2918977_PWS.pdf
PDF 681 KB Posted
- Attached to
- Waveguide Assembly Federal contract opportunity
- Solicitation number
- FA825020Q0002
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 1245125_ITMDESC_REPORT.pdf | ||
| CAV_AF.pdf | ||
| 2922996_PKGRQMT_REPORT.pdf | ||
| GFPFA825020Q0002_1.pdf | ||
| 2350028_SQSR.pdf | ||
| 2922506_RDL_REPORT.pdf | ||
| CDRLS.pdf | ||
| 2808343_UIIEC_REPORT.pdf | ||
| FA825020Q0002.pdf | ||
| 2923000_TRNSPDATA_REPORT.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
(Rev 24 Oct. 2013)
DEPARTMENT OF THE AIR FORCE
OGDEN AIR LOGISTICS CENTER, HILL AFB, UTAH 84056-5820
PERFORMANCE WORK SPECIFICATION (PWS)
PR NO: FD2020-20-00139 DATE: 5 Nov 2019
1.0 Contract Type Two-step
1.1 SCOPE OF WORK: For the end item, the contractor shall furnish all facilities, parts, materials, equipment and services, required to inspect and, if necessary, restore to serviceable condition. Services to be performed will not be essential in a crisis situation.
Work consists of one of two efforts: Test, teardown, and evaluation (TT&E) only or TT&E and repair.
1.1.1 TEST, TEARDOWN, AND EVALUATION: (FFP) The contractor shall perform visual, mechanical and electrical testing of the end item, reusable or replacement component parts, and materials according to the schedule in the contract to determine the condition of the end item. Upon completion of this task, all of the components of the end item requiring repair or replacement will be identified by part number, NSN (if applicable), nomenclature, and location in the assembly. This information will be reported in writing to the Procurement
Contracting Officer (PCO)/ Defense Contract Management Agency (DCMA)
Administrative Contracting Officer (ACO) and, if necessary, a category of repair will be negotiated. The price of repair for the end item will be firm-fixed based on this negotiated repair level. If no further repair is required, the asset must be returned in serviceable like new condition.
1.1.2 REPAIR: (NTE) The contractor shall perform the repair or replacement of all failed parts and components. Each end item must be cleaned, configured, refinished, and tested to meet the original specifications of the end item. The end item shall be returned in serviceable like new condition.
Below listed item(s) will be shipped to contractor to repair:
Item Description NSN Part Number
Monoscan Resolver Assy WR62 5985-01-196-5862 FD 715656-01
ESD: No
2.0 REF. DOCUMENTS:
1. T.O.s
a. 43D7-11-36-4; Figure 86 (Monoscan Resolver Assembly (1A9A2), 715656-01)
2. Drawings
CAGE
CODE
DOC REF NUM/
ACCOMP DOC
NUM
NOUN/TITLE REMARKS
09017 715656 MONOSCAN RESOLVER ASSY, WR62 See EO 08A0970
09017 PL715656 MONOSCAN RESOLVER ASSY-WR62 Parts List
09017 BTP715656 MONOSCAN RESOLVER BENCH TEST
PROCEDURE
09017 715818 PROCESS SPECIFICATION PART MARKING
09017 716118 WAVEGUIDE COMPARATOR TO SCAN
RESOLVER, WR62
09017 716119 WAVEGUIDE, SWITCH 3 TO SWITCH 2, WR62
09017 716120 WAVEGUIDE, 0° PHASE, WR62
09017 716121 WAVEGUIDE, 180° PHASE, WR62
09017 752266 FLANGE, CHOKE
09017 PL752266 FLANGE, CHOKE Parts List
09017 600980 CIRCULATOR, RADIO FREQUENCY, J BAND See EO 18C0988-H
09017 602047 BEND, WAVEGUIDE, E-BEND
09017 602053 BEND, WAVEGUIDE, H-BEND
09017 BTP715168 WAVEGUIDE COMPONENTS, THREAT 4 BENCH
TEST PROCEDURE
09017 715476 SURFACE PREPARATION PROCEDURES AND
FINISHES FOR MTE EQUIPMENT
3. Special Packaging Instructions (SPI)
a. Monoscan Resolver Assy WR62 5985-01-196-5862 FD
i. F000003XA5
3.0 SERVICE DELIVERY SUMMARY (SDS): DCMA/ACO Quality Assurance Representative
(QAR) is ultimately responsible for inspecting and accepting the reparable assets In Accordance
With (IAW) Federal Acquisition Regulation (FAR) Inspection Clause 52.246-4 & 52.245-1
Performance Objective PWS Para Performance Threshold Surveillance
Return the assets to a serviceable condition.
4.1 Successful completion of
repair on all items not determined to be beyond economical repair.
DCMA QAR/DCMA ACO
Delivery of repaired asset made IAW contract delivery schedule.
7.5 No more than one item
delivered after the schedule date.
DCMA QAR/ACO/PCO
Performance Objective PWS Para Performance Threshold Surveillance
Asset determined to be
Beyond Economical Repair
(BER)
6.0 No contested BERs allowed. DCMA QAR/DCMA
ACO/PCO/ 415 SCMS
Cognizant Integrated
Product Team (IPT)
Quality Deficiency Report
(QDR)
4.5 No contested QDRs
allowed.
DCMA QAR/DCMA
ACO/PCO/ 415 SCMS
Cognizant IPT
Reporting in Commercial
Asset Visibility Air Force
(CAVAF)
DD250/Material/Inspection
Reporting and Receiving reports.
5.5, 10.1 Condition Code changes
Must be noted no later than
7 days after change has taken place. 100% (or as detailed in) DCMA risk
Management Plan Accuracy rate for material handling and reporting in DD250 or
CAVAF. 100% of the overhauled assets require workmanship inspections through the maintenance process as required in
DD250 or CAVAF.
PCO/CAV AF POC
Item failures and component consumption data shall be documented and reported
10.2
Reporting shall take place according to contract schedule
415 SCMS Cognizant IPT
Acceptance Test 4.1, 8.4.1 100% assets must meet form-fit-function-interface requirements of the applicable specification drawings. FAR Inspection clause 52.246-4
DCMA QAR
Test Requirements 4.4, 10.4 100% of the time these items must pass performance acceptance testing per previously approved Acceptance Test
Plan (ATP).
ENG/ES/DCMA QAR
Warranty 4.5, 7.6 Item functions properly within warranty period.
ENG/ES/PM/DCMA
Preservation of markings/
Item Unique Item
Identifier (IUID) marking
8.5
All parts to be marked with
IUID label per drawing.
IUID information for all parts uploaded to IUID database. DCMA has IUID inspection responsibility.
DCMA QAR
Counterfeit Prevention
Plan
10.3 Report submitted per C001 PCO/ACO
4.0 WORK PERFORMANCE REQUIREMENTS:
4.1 TECHNICAL OR PERFORMANCE REQUIREMENTS: Unit will meet all performance requirements of a new item. All repaired/retrofitted items will be configured and perform
IAW the latest requirements of the Specification Control Drawings listed in Para. 2.0.
4.2 OBSOLETE COMPONENTS will be identified to the ACO/PCO after the Test and
Evaluation and before the repair price is negotiated/defined.
4.3 FOREIGN DISCLOSURE RESTRICTIONS: This item contains critical technology and is export controlled. Distribution authorized to DoD and U.S. DoD Contractors only (Critical
Technology, {10 Jan 2005 [715656-01]}).
4.4 TEST REQUIREMENTS: The Contractor shall perform an acceptance test and checkout of each completed end-item to assure serviceability and full functionality prior to presentation to the Government. This testing will be performed IAW existing approved test plan or IAW developed test plans approved by the Government.
4.5 QUALITY DEFICIENCY REPORTING: Any asset that fails to function within
Government-Contractor mutually agreed warranty period after date of repair, and the
Government suspects failure is due to quality of workmanship, level of overhaul, or quality of replacement parts used by the contracted repair source, the asset shall be returned to the repair source for correction. This repair shall be accomplished at no additional cost to the government if deemed by DCMA to be the fault of the contractor and will be delivered back to the government under the terms of the original contract. The contractor may dispute Air
Force determination of responsibility through the ACO to the PCO with DCMA providing evidence that the failure was not the fault of the contractor. This measure will be accomplished by customer reported deficiencies in the form of product quality deficiency or material deficiency reports according to T.O. 00-35D-54 titled USAF Deficiency Reporting
Investigation and Resolution.
4.6 COST OUTCOMES: Contractor shall repair assets at a cost that meets the contractual firm-fixed price at each level of repair (TT&E, Minor Repair, Major Repair, Total Rebuild) for the life of the contract 100% of the time. In cases where costs are identified by the contractor which fall outside the normal scope of repairs, contractor shall immediately notify the government contracting officer, who will in turn contact the program engineer and program manager to discuss appropriate courses of action, and the relief, if any, the government might provide.
4.7 SCHEDULE OUTCOMES: Contractor shall deliver assets on or before the contractual delivery schedule 100% of the time. In cases where risks to delivery schedule are identified that fall outside the normal scope of repairs, contractor shall immediately notify the government contracting officer, who will in turn contact the program engineer and program manager to discuss appropriate courses of action, and the relief, if any, the government might provide.
4.8 PERFORMANCE OUTCOMES: If after TT&E asset is determined to be reparable by the contractor, contractor shall restore asset to serviceable condition 100% of the time, i.e. asset shall be repaired to government specifications required by the contract. In cases where the contractor identifies additional problems with an asset, unforeseen at the TT&E phase, contractor shall immediately notify the government contracting officer, who will in turn contact the program engineer and program manager to discuss appropriate courses of action, and the relief, if any, the government might provide.
5.0 PACKAGING, HANDLING, SECURITY AND TRANSPORTATION:
5.1 RECEIVING INSPECTION: Contractor shall notify the ACO/PCO along with the Quality
Assurance Representative (QAR) of all damages and shortages, or discrepancies (i.e. items not packaged in accordance with applicable Special Packaging Instructions (SPI)) discovered upon receipt of any item(s). All issues must be reported back to the originating organization for disposition. If items are damaged in transit or assets are found to be misidentified during the inspection process, the ACO/PCO will request disposition instruction from the 415 SCMS.
The 415 SCMS will verify if additional assets are available to resubmit to the contractor. If no assets are available, ACO/PCO will address the required changes. The ACO or QAR shall initiate a Supply Discrepancy Report (SDR). Access to WebSDR can be found at https://www.daas.dla.mil/sar/warning.asp.
5.2 SECURITY REQUIREMENTS: N/A
5.3 REUSABLE CONTAINERS: Contractor shall handle and store reusable containers and materials used for packing and packaging in a manner, which shall assure that they are retained in a serviceable condition for reuse. If the contractor questions the serviceability/condition of the reusable containers, notify the ACO for repair/replacement instructions.
5.4 HANDLING: All items shall be handled and packaged in accordance with applicable
Special Packaging Instructions (SPI).
5.4.1 Care shall be exercised to prevent damage to Government Furnished
Property/Equipment while in the contractor’s possession.
5.4.2 All Government Furnished Property shall be stored in a secure area to provide protection against damage, pilferage, or loss. Storage areas shall provide protection against all adverse environmental conditions.
5.5 SHIPPING DOCUMENT REQUIREMENT: A DD Form 1348 shall be prepared and attached to any item or items that have been repaired and are ready to be shipped without exception. Under no circumstances shall a DD Form 250 or DD Form 1149 ever be sent with a shipment and/or used as a shipping document. If CAV AF is used by the contractor for repair data reporting, the DD Form 1348 generated as a part of the shipping transaction shall be printed and used. NOTE: The DD Form 1348 must be printed when prompted in
CAV AF. The DD Form 1348 cannot be printed after that point. If CAV AF reporting is not fully completed or used by the contractor for any reason, a manual DD Form 1348 shall be prepared and shall be annotated with the following statement: “Contract Repair;
Receiving activities process as D6M receipt, __ Condition Stock.” (Enter appropriate condition code). When a manual DD Form 1348 is used, a copy must be sent to the
Procuring Contracting Officer (PCO) with a statement indicating that the DD Form 1348 is to be sent to the CAV AF POC for the contract.
6.0 CONDEMNATION: In general, BER is not allowed / authorized. It shall be considered uneconomical to accomplish repair on an end item when the total cost for parts, material, and labor exceeds 65 percent of the stock list price of a new item. Parts obsolescence may be a condition for
BER. Authorization to accomplish repair, condemnation, or disposition shall be obtained through the ACO/PCO from the 415 SCMS for end items determined to be uneconomical to return to a serviceable condition. If BER is approved the contract delivery schedule will be adjusted accordingly to relieve contractor delivery schedule on item.
7.0 GENERAL:
7.1 RELIABILITY AND MAINTAINABILITY (R&M): Additional R&M is not required;
however, existing R&M performance shall not be degraded during this work effort.
7.2 ENVIRONMENTAL IMPACT (EI) REQUIREMENTS: N/A
7.3 ROUTINE, MISSION IMPAIRED CAPABILITY AWAITING PARTS (MICAP),
SURGE, and ESSENTIAL DoD CONTRACTOR SERVICES: The Contractor shall be responsible for returning serviceable assets in the time set forth in this contract. In the event that the Government requires an asset for coverage of a MICAP requirement, the Contractor agrees to enter into negotiations with the Government to expedite delivery of the needed asset(s).
7.4 ELECTROSTATIC DISCHARGE CONTROL: N/A
7.5 DISPOSITION: Repaired parts shall be shipped to the destination specified in the contract.
Disposition of any misidentified items shall be as stated in paragraph 5.1. Delivery shall be according to the delivery schedule in the contract. Early and partial shipments are acceptable.
7.6 WARRANTY: Warranty shall be 12 months from date of delivery to the government.
7.7 TRIAGE CONCEPT IS AUTHORIZED: Cross utilization of components are authorized following coordination with DCMA COR.
7.8 ENGINEERING SERVICES: In the event an item cannot be repaired due to the obsolescence issues, the government may provide an opportunity for contractor to provide engineering solutions to mitigate obsolescence issues and provide a form, fit, function, and interface solution. Travel may be reimbursed using travel CLIN.
7.9 SAFETY AND HEALTH: While performing work under this contract the contractor shall comply with all applicable federal, state and local regulations regarding occupational safety and health. The contractor shall notify the Contracting Officer (CO), within eight (8) hours of any damage to government property where the dollar value exceeds $500,000.00 and within two workdays, for any damage to government property less than $500,000.00 during the execution of the contract.
Mishap notifications shall contain, as a minimum, the following information:
a. Contract, Contract Number, Name and Title of Person(s) Reporting
b. Date, Time and exact location of accident/incident
c. Brief Narrative of accident/incident (Events leading to accident/incident)
d. Cause of accident/incident, if known
e. Estimated cost of accident/incident (material and labor to repair/replace)
f. Nomenclature of equipment and personnel involved in accident/incident
g. Corrective actions (taken or proposed)
h. Other pertinent information
If requested by the designated CO, the contractor shall immediately secure the mishap scene/damaged property and impound pertinent maintenance and training records, until released by the Procuring Safety Office.
8.0 SPECIFIC WORK REQUIREMENTS:
8.1 DISASSEMBLY: The Contractor shall disassemble each item only to the extent necessary to accomplish inspection, testing, fault isolation, and maintenance.
8.2 CLEANING: The end item shall be cleaned thoroughly prior to and after disassembly and maintain cleanliness during this maintenance effort IAW MIL-
HDBK-454 and TO 1-1-691.
8.3 CORROSION CONTROL AND TREATMENT: Accomplish corrosion control and treatment as required, using methods and materials IAW MIL-HDBK-1568, paragraphs 5.4 through 5.9 and TO 1-1-691 as applicable, and specification drawings.
8.4 MAINTENANCE: The contractor shall perform the required maintenance, inspection, reassembly of the reworked end item and components and calibration, if applicable, IAW T.O. 00-25-234.
8.4.1 The contractor shall perform an acceptance test and checkout of each completed end item to assure serviceability prior to presentation to the government.
8.4.2 The contractor shall provide a test report for each completed end-item
IAW applicable Contract Data Requirements List (CDRL) (E001) (DI-
NDTI-80809).
8.4.3 Upon satisfactory completion of final test, the contractor shall cover and seal all ports, vents and electrical connection/plugs with suitable caps to prevent entry of foreign matter or damage during handling and shipment, IAW MIL-C-5501/11. Cap or seal all open flexible or rigid lines, hoses, and fittings at all times when not in use.
8.5 MARKING:
8.5.1 Preservation of Markings: The Contractor shall ensure nameplates and product markings are correct and accurate upon repair completion. The
Contractor shall replace damaged markings, identification, and decals
IAW drawings or equivalent best commercial practice. The assemblies, subassemblies, and parts that constitute this repair shall be marked for identification in accordance with existing style and format.
8.5.2 If not already marked, Item Unique Item Identifier (IUID) marking shall be accomplished according to MIL-STD-130 and MIL-STD-129 latest versions and per DFARS Clause 252.211.7003. All marking shall be placed in accordance with the technical data for the part.
8.5.2.1 Specification requirements for IUID marking will be contained in the applicable Air Force/OEM Technical Order, Specific Work
Requirements appendix, approved engineering drawing, or a
Government provided Engineering order as applicable. The government will provide IUID marking specifications.
8.5.2.2 In the event the government cannot provide or it is not feasible for the contractor to provide IUID marking specifications a determination and findings will be accomplished IAW DFARS
211.274-2 Policy for unique item identification.
8.5.2.3 IUID markings currently in place on items undergoing repair shall be protected from damage or removal during repair. Ensure 2-D matrix IUID markings are readable per TO 00-25-260. Should
IUID marking be rendered unreadable during repair, the contractor shall notify the PCO/ACO for determination.
8.5.2.4 Prior to government acceptance, the contractor shall submit the required and applicable contingent data to the IUID Registry per the data submission procedures at http://www.acq.osd.mil/dpap/pdi/uid/data_submission_informatio n.html. DCMA has IUID inspection responsibility.
8.5.2.5 Enter logistical data into database. See MIL-STD-130N
CHANGE 1 [3.2 Item unique identification (IUID)]. The registry is maintained by the Defense Logistics Agency Logistics
Information Service (DLIS) (see http://www.acq.osd.mil/dpap/pdi/uid/).
IUID REGISTRY
To access the IUID Registry website, please use the following link:
https://iuid.logisticsinformationservice.dla.mil http://www.acq.osd.mil/dpap/pdi/uid/data_submission_information.html http://www.acq.osd.mil/dpap/pdi/uid/data_submission_information.html http://www.acq.osd.mil/dpap/pdi/uid/ https://iuid.logisticsinformationservice.dla.mil/
8.6 REFINISHING: Refinish only to the extent necessary to assure adequate protection of all surfaces IAW Technical Data.
8.7 COUNTERFEIT PREVENTION PLAN (CPP): Contractors that supply electronic parts or systems that contain electronic parts shall establish policies and procedures to avoid, detect, mitigate and dispose of counterfeit electronic parts to prevent such parts from entering the USAF/DoD supply chain. These policies and procedures shall be documented in a CPP for submission and approval in accordance with
CDRL C001 (DI-MISC-81832) and accomplished for all specified contract items.
DI-MISC-81832 is applicable to Parts, Material and Processes Selection (PMPS) associated with delivery of systems and assemblies to the USAF and DoD. The requirements established by DI-MISC-81832 also apply to electronics components procured in sustainment of such systems and assemblies. The requirements of the recently DoD-adopted SAE 5553, Aerospace Standard, Counterfeit Electronics
Parts; Avoidance, Detection, Mitigation, and Disposition shall also apply.
8.7.1 At a minimum, the CPP shall address:
8.7.1.1 Applicability. The Contractor shall identify all Business locations and programs to which the CPP applies. The CPP shall address materials, hardware, electronic parts, and procured assemblies.
8.7.1.2 Definitions. The Contractor shall utilize definitions per AS 5553 to ensure consistency. Any contractor-derived definitions must be included in an appropriate CPP appendix or annex. (Ref. AS5553, Section 3)
8.7.1.3 Parts Availability and Use of Parts Brokers. The Contractor shall not procure materials, systems, assemblies, subassemblies or parts from parts Brokers when available from Original Manufacturers
(OM) or their Authorized Distributors. In cases where materials, systems, assemblies, subassemblies or parts are no longer available from the OM or their Authorized Distributors, procurement from Brokers may be authorized as defined by the
Contractor’s policy and their CPP. (Ref. AS5553, Section 3.1)
8.7.1.4 Procurement Policies. The Contractor shall provide and implement policy directing development and implementation of business practices and procedures, and processes to prevent procurement of Counterfeit materials and parts. The Contractor shall identify the appropriate office(s), business units, functional organizations, and programs, who shall have responsibility for development, maintenance and implementation of the CPP. The
CPP shall identify the specific roles and responsibility for each.
(Ref. AS5553, Section 3.1.3, 3.1.4)
8.7.1.5 Risk Assessment. The contract shall address the risk of using unknown sources and or unauthorized suppliers in the CPP.
Application or technical risk assessments shall establish the effect that counterfeit parts may have on performance. Vendor or source of supply risk assessments shall establish the potential for obtaining counterfeit parts. Using any risk analysis tool acceptable to the Government, the Contractor shall conduct a risk assessment based upon item characteristics and how likely it is that a counterfeit part will be received. The contractor shall identify and describe in the CPP how parts are selected for assessment and what risk is acceptable based upon the parts design, construction, material and functional requirements. As a minimum, analysis shall be completed for flagging high risk items, such as items that are obsolete, discontinued, rare, etc. The contractor shall require completion of a trade study, documented within the CPP, that shall facilitate determining whether 100% testing of parts procured from after-market sources is more cost effective than qualification or requalification of a manufacturer. (Ref. AS5553, Section 3)
8.7.1.6 Detection and Avoidance Responsibilities. The Contractor shall establish processes for the review and approval of contractor and applicable subcontractor systems for the detection and avoidance of counterfeit electronic parts and suspect counterfeit electronic parts, which processes shall be comparable to the processes established for contractor business systems under section 893 of the Ike Skelton National Defense Authorization Act for Fiscal
Year 2011 (Public Law 111–383; 124 Stat. 4311; 10 U.S.C. 2302 note). The Contractor shall flow down such requirements and processes to their subcontractors per ODASD Memo titled
“Overarching DoD Counterfeit Prevention Guidance”, dated 16
March 2012. (Ref. AS5553, Section 3)
8.7.1.7 Testing and Verification. The Contractor shall establish and accomplish testing and verification processes for items not received from an original equipment manufacturer, original component manufacturer, or authorized distributor that are identified as having high risk for counterfeit potential. These processes apply to prime contracts, and to subcontracts or suppliers below the prime contracts. The Contractor shall provide a list of acceptable test facilities if the subcontractor or supplier does not have the capability to perform required testing.
Submittal of Certificates of Compliance indicating the parts are not counterfeit shall be acceptable for verification of testing. (Ref.
AS5553, Section 3.1.5)
8.7.1.8 Configuration Identification and Traceability. The Contractor shall identify and control the configurations of all systems, assemblies, subassemblies and parts, and enable mechanisms to provide traceability of parts. The Contractor shall report to the
Government when control of the configurations of all systems, assemblies, subassemblies and parts, and mechanisms to provide traceability of parts are not possible. The Contractor shall identify the specific systems, assemblies, subassemblies and parts beyond the Contractors’ control. The Contractor shall be responsible for detecting and avoiding the use or inclusion of counterfeit materials and parts, to include procured assemblies and subassemblies, in such products and shall be responsible for the rework or corrective action that may be required to resolve the use or inclusion of counterfeit materials and parts. The cost of counterfeit electronic parts and suspect counterfeit electronic parts and the cost of rework or corrective action that may be required to remedy the use or inclusion of such parts are not allowable costs under Department contracts , unless: a) the contractor has established a counterfeit avoidance/detection system approved by the DoD, b) the counterfeit parts were procured from a DoD-accredited trusted supplier or provided as government property, and c) the contractor has provide timely notification to the government. (Ref. AS5553, Section 3.1.7)
8.7.1.9 Counterfeit Notification and Reporting. The Contractor shall report in writing to the Procuring Activity within 30 days of determining any end item, component, part, or material contained in supplies purchased by the Department of Defense, or purchased by a contractor or subcontractor for delivery to, or on behalf of, the Department, contains counterfeit electronic parts or suspect counterfeit electronic parts for the purpose of investigation and notification of the Air Force Office of Special Investigations
(AFOSI). The Procuring Contracting Officer (PCO) shall coordinate reporting to the appropriate Program
Management/Item Management, System Engineering
Management, the AFMC Discrepant Materiel Reporting Program
(DMRP) Office in 406 SCMS/GULAB, and the AFOSI.
Additionally, the Contractor shall within the same 30 day period ensure all suspected or confirmed counterfeit items are entered into the Government-Industry Data Exchange Program (GIDEP) system, which will serve as the DoD central reporting repository.
(Ref. AS5553, Section 3.1.8)
8.7.1.10 Counterfeit Prevention Training. The Contractor shall provide appropriate training and shall require all personnel working procurement within their company, to include at a minimum their supply chain management specialists, receiving inspectors, and engineers, to complete said training. The
Contractor shall determine the appropriate training required.
Training may be developed in-house or may be other Industry accepted training. The CPP shall describe and list the training provided by the contractor to their personnel. (Ref. AS5553, Section 3.1.1)
9.0 DISCREPANCIES: In case of conflict between this document and any referenced document, contact ACO & PCO for resolution of discrepancy.
10.0 DATA:
10.1 CAV AF: Contractor shall provide the status of maintenance production, asset management, and condemnations IAW Contract Data Requirements List (CDRL)
Exhibit A001 (DI-MGMT-81838), A002 (DI-PSSS-81995), A003 (DI-MGMT-
80441) and all requirements of this PWS. Contractor shall be ready to report in
CAVAF before receipt of assets. Contractor shall complete on time all required
CAVAF production/repair data reporting as required in paragraph Error!
Reference source not found. of this PWS.
10.2 REPAIRED ITEM INSPECTION REPORT: All item failures and component consumption data shall be documented and reported to 415 SCMS/GUMBB IAW with the Repairable Item Inspection Report, Exhibit B001 (DI-PSSS-80386A).
10.3 COUNTERFEIT PREVENTION PLAN: The contractor shall provide a
Counterfeit Prevention Plan (CPP) per CDRL C001 (DI-MISC-81832), including the identified items of SAE AS5553 per section 8.7. This requirement may be waived if the contractor has had a previously presented CPP approved.
10.4 TEST PLAN: The contractor shall provide a Test Plan for each of the NSNs listed in Section 1 per CDRL Exhibit E001 (DI-NDTI-80603A) (See paragraph 4.4).
10.5 TEST REPORT: The contractor shall provide a Test Report for each repair attempt per CDRL Exhibit F001 (DI-NDTI-80809B).
PREPARED BY: 448 SCMW/415 SCMS