PWS_8767.pdf

PDF 506 KB Posted

Attached to
Repair Services Federal contract opportunity
Solicitation number
FA8250-20-R-0001
Issued by
Department of the Air Force Materiel Command Air Force Sustainment Center

About this file

This performance work statement outlines requirements for repair services of an amplifier assembly. The Department of the Air Force Materiel Command Air Force Sustainment Center requires test, teardown, evaluation, minor repair and major repair of circuit card assemblies. The contractor shall inspect, test and restore items to serviceable condition in accordance with technical manuals and drawings. Repairs include cleaning, corrosion treatment, maintenance, testing, and refinishing. The contractor must also implement an electrostatic discharge control program, properly mark all parts, and report production data in the Commercial Asset Visibility Air Force system. The contractor shall provide a counterfeit prevention plan and contractor manpower reporting. The performance period is not specified in the document.

View the file

Other files for this federal contract opportunity

Other files attached to Repair Services, newest first.
File Type Posted
RQR_8767.pdf PDF
SOW.pdf PDF
IUID_0555.pdf PDF
Item_Description_1617.pdf PDF
RDL_8284.pdf PDF
Transportation_8767.pdf PDF
Item_Description_0555.pdf PDF
Engineering_Order_01.pdf PDF
RDL_0555.pdf PDF
Item_Description_7460.pdf PDF
IUID_0040.pdf PDF
IUID_8284.pdf PDF
2921458_PKGRQMT_REPORT.pdf PDF
IUID_8767.pdf PDF
IUID_1617.pdf PDF
IUID_9336.pdf PDF
Item_Description_9336.pdf PDF
RDL_7460.pdf PDF
Engineering_Order_05.pdf PDF
SPI_3.pdf PDF
IUID_7460.pdf PDF
SPI_2.pdf PDF
Engineering_Order_04.pdf PDF
CDRLs.pdf PDF
PWS.pdf PDF
PKG_SOW_8767.pdf PDF
Engineering_Order_03.pdf PDF
CAVAF_8767.pdf PDF
2921456_TRNSPDATA_REPORT.pdf PDF
Item_Description_0040.pdf PDF
CAVAF.pdf PDF
RDL_1617.pdf PDF
FA825020R0001.pdf PDF
RDL_9336.pdf PDF
SPI.pdf PDF
RDL_0040.pdf PDF
GFPFA825020R0001_1.pdf PDF
RDL_8767.pdf PDF
Item_Description_8284.pdf PDF
Item_Description_8767.pdf PDF
Engineering_Order_07.pdf PDF
Packaging_8767.pdf PDF
CDRLs_8767.pdf PDF
Engineering_Order_02.pdf PDF
Engineering_Order_06.pdf PDF
Show all 45

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

12 Nov 2019 PWS One NSNs 1/11

DEPARTMENT OF THE AIR FORCE

OGDEN AIR LOGISTICS CENTER, HILL AFB, UTAH 84056-5820

PERFORMANCE WORK SPECIFICATION (PWS)

PR NO:FD20202000142 DATE: 12 November 2019

1.0 SCOPE OF WORK: For the end item the contractor shall furnish all facilities, parts, materials, equipment and services, required to inspect and, if necessary, restore to serviceable condition.

Services to be performed will not be essential in a crisis situation. Work consists of one of three efforts: Test, teardown, and evaluation (TT&E) only; TT&E and Minor Repair; TT&E and Major Repair.

1.1 TEST, TEARDOWN, AND EVALUATION (FFP) The contractor shall perform visual, mechanical and electrical testing of the end item, reusable or replacement component parts, and materials according to the schedule in the contract to determine the condition of the end item.

Upon completion of this task, all of the components of the end item requiring repair or replacement will be identified by part number, NSN (if applicable), nomenclature, and location in the assembly. This information will be reported in writing to the Procurement Contracting Officer (PCO)/ Defense Contract Management Agency (DCMA) Administrative Contracting Officer (ACO) and, if necessary, a category of repair will be negotiated. If no further repair is required, the asset must be returned in serviceable like new condition.

1.2 MINOR REPAIR: (FFP) Minor repair is a repair that does not require total disassembly of the end item or replacement of major subcomponents. A minor repair candidate typically requires external adjustments or rework in order to meet all of the electrical specifications in accordance with the Technical Order Test Procedure and mechanical dimensions in accordance with the outline drawing. It would include repair or replacement of damaged or missing minor external parts as required. Test each end item IAW the specifications for P/N’s as listed in the contract schedule. If minor repair is initiated and it is found that, in order to return the end item to serviceable condition that the level of repair must increase to a major repair, the DCMA Government representative (ACO/PCO or QAR) will be notified and give the notice to proceed to the major repair category.

1.3 MAJOR REPAIR: (FFP) Defined as an end item that is beyond the minor repair category to the extent that the end item is to be disassembled or reconstituted. This could be due to extensive mechanical damage, extensive disassembly to access or replace subcomponents and/or replacement of major subcomponents. As with minor repair, the end item will be tested IAW the specifications and Technical Order test procedures to verify correct Form, Fit, Function and Interface of the P/N’s listed in the contract schedule.

Below listed item(s) will be shipped to contractor to repair:

Item Description NSN Part Number

5998013268767 Circuit Card Assembly 3D56988 This PWS establishes the minimum work requirements to return the end item(s) to a serviceable but like new condition.

12 Nov 2019 PWS One NSNs 2/11

ESD: YES

2.0 REF. DOCUMENTS: (Latest Revision Applies)

1. T.O.s: 31P3-2TPS75-2-1, 31P3-2TPS75-2-2, 31P3-2TPS75-3, 31P3-2TPS75-3-2-1, 31P3-2TPS75-4, 31P3-2TPS75-6, 31P3-2TPS75-12, 31P3-2TPS43-341

2. Drawings:

NSN Item Description Drawings/Special Packaging

Instructions 5998013268767 Circuit Card Assembly 3D56988

3.0 SERVICE DELIVERY SUMMARY (SDS): DCMA/ACO Quality Assurance Representative

(QAR) is ultimately responsible for inspecting and accepting the reparable assets In Accordance With (IAW) Federal Acquisition Regulation (FAR) Inspection Clause 52.246-4 & 52.245-1

Performance Objective PWS Para Performance Threshold Surveillance

Return the assets to a serviceable condition.

4.1 Successful completion of

repair on all items not determined to be beyond economical repair.

DCMA QAR/DCMA ACO

Delivery of repaired asset made IAW contract delivery schedule.

7.5 No more than one item

delivered after the schedule date.

DCMA QAR/ACO/PCO

Asset determined to be Beyond Economical Repair

(BER)

6.0 No contested BERs allowed. DCMA QAR/DCMA

ACO/PCO/ 415 SCMS

Quality Deficiency Report

(QDR)

4.5 No contested QDRs

allowed.

DCMA QAR/DCMA

ACO/PCO/ 415 SCMS

12 Nov 2019 PWS One NSNs 3/11

Performance Objective PWS Para Performance Threshold Surveillance Reporting in Commercial Asset Visibility Air Force

(CAVAF)

DD250/Material/Inspection Reporting and Receiving reports.

5.5, 10.1 Condition Code changes Must be noted no later than 7 days after change has taken place. 100% (or as detailed in) DCMA risk Management Plan Accuracy rate for material handling and reporting in DD250 or CAVAF. 100% of the overhauled assets require workmanship inspections through the maintenance process as required in DD250 or CAVAF.

PCO/CAV AF POC

Item failures and component consumption data shall be documented and reported

10.2

Reporting shall take place according to contract schedule

415 SCMS

Acceptance Test Plan

(ATP)

4.1 100% assets must meet form-fit-function-interface.

FAR Inspection clause 52.246-4

DCMA QAR

Test Requirements 4.4 100% of the time this item must pass performance acceptance testing per previously approved ATP.

ENG/ES/DCMA QAR

Warranty 4.5, 7.6 Item functions properly within warranty period.

ENG/ES/PM/DCMA

Preservation of markings/ Item Unique Item Identifier (IUID) marking

8.5 All parts to be marked with

IUID label per drawing.

IUID information for all parts uploaded to IUID database. DCMA has IUID inspection responsibility.

DCMA QAR

Counterfeit Prevention Plan

8.7, 10.3 Report submitted per C001 PCO/ACO

4.0 WORK PERFORMANCE REQUIREMENTS:

4.1 TECHNICAL OR PERFORMANCE REQUIREMENTS: Unit will meet all performance requirements of a new item. All repaired/retrofitted items will be configured and perform IAW the latest requirements of the Specification Control Drawing and Acceptance Test Plan listed in Para. 2.0.

4.2 OBSOLETE COMPONENTS will be identified to the ACO/PCO after the Test and Evaluation and before the repair price is negotiated/defined.

12 Nov 2019 PWS One NSNs 4/11

4.3 FOREIGN DISCLOSURE RESTRICTIONS: These items contain critical technology and are export controlled. Distribution authorized to DoD and U.S. DoD Contractors only (Critical Technology).

4.4 TEST REQUIREMENTS: The Contractor shall perform an acceptance test and checkout of each completed end-item to assure serviceability and full functionality prior to presentation to the Government. This testing will be performed IAW existing approved test plan or IAW developed test plans approved by the Government.

4.5 QUALITY DEFICIENCY REPORTING: Any asset that fails to function within Government- Contractor mutually agreed warranty period after date of repair, and the Government suspects failure is due to quality of workmanship, level of overhaul, or quality of replacement parts used by the contracted repair source, the asset shall be returned to the repair source for correction.

This repair shall be accomplished at no additional cost to the government if deemed by 415 SCMS to be the fault of the contractor and will be delivered back to the government under the terms of the original contract. The contractor may dispute Air Force determination of responsibility through the ACO to the PCO with DCMA providing evidence that the failure was not the fault of the contractor. This measure will be accomplished by customer reported deficiencies in the form of product quality deficiency or material deficiency reports according to T.O. 00-35D-54 titled USAF Deficiency Reporting Investigation and Resolution.

5.0 PACKAGING, HANDLING, SECURITY AND TRANSPORTATION:

5.1 RECEIVING INSPECTION: Contractor shall notify the ACO/PCO along with the Quality Assurance Representative (QAR) of all damages and shortages, or discrepancies (i.e. items not packaged in accordance with applicable Special Packaging Instructions (SPI)) discovered upon receipt of any item(s). All issues must be reported back to the originating organization for disposition. If items are damaged in transit or assets are found to be misidentified during the inspection process, the ACO/PCO will request disposition instruction from the 415 SCMS. The 415 SCMS will verify if additional assets are available to resubmit to the contractor. If no assets are available, ACO/PCO will address the required changes. The ACO or QAR shall initiate a Supply Discrepancy Report (SDR). Access to WebSDR can be found at https://www.daas.dla.mil/sar/warning.asp.

5.2 SECURITY REQUIREMENTS: N/A

5.3 REUSABLE CONTAINERS: Contractor shall handle and store reusable containers and materials used for packing and packaging in a manner, which shall assure that they are retained in a serviceable condition for reuse. If the contractor questions the serviceability/condition of the reusable containers, notify the ACO for repair/replacement instructions.

5.4 HANDLING: All items shall be handled and packaged in accordance with applicable Special

Packaging Instructions (SPI).

5.4.1 Care shall be exercised to prevent damage to Government Furnished Property/Equipment while in the contractor’s possession.

5.4.2 All Government Furnished Property shall be stored in a secure area to provide protection against damage, pilferage, or loss. Storage areas shall provide protection against all adverse environmental conditions.

12 Nov 2019 PWS One NSNs 5/11

5.5 SHIPPING DOCUMENT REQUIREMENT: A DD Form 1348 shall be prepared and attached to any item or items that have been repaired and are ready to be shipped without exception.

Under no circumstances shall a DD Form 250 or DD Form 1149 ever be sent with a shipment and/or used as a shipping document. If CAV AF is used by the contractor for repair data reporting, the DD Form 1348 generated as a part of the shipping transaction shall be printed and used. NOTE: The DD Form 1348 must be printed when prompted in CAV AF. The DD Form 1348 cannot be printed after that point. If CAV AF reporting is not fully completed or used by the contractor for any reason, a manual DD Form 1348 shall be prepared and shall be annotated with the following statement: “Contract Repair; Receiving activities process as D6M receipt, __ Condition Stock.” (Enter appropriate condition code). When a manual DD Form 1348 is used, a copy must be sent to the Procuring Contracting Officer (PCO) with a statement indicating that the DD Form 1348 is to be sent to the CAV AF POC for the contract.

6.0 CONDEMNATION: It shall be considered uneconomical to accomplish repair on an end item when the total cost for parts, material, and labor exceeds 75 percent of the stock list price of a new item. Parts obsolescence may also be a condition for BER. Authorization to accomplish repair, condemnation, or disposition shall be obtained through the ACO/PCO from the 415 SCMS for end items determined to be uneconomical to return to a serviceable condition. If BER is approved the contract delivery schedule will be adjusted accordingly to relieve contractor delivery schedule on item.

7.0 GENERAL:

7.1 RELIABILITY AND MAINTAINABILITY (R&M): Additional R&M is not required;

however, existing R&M performance shall not be degraded during this work effort.

7.2 ENVIRONMENTAL IMPACT (EI) REQUIREMENTS: The SF6 Tank Assembly will likely contain Sulfur Hexaflouride (SF6). Take appropriate Industry Standard precautions when working on the SF6 Tank Assembly.

7.3 ROUTINE, MISSION IMPAIRED CAPABILITY AWAITING PARTS (MICAP), SURGE,

and ESSENTIAL DoD CONTRACTOR SERVICES: The Contractor shall be responsible for returning serviceable assets in the time set forth in this contract. In the event that the Government requires an asset for coverage of a MICAP requirement, the Contractor agrees to enter into negotiations with the Government to expedite delivery of the needed asset(s).

7.4 ELECTROSTATIC DISCHARGE CONTROL: The contractor shall implement or maintain an Electrostatic Discharge (ESD) control program in accordance with MIL-PRF-87893, MIL-STD- 1686, paragraphs 5.1, 5.4, 5.5, 5.6, 5.7, 5.8.2, 5.10, 5.11, 5.12, and 5.13 and with T.O. 00-25- 234, Section VII for all electronics ESD sensitive end items/components.

7.5 DISPOSITION: Repaired parts shall be shipped to the destination specified in the contract.

Disposition of any misidentified items shall be as stated in paragraph 5.1. Delivery shall be according to the delivery schedule in the contract. Early and partial shipments are acceptable.

7.6 WARRANTY: 3 Months From Delivery

7.7 TRIAGE CONCEPT IS AUTHORIZED: Cross utilization of components are authorized following coordination with DCMA COR.

12 Nov 2019 PWS One NSNs 6/11

7.8 SAFETY AND HEALTH: While performing work under this contract the contractor shall comply with all applicable federal, state and local regulations regarding occupational safety and health. The contractor shall notify the Contracting Officer (CO), within eight (8) hours of any damage to government property where the dollar value exceeds $500,000.00 and within two workdays, for any damage to government property less than $500,000.00 during the execution of the contract.

Mishap notifications shall contain, as a minimum, the following information:

a. Contract, Contract Number, Name and Title of Person(s) Reporting

b. Date, Time and exact location of accident/incident

c. Brief Narrative of accident/incident (Events leading to accident/incident)

d. Cause of accident/incident, if known

e. Estimated cost of accident/incident (material and labor to repair/replace)

f. Nomenclature of equipment and personnel involved in accident/incident

g. Corrective actions (taken or proposed)

h. Other pertinent information

If requested by the designated CO, the contractor shall immediately secure the mishap scene/damaged property and impound pertinent maintenance and training records, until released by the Procuring Safety Office.

8.0 SPECIFIC WORK REQUIREMENTS:

8.1 DISASSEMBLY: The Contractor shall disassemble each item only to the extent necessary to accomplish inspection, testing, fault isolation, and maintenance.

8.2 CLEANING: The end item shall be cleaned thoroughly prior to and after disassembly and maintain cleanliness during this maintenance effort. IAW MIL-HDBK-454 and T.O. 1-1-1.

8.3 CORROSION CONTROL AND TREATMENT: Accomplish corrosion control and treatment as required, using methods and materials IAW MIL-STD-1568, section 4 and T.O. 1-1-2 as applicable, and specification drawings.

8.4 MAINTENANCE: The contractor shall perform the required maintenance, inspection, reassembly of the reworked end item and components and calibration, if applicable, IAW T.O. 00-25-234.

8.4.1 The contractor shall perform an acceptance test and checkout of each completed end item to assure serviceability prior to presentation to the government.

8.4.2 Upon satisfactory completion of final test, the contractor shall cover and seal all ports, vents and electrical connection/plugs with suitable caps to prevent entry of foreign matter or damage during handling and shipment. Cap or seal all open flexible or rigid lines, hoses, and fittings at all times when not in use.

12 Nov 2019 PWS One NSNs 7/11

8.5 MARKING:

8.5.1 Preservation of Markings: The Contractor shall ensure nameplates and product markings are correct and accurate upon repair completion. The Contractor shall replace damaged markings, identification, and decals IAW drawings or equivalent best commercial practice. The assemblies, subassemblies, and parts that constitute this repair shall be marked for identification in accordance with existing style and format.

8.5.2 If not already marked, Item Unique Item Identifier (IUID) marking shall be accomplished according to MIL-STD-130 and MIL-STD-129 latest versions and per DFARS Clause 252.211.7003. All marking shall be placed in accordance with the technical data for the part.

8.5.2.1 Specification requirements for IUID marking will be contained in the applicable Air Force/OEM Technical Order, Specific Work Requirements appendix, approved engineering drawing, or a Government provided Engineering order as applicable. The government will provide IUID marking specifications.

8.5.2.2 In the event the government cannot provide or it is not feasible for the contractor to provide IUID marking specifications a determination and findings will be accomplished IAW DFARS 211.274-2 Policy for unique item identification.

8.5.2.3 IUID markings currently in place on items undergoing repair shall be protected from damage or removal during repair. Ensure 2-D matrix IUID markings are readable per TO 00-25-260. Should IUID marking be rendered unreadable during repair, the contractor shall notify the PCO/ACO for determination.

8.5.2.4 Prior to government acceptance, the contractor shall submit the required and applicable contingent data to the IUID Registry per the data submission procedures at http://www.acq.osd.mil/dpap/pdi/uid/data_submission_information.html.

DCMA has IUID inspection responsibility.

8.5.2.5 Enter logistical data into database

8.6 REFINISHING: Refinish only to the extent necessary to assure adequate protection of all surfaces IAW Technical Data.

8.7 COUNTERFEIT PREVENTION PLAN (CPP): Contractors that supply electronic parts or systems that contain electronic parts shall establish policies and procedures to avoid, detect, mitigate and dispose of counterfeit electronic parts to prevent such parts from entering the USAF/DoD supply chain. These policies and procedures shall be

12 Nov 2019 PWS One NSNs 8/11 documented in a CPP for submission and approval in accordance with CDRL C001 (DI- MISC-81832) and accomplished for all specified contract items. DI-MISC-81832 is applicable to Parts, Material and Processes Selection (PMPS) associated with delivery of systems and assemblies to the USAF and DoD. The requirements established by DI- MISC-81832 also apply to electronics components procured in sustainment of such systems and assemblies. The requirements of the recently DoD-adopted SAE 5553, Aerospace Standard, Counterfeit Electronics Parts; Avoidance, Detection, Mitigation, and Disposition shall also apply.

8.7.1 At a minimum, the CPP shall address:

8.7.1.1 Applicability. The Contractor shall identify all Business locations and programs to which the CPP applies. The CPP shall address materials, hardware, electronic parts, and procured assemblies.

8.7.1.2 Definitions. The Contractor shall utilize definitions per AS 5553 to ensure consistency. Any contractor-derived definitions must be included in an appropriate CPP appendix or annex. (Ref. AS5553, Section 3)

8.7.1.3 Parts Availability and Use of Parts Brokers. The Contractor shall not procure materials, systems, assemblies, subassemblies or parts from parts Brokers when available from Original Manufacturers (OM) or their Authorized Distributors. In cases where materials, systems, assemblies, subassemblies or parts are no longer available from the OM or their Authorized Distributors, procurement from Brokers may be authorized as defined by the Contractor’s policy and their CPP. (Ref. AS5553, Section 3.1)

8.7.1.4 Procurement Policies. The Contractor shall provide and implement policy directing development and implementation of business practices and procedures, and processes to prevent procurement of Counterfeit materials and parts. The Contractor shall identify the appropriate office(s), business units, functional organizations, and programs, who shall have responsibility for development, maintenance and implementation of the CPP. The CPP shall identify the specific roles and responsibility for each. (Ref. AS5553, Section 3.1.3, 3.1.4)

8.7.1.5 Risk Assessment. The contract shall address the risk of using unknown sources and or unauthorized suppliers in the CPP. Application or technical risk assessments shall establish the effect that counterfeit parts may have on performance. Vendor or source of supply risk assessments shall establish the potential for obtaining counterfeit parts. Using any risk analysis tool acceptable to the Government, the Contractor shall conduct a risk assessment based upon item characteristics and how likely it is that a counterfeit part will be received. The contractor shall identify and describe in the CPP how parts are selected for assessment and what risk is acceptable

12 Nov 2019 PWS One NSNs 9/11 based upon the parts design, construction, material and functional requirements. As a minimum, analysis shall be completed for flagging high risk items, such as items that are obsolete, discontinued, rare, etc. The contractor shall require completion of a trade study, documented within the CPP, that shall facilitate determining whether 100% testing of parts procured from after-market sources is more cost effective than qualification or requalification of a manufacturer. (Ref. AS5553, Section 3)

8.7.1.6 Detection and Avoidance Responsibilities. The Contractor shall establish processes for the review and approval of contractor and applicable subcontractor systems for the detection and avoidance of counterfeit electronic parts and suspect counterfeit electronic parts, which processes shall be comparable to the processes established for contractor business systems under section 893 of the Ike Skelton National Defense Authorization Act for Fiscal Year 2011 (Public Law 111–383; 124 Stat.

4311; 10 U.S.C. 2302 note). The Contractor shall flow down such requirements and processes to their subcontractors per ODASD Memo titled “Overarching DoD Counterfeit Prevention Guidance”, dated 16 March 2012. (Ref. AS5553, Section 3)

8.7.1.7 Testing and Verification. The Contractor shall establish and accomplish testing and verification processes for items not received from an original equipment manufacturer, original component manufacturer, or authorized distributor that are identified as having high risk for counterfeit potential.

These processes apply to prime contracts, and to subcontracts or suppliers below the prime contracts. The Contractor shall provide a list of acceptable test facilities if the subcontractor or supplier does not have the capability to perform required testing. Submittal of Certificates of Compliance indicating the parts are not counterfeit shall be acceptable for verification of testing. (Ref. AS5553, Section 3.1.5)

8.7.1.8 Configuration Identification and Traceability. The Contractor shall identify and control the configurations of all systems, assemblies, subassemblies and parts, and enable mechanisms to provide traceability of parts. The Contractor shall report to the Government when control of the configurations of all systems, assemblies, subassemblies and parts, and mechanisms to provide traceability of parts are not possible. The Contractor shall identify the specific systems, assemblies, subassemblies and parts beyond the Contractors’ control. The Contractor shall be responsible for detecting and avoiding the use or inclusion of counterfeit materials and parts, to include procured assemblies and subassemblies, in such products and shall be responsible for the rework or corrective action that may be required to resolve the use or inclusion of counterfeit materials and parts. The cost of counterfeit electronic parts and suspect counterfeit electronic parts and the cost of rework or corrective action that may be required to remedy the use or inclusion of such parts are not allowable costs

12 Nov 2019 PWS One NSNs 10/11 under Department contracts , unless: a) the contractor has established a counterfeit avoidance/detection system approved by the DoD, b) the counterfeit parts were procured from a DoD-accredited trusted supplier or provided as government property, and c) the contractor has provide timely notification to the government. (Ref. AS5553, Section 3.1.7)

8.7.1.9 Counterfeit Notification and Reporting. The Contractor shall report in writing to the Procuring Activity within 30 days of determining any end item, component, part, or material contained in supplies purchased by the Department of Defense, or purchased by a contractor or subcontractor for delivery to, or on behalf of, the Department, contains counterfeit electronic parts or suspect counterfeit electronic parts for the purpose of investigation and notification of the Air Force Office of Special Investigations (AFOSI).

The Procuring Contracting Officer (PCO) shall coordinate reporting to the appropriate Program Management/Item Management, System Engineering Management, the AFMC Discrepant Materiel Reporting Program (DMRP) Office in 406 SCMS/GULAB, and the AFOSI. Additionally, the Contractor shall within the same 30 day period ensure all suspected or confirmed counterfeit items are entered into the Government-Industry Data Exchange Program (GIDEP) system, which will serve as the DoD central reporting repository. (Ref. AS5553, Section 3.1.8)

8.7.1.10 Counterfeit Prevention Training. The Contractor shall provide appropriate training and shall require all personnel working procurement within their company, to include at a minimum their supply chain management specialists, receiving inspectors, and engineers, to complete said training.

The Contractor shall determine the appropriate training required. Training may be developed in-house or may be other Industry accepted training. The CPP shall describe and list the training provided by the contractor to their personnel. (Ref. AS5553, Section 3.1.1)

9.0 DISCREPANCIES: In case of conflict between this document and any referenced document, contact ACO & PCO for resolution of discrepancy.

10.0 DATA:

10.1 CAV AF: Contractor shall provide the status of maintenance production, asset management, and condemnations IAW Contract Data Requirements List (CDRL) Exhibit A001 (DI-MGMT-81838/T), A002 (DI-PSSS-81995/T), A003 (DI- MGMT-80441 C/T) and all requirements of this PWS. Contractor shall be ready to report in CAVAF before receipt of assets. Contractor shall complete on time all required CAVAF production/repair data reporting as required in paragraph 5.5 of this PWS.

12 Nov 2019 PWS One NSNs 11/11

10.2 REPAIRED ITEM INSPECTION REPORT: All item failures and component consumption data shall be documented and reported to OO-ALC 415 SCMS IAW with the Repairable Item Inspection Report, CDRL B001 (DI-ILSS-80386).

10.3 COUNTERFEIT PREVENTION PLAN: The contractor shall provide a Counterfeit Prevention Plan (CPP) per CDRL C001 (DI-MISC-81832), including the identified items of SAE AS5553 per section 8.7.

10.4 CONTRACTOR MANPOWER REPORTING: The contractor shall report ALL contractor labor hours (including subcontractor labor hours) required for performance of services provided under this contract for the [NAMED COMPONENT] via a secure data collection site. The contractor is required to completely fill in all required data fields at http://www.ecmra.mil. Reporting inputs will be for the labor executed during the period of performance for each Government fiscal year (FY), which runs 1 October through 30 September. While inputs may be reported any time during the FY, all data shall be reported no later than 31 October of each calendar year. Contractors may direct questions to the CMRA help desk.

10.4.1 Reporting Period: Contractors are required to input data by 31 October of each year.

10.4.2 Uses and Safeguarding of Information: Information from the secure web site is considered to be proprietary in nature when the contract number and contractor identity are associated with the direct labor hours and direct labor dollars. At no time will any data be released to the public with the contractor name and contract number associated with the data.

10.4.3 User Manuals: Data for Air Force service requirements must be input at the Air Force CMRA link. However, user manuals for government personnel and contractors are available at the Army CMRA link at http://www.ecmra.mil.

PREPARED BY: Jerry A. Bialek 448 SCMW/415 SCMS

File details come from the government source that posted it. Updated .