Performance Work Statement

View the file

Other files for this federal contract opportunity

Other files attached to Repair Electron Tubes, newest first.
File Type Posted
Attachment_2_-_CDRL.pdf PDF
FA825019Q1607.pdf PDF
Attachment_7_-_GFP.pdf PDF
Attachment_1_-_CAVAF_Reporting.pdf PDF
Attachment_3_-_Transportation_Data.pdf PDF
Attachment_4_-_Special_Packaging_Instructions.pdf PDF
Attachment_5_-_Packaging_SOW.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DEPARTMENT OF THE AIR FORCE

OGDEN AIR LOGISTICS CENTER, HILL AFB, UTAH 84056-5820

PERFORMANCE WORK SPECIFICATION (PWS)

PR NO: FD20201901607 DATE: 04 September 2019

1.0 SCOPE OF WORK: For the following end item(s), the contractor shall furnish all facilities, parts, materials, data, equipment and services, required to dissemble, (the process of breaking down item(s) into component parts that will be reworked, rehabilitated, altered, and/or replaced), inspect, repair as necessary (providing manufacturing processes that are similar to the original manufacturing process to totally rebuild items), upgrade, reassemble, align and functionally test each item(s), returning the item(s) to a serviceable condition. Electron tubes identified as MICAP (Mission

Incapable Awaiting Parts) repairs will follow the same scope of work processes identified in paragraph 1.2 and its subparagraphs.

1.1 TEST, TEARDOWN, AND EVALUATION (FFP): The contractor shall perform visual, mechanical and electrical testing of the end item, reusable or replacement component parts, and materials according to the schedule in the contract to determine the condition of the end item. Upon completion of this task, all of the components of the end item requiring repair or replacement will be identified by part number, NSN (if applicable), nomenclature, and location in the assembly. This information will be reported in writing to the Procurement

Contracting Officer (PCO)/ Defense Contract Management Agency (DCMA) Administrative

Contracting Officer (ACO) and, if necessary, a category of repair will be negotiated. If no further repair is required, the asset must be returned in serviceable like new condition.

1.2 REPAIR (NTE): Visual, mechanical and electrical testing shall be accomplished to determine the condition of the tubes. Test procedures must be done in accordance with manufacturer’s original specification. The contractor shall perform the repair or replacement of all failed parts and components. Each end item must be cleaned, configured, refinished, and tested to meet the original specifications of the end item. The end item shall be returned in serviceable like new condition.

Below listed item(s) will be shipped to the contractor for repair and return per negotiated schedules:

NSN Nomenclature MFR PART

NUMBER (CAGE)

System

5960-01-107-2549 TWT L-5714-50 (80080) AN/MST-T1A

ESD: NO

2.0 COMPLIANCE DOCUMENTS:

2.1 TWT 5960-01-107-2549

1. T.O.s

a. 43D7-19-2-4, Figure 172, Index 110/1

2. Specification drawings

a. 654VE0007 (CAGE 81755), TWT, E Band

i. Engineering Order 08A1913-H

ii. Engineering Order 12C0393-H

b. 654CE0007 (CAGE 81755), Specification for a 2.1 – 2.7 GHz Grid Pulsed TWT

3. Special Packaging Instructions (SPI)

a. F011072549

3.0 SERVICE DELIVERY SUMMARY (SDS): DCMA/ACO/Quality Assurance Representative

(QAR) is ultimately responsible for inspecting and accepting the reparable assets In Accordance

With (IAW) Federal Acquisition Regulation (FAR) Inspection Clause 52.246-4 & 52.245-1

Performance Objective PWS Para Performance Threshold Surveillance*

Return the assets to a serviceable condition.

4.1 Successful completion of

repair on all items not determined to be beyond economical repair.

DCMA QAR/DCMA

ACO/COR

Delivery of repaired asset made IAW contract delivery schedule.

7.5 No more than one item

delivered after the scheduled due date per delivery order.

DCMA QAR/ACO/COR

Asset determined to be

Beyond Economical Repair

(BER)

6.0 No contested BERs allowed. DCMA QAR/DCMA

ACO/PCO/COR

Quality Deficiency Report

(QDR)

4.5 No contested QDRs

allowed.

DCMA QAR/DCMA

ACO/COR

Reporting in Commercial

Asset Visibility Air Force

(CAVAF)

DD250/Material/Inspection

Reporting and Receiving reports.

5.5, 10.1 Condition Code changes

Must be noted no later than

7 days after change has taken place. 100% (or as detailed in) DCMA risk

Management Plan Accuracy rate for material handling and reporting in DD250 or

CAV-AF. 100% of the overhauled assets require workmanship inspections through the maintenance process as required in

DD250 or CDRL Exhibit

A001 CAV-AF (DI-

MGMT-81634)

CAV-AF POC/COR

Performance Objective PWS Para Performance Threshold Surveillance*

Item failures and component consumption data shall be documented and reported

10.2

Reporting shall take place according to contract schedule and CDRL

Exhibit B001 (DI-ILSS-

80386.

ENG

Acceptance Test Plan

(ATP)

4.1, 4.4, 10.5 100% assets must meet form-fit-function-interface requirements of the applicable specification drawings and must pass performance acceptance testing per CDRL Exhibit

E001 (DI-NDTI-80603A)

govt. approved Acceptance

Test Plan (ATP). FAR

Inspection clause 52.246-4

ENG/ES/DCMA QAR

Test Requirements 4.4, 8.4.1, 10.6

100% of the time these items must pass performance acceptance testing and provide test report for each repair per

CDRL Exhibit F001 (DI-

NDTI-80809B).

ENG/ES/DCMA QAR

Warranty 4.5, 7.6 Items under warranty shall be repaired and returned within greed upon schedule and have no impact on current delivery schedule.

ENG/ES/PM/DCMA

Preservation of markings/

Item Unique Item

Identifier (IUID) marking

8.5

All parts to be marked with

IUID label per drawing.

IUID information for all parts uploaded to IUID database. DCMA has IUID inspection responsibility.

DCMA QAR

Counterfeit Prevention

Plan

8.7, 10.3 Submitted with govt.

approval per CDRL C001

(DI-MISC-81832),

ENG

Monthly Status Report 10.4 Contractor shall submit monthly status reports item

IAW applicable CDRL

D001 (DI-MGMT-80277) to the COR within 24 hours of the due date with no more than 5 significant errors.

COR

*All items will be 100% inspected by the function listed on a periodic basis as described in the reference paragraph.

4.0 WORK PERFORMANCE REQUIREMENTS:

4.1 TECHNICAL OR PERFORMANCE REQUIREMENTS: Unit will meet all performance requirements of a new item. All repaired/retrofitted items will be configured and perform

IAW the latest requirements of the Drawings listed in Para. 2.0 and the govt. approved

Acceptance Test Plan.

4.2 OBSOLETE COMPONENTS will be identified to the ACO/PCO after the Test and

Evaluation and before the level of repair is negotiated/defined.

4.3 FOREIGN DISCLOSURE RESTRICTIONS: These items contain critical technology and are export controlled. Distribution authorized to DoD and U.S. DoD Contractors only (Critical

Technology).

4.4 TEST REQUIREMENTS: The Contractor shall perform an acceptance test and checkout of each completed end-item to assure serviceability and full functionality prior to presentation to the Government. This testing will be performed IAW existing approved test plan or IAW developed test plans approved by the Government (See paragraph 10.5).

4.5 QUALITY DEFICIENCY REPORTING: Any asset that fails to function within Government-

Contractor mutually agreed warranty period after date of repair, and the Government suspects failure is due to quality of workmanship, level of overhaul, or quality of replacement parts used by the contracted repair source, the asset shall be returned to the repair source for correction. This repair shall be accomplished at no additional cost to the government if deemed by DCMA to be the fault of the contractor and will be delivered back to the government under the terms of the original contract. The contractor may dispute Air Force determination of responsibility through the ACO to the PCO with DCMA providing evidence that the failure was not the fault of the contractor. This measure will be accomplished by customer reported deficiencies in the form of product quality deficiency or material deficiency reports according to T.O. 00-35D-54 titled USAF Deficiency Reporting Investigation and

Resolution.

4.6 COST OUTCOMES: Contractor shall repair assets at a cost that meets the contractual firm-fixed price of repair for the life of the contract 100% of the time. If it is determined that over and above funding is required to repair the item, the contractor shall immediately notify the government contracting officer, who will in turn contact the program engineer and program manager to discuss appropriate courses of action, and the relief, if any, the government might provide.

4.7 SCHEDULE OUTCOMES: Contractor shall deliver assets on or before the contractual delivery schedule 100% of the time. In cases where risks to delivery schedule are identified that fall outside the expected repair date, the contractor shall immediately notify the government contracting officer, who will in turn contact the program engineer and program manager to discuss appropriate courses of action, and the relief, if any, the government might provide.

4.8 PERFORMANCE OUTCOMES: If after Test, teardown, and evaluation (TT&E) asset is determined to be reparable by the contractor, contractor shall restore asset to serviceable condition 100% of the time, i.e. asset shall be repaired to government specifications required by the contract. In cases where the contractor identifies additional problems with an asset, unforeseen at the TT&E phase, contractor shall immediately notify the government contracting officer, who will in turn contact the program engineer and program manager to discuss appropriate courses of action, and the relief, if any, the government might provide.

5.0 PACKAGING, HANDLING, SECURITY AND TRANSPORTATION:

5.1 RECEIVING INSPECTION: Contractor shall notify the ACO/PCO along with the Quality

Assurance Representative (QAR) of all damages and shortages, or discrepancies (i.e. items not packaged in accordance with applicable Special Packaging Instructions (SPI)) discovered upon receipt of any item(s). All issues must be reported back to the originating organization for disposition. If items are damaged in transit or assets are found to be misidentified during the inspection process, the ACO/PCO will request disposition instruction from the 415 SCMS. The

415 SCMS will verify if additional assets are available to resubmit to the contractor. If no assets are available, ACO/PCO will address the required changes. The ACO or QAR shall initiate a

Supply Discrepancy Report (SDR). Access to Web-SDR can be found at https://www.daas.dla.mil/sar/warning.asp.

5.2 SECURITY REQUIREMENTS: N/A

5.3 REUSABLE CONTAINERS: Contractor shall handle and store reusable containers and materials used for packing and packaging in a manner, which shall assure that they are retained in a serviceable condition for reuse. If the contractor questions the serviceability/condition of the reusable containers, notify the ACO for repair/replacement instructions.

5.4 HANDLING: All items shall be handled and packaged in accordance with applicable Special

Packaging Instructions (SPI).

5.4.1 Electron tubes having permanent magnets shall be preserved in accordance with physical and mechanical protection methods of MIL-STD-2073-1 and MIL-

DTL-75K. The distance between the outer magnetic surfaces and the outside of the unit container shall be no less than the protective distance required in the precautionary handling or magnetic isolation instruction in the MIL-PRF-1 detail specification, or manufacturer's tube specification, as applicable. When special instructions are not available, a minimum protective distance of 4 inches shall be maintained.

Permanent magnets of tubes must be kept away from ferromagnetic items such as steel tools, tabletops, floors, etc. Each tube of this type must have a warning label on the magnet to indicate the minimum proximity permissible for ferromagnetic materials. The permanent magnet can be demagnetized by a severe mechanical shock or by being in close proximity to ferromagnetic materials. Forces exerted on a microwave tube structure as the result of dropping the tube or picking it up or setting it down roughly, can be destructive.

5.4.2 Care shall be exercised to prevent damage to Government Furnished

Property/Equipment while in the contractor’s possession.

5.4.3 All Government Furnished Property shall be stored in a secure area to provide protection against damage, pilferage, or loss. Storage areas shall provide protection against all adverse environmental conditions.

5.5 SHIPPING DOCUMENT REQUIREMENT: A DD Form 1348 shall be prepared and attached to any item or items that have been repaired and are ready to be shipped without exception. Under no circumstances shall a DD Form 250 or DD Form 1149 ever be sent with a shipment and/or used as a shipping document. If CAV AF is used by the contractor for repair data reporting, the DD Form 1348 generated as a part of the shipping transaction shall be printed and used. NOTE: The DD Form 1348 must be printed when prompted in CAV AF.

The DD Form 1348 cannot be printed after that point. If CAV AF reporting is not fully completed or used by the contractor for any reason, a manual DD Form 1348 shall be prepared and shall be annotated with the following statement: “Contract Repair; Receiving activities process as D6M receipt, __ Condition Stock.” (Enter appropriate condition code). When a manual DD Form 1348 is used, a copy must be sent to the Procuring

Contracting Officer (PCO) with a statement indicating that the DD Form 1348 is to be sent to the CAV AF POC for the contract.

6.0 CONDEMNATION: In general BER is not allowed / authorized as all repairs can be accomplished under the 'total re-build' category. Parts obsolescence may be a condition for BER.

Authorization to accomplish repair, condemnation, or disposition shall be obtained through the

415th Strategic Sourcing Office (415SCMS.STRATEGIC.CONTRACTS@us.af.mil) and

ACO/PCO for end items determined to be uneconomical to return to a serviceable condition. If

BER is approved the contract delivery schedule will be adjusted accordingly to relieve contractor delivery schedule on item.

7.0 GENERAL:

7.1 RELIABILITY AND MAINTAINABILITY (R&M): Additional R&M is not required;

however, existing R&M performance shall not be degraded during this work effort.

7.2 ENVIRONMENTAL IMPACT (EI) REQUIREMENTS: The Tubes may contain Beryllium

Oxide (BeO), Lead (Pb), or Cobalt (Co). Take appropriate Industry Standard precautions when working on tubes containing any of these materials.

7.3 ROUTINE, MISSION IMPAIRED CAPABILITY AWAITING PARTS (MICAP), SURGE,

and ESSENTIAL DoD CONTRACTOR SERVICES: The Contractor shall be responsible for returning serviceable assets in the time set forth in this contract. In the event that the

Government requires an asset for coverage of a MICAP requirement, the Contractor agrees to enter into negotiations with the Government to expedite delivery of the needed asset(s).

7.4 ELECTROSTATIC DISCHARGE CONTROL: N/A

7.5 DISPOSITION: Repaired parts shall be shipped to the destination specified in the contract.

Disposition of any misidentified items shall be as stated in paragraph 5.1. Delivery shall be according to the delivery schedule in the contract. Early and partial shipments are acceptable.

mailto:415SCMS.STRATEGIC.CONTRACTS@us.af.mil

7.6 WARRANTY: Warranty shall be 30 days for a Minor Repair, 60 days for a Major Repair, and

1 year for Total Rebuilds from the shipment data of the repaired unit.

7.7 TRIAGE CONCEPT IS AUTHORIZED: Cross utilization of components are authorized

ONLY after coordination with 415SCMS.STRATEGIC.CONTRACTS@us.af.mil .

7.8 ENGINEERING SERVICES: In the event an electron tube cannot be repaired due to the obsolescence issues; the government may provide an opportunity for contractor to provide engineering solutions to mitigate obsolescence issues and provide a form, fit, function, and interface solution. Travel may be reimbursed using travel CLIN.

7.9 SAFETY AND HEALTH: While performing work under this contract the contractor shall comply with all applicable federal, state and local regulations regarding occupational safety and health. The contractor shall notify the Contracting Officer, within eight (8) hours of any damage to government property where the dollar value exceeds $500,000.00 and within two workdays, for any damage to government property less than $500,000.00 during the execution of the contract.

Mishap notifications shall contain, as a minimum, the following information:

a. Contract, Contract Number, Name and Title of Person(s) Reporting

b. Date, Time and exact location of accident/incident

c. Brief Narrative of accident/incident (Events leading to accident/incident)

d. Cause of accident/incident, if known

e. Estimated cost of accident/incident (material and labor to repair/replace)

f. Nomenclature of equipment and personnel involved in accident/incident

g. Corrective actions (taken or proposed)

h. Other pertinent information

If requested by the designated Contracting Officer, the contractor shall immediately secure the mishap scene/damaged property and impound pertinent maintenance and training records, until released by the Procuring Safety Office.

7.10 CORRECTIVE ACTION REPORTS: The contractor shall provide a Corrective Action

Report (CAR) within 10 business days of receipt on the Performance Assessment Report

(PAR).See QASP para.7 (Performance Reporting) for more detailed information.

8.0 SPECIFIC WORK REQUIREMENTS:

8.1 DISASSEMBLY: The Contractor shall disassemble each item only to the extent necessary to accomplish inspection, testing, fault isolation, and maintenance.

8.2 CLEANING: The end item shall be cleaned thoroughly prior to and after disassembly and maintain cleanliness during this maintenance effort IAW MIL-HDBK-454 and

TO 00-25-251.

mailto:415SCMS.STRATEGIC.CONTRACTS@us.af.mil

8.3 CORROSION CONTROL AND TREATMENT: Accomplish corrosion control and treatment as required, using methods and materials IAW MIL-HDBK-1568, paragraphs 5.4 through 5.9 and TO 1-1-691 as applicable, and specification drawings.

8.4 MAINTENANCE: The contractor shall perform the required maintenance, inspection, reassembly of the reworked end item and components and calibration, if applicable, IAW T.O. 00-25-234.

8.4.1 The contractor shall perform an acceptance test and checkout of each completed end item to assure serviceability prior to presentation to the government IAW approved Test Plan.

8.4.2 Upon satisfactory completion of final test, the contractor shall cover and seal all ports, vents and electrical connection/plugs with suitable caps to prevent entry of foreign matter or damage during handling and shipment, IAW MIL-C-5501/11. Cap or seal all open flexible or rigid lines, hoses, and fittings at all times when not in use.

8.5 MARKING:

8.5.1 Preservation of Markings: The Contractor shall ensure nameplates and product markings are correct and accurate upon repair completion. The

Contractor shall replace damaged markings, identification, and decals

IAW drawings or equivalent best commercial practice. The assemblies, subassemblies, and parts that constitute this repair shall be marked for identification in accordance with existing style and format.

8.5.2 If not already marked, Item Unique Item Identifier (IUID) marking shall be accomplished according to MIL-STD-130 and MIL-STD-129 latest versions and per DFARS Clause 252.211.7003. All marking shall be placed in accordance with the technical data for the part.

8.5.2.1 Specification requirements for IUID marking will be contained in the applicable Air Force/OEM Technical Order, Specific Work

Requirements appendix, approved engineering drawing, or a

Government provided Engineering order as applicable. The government will provide IUID marking specifications.

8.5.2.2 In the event the government cannot provide or it is not feasible for the contractor to provide IUID marking specifications a determination and findings will be accomplished IAW DFARS

211.274-2 Policy for unique item identification.

8.5.2.3 IUID markings currently in place on items undergoing repair shall be protected from damage or removal during repair. Ensure 2-D matrix IUID markings are readable per TO 00-25-260. Should

IUID marking be rendered unreadable during repair, the contractor shall notify the PCO/ACO for determination.

8.5.2.4 Prior to government acceptance, the contractor shall submit the required and applicable contingent data to the IUID Registry per the data submission procedures at http://www.acq.osd.mil/dpap/pdi/uid/data_submission_informatio n.html. DCMA has IUID inspection responsibility.

8.5.2.5 Enter logistical data into database. See MIL-STD-130N

CHANGE 1 [3.2 Item unique identification (IUID)]. The registry is maintained by the Defense Logistics Agency Logistics

Information Service (DLIS) (see http://www.acq.osd.mil/dpap/pdi/uid/).

IUID REGISTRY

To access the IUID Registry website, please use the following link:

https://iuid.logisticsinformationservice.dla.mil

8.5.3 Serial Numbers: Electron Tubes shall have the letters “RX” (where X is a number described in the following paragraphs) appended to the Serial

Number.

8.5.3.1 When an electron tube receives a Total Rebuild the base Serial

Number is to have the letters “R0” appended to the number, or if the last two letters of the Serial Number are already “RX” (where

X is any number) the last two letters of the number are to be changed to “R0”.

8.5.3.1.1 Example: VKC7810H Serial Number 2076 becomes

2076R0 following a Total Rebuild.

8.5.3.1.2 Example: VKC7810H Serial Number 2076R2

becomes 2076R0 following a Total Rebuild.

8.5.3.2 Minor repairs do not change the “RX” number in the serial number.

8.5.3.2.1 Example: VKC7810H Serial Number 2076R2 remains

2076R2 following a Minor Repair http://www.acq.osd.mil/dpap/pdi/uid/ https://iuid.logisticsinformationservice.dla.mil/

8.5.3.3 Each Major Repair increments the “RX” number in the Serial

Number by 1.

8.5.3.3.1 Example: VKC7810H Serial Number 2076R2

becomes 2076R3 following a Major Repair

8.5.3.4 If the initial Serial Number of the Electron Tube has no “RX” number appended to it, append “R0” to the Serial Number for any

Total Rebuilds or “R1” for any other evaluations or repairs.

8.6 REFINISHING: Refinish only to the extent necessary to assure adequate protection of all surfaces. Touch-up minor scratches, chipped, or scaled surfaces. Refinish severely marred surfaces to provide adequate protection and smooth even surface.

Blend all spot painting to avoid unsightly mismatches. Use only approved paint per

OEM specifications.

8.7 COUNTERFEIT PREVENTION PLAN (CPP): Contractors that supply electronic parts or systems that contain electronic parts shall establish policies and procedures to avoid, detect, mitigate and dispose of counterfeit electronic parts to prevent such parts from entering the USAF/DoD supply chain. These policies and procedures shall be documented in a CPP for submission and approval in accordance with CDRL C001 (DI-

MISC-81832) and accomplished for all specified contract items. DI-MISC-81832 is applicable to Parts, Material and Processes Selection (PMPS) associated with delivery of systems and assemblies to the USAF and DoD. The requirements established by DI-

MISC-81832 also apply to electronics components procured in sustainment of such systems and assemblies. The requirements of the recently DoD-adopted SAE 5553, Aerospace Standard, Counterfeit Electronics Parts; Avoidance, Detection, Mitigation, and Disposition shall also apply.

8.7.1 At a minimum, the CPP shall address:

8.7.1.1 Applicability. The Contractor shall identify all Business locations and programs to which the CPP applies. The CPP shall address materials, hardware, electronic parts, and procured assemblies.

8.7.1.2 Definitions. The Contractor shall utilize definitions per AS 5553 to ensure consistency. Any contractor-derived definitions must be included in an appropriate CPP appendix or annex. (Ref. AS5553, Section 3)

8.7.1.3 Parts Availability and Use of Parts Brokers. The Contractor shall not procure materials, systems, assemblies, subassemblies or parts from parts

Brokers when available from Original Manufacturers (OM) or their

Authorized Distributors. In cases where materials, systems, assemblies, subassemblies or parts are no longer available from the OM or their

Authorized Distributors, procurement from Brokers may be authorized as defined by the Contractor’s policy and their CPP. (Ref. AS5553, Section

3.1)

8.7.1.4 Procurement Policies. The Contractor shall provide and implement policy directing development and implementation of business practices and procedures, and processes to prevent procurement of Counterfeit materials and parts. The Contractor shall identify the appropriate office(s), business units, functional organizations, and programs, who shall have responsibility for development, maintenance and implementation of the CPP. The CPP shall identify the specific roles and responsibility for each. (Ref. AS5553, Section 3.1.3, 3.1.4)

8.7.1.5 Risk Assessment. The contract shall address the risk of using unknown sources and or unauthorized suppliers in the CPP. Application or technical risk assessments shall establish the effect that counterfeit parts may have on performance. Vendor or source of supply risk assessments shall establish the potential for obtaining counterfeit parts. Using any risk analysis tool acceptable to the Government, the Contractor shall conduct a risk assessment based upon item characteristics and how likely it is that a counterfeit part will be received. The contractor shall identify and describe in the CPP how parts are selected for assessment and what risk is acceptable based upon the parts design, construction, material and functional requirements. As a minimum, analysis shall be completed for flagging high risk items, such as items that are obsolete, discontinued, rare, etc. The contractor shall require completion of a trade study, documented within the

CPP that shall facilitate determining whether 100% testing of parts procured from after-market sources is more cost effective than qualification or requalification of a manufacturer. (Ref. AS5553, Section 3)

8.7.1.6 Detection and Avoidance Responsibilities. The Contractor shall establish processes for the review and approval of contractor and applicable subcontractor systems for the detection and avoidance of counterfeit electronic parts and suspect counterfeit electronic parts, which processes shall be comparable to the processes established for contractor business systems under section 893 of the Ike Skelton National Defense

Authorization Act for Fiscal Year 2011 (Public Law 111–383; 124 Stat.

4311; 10 U.S.C. 2302 note). The Contractor shall flow down such requirements and processes to their subcontractors per ODASD Memo titled

“Overarching DoD Counterfeit Prevention Guidance”, dated 16 March

2012. (Ref. AS5553, Section 3)

8.7.1.7 Testing and Verification. The Contractor shall establish and accomplish testing and verification processes for items not received from an original equipment manufacturer, original component manufacturer, or authorized distributor that are identified as having high risk for counterfeit potential.

These processes apply to prime contracts, and to subcontracts or suppliers below the prime contracts. The Contractor shall provide a list of acceptable test facilities if the subcontractor or supplier does not have the capability to perform required testing. Submittal of Certificates of Compliance indicating the parts are not counterfeit shall be acceptable for verification of testing. (Ref. AS5553, Section 3.1.5)

8.7.1.8 Configuration Identification and Traceability. The Contractor shall identify and control the configurations of all systems, assemblies, subassemblies and parts, and enable mechanisms to provide traceability of parts. The

Contractor shall report to the Government when control of the configurations of all systems, assemblies, subassemblies and parts, and mechanisms to provide traceability of parts are not possible. The

Contractor shall identify the specific systems, assemblies, subassemblies and parts beyond the Contractors’ control. The Contractor shall be responsible for detecting and avoiding the use or inclusion of counterfeit materials and parts, to include procured assemblies and subassemblies, in such products and shall be responsible for the rework or corrective action that may be required to resolve the use or inclusion of counterfeit materials and parts. The cost of counterfeit electronic parts and suspect counterfeit electronic parts and the cost of rework or corrective action that may be required to remedy the use or inclusion of such parts are not allowable costs under Department contracts , unless: a) the contractor has established a counterfeit avoidance/detection system approved by the DoD, b) the counterfeit parts were procured from a DoD-accredited trusted supplier or provided as government property, and c) the contractor has provide timely notification to the government. (Ref. AS5553, Section 3.1.7)

8.7.1.9 Counterfeit Notification and Reporting. The Contractor shall report in writing to the Procuring Activity within 30 days of determining any end item, component, part, or material contained in supplies purchased by the

Department of Defense, or purchased by a contractor or subcontractor for delivery to, or on behalf of, the Department, contains counterfeit electronic parts or suspect counterfeit electronic parts for the purpose of investigation and notification of the Air Force Office of Special Investigations (AFOSI).

The Procuring Contracting Officer (PCO) shall coordinate reporting to the appropriate Program Management/Item Management, System Engineering

Management, the AFMC Discrepant Materiel Reporting Program (DMRP)

Office in 406 SCMS/GULAB, and the AFOSI. Additionally, the Contractor shall within the same 30 day period ensure all suspected or confirmed counterfeit items are entered into the Government-Industry Data Exchange

Program (GIDEP) system, which will serve as the DoD central reporting repository. (Ref. AS5553, Section 3.1.8)

8.7.1.10 Counterfeit Prevention Training. The Contractor shall provide appropriate training and shall require all personnel working procurement within their company, to include at a minimum their supply chain management specialists, receiving inspectors, and engineers, to complete said training.

The Contractor shall determine the appropriate training required. Training may be developed in-house or may be other Industry accepted training. The

CPP shall describe and list the training provided by the contractor to their personnel. (Ref. AS5553, Section 3.1.1)

9.0 DISCREPANCIES: In case of conflict between this document and any referenced document, contact ACO & PCO for resolution of discrepancy.

10.0 DATA DELIVERABLES:

10.1 CAV AF: Contractor shall provide the status of maintenance production, asset management, and condemnations IAW Contract Data Requirements List (CDRL)

Exhibit A001 CAV AF (DI-MGMT-81838/T), A002 CAV AF (DI-PSSS-81995/T, A0003 CAV AF (DI-MGMT-80441 C/T) and all requirements of this PWS.

10.2 REPAIRED ITEM INSPECTION REPORT: All item failures and component consumption data shall be documented and reported to 415 SCMS/GUMBB IAW with the Repairable Item Inspection Report, Exhibit B001 (DI-ILSS-80386).

10.3 COUNTERFEIT PREVENTION PLAN: The contractor shall provide a

Counterfeit Prevention Plan (CPP) per CDRL C001 (DI-MISC-81832), including items from section 4 of SAE AS5553. This requirement may be waived if the contractor has had a previously presented CPP approved.

10.4 MONTHLY STATUS REPORTS: The contractor shall document the status of the efforts of this task in monthly status reports in accordance with IAW Contractor's

Progress, Status, and Management Report CDRL, Exhibit D001. IAW Section

10.3p of DI-MGMT-80227 the Contractor shall include as part of the Monthly

Status Report a Microsoft Excel 2010 Spreadsheet (Save as Type: Excel

Workbook) that provides a cumulative status of the categories shown in the attached example spreadsheet.

10.5 TEST PLAN: The contractor shall provide a Test Plan for each of the NSNs listed in Section 1 per CDRL Exhibit E001 (DI-NDTI-80603A).

10.6 TEST REPORT: The contractor shall provide a Test Report for each repair attempt per CDRL Exhibit F001 (DI-NDTI-80809B).

PREPARED BY: 448 SCMW/415 SCMS

Attachment A

Monthly Status Reports

Electron Tube Status

Electron Tube Cumulative Status Categories shall include:

1. Shipment #

2. (Contractor) PN

3. NSN

4. CLIN

5. Orig Serial #

6. New (Contractor) Serial #

7. Cust Serial #

8. Date Asset Rec'd

9. T& E Date Competed

10. Contract Due Date

11. Repair Classification

12. Invoice Amount

13. Date (sold off) in WAWF

14. "EZ" Ship Doc #

15. Date (Physically) Shipped From (Contractor)

16. Date (Physically) Received at Barstow

17. Comments

Electron Tube Cumulative Status Spreadsheet Example

Shipment

(Contractor)

PN NSN CLIN

Orig

Serial #

New

(Contractor)

Serial #

Cust

Serial #

Date Asset

Rec'd

T& E Date

Competed

Contract

Due Date

Repair

Classif ication

Invoice

Amount

Date (sold off) in WAAF "EZ" Ship Doc #

Date (Physically)

Shipped From

(Contractor)

Date (Physically)

Received at

Barstow Comments

PRODUCTION (OPEN / COMPLETE)

Note:

Note:

Hill AFB Contract Number

File details come from the government source that posted it.