SITT_INDUSTRY_DAY_BRIEFING.pptx
PPTX presentation 4 MB Posted
- Attached to
- Shock Isolator Test Stand Federal contract opportunity
- Solicitation number
- FA8224-16-R-0026
About this file
SITT Industry Day Briefing
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| SITT_DESIGN_CONCEPT_-_INDUSTRY_DAY.docx | DOCX document | |
| SD-SITT_Specification_Approved_12-1-15.pdf | ||
| Shock_Isolator_Test_Purchase_Request.docx | DOCX document | |
| Shock_Isolator_Test_Purchase_Request.docx | DOCX document |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Built Right, Ready to Fight Shock Isolator Test Tower (SITT)
Industry Day 16-17 February 2016
Ogden Air Logistics Complex
O G D E N A I R L O G I S T I C S COMPLEX
Introductions Built Right, Ready to Fight Contracting Officer: David Bryan, 801-586-7779 Lead Process Engineer: Savanna Stepp, 801-777-4659 Process Engineer: Clair Condie, 801-586-9791 Facilities Engineer: Cary Haws, 801-775-3470
CONTRACTORS:
| Sytronics, Inc. | Renmark-Pacific | ||
| X-Technologies, Inc. | Major Tool & Machine | ||
| Arbor Controls & Testing, Inc. | Consolidated Technical Services | ||
| Setpoint Systems, Inc. | Merrick Co. |
Industry Day Agenda Built Right, Ready to Fight
TUESDAY - 16 FEBRUARY
Welcome and Introductions 0930 -1030 – Initial Presentation (AF Museum) 1030-1200 – Tour of Building 1913 SITT & Shock Isolators 1200-1230 – Tour of Building 850 1230-1300 – Lunch
One-on-One Meetings with Contractors (AF Museum)
1300-1345 – Sytronics, Inc.
1400-1445 – Renmark-Pacific 1500-1545 – X-Technologies 1600 – Adjourn for the day
Industry Day Agenda
WEDNESDAY – 17 FEBRUARY
One-on-One Meetings with Contractors (AF Museum)
0930-1015 – Major Tool & Machine 1030-1115 – Arbor Controls & Testing, Inc.
1130-1200 – Lunch 1200-1245 – Consolidated Technical Services 1300-1345 – Setpoint Systems, Inc.
1400-1445 – Merrick Co.
1500 – Conclude Industry Day
PURPOSE OF ACQUISITION
REPLACE AN AGING & OBSOLETE SITT
PROCURE 2 EACH, REDESIGNED SITTs THAT WILL BE DESIGNED TO:
BE SAFER TO OPERATE
BE MORE EFFICIENT TO USE
PROVIDE MORE CONSISTENT TESTING OF SHOCK ISOLATORS
AUTOMATICALLY CONTROL PREPROGRAMMED TESTS, INCLUDING DATA ACQUISITION
KEEP UP WITH INCREASING WORKLOAD
SITT PURPOSE-FUNCTION
TEST THE OPERATING PARAMETERS OF 3 SIs
MISSILE SUSPENSION SYSTEM (MSS)
LIQUID SPRING – USES COMPRESSIBLE FLUID WITH STEPPED PISTON DIAMETER TO CREATE RETRACT FORCE
LAUNCH EQUIPMENT ROOM (LER)
LIQUID SPRING– USES COMPRESSIBLE FLUID WITH STEPPED PISTON DIAMETER TO CREATE RETRACT FORCE
LAUNCH CONTROL CENTER (LCC)
PNEUMATIC with MECHANICAL SPRING – USES CHECK & RELIEF VALVES BETWEEN OUTER TANK & INNER CYLINDER
SHOCK ISOLATORS
MSS SI TESTS
SPRING RATE & FRICTION TEST
EXTEND & RETRACT THE PISTON
DAMPING/ DROP TEST
DROP 41,000 # WEIGHT SLUG – EXTEND PISTON FROM FULL RETRACT TO FULL EXTEND
REQUIRED DATA ACQUISITION
FORCE VS. PISTON DISPLACEMENT DURING BOTH TESTS
- MSS -
SPRING RATE & FRICTION TEST
- MSS -
DAMPING/DROP TEST
LER SI TESTS
SPRING RATE & FRICTION TEST
EXTEND & RETRACT THE PISTON
REQUIRED DATA ACQUISITION
FORCE VS. PISTON DISPLACEMENT DURING THE TEST
- LER –
SPRING RATE TEST
LCC SI TESTS
EQUALIBRIUM TEST
WITH 19,000 # HANGING ON SI - TEST SI MOVEMENT WITH RESPECT TO CHANGING CYLINDER PRESSURE
DIFFERENTIAL TEST
WITH 19,000 # HANGING ON SI -TEST RESPONSE OF TANK PRESSURE TO CHANGING CYLINDER PRESSURE
DROP TEST
DROP 19,000 # WEIGHT SLUG – EXTEND PISTON FROM FULL RETRACT TO FULL EXTEND – USE 2” DROP LINK
REQUIRED DATA ACQUISITION
MEASURE PISTON DISPLACEMENT AND CYLINDER PRESSURE DURING ALL TESTS
- LCC –
DROP TEST DATA
EXISTING SITT
LOADING LCC
SOME KEY DESIGN
POINTS & CHALLENGES
LOAD-UNLOAD SI FROM CARTS @ FLOOR LEVEL WITHOUT USING AUXILIARY LIFTING EQUIPMENT
OPERATOR SAFETY – KEEP WORK AS CLOSE TO FLOOR LEVEL AS POSSIBLE
INSTANT RELEASE OF WEIGHT SLUGS DURING MSS & LCC DROP TESTS – TYPE OF MECHANISM?
DESIGNED FOR ALL 3 SI CONFIGURATIONS AND SHORT CONVERSION TIME
POTENTIAL
DESIGN CONCEPT
A potential design concept has been prepared to stimulate ideas for the replacement SITT. It will be distributed at the end of the facility tour to any contractor that desires it.
Contractors are under no obligation to use the potential design concept. Any contractor who uses any portion of it in their proposal and/or final design shall be fully responsible for the integrity of that design.
Contractors are encouraged to use modern technology and innovative ideas to provide a SITT that will meet the given requirements.
QUESTIONS ?
David Bryan (Contracting Officer) will now provide direction as to how questions will be addressed during the Industry Day.
Thank you for your time and interest in the Shock Isolator Test Tower project image3.jpeg image7.png image8.png image9.png image10.png image11.png image12.jpeg image14.emf image15.emf image13.jpg image16.jpg image17.jpg image18.jpg image19.png image1.png image2.png image4.png image5.png image6.emf
File details come from the government source that posted it. Updated .