Questions and Answers for CNC Controller.pdf
PDF 419 KB Posted
- Attached to
- CNC Controller Federal contract opportunity
- Solicitation number
- FA8227-21-Q-0022
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Combined Synopsis and Solicitation Amendment 1.pdf | ||
| Updated CNC Controller PWS 17 Nov.pdf | ||
| CDRL A003 Signed.pdf | ||
| CNC Controller PWS 17 Sept.pdf | ||
| Combined Synopsis and Solicitation.pdf | ||
| CDRL A001 Signed.pdf | ||
| CDRL A004 Signed.pdf | ||
| CDRL A002 Signed.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Questions and Answers for CNC Controller:
2.1.1.4.5 Perform Fives Machine Tool Services & Solutions (MTSS) standard test cuts
Can we use our standard test cuts in place of Fives' standard test cuts? Will the test cut documentation be provided so they can be performed?
A: The Government will provide a piece of billet for the machine test cuts. Test cutting will be standard cutting sequences for all axis X,Y,Z,W, and B. Test cust must also be able to show functions of the contouring head. Any specific documentation on how to perform test cuts are proprietary to Fives MTSS and must be obtained from them.
3.2.1 Contractor shall provide documentation of the areas of the machine that were modified by Fives MTSS during the installation of the Fanuc 0i-MF CNC Control Kit...
We assume this is an error in the PWS. If a contractor, other than Fives MTSS, is awarded the contract they won't "provide documentation of the areas of the machine that were modified by
Fives MTSS...". Would you please confirm?
A: The awarded contractor must provide documentation of the areas of the machine that were modified.
3.2.1.2.1 Fives MTSS Preventative Maintenance (PM) forms, if PM actions are performed
Again, we assume this an error in the PWS. If a contractor, other than Fives MTSS, is awarded the contract they won't provide "Fives MTSS Preventative Maintenance (PM) forms...". Would you please confirm?
A: The awarded contractor must provide the recommended PM schedule from Fives MTSS.
Information required for engineering:
CNC Engineering needs to review the following information before we can submit a firm offer. Would you please indicate which documentation will be available before the offer due date?
1 - FANUC Control Data Sheets
2 - FANUC CNC Serial Number
3 - FANUC CNC System Material List with Part Numbers
4 - Machine Electrical Schematics
5 - Operators Panel Layout Drawings
6 - OEM Machine Documentation
A: The information requested is proprietary to Fives MTSS. All documentation must be requested and provided to your company by Fives MTSS.
1 - Does the End User want a new Operators Pendant or are they planning to reuse the existing pendant?
A: The Government will use the existing pendant.
2 - Does the End User want custom macro probing for the Renishaw RMP60 compact spindle probe (PWS 2.1.1.2.1.4) or the standard Renishaw macros?
A: Probing macros would need to be off the shelf, but must include a B ADJUST macro like what the Fives offers
File details come from the government source that posted it. Updated .