP). Contractors that supply electronic parts or systems that contain electronic parts shall establish policies and procedures to avoid, detect, mitigate and disposition counterfeit electronic parts to prevent such parts from entering the USAF/DoD supply chain. These policies and procedures shall be documented in a CPP for submission and approval in accordance with Data Item Description (DID) DI-MISC-81832 and accomplished for all specified contract items. DI-MISC-81832 is applicable to Parts, Material and Processes Selection (PMPS) associated with delivery of systems and assemblies to the USAF and DoD. The requirements established by DI-MISC-81832 also apply to electronics components procured in sustainment of such systems and assemblies. The requirements of the recently DoD-adopted SAE 5553, Aerospace Standard, Counterfeit Electronics Parts;
Avoidance, Detection, Mitigation, and Disposition shall also apply.
8.5.2. At a minimum, the CPP shall address:
8.5.2.1. Applicability. The Contractor shall identify all Business locations and programs to which the CPP applies. The CPP shall address materials, hardware, electronic parts, and procured assemblies.
8.5.2.2. Definitions. The Contractor shall utilize definitions per AS 5553 to ensure consistency. Any contractor-derived definitions must be included in an appropriate CPP appendix or annex. (Ref. AS5553, paragraph 3, 3.1, 3.2, 3.3, appendix H)
DISTRIBUTION STATEMENT D. Distribution authorized to the Department of Defense and U.S. DoD contractors only: Administrative or Operational Use, Critical Technology and Export Controlled, 8 August 2017. Other requests for this document shall be deferred to the OO-ALC, DISTRIBUTION STATEMENT D. Distribution authorized to the Department of Defense and U.S. DoD contractors only: Administrative or Operational Use, Critical Technology and Export Controlled, 8 August 2017. Other requests for this document shall be deferred to the OO-ALC, 416 SCMS/GUMAC, Hill AFB, UT.
8.5.2.3. Parts Availability and Use of Parts Brokers. The Contractor shall not procure materials, systems, assemblies, subassemblies or parts from parts Brokers when available from Original Manufacturers (OM) or their Authorized Distributors. In cases where materials, systems, assemblies, subassemblies or parts are no longer available from the OM or their Authorized Distributors, procurement from Brokers may be authorized as defined by the Contractor’s policy and their CPP. (Ref. AS5553, paragraph 4.1.1, 4.1.2.e., appendix A)
8.5.2.4. Procurement Policies. The Contractor shall provide and implement policy directing development and implementation of business practices and procedures, and processes to prevent procurement of Counterfeit materials and parts. The Contractor shall identify the appropriate office(s), business units, functional organizations, and programs, who shall have responsibility for development, maintenance and implementation of the CPP. The CPP shall identify the specific roles and responsibility for each. (Ref. AS5553, paragraph 4.1.2, 4.1.3, appendix B, C, D).
8.5.2.4.1. Risk Assessment. The contract shall address the risk of using unknown sources and or unauthorized suppliers in the CPP. Application or technical risk assessments shall establish the effect that counterfeit parts may have on performance. Vendor or source of supply risk assessments shall establish the potential for obtaining counterfeit parts. Using any risk analysis tool acceptable to the Government, the Contractor shall conduct a risk assessment based upon item characteristics and how likely it is that a counterfeit part will be received. The contractor shall identify and describe in the CPP how parts are selected for assessment and what risk is acceptable based upon the parts design, construction, material and functional requirements. As a minimum, analysis shall be completed for flagging high risk items, such as items that are obsolete, discontinued, rare, etc.The contractor shall require completion of a trade study, documented within the CPP, that shall facilitate determining whether 100% testing of parts procured from after-market sources is more cost effective than qualification or requalification of a manufacturer. (Ref AS5553, paragraph 4.1.2, 4.1.3, appendix B, C, D).
8.5.2.5. Detection and Avoidance Responsibilities. The contractor shall establish processes for review and approval of contractor and applicable subcontractor systems for the detection and avoidance of counterfeit electronic parts and suspect counterfeit electronic parts, which processes shall be comparable to the processes established for contractor business systems under section 893 of the Ike Skelton National Defense Authorization Act for Fiscal Year 2011 (Public L 111-383, 124 Stat. 4311; 10 U.S.C.
2302 note). The contractor shall flow down such requirements and processes to their subcontractors per ODASD Memo titled “Overarching DoD Counterfeit Prevention Guidance”, dated 16 March 2012. (Ref. AS5553, paragraph 4.1.4, 4.1.5, appendix E).
8.5.2.6. Testing and Verification. The Contractor shall establish and accomplish testing and verification processes for items not received from an original equipment manufacturer, original component manufacturer, or authorized distributor that are identified as having high risk for counterfeit potential. These processes apply to prime contracts, and to subcontracts or suppliers below the prime contracts. The Contractor shall provide a list of acceptable test facilities if the subcontractor or supplier does not have the capability to perform required testing. Submittal of Certificates of Compliance indicating the parts are not counterfeit shall be acceptable for verification of testing.
(Ref. AS5553, paragraph 4.1.4, appendix E)
DISTRIBUTION STATEMENT D. Distribution authorized to the Department of Defense and U.S. DoD contractors only: Administrative or Operational Use, Critical Technology and Export Controlled, 8 August 2017. Other requests for this document shall be deferred to the OO-ALC, DISTRIBUTION STATEMENT D. Distribution authorized to the Department of Defense and U.S. DoD contractors only: Administrative or Operational Use, Critical Technology and Export Controlled, 8 August 2017. Other requests for this document shall be deferred to the OO-ALC, 416 SCMS/GUMAC, Hill AFB, UT.
8.5.2.7. Configuration Identification and Traceability. The Contractor shall identify and control the configurations of all systems, assemblies, subassemblies and parts, and enable mechanisms to provide traceability of parts. The Contractor shall report to the Government when control of the configurations of all systems, assemblies, subassemblies and parts, and mechanisms to provide traceability of parts are not possible. The Contractor shall identify the specific systems, assemblies, subassemblies and parts beyond the Contractors’ control. The Contractor shall be responsible for detecting and avoiding the use or inclusion of counterfeit materials and parts, to include procured assemblies and subassemblies, in such products and shall be responsible for the rework or corrective action that may be required to resolve the use or inclusion of counterfeit materials and parts. The cost of counterfeit electronic parts and suspect counterfeit electronic parts and the cost of rework or corrective action that may be required to remedy the use or inclusion of such parts are not allowable costs under Department contracts , unless: a) the contractor has established a counterfeit avoidance/detection system approved by the DoD, b) the counterfeit parts were procured from a DoD-accredited trusted supplier or provided as government property, and c) the contractor has provide timely notification to the government. (Ref. AS5553, paragraph 4.1.6, appendix F)
8.5.2.8. Counterfeit Notification and Reporting. The Contractor shall report in writing to the Procuring Activity within 30 days of determining any end item, component, part, or material contained in supplies purchased by the Department of Defense, or purchased by a contractor or subcontractor for delivery to, or on behalf of, the Department, contains counterfeit electronic parts or suspect counterfeit electronic parts for the purpose of investigation and notification of the Air Force Office of Special Investigations (AFOSI).
The Procuring Contracting Officer (PCO) shall coordinate reporting to the appropriate Program Management/Item Management, System Engineering Management, the AFMC Discrepant Materiel Reporting Program (DMRP) Office in 406 SCMS/GULAB, and the AFOSI. Additionally, the Contractor shall within the same 30 day period ensure all suspected or confirmed counterfeit items are entered into the Government-Industry Data Exchange Program (GIDEP) system, which will serve as the DoD central reporting repository. (Ref. AS5553, paragraph 4.1.7, appendix G)
8.6. Counterfeit Prevention Training. The Contractor shall provide appropriate training and shall require all personnel working procurement within their company, to include at a minimum their supply chain management specialists, receiving inspectors, and engineers, to complete said training. The Contractor shall determine the appropriate training required. Training may be developed in-house or may be other Industry accepted training. The CPP shall describe and list the training provided by the contractor to their personnel.
9. Safety and Health
While performing work under this contract the contractor shall comply with all applicable federal, state and local regulations regarding occupational safety and health. The contractor shall notify the contracting officer (CO), within eight (8) hours of any damage to government property where the dollar value exceeds $500,000.00 and within two workdays, for any damage to government property less than $500,000.00 during the execution of the contract.
If requested by the designated CO, the contractor shall immediately secure the mishap scene/damaged property and impound pertinent maintenance and training records, until released by the procuring safety office. Mishap notifications shall be IAW CDRL A005.
DISTRIBUTION STATEMENT D. Distribution authorized to the Department of Defense and U.S. DoD contractors only: Administrative or Operational Use, Critical Technology and Export Controlled, 8 August 2017. Other requests for this document shall be deferred to the OO-ALC, DISTRIBUTION STATEMENT D. Distribution authorized to the Department of Defense and U.S. DoD contractors only: Administrative or Operational Use, Critical Technology and Export Controlled, 8 August 2017. Other requests for this document shall be deferred to the OO-ALC, 416 SCMS/GUMAC, Hill AFB, UT.
10. Services Summary:
# Performance Objective Para. Performance Threshold 1 Perform a deficiency Root-
Cause Analysis
8.1 Period of Performance 6 Months
2 Accomplish and Document SCRIU deficiency Root-Cause Analysis, including DMSMS analysis, resolution recommendations, resolution validation/verification (as required)
8.2 Threshold: Draft delivered to 416
SCMS/GUMAC within 60 days ARO, Final delivered 90 days ARO.
Objective: Draft delivered within 45 days ARO, Final delivered within 60 days ARO. Final Report threshold and objective timelines may be adjusted at contract award or when identified by the contractor based on parts procurement lead times. IAW
CDRL A001.
File details come from the government source that posted it. Updated .