FA821321R3047.pdf
PDF 112 KB Posted
- Attached to
- WCMD Engineering Services Federal contract opportunity
- Solicitation number
- FA821321R3047
About this file
This solicitation is for Wind Corrected Munitions Dispenser engineering services. The contractor shall provide support for WSEP surveillance flight testing, engineering services, aging and surveillance testing, travel reimbursement, and data deliverables. The contractor must submit CDRLs to the Hill Air Force Base contracting office. The period of performance is 12 months. The sole source recipient will be Smart Munitions Expert Solutions due to a lack of technical data rights ownership. The minimum response time is by 2:00pm on August 16, 2021. Pricing is firm fixed price for flight testing support, engineering services, and aging/surveillance testing items, with cost reimbursement for travel. The total estimated value is not included. The Department of the Air Force is the contracting agency.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| FA821321R3047-0002.pdf | ||
| FA821321R3047-0001.pdf | ||
| PWSWCMDEngineeringSupportrev1.pdf | ||
| DD254FA821321R3047.pdf | ||
| GFP.xlsx | XLSX spreadsheet | |
| FD20202152210CDRLs.pdf | ||
| PWSWCMDEngineeringSupport.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AUTHORIZED FOR LOCAL REPRODUCTION STANDARD FORM 1447 (REV. 8/2016)
PREVIOUS EDITION NOT USABLE Prescribed by GSA - FAR (48 CFR) 53.214(d)
23. ACCOUNTING AND APPROPRIATION DATA
SEE SCHEDULE
24. TOTAL AWARD AMOUNT (For Government Use Only)
TELEPHONE NUMBER
UNIQUE ENTITY
IDENTIFIER
CHECK IF REMITTANCE IS DIFFERENT AND PUT SUCH ADDRESS IN OFFER
NO COLLECT CALLS
4. SOLICITATION NUMBER
FA8213-21-R-3047
6.SOLICITATION ISSUE DATE
8. THIS ACQUISITION IS UNRESTRICTED OR SET ASIDE: % FOR
SMALL BUSINESS WOMEN-OWNED SMALL BUSINESS (WOSB)
ELIGIBLE UNDER THE WOSB PROGRAM
HUBZONE SMALL
BUSINESS EDWOSB
SERVICE-DISABLED VETERAN-
OWNED SMALL BUSINESS NAICS: 541330
8(A) SIZE STANDARD: $16.50
DATE SIGNED
28. UNITED STATES OF AMERICA (Signature of Contracting Officer)
26. AWARD OF CONTRACT: YOUR OFFER ON SOLICITATION NUMBER
SHOWN IN BLOCK 4 INCLUDING ANY ADDITIONS OR CHANGES WHICH
ARE SET FORTH HEREIN, IS ACCEPTED AS TO ITEMS:
ROUTINE.
Subject to the terms and conditions stated herein, the Contractor agrees to hold its offered prices firm for 120 days.
Sole source to: Smart Munitions Expert Solutions, Inc.; cage code 8MYD9
Either a complete and adequate data package is not available to be provided as a part of this solicitation, or special materials, facilities, tooling, or test equipment which may be required for performance are not available from the government. Offers from firms not previously identified as sources for this requirement will only be considered when it can be determined prior to award that the item or services being offered will meet the government's requirements.
SEE LINE ITEM SCHEDULE
22.
AMOUNT
16. AUTHORITY FOR USING OTHER THAN 10 USC 2304 41 USC 253
FULL AND OPEN COMPETITION (c) (1 ) (c) ( )
DATE SIGNED
27. SIGNATURE OF OFFEROR/CONTRACTOR
20.
UNIT
21.
UNIT PRICE
19.
QUANTITY
13. CONTRACTOR OFFEROR CODE FACILITY CODE
11. IF OFFER IS ACCEPTED BY THE GOVERNMENT WITHIN * ___ CALENDAR DAYS (60 CALENDAR DAYS UNLESS OFFEROR
INSERTS A DIFFERENT PERIOD) FROM THE DATE SET FORTH IN BLOCK 9 ABOVE, THE CONTRACTOR AGREES TO HOLD
ITS OFFERED PRICES FIRM FOR THE ITEMS SOLICITED HEREIN AND TO ACCEPT ANY RESULTING CONTRACT SUBJECT TO
THE TERMS AND CONDITIONS STATED HEREIN. *120
RATING
DO: A6
3. AWARD/EFFECTIVE DATE
FA8213
2. CONTRACT NUMBER
X
17.
ITEM NUMBER
12. ADMINISTERED BY CODE
Total
SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK: 14 EFT:T
SCD:B
NAME AND TITLE OF SIGNER (Type or Print) NAME OF CONTRACTING OFFICER
5. SOLICITATION TYPE
SEALED BIDS NEGOTIATED
(IFB) (RFP)
15. PROMPT PAYMENT DISCOUNT
25. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN 1
COPIES TO ISSUING OFFICE. CONTRACTOR AGREES TO FURNISH AND DELIVER ALL ITEMS SETFORTH OR OTHERWISE
IDENTIFIED ABOVE AND ON ANY CONTINUATION SHEETS SUBJECT
THE TERMS AND CONDITIONS SPECIFIED HEREIN.
10. ITEMS TO BE PURCHASED (Brief Description)
SUPPLIES SERVICES Engineering Services
9. (Agency Use) Solicitation: Offers will be received at the Issuing office until * on * . Late offers are subject to late proposal provisions incorporated herein. All offers are subject to such provisions, representations certifications and specifications as are attached or incorporated by reference.*
16-AUG-2021 2:00PM
X
18.
SCHEDULE OF SUPPLIES/SERVICES
14. PAYMENT WILL BE MADE BY CODE
(SEE ESP CLAUSE 252.232-7003.)
X
7. ISSUED BY CODE
DEPARTMENT OF THE AIR FORCE, DIRECTORATE OF CONTRACTING
AFLCMC EBHK
6072 FIR AVENUE BLDG 1233
HILL AIR FORCE BASE UT 84056-5820
BUYER: Ellis Swenson/AFLCMC ellis.swenson@us.af.mil Phone: (801) 777- 0083
X
1. THIS CONTRACT IS A RATED ORDER UNDER DPAS
(15 CFR 700)SOLICITATION/CONTRACT
BIDDER/OFFEROR TO COMPLETE BLOCKS 11, 13, 15, 21, 22, & 27.
JS
STANDARD FORM 1447 (REV. 8/2016) BACK
NO RESPONSE FOR REASONS CHECKED
TYPE OR PRINT NAME AND TITLE OF SIGNER
SIGNATURENAME AND ADDRESS OF FIRM (Include Zip Code)
WE DO NOT DESIRE TO BE RETAINED ON THE MAILING LIST FOR FUTURE PROCUREMENT OF THE TYPE OF
ITEMS INVOLVED
WE DO
OTHER (Specify)
UNABLE TO IDENTIFY THE ITEM(S)
CANNOT COMPLY WITH SPECIFICATIONS CANNOT MEET DELIVERY REQUIREMENT
DO NOT REGULARILY MANUFACTURE OR SELL THE TYPE OF ITEMS
INVOLVED
DATE AND LOCAL TIME 16 AUG 2021 2:00 PM
SOLICITATION NUMBER FA821321R3047
FROM: AFFIX
STAMP
HERE
TO:
ATTN: Ellis Swenson/AFLCMC
DEPARTMENT OF THE AIR FORCE, DIRECTORATE OF CONTRACTING
AFLCMC EBHK
6072 FIR AVENUE BLDG 1233
HILL AIR FORCE BASE UT 84056-5820
FA8213-21-R-3047
PART I - THE SCHEDULE
SECTION B
SUPPLIES OR SERVICES AND PRICES/COSTS
DCMA and DFAS are required to withhold payment IAW DFAR 252.227-7030 until CDRL A001, A002, A003, A004, A005, & A006 have been delivered and/or approved by Hill AFB.
Flight Testing Support
Item No.
Firm Fixed Price Quantity U/I Unit Price Amount
5 LO
CLIN ACRN ACRN Total
0001 AA
Flight Test Support The contractor shall provide engineering support for WSEP surveillance flight testing.In accordance with the attached Performance of Work Statement (PWS).
Associated Document(s) Line Item(s)
FD20202152210 0001
Priority: R ROUTINE.
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Standard Inspection Place of Perf Quantity (U/I) *ARO Written Notice of Award _ Req No / Pri
Required Period of Performance
5 LO *12 Months
Proposed Period of Performance
5 LO
Engineering Services & Technical Support
Item No.
Firm Fixed Price Quantity U/I Unit Price Amount
Engineering Services & Technical Support
5 LO
CLIN ACRN ACRN Total
0002 AA
Engineering Services The contractor shall provide Engineering Services in accordance with the attached PWS.
Associated Document(s) Line Item(s)
FD20202151220 0001
Priority: R ROUTINE.
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Standard Inspection Place of Perf Quantity (U/I) *ARO Written Notice of Award Req No / Pri
Required Period of Performance
5 LO *12 Months
Proposed Period of Performance
5 LO
Engineering Services & Technical Support
Item No.
Firm Fixed Price Quantity U/I Unit Price Amount
20 LO
CLIN ACRN ACRN Total
0003 AA
Aging & Surveillance Testing The contractor shall provide Aging and Surveillance Testing in accordance with the attached PWS.
Associated Document(s) Line Item(s)
FD20202151220 0001
Priority: R ROUTINE.
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Standard Inspection Place of Perf Quantity (U/I) *ARO Written Notice of Award Req No / Pri
Engineering Services & Technical Support
Required Period of Performance
20 LO *12 Months
Proposed Period of Performance
20 LO
Travel
Item No.
Cost Reimbursement - No Fee Quantity U/I Cost Total Estimated Cost
25 LO
CLIN ACRN ACRN Total
0004 AA
TRAV
TRAVEL
Reimbursement of travel costs IAW FAR 31.205-46 Associated Document(s) Line Item(s)
FD20202151220 0001
Priority: R ROUTINE.
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Standard Inspection Place of Perf Quantity (U/I) *ARO Written Notice of Award _ Req No / Pri
Required Period of Performance
25 LO *12 Months
Proposed Period of Performance
25 LO
DATA
Item No.
Not Separately Priced Quantity U/I Unit Price
DATA
5 LO NSP
DATA
The contractor shall submit data in accordance with the attached Contract Data Requirements List (CDRLs A001-A006).
IAW DD Form 1423 Priority: R ROUTINE Exhibit: A Type / Ship To Quantity (U/I) *ARO IAW DD FORM
Req No / Pri
Required Delivery
B 1423 5 LO *30 Calendar Days
Proposed Delivery
B 1423 5 LO
SHIP TO / PLACE OF PERFORMANCE
TYPE/CODE: B 1423
IAW DD FORM 1423
MARK FOR: (See Individual Line Item) REQUISITION NUMBER: (See Individual Line Item) REQUISITION PRIORITY: (See Individual Line Item)
AWARD NUMBER:
PART I - THE SCHEDULE
SECTION E
INSPECTION AND ACCEPTANCE
52.246-4 INSPECTION OF SERVICES--FIXED-PRICE (AUG 1996)
(IAW FAR 46.304)
52.246-5 INSPECTION OF SERVICES--COST-REIMBURSEMENT (APR 1984)
(IAW FAR 46.305)
INSPECTION AND ACCEPTANCE (SEP 1999)
(IAW FAR 46.401(b), FAR 46.503) Government Contract Quality Assurance Inspection and Acceptance will be at destination(s) specified herein (Final).
Item No(s): 0001, 0002, 0003, 0004
PART I - THE SCHEDULE
SECTION F
DELIVERIES OR PERFORMANCE
52.211-8 TIME OF DELIVERY (JUN 1997)
(IAW FAR 11.404(a)(2))
(a) The Government requires delivery to be made according to the following schedule:
DELIVERY FOR EACH ITEM IS ANNOTATED IN THE SCHEDULE (PART I SECTION B) UNDER EACH LINE ITEM.
The Government will evaluate equally, as regards time of delivery, offers that propose delivery of each quantity within the applicable delivery period specified above. Offers that propose delivery that will not clearly fall within the applicable required delivery period specified above, will be considered nonresponsive and rejected. The Government reserves the right to award under either the required delivery schedule or the proposed delivery schedule, when an offeror offers an earlier delivery schedule than required above. If the offeror proposes no other delivery schedule, the required delivery schedule above will apply.
ANNOTATE YOUR PROPOSED DELIVERY, IF ANY, UNDER THE GOVERNMENT’S DELIVERY SET FORTH UNDER EACH ITEM IN THE
SCHEDULE.
(b) Attention is directed to the Contract Award provision of the solicitation that provides that a written award or acceptance of offer mailed, or otherwise furnished to the successful offeror, results in a binding contract. The Government will mail or otherwise furnish to the offeror an award or notice of award not later than the day award is dated. Therefore, the offeror should compute the time available for performance beginning with the actual date of award, rather than the date the written notice of award is received from the Contracting Officer through the ordinary mails. However, the Government will evaluate an offer that proposes delivery based on the Contractor's date of receipt of the contract or notice of award by adding (1) five calendar days for delivery of the award through the ordinary mails, or (2) one working day if the solicitation states that the contract or notice of award will be transmitted electronically. (The term "working day" excludes weekends and U.S. Federal holidays.) If, as so computed, the offered delivery date is later than the required delivery date, the offer will be considered nonresponsive and rejected.
52.211-8 TIME OF DELIVERY -- ALTERNATE III (APR 1984)
(IAW FAR 11.404(a)(2)) If the delivery schedule is to be based on the actual date the contractor receives a written notice of award, the contracting officer may be delete paragraph (b) of the basic clause. The time may be expressed by substituting "within days after the date of receipt of a written notice of award” as the heading for the third column of paragraph (a) of the basic clause.
52.242-15 STOP-WORK ORDER (AUG 1989)
(IAW FAR 42.1305(b)(1))
52.242-15 STOP-WORK ORDER -- ALTERNATE I (APR 1984)
(IAW FAR 42.1305(b)(2))
PART I - THE SCHEDULE
SECTION G
CONTRACT ADMINISTRATION DATA
252.232-7006 WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (DEC 2018)
(IAW DFARS 232.7004(b), PGI 232.7004(b)(1), DFARS 212.301(f)(liii))
(f) WAWF payment instructions. The Contractor must use the following information when submitting payment requests and receiving reports in WAWF for this contract/order:
(1) Document type. The Contractor shall use the following document type(s).
(Contracting Officer: Insert applicable document type(s).
Note: If a “Combo” document type is identified but not supportable by the Contractor’s business systems, an “Invoice” (stand-alone) and “Receiving Report” (stand-alone) document type may be used instead.)
(2) Inspection/acceptance location. The Contractor shall select the following inspection/acceptance location(s) in WAWF, as specified by the contracting officer.
(Contracting Officer: Insert inspection and acceptance locations or “Not applicable.”)
(3) Document routing. The Contractor shall use the information in the Routing Data Table below only to fill in applicable fields in WAWF when creating payment requests and receiving reports in the system.
Routing Data Table* Field Name in WAWF Data to be entered in WAWF Pay Official DoDAAC Issue By DoDAAC Admin DoDAAC Inspect By DoDAAC Ship To Code Ship From Code Mark For Code Service Approver (DoDAAC) Service Acceptor (DoDAAC) Accept at Other DoDAAC LPO DoDAAC DCAA Auditor DoDAAC Other DoDAAC(s) (*Contracting Officer: Insert applicable DoDAAC information or “See schedule” if multiple ship to/acceptance locations apply, or “Not applicable.”)
(4) Payment request and supporting documentation. The Contractor shall ensure a payment request includes appropriate contract line item and subline item descriptions of the work performed or supplies delivered, unit price/cost per unit, fee (if applicable), and all relevant back-up documentation, as defined in DFARS Appendix F, (e.g.
timesheets) in support of each payment request.
(5) WAWF email notifications. The Contractor shall enter the e-mail address identified below in the “Send Additional Email Notifications” field of WAWF once a document is submitted in the system.
(Contracting Officer: Insert applicable email addresses or “Not applicable.”)
(g) WAWF point of contact.
(1) The Contractor may obtain clarification regarding invoicing in WAWF from the following contracting activity’s WAWF point of contact.
(Contracting Officer: Insert applicable information or “Not applicable.”)
(2) For technical WAWF help, contact the WAWF helpdesk at 866-618-5988.
ACCOUNTING AND APPROPRIATION DATA (AUG 1998)
Accounting and Appropriation Chargeable ACRN Funds Citation Amount Chargeable
AA 57 13400 . 30 1 87 HI XX27M3 010000 58300 28030F 503000 F03000 $0.00
ESP: 7C PSR: B44936 FSR: 084762 DSR: 298265 CIN: F2DCAE1166A1010000AA / FD2020-21-52210
ACRN TOTAL $ 0.00
PART II - CONTRACT CLAUSES
SECTION I
CONTRACT CLAUSES
252.201-7000 CONTRACTING OFFICER'S REPRESENTATIVE (DEC 1991)
(IAW DFARS 201.602-70)
5352.201-9101 OMBUDSMAN (OCT 2019)
(IAW AFFARS 5301.9103)
(a) An ombudsman has been appointed to hear and facilitate the resolution of concerns from offerors, potential offerors, and others for this acquisition. When requested, the ombudsman will maintain strict confidentiality as to the source of the concern.
The existence of the ombudsman does not affect the authority of the program manager, contracting officer, or source selection official. Further, the ombudsman does not participate in the evaluation of proposals, the source selection process, or the adjudication of protests or formal contract disputes. The ombudsman may refer the interested party to another official who can resolve the concern.
(b) Before consulting with an ombudsman, interested parties must first address their concerns, issues, disagreements, and/or recommendations to the contracting officer for resolution. Consulting an ombudsman does not alter or postpone the timelines for any other processes (e.g., agency level bid protests, GAO bid protests, requests for debriefings, employee-employer actions, contests of OMB Circular A-76 competition performance decisions).
(c) If resolution cannot be made by the contracting officer, the interested party may contact the ombudsman, Melinda M.
Schmidt at 801 777 -6549 , FAX 000 000 -0000 , email melinda.schmidt@us.af.mil . Concerns, issues, disagreements, and recommendations that cannot be resolved at the Center/MAJCOM/DRU/SMC ombudsman level, may be brought by the interested party for further consideration to the Air Force ombudsman, Associate Deputy Assistant Secretary (ADAS) (Contracting), SAF/AQC, 1060 Air Force Pentagon, Washington DC 20330-1060, phone number (571) 256-2395, facsimile number (571) 256-2431.
(d) The ombudsman has no authority to render a decision that binds the agency.
(e) Do not contact the ombudsman to request copies of the solicitation, verify offer due date, or clarify technical requirements.
Such inquiries shall be directed to the contracting officer.
52.202-1 DEFINITIONS (JUN 2020)
(IAW FAR 2.201)
52.203-3 GRATUITIES (APR 1984)
(IAW FAR 3.202)
52.203-5 COVENANT AGAINST CONTINGENT FEES (MAY 2014)
(IAW FAR 3.404)
52.203-6 RESTRICTIONS ON SUBCONTRACTOR SALES TO THE GOVERNMENT (JUN 2020)
(IAW FAR 3.503-2)
52.203-7 ANTI-KICKBACK PROCEDURES (JUN 2020)
(IAW FAR 3.502-3)
52.203-8 CANCELLATION, RESCISSION, AND RECOVERY OF FUNDS FOR ILLEGAL OR
IMPROPER ACTIVITY (MAY 2014)
(IAW FAR 3.104-9(a))
52.203-10 PRICE OR FEE ADJUSTMENT FOR ILLEGAL OR IMPROPER ACTIVITY (MAY 2014)
(IAW FAR 3.104-9(b))
52.203-12 LIMITATION ON PAYMENTS TO INFLUENCE CERTAIN FEDERAL TRANSACTIONS
(JUN 2020)
(IAW FAR 3.808(b))
52.203-19 PROHIBITION ON REQUIRING CERTAIN INTERNAL CONFIDENTIALITY
AGREEMENTS OR STATEMENTS (JAN 2017)
(IAW FAR 3.909-3 (b))
252.203-7000 REQUIREMENTS RELATING TO COMPENSATION OF FORMER DOD OFFICIALS
(SEP 2011)
(IAW DFARS 203.171-4(a), DFARS 212.301(f)(ii))
252.203-7001 PROHIBITION ON PERSONS CONVICTED OF FRAUD OR OTHER
DEFENSE-CONTRACT-RELATED FELONIES (DEC 2008)
(IAW DFARS 203.570-3)
252.203-7002 REQUIREMENT TO INFORM EMPLOYEES OF WHISTLEBLOWER RIGHTS
(SEP 2013)
(IAW DFARS 203.970)
52.204-4 PRINTED OR COPIED DOUBLE-SIDED ON RECYCLED PAPER (MAY 2011)
(IAW FAR 4.303)
52.204-10 REPORTING EXECUTIVE COMPENSATION AND FIRST-TIER SUBCONTRACT
AWARDS (JUN 2020)
(IAW FAR 4.1403(a))
52.204-13 SYSTEM FOR AWARD MANAGEMENT MAINTENANCE (OCT 2018)
(IAW FAR 4.1105(b))
52.204-18 COMMERCIAL AND GOVERNMENT ENTITY CODE MAINTENANCE (AUG 2020)
(IAW FAR 4.1804(c), FAR 12.301(d))
52.204-19 INCORPORATION BY REFERENCE OF REPRESENTATIONS AND CERTIFICATIONS
(DEC 2014)
(IAW FAR 4.1202(b))
52.204-21 BASIC SAFEGUARDING OF COVERED CONTRACTOR INFORMATION SYSTEMS
(JUN 2016)
(IAW FAR 4.1903)
52.204-23 PROHIBITION ON CONTRACTING FOR HARDWARE, SOFTWARE, AND SERVICES
DEVELOPED OR PROVIDED BY KASPERSKY LAB AND OTHER COVERED
ENTITIES (JUL 2018)
(IAW FAR 4.2004)
52.204-25 PROHIBITION ON CONTRACTING FOR CERTAIN TELECOMMUNICATIONS AND
VIDEO SURVEILLANCE SERVICES OR EQUIPMENT (AUG 2020)
(IAW 4.2105(b))
252.204-7002 PAYMENT FOR SUBLINE ITEMS NOT SEPARATELY PRICED (APR 2020)
(IAW DFARS 204.7109(a))
252.204-7003 CONTROL OF GOVERNMENT PERSONNEL WORK PRODUCT (APR 1992)
(IAW DFARS 204.404-70(b))
252.204-7012 SAFEGUARDING COVERED DEFENSE INFORMATION AND CYBER INCIDENT
REPORTING (DEC 2019)
(IAW DFARS 204.7304(c))
252.204-7015 NOTICE OF AUTHORIZED DISCLOSURE OF INFORMATION FOR LITIGATION
SUPPORT (MAY 2016)
(IAW DFARS 204.7403(b), DFARS 212.301(f)(i)(F))
252.204-7018 PROHIBITION ON THE ACQUISITION OF COVERED DEFENSE
TELECOMMUNICATIONS EQUIPMENT OR SERVICES (JAN 2021)
(IAW DFARS 204.2105(c))
252.204-7020 NIST SP 800-171 DOD ASSESSMENT REQUIREMENTS (NOV 2020)
(IAW DFARS 204.7304(e))
252.204-7022 EXPEDITING CONTRACT CLOSEOUT (MAY 2021)
(IAW DFARS 204.804-70)
(a) At the conclusion of all applicable closeout requirements of Federal Acquisition Regulation 4.804, the Government and Contractor shall mutually agree on the residual dollar amount remaining on the contract. Both the Government and Contractor agree to waive payment of any residual dollar amount of $1,000 or less to which either party may be entitled at the time of contract closeout.
(b) A residual dollar amount includes all money owed to either party at the end of the contract and as a result of the contract, excluding amounts connected in any way with taxation or a violation of law or regulation.
(c) For purposes of determining residual dollar amounts, offsets (e.g., across multiple contracts or orders) may be considered only to the extent permitted by law.
252.205-7000 PROVISION OF INFORMATION TO COOPERATIVE AGREEMENT HOLDERS
(DEC 1991)
(IAW DFARS 205.470, DFARS 212.301(f)(x))
52.209-6 PROTECTING THE GOVERNMENT'S INTEREST WHEN SUBCONTRACTING WITH
CONTRACTORS DEBARRED, SUSPENDED, OR PROPOSED FOR DEBARMENT
(JUN 2020)
(IAW FAR 9.409)
52.209-9 UPDATES OF PUBLICLY AVAILABLE INFORMATION REGARDING
RESPONSIBILITY MATTERS (OCT 2018)
(IAW FAR 9.104-7(c))
52.209-10 PROHIBITION ON CONTRACTING WITH INVERTED DOMESTIC CORPORATIONS
(NOV 2015)
(IAW FAR 9.108-5(b))
252.209-7004 SUBCONTRACTING WITH FIRMS THAT ARE OWNED OR CONTROLLED BY THE
GOVERNMENT OF A COUNTRY THAT IS A STATE SPONSOR OF TERRORISM
(MAY 2019)
(IAW DFARS 209.409)
52.211-15 DEFENSE PRIORITY AND ALLOCATION REQUIREMENTS (APR 2008)
(IAW FAR 11.604(b)) This is a rated order certified for national defense, emergency preparedness, and energy program use, and the Contractor shall follow all the requirements of the Defense Priorities and Allocations System regulation (15 CFR 700).
252.211-7007 REPORTING OF GOVERNMENT-FURNISHED PROPERTY (AUG 2012)
(IAW DFARS 211.274-6(b), DFARS 212.301(f)(iv))
52.215-2 AUDIT AND RECORDS--NEGOTIATION (JUN 2020)
(IAW FAR 15.209(b)(1))
52.215-8 ORDER OF PRECEDENCE--UNIFORM CONTRACT FORMAT (OCT 1997)
(IAW FAR 15.209(h), AFFARS 53.15.209(h))
52.215-23 LIMITATIONS ON PASS-THROUGH CHARGES (JUN 2020)
(IAW FAR 15.408(n)(2))
52.216-7 ALLOWABLE COST AND PAYMENT (AUG 2018)
(IAW FAR 16.307(a))
(a) Invoicing.
(3) The designated payment office will make interim payments for contract financing on the _30th day
52.216-11 COST CONTRACT--NO FEE (APR 1984)
(IAW FAR 16.307(e)(1))
52.219-8 UTILIZATION OF SMALL BUSINESS CONCERNS (OCT 2018)
(IAW FAR 19.708(a))
52.219-9 SMALL BUSINESS SUBCONTRACTING PLAN (JUN 2020)
(IAW FAR 19.708(b))
52.219-16 LIQUIDATED DAMAGES--SUBCONTRACTING PLAN (JAN 1999)
(IAW FAR 19.708(b)(2))
52.219-28 POST-AWARD SMALL BUSINESS PROGRAM REREPRESENTATION (NOV 2020)
(IAW FAR 19.309(c))
(h) If the Contractor does not have representations and certifications in SAM, or does not have a representation in SAM for the NAICS code applicable to this contract, the Contractor is required to complete the following rerepresentation and submit it to the contracting office, along with the contract number and the date on which the rerepresentation was completed:
(1) The Contractor represents that it [ ] is, [ ] is not a small business concern under NAICS Code ________ assigned to contract number _______________.
(2) [Complete only if the Contractor represented itself as a small business concern in paragraph (h)(1) of this clause.] The Contractor represents that it [ ] is, [ ] is not, a small disadvantaged business concern as defined in 13 CFR 124.1002.
(3) [Complete only if the Contractor represented itself as a small business concern in paragraph (h)(1) of this clause.] The Contractor represents that it [ ] is, [ ] is not a women-owned small business concern.
(4) Women-owned small business (WOSB) concern eligible under the WOSB Program.
[Complete only if the Contractor represented itself as a women-owned small business concern in paragraph (h)(3) of this clause.] The Contractor represents that—
(i) It [ ] is, [ ] is not a WOSB concern eligible under the WOSB Program, has provided all the required documents to the WOSB Repository, and no change in circumstances or adverse decisions have been issued that affects its eligibility; and
(ii) It [ ] is, [ ] is not is not a joint venture that complies with the requirements of 13 CFR part 127, and the representation in paragraph (h)(4)(i) of this clause is accurate for each WOSB concern eligible under the WOSB Program participating in the joint venture.
[The Contractor shall enter the name or names of the WOSB concern eligible under the WOSB Program and other small businesses that are participating in the joint venture: _______________________________.] Each WOSB concern eligible under the WOSB Program participating in the joint venture shall submit a separate signed copy of the WOSB representation.
(5) Economically disadvantaged women-owned small business (EDWOSB) concern.
[Complete only if the Contractor represented itself as a women-owned small business concern eligible under the WOSB Program in (h)(4) of this clause.] The Contractor represents that—
(i) It [ ] is, [ ] is not an EDWOSB concern eligible under the WOSB Program, has provided all the required documents to the WOSB Repository, and no change in circumstances or adverse decisions have been issued that affects its eligibility; and
(ii) It [ ] is, [ ] is not a joint venture that complies with the requirements of 13 CFR part 127, and the representation in paragraph (h)(5)(i) of this clause is accurate for each EDWOSB concern participating in the joint venture.
[The Contractor shall enter the name or names of the EDWOSB concern and other small businesses that are participating in the joint venture: ___________________________________.] Each EDWOSB concern participating in the joint venture shall submit a separate signed copy of the EDWOSB representation.
(6) [Complete only if the Contractor represented itself as a small business concern in paragraph (h)(1) of this clause.] The Contractor represents that it [ ] is, [ ] is not a veteran-owned small business concern.
(7) [Complete only if the Contractor represented itself as a veteran-owned small business concern in paragraph (h)(6) of this clause.] The Contractor represents that it [ ] is, [ ] is not a service-disabled veteran-owned small business concern.
(8) [Complete only if the Contractor represented itself as a small business concern in paragraph (h)(1) of this clause.] The Contractor represents that—
(i) It [ ] is, [ ] is not a HUBZone small business concern listed, on the date of this representation, on the List of Qualified HUBZone Small Business Concerns maintained by the Small Business Administration, and no material changes in ownership and control, principal office, or HUBZone employee percentage have occurred since it was certified in accordance with 13 CFR part 126; and
(ii) It [ ] is, [ ] is not a HUBZone joint venture that complies with the requirements of 13 CFR part 126, and the representation in paragraph (h)(8)(i) of this clause is accurate for each HUBZone small business concern participating in the HUBZone joint venture.
[The Contractor shall enter the names of each of the HUBZone small business concerns participating in the HUBZone joint venture: _________________________________________.] Each HUBZone small business concern participating in the HUBZone joint venture shall submit a separate signed copy of the HUBZone representation.
[Contractor to sign and date and insert authorized signer’s name and title.]
252.219-7003 SMALL BUSINESS SUBCONTRACTING PLAN (DoD CONTRACTS) (DEC 2019)
(IAW DFARS 219.708(b)(1)(A), DFARS 219.708(b)(1)(A)(1))
252.219-7003 SMALL BUSINESS SUBCONTRACTING PLAN (DoD CONTRACTS)--ALTERNATE I
(DEC 2019)
(IAW DFARS 219.708(b)(1)(A)(2), DFARS 219.708(b)(1)(A)(1))
252.219-7004 SMALL BUSINESS SUBCONTRACTING PLAN (TEST PROGRAM) (MAY 2019)
(IAW DFARS 219.708(b)(1)(B))
52.222-1 NOTICE TO THE GOVERNMENT OF LABOR DISPUTES (FEB 1997)
(IAW FAR 22.103-5(a), AFFARS 5322.101-1)
52.222-2 PAYMENT FOR OVERTIME PREMIUMS (JUL 1990)
(IAW FAR 22.103-5(b))
(a) overtime premium does not exceed ___*___
*Overtime Premium $
52.222-3 CONVICT LABOR (JUN 2003)
(IAW FAR 22.202)
52.222-21 PROHIBITION OF SEGREGATED FACILITIES (APR 2015)
(IAW FAR 22.810(a)(1))
52.222-26 EQUAL OPPORTUNITY (SEP 2016)
(IAW FAR 22.810(e))
52.222-35 EQUAL OPPORTUNITY FOR VETERANS (JUN 2020)
(IAW FAR 22.1310(a)(1), DFARS 222.1310(a)(1))
(a) Definitions. As used in this clause-- “Active duty wartime or campaign badge veteran,” “Armed Forces service medal veteran,” “disabled veteran,” “protected veteran,” “qualified disabled veteran,’ and “recently separated veteran” have the meanings given at Federal Acquisition Regulation (FAR) 22.1301.
(b) Equal opportunity clause. The Contractor shall abide by the requirements of the equal opportunity clause at 41 CFR
60-300.5(a), as of March 24, 2014. This clause prohibits discrimination against qualified protected veterans, and requires affirmative action by the Contractor to employ and advance in employment qualified protected veterans.
(c) Subcontracts. The Contractor shall insert the terms of this clause in subcontracts valued at or above the threshold specified in FAR 22.1303(a) on the date of subcontract award, unless exempted by rules, regulations, or orders of the Secretary of Labor.
The Contractor shall act as specified by the Director, Office of Federal Contract Compliance Programs, to enforce the terms, including action for noncompliance. Such necessary changes in language may be made as shall be appropriate of identify properly the parties and their undertakings.
52.222-36 EQUAL OPPORTUNITY FOR WORKERS WITH DISABILITIES (JUN 2020)
(IAW FAR 22.1408(a))
(a) Equal opportunity clause. The Contractor shall abide by the requirements of the equal opportunity clause at 41 CFR 60.741.5(a), as of March 24, 2014. This clause prohibits discrimination against qualified individuals on the basis of disability, and requires affirmative action by the Contractor to employ and advance in employment qualified individuals with disabilities.
(b) Subcontracts. The Contractor shall include the terms of this clause in every subcontract or purchase order in excess of the threshold specified in Federal Acquisition Regulation (FAR) 22.1408(a) on the date of subcontract award, unless exempted by rules, regulations, or orders of the Secretary, so that such provisions will be binding upon each subcontractor or vendor. The Contractor shall act as specified by the Director, Office of Federal Contract Compliance Programs of the U.S. Department of Labor, to enforce the terms, including action for noncompliance. Such necessary changes in language may be made as shall be appropriate to identify properly the parties and their undertakings.
52.222-37 EMPLOYMENT REPORTS ON VETERANS (JUN 2020)
(IAW FAR 22.1310(b))
52.222-40 NOTIFICATION OF EMPLOYEE RIGHTS UNDER THE NATIONAL LABOR
RELATIONS ACT (DEC 2010)
(IAW FAR 22.1605)
52.222-41 SERVICE CONTRACT LABOR STANDARDS (AUG 2018)
(IAW FAR 22.1006(a))
52.222-42 STATEMENT OF EQUIVALENT RATES FOR FEDERAL HIRES (MAY 2014)
(IAW FAR 22.1006(b)) In compliance with the Service Contract Labor Standards statute, and the regulations of the Secretary of Labor (29 CFR Part 4), this clause identifies the classes of service employees expected to be employed under the contract and states the wages and fringe benefits payable to each if they were employed by the contracting agency subject to the provisions of 5 U.S.C. 5341 or 5332.
This Statement is for Information Only:
It is not a Wage Determination
Employee Class Monetary Wage Fringe Benefits
52.222-44 FAIR LABOR STANDARDS ACT AND SERVICE CONTRACT LABOR
STANDARDS--PRICE ADJUSTMENT (MAY 2014)
(IAW FAR 22.1006(c)(2))
52.222-50 COMBATING TRAFFICKING IN PERSONS (OCT 2020)
(IAW FAR 22.1705(a)(1))
52.222-55 MINIMUM WAGES UNDER EXECUTIVE ORDER 13658 (NOV 2020)
(IAW FAR 22.1906)
52.222-62 PAID SICK LEAVE (EXECUTIVE ORDER 13706) (JAN 2017)
(IAW FAR 22.2110)
252.222-7006 RESTRICTIONS ON THE USE OF MANDATORY ARBITRATION AGREEMENTS
(DEC 2010)
(IAW DFARS 222.7405)
52.223-6 DRUG-FREE WORKPLACE (MAY 2001)
(IAW FAR 23.505)
52.223-18 ENCOURAGING CONTRACTOR POLICIES TO BAN TEXT MESSAGING WHILE
DRIVING (JUN 2020)
(IAW FAR 23.1105)
52.224-3 PRIVACY TRAINING (JAN 2017)
(IAW FAR 24.302(a))
52.225-13 RESTRICTIONS ON CERTAIN FOREIGN PURCHASES (FEB 2021)
(IAW FAR 25.1103(a))
252.225-7012 PREFERENCE FOR CERTAIN DOMESTIC COMMODITIES (DEC 2017)
(IAW DFARS 225.7002-3(a))
252.225-7048 EXPORT-CONTROLLED ITEMS (JUN 2013)
(IAW DFARS 225.7901-4)
252.225-7052 RESTRICTION ON THE ACQUISITION OF CERTAIN MAGNETS, TANTALUM, AND
TUNGSTEN (OCT 2020)
(IAW DFARS 225.7018-5)
252.225-7972 PROHIBITION ON THE PROCUREMENT OF FOREIGN-MADE UNMANNED AIRCRAFT
SYSTEMS (DEVIATION 2020-O0015) (MAY 2020)
(IAW Deviation 2020-O0015)
Deviation 2020-O0015
(a) Prohibition. In accordance with section 848 of the National Defense Authorization Act for Fiscal Year 2020, the Contractor shall not provide or use in the performance of this contract—
(1) An unmanned aircraft system (UAS), or any related services or equipment, that—
(i) Is manufactured in the People’s Republic of China or by an entity domiciled in the People’s Republic of China;
(ii) Uses flight controllers, radios, data transmission devices, cameras, or gimbals manufactured in the People’s Republic of China or by an entity domiciled in the People’s Republic of China;
(iii) Uses a ground control system or operating software developed in the People’s Republic of China or by an entity domiciled in the People’s Republic of China; or
(iv) Uses network connectivity or data storage located in, or administered by an entity domiciled in, the People’s Republic of China; or
(2) A system for the detection or identification of a UAS, or any related services or equipment, that is manufactured—
(i) In the People’s Republic of China; or
(ii) By an entity domiciled in the People’s Republic of China.
(b) Subcontracts. The Contractor shall insert the substance of this clause, including this paragraph (b), in all subcontracts or other contractual instruments, including subcontracts for the acquisition of commercial items.
(End of clause)
252.226-7001 UTILIZATION OF INDIAN ORGANIZATIONS, INDIAN-OWNED ECONOMIC
ENTERPRISES, AND NATIVE HAWAIIAN SMALL BUSINESS CONCERNS
(APR 2019)
(IAW DFARS 226.104)
52.227-1 AUTHORIZATION AND CONSENT (JUN 2020)
(IAW FAR 27.201-2(a)(1))
52.227-2 NOTICE AND ASSISTANCE REGARDING PATENT AND COPYRIGHT
INFRINGEMENT (JUN 2020)
(IAW FAR 27.201-2(b))
252.227-7013 RIGHTS IN TECHNICAL DATA--NONCOMMERCIAL ITEMS (FEB 2014)
(IAW DFARS 227.7102-4(b), DFARS 227.7103-6(a))
(e) (3) The Contractor asserts for itself, or the persons identified below, that the Government's rights to use, release, or disclose the following technical data should be restricted—
Technical Data to be Furnished With Restrictions*
Basis for Assertion**
Asserted Rights Category***
Name of person Asserting Restrictions****
(LIST) (LIST) (LIST) (LIST)
*If the assertion is applicable to items, components, or processes developed at private expense, identify both the data and each such item, component, or process.
**Generally, the development of an item, component, or process at private expense, either exclusively or partially, is the only basis for asserting restrictions on the Government's rights to use, release, or disclose technical data pertaining to such items, components, or processes. Indicate whether development was exclusively or partially at private expense. If development was not at private expense, enter the specific reason for asserting that the Government's rights should be restricted.
***Enter asserted rights category (e.g., government purpose license rights from a prior contract, rights in SBIR data generated under another contract, limited or government purpose rights under this or a prior contract, or specifically negotiated licenses).
****Corporation, individual, or other person, as appropriate.
Date ___________________________________ Printed Name ___________________________________ and Title ___________________________________ Signature ___________________________________
(End of identification and assertion)
(f) (2) Government purpose rights markings.
Data delivered or otherwise furnished to the Government purpose rights shall be marked as follows:
GOVERNMENT PURPOSE RIGHTS
Contract No __________________________________ Contractor Name __________________________________ Contractor Address __________________________________
Expiration Date __________________________________
The Government's rights to use, modify, reproduce, release, perform, display, or disclose these technical data are restricted by paragraph (b)(2) of the Rights in Technical Data--Noncommercial Items clause contained in the above identified contract. No restrictions apply after the expiration date shown above. Any reproduction of technical data or portions thereof marked with this legend must also reproduce the markings.
(End of Legend)
(3) Limited rights markings.
Data delivered or otherwise furnished to the Government with limited rights shall be marked with the following legend:
LIMITED RIGHTS
Contract No __________________________________ Contractor Name __________________________________ Contractor Address __________________________________
The Government's rights to use, modify, reproduce, release, perform, display, or disclose these technical data are restricted by paragraph (b)(3) of the Rights in Technical Data--Noncommercial Items clause contained in the above identified contract. Any reproduction of technical data or portions thereof marked with this legend must also reproduce the markings. Any person, other than the Government, who has been provided access to such data must promptly notify the above name Contractor.
(End of legend)
(4) Special license rights markings.
(i) Data in which the Government's rights stem from a specifically negotiated license shall be marked with the following legend:
SPECIAL LICENSE RIGHTS
The Government's rights to use, modify, reproduce, release, perform, display, or disclose these data are restricted by Contract No. __________ (Insert contract number)_______, License No. __________ (Insert license identifier)______. Any reproduction of technical data or portions thereof marked with this legend must also reproduce the markings.
(End of legend)
252.227-7016 RIGHTS IN BID OR PROPOSAL INFORMATION (JAN 2011)
(IAW DFARS 227.7103-6(e)(1), DFARS 227.7104(e)(1), DFARS 227.7203-6(b))
252.227-7030 TECHNICAL DATA--WITHHOLDING OF PAYMENT (MAR 2000)
(IAW DFARS 227.7103-6(e)(2), DFARS 227.7104(e)(4))
(a) the Contracting Officer may until such data is accepted by the Government, withhold payment to the Contractor of ten percent (10%) of the total contract price or amount
252.227-7037 VALIDATION OF RESTRICTIVE MARKINGS ON TECHNICAL DATA (SEP 2016)
(IAW DFARS 227.7102-4(c), DFARS 227.7103-6(e)(3), DFARS 227.7104(e)(5), DFARS 227.7203-6(f))
52.228-7 INSURANCE--LIABILITY TO THIRD PERSONS (MAR 1996)
(IAW FAR 28.311-1)
52.229-4 FEDERAL, STATE, AND LOCAL TAXES (STATE AND LOCAL ADJUSTMENTS)
(FEB 2013)
(IAW FAR 29.401-3(b))
52.229-12 TAX ON CERTAIN FOREIGN PROCUREMENTS (FEB 2021)
(IAW 29.402-3(b))
52.230-6 ADMINISTRATION OF COST ACCOUNTING STANDARDS (JUN 2010)
(IAW FAR 30.201-4(d)(1))
252.231-7000 SUPPLEMENTAL COST PRINCIPLES (DEC 1991)
(IAW DFARS 231.100-70)
52.232-1 PAYMENTS (APR 1984)
(IAW FAR 32.111(a)(1))
52.232-8 DISCOUNTS FOR PROMPT PAYMENT (FEB 2002)
(IAW FAR 32.111(b)(1))
52.232-11 EXTRAS (APR 1984)
(IAW FAR 32.111(c)(2))
52.232-17 INTEREST (MAY 2014)
(IAW FAR 32.611(a), FAR 32.611(b))
52.232-20 LIMITATION OF COST (APR 1984)
(IAW FAR 32.706-2(a))
52.232-23 ASSIGNMENT OF CLAIMS (MAY 2014)
(IAW FAR 32.806(a)(1))
52.232-25 PROMPT PAYMENT (JAN 2017)
(IAW FAR 32.908(c))
(a) Invoice payments—
(5) Computing penalty amount. The Government will compute the interest penalty in accordance with the Office of Management and Budget prompt payment regulations at 5 CFR part 1315.
(i) For the sole purpose of computing an interest penalty that might be due the Contractor, Government acceptance is deemed to occur constructively on the 7th day (unless otherwise specified in this contract) after the Contractor delivers the supplies or performs the services in accordance with the terms and conditions of the contract, unless there is a disagreement over quantity, quality, or Contractor compliance with a contract provision. If actual acceptance occurs within the constructive acceptance period, the Government will base the determination of an interest penalty on the actual date of acceptance. The constructive acceptance requirement does not, however, compel Government officials to accept supplies or services, perform contract administration functions, or make payment prior to fulfilling their responsibilities.
52.232-33 PAYMENT BY ELECTRONIC FUNDS TRANSFER--SYSTEM FOR AWARD
MANAGEMENT (OCT 2018)
(IAW FAR 32.1110(a)(1))
52.232-39 UNENFORCEABILITY OF UNAUTHORIZED OBLIGATIONS (JUN 2013)
(IAW FAR 32.706-3)
52.232-40 PROVIDING ACCELERATED PAYMENTS TO SMALL BUSINESS
SUBCONTRACTORS (DEC 2013)
(IAW FAR 32.009-2)
252.232-7003 ELECTRONIC SUBMISSION OF PAYMENT REQUESTS AND RECEIVING REPORTS
(DEC 2018)
(IAW DFARS 232.7004(a))
(a) Definitions. As used in this clause— “Contract financing payment” means an authorized Government disbursement of monies to a contractor prior to acceptance of supplies or services by the Government.
(1) Contract financing payments include—
(i) Advance payments;
(ii) Performance-based payments;
(iii) Commercial advance and interim payments;
(iv) Progress payments based on cost under the clause at Federal Acquisition Regulation (FAR) 52.232-16, Progress Payments;
(v) Progress payments based on a percentage or stage of completion (see FAR 32.102(e)), except those made under the clause at FAR 52.232-5, Payments Under Fixed-Price Construction Contracts, or the clause at FAR 52.232-10, Payments Under Fixed-Price Architect-Engineer Contracts; and
(vi) Interim payments under a cost reimbursement contract, except for a cost reimbursement contract for services when Alternate I of the clause at FAR 52.232-25, Prompt Payment, is used.
(2) Contract financing payments do not include—
(i) Invoice payments;
(ii) Payments for partial deliveries; or
(iii) Lease and rental payments.
“Electronic form” means any automated system that transmits information electronically from the initiating system to affected systems.
“Invoice payment” means a Government disbursement of monies to a contractor under a contract or other authorization for supplies or services accepted by the Government.
(1) Invoice payments include—
(i) Payments for partial deliveries that have been accepted by the Government;
(ii) Final cost or fee payments where amounts owed have been settled between the Government and the contractor;
(iii) For purposes of subpart 32.9 only, all payments made under the clause at 52.232-5, Payments Under Fixed-Price Construction Contracts, and the clause at 52.232-10, Payments Under Fixed-Price Architect-Engineer Contracts; and
(iv) Interim payments under a cost-reimbursement contract for services when Alternate I of the clause at 52.232-25, Prompt Payment, is used.
(2) Invoice payments do not include contract financing payments.
“Payment request” means any request for contract financing payment or invoice payment submitted by the Contractor under this contract or task or delivery order.
“Receiving report” means the data prepared in the manner and to the extent required by Appendix F, Material Inspection and Receiving Report, of the Defense Federal Acquisition Regulation Supplement.
(b) Except as provided in paragraph (d) of this clause, the Contractor shall submit payment requests and receiving reports in electronic form using Wide Area WorkFlow (WAWF). The Contractor shall prepare and furnish to the Government a receiving report at the time of each delivery of supplies or services under this contract or task or delivery order.
(c) Submit payment requests and receiving reports to WAWF in one of the following electronic formats:
(1) Electronic Data Interchange.
(2) Secure File Transfer Protocol.
(3) Direct input through the WAWF website.
(d) The Contractor may submit a payment request and receiving report using methods other than WAWF only when—
(1) The Contractor has requested permission in writing to do so, and the Contracting Officer has provided instructions for a temporary alternative method of submission of payment requests and receiving reports in the contract administration data section of this contract or task or delivery order;
(2) DoD makes payment for commercial transportation services provided under a Government rate tender or a contract for transportation services using a DoD-approved electronic third party payment system or other exempted vendor payment/invoicing system (e.g., PowerTrack, Transportation Financial Management System, and Cargo and Billing System);
(3) DoD makes payment on a contract or task or delivery order for rendered health care services using the TRICARE Encounter Data System; or
(4) The Governmentwide commercial purchase card is used as the method of payment, in which case submission of only the receiving report in WAWF is required.
(e) Information regarding WAWF is available at https://wawf.eb.mil/.
(f) In addition to the requirements of this clause, the Contractor shall meet the requirements of the appropriate payment clauses in this contract when submitting payment requests.
252.232-7010 LEVIES ON CONTRACT PAYMENTS (DEC 2006)
(IAW DFARS 232.7102)
252.232-7017 ACCELERATING PAYMENTS TO SMALL BUSINESS SUBCONTRACTORS -
PROHIBITION ON FEES AND CONSIDERATION (APR 2020)
(IAW DFARS 232.009-2)
52.233-1 DISPUTES (MAY 2014)
(IAW FAR 33.215)
52.233-3 PROTEST AFTER AWARD (AUG 1996)
(IAW FAR 33.106(b))
52.233-3 PROTEST AFTER AWARD -- ALTERNATE I (JUN 1985)
(IAW FAR 33.106(b))
52.233-4 APPLICABLE LAW FOR BREACH OF CONTRACT CLAIM (OCT 2004)
(IAW FAR 33.215(b))
252.237-7010 PROHIBITION ON INTERROGATION OF DETAINEES BY CONTRACTOR
PERSONNEL (JUN 2013)
(IAW DFARS 237.173-5)
52.242-1 NOTICE OF INTENT TO DISALLOW COSTS (APR 1984)
(IAW FAR 42.802)
52.242-4 CERTIFICATION OF FINAL INDIRECT COSTS (JAN 1997)
(IAW FAR 42.703-2(f))
(c) The certificate of final indirect costs shall read as follows:
CERTIFICATE OF FINAL INDIRECT COSTS
This is to certify that I have reviewed this proposal to establish final indirect cost rates and to the best of my knowledge and belief:
1. All costs included in this proposal (identify proposal and date) to establish final indirect costs rates for (identify period covered by rate) are allowable in accordance with the cost principles of the Federal Acquisition Regulation (FAR) and its supplements applicable to the contracts to which the final indirect cost rates will apply; and
2. This proposal does not include any costs which are expressly unallowable under applicable cost principles of the FAR or its supplements.
Firm: ___________________________________________________ Signature: _______________________________________________ Name of Certifying Official: __________________________________ Title: ____________________________________________________ Date of Execution: _________________________________________
52.242-5 PAYMENTS TO SMALL BUSINESS SUBCONTRACTORS (JAN 2017)
(IAW FAR 42.1504)
52.242-13 BANKRUPTCY (JUL 1995)
(IAW FAR 42.903)
252.242-7004 MATERIAL MANAGEMENT AND ACCOUNTING SYSTEM (MAY 2011)
(IAW DFARS 242.7204)
52.243-1 CHANGES--FIXED-PRICE (AUG 1987)
(IAW FAR 43.205(a)(1))
52.243-1 CHANGES--FIXED-PRICE -- ALTERNATE I (APR 1984)
(IAW FAR 43.205(a)(2))
52.243-2 CHANGES--COST-REIMBURSEMENT (AUG 1987)
(IAW FAR 43.205(b)(1))
52.243-2 CHANGES--COST-REIMBURSEMENT -- ALTERNATE I (APR 1984)
(IAW FAR 43.205(b)(2))
252.243-7001 PRICING OF CONTRACT MODIFICATIONS (DEC 1991)
(IAW DFARS 243.205-70)
252.243-7002 REQUESTS FOR EQUITABLE ADJUSTMENT (DEC 2012)
(IAW DFARS 243.205-71)
252.243-7999 SECTION 3610 REIMBURSEMENT (DEVIATION 2020-O0021) (AUG 2020)
(IAW Deviation 2020-O0021, Revision 3)
(a) Definitions. As used in this clause—
“Affected contractor” means a contractor that has incurred costs to provide paid leave for its employees or subcontractors to maintain its workforce in a ready state and otherwise meets all the requirements of section 3610 of the Coronavirus Aid, Relief, and Economic Security Act (CARES Act) (Pub. L. 116–136).
(b) Reduction for credits or loan forgiveness.
(1) Section 3610 of the CARES Act requires that the maximum reimbursement to affected contractors authorized by section 3610 shall be reduced by the amount of any credits received pursuant to Division G of Public Law 116-127 and any applicable credits a contractor is allowed under the CARES Act. The Contracting Officer will reduce the amount of the funds authorized under section 3610 and provided by modification, commensurate with the amount of any credits or loan forgiveness received.
(2) Should the timing of any other reimbursements be such that the Contractor is unable to provide notification to the contracting officer prior to execution of a contract modification resulting from the Contractor’s section 3610 reimbursement request, the Contractor shall notify the contracting officer, as provided in paragraph (c), and agrees that the Government will modify the contract to reduce the reimbursed amount by the credit or loan forgiveness amount received.
(c) Notice of receipt of credits or loan forgiveness.
(1) The Contractor shall notify the Contracting Officer in writing within 30 days of receiving—
12. Loan forgiveness pursuant to—
13. Division G of the Families First Coronavirus Response Act (Pub. L. 116–127); or
(B) The Coronavirus Aid, Relief, and Economic Security Act (CARES Act) (Pub. L. 116–136); and
13. Any other credit allowed by law (including State and local laws that are specifically identifiable with the public health emergency declared on January 31, 2020, for COVID-19).
(2) Include in the notice to the Contracting Officer the amount of any credits or loan forgiveness received along with supporting information necessary to facilitate calculation of the required reductions of reimbursement provided under any contract modification pursuant to section 3610 reimbursement to offset credits or loan forgiveness received under paragraph (c)(1).
(d) Audit. The Government reserves the right to audit the Contractor’s billed costs reimbursed under section 3610 of the CARES Act to ensure accuracy and compliance with law and any applicable regulations.
(e) Subcontracts. The Contractor shall insert the substance of this clause, including this paragraph (e), in any subcontract modification that involves the reimbursement of paid leave under section 3610 of the CARES Act to affected subcontractors, including subcontracts for the acquisition of commercial items.
52.244-2 SUBCONTRACTS (JUN 2020)
(IAW FAR 44.204(a)(1), FAR 44.204(a)(3))
(d) If the Contractor has an approved purchasing system, the Contractor nevertheless shall obtain the Contracting Officer's written consent before placing the following subcontracts:
Subcontracts
(j) Paragraphs (c) and (e) of this clause do not apply to the following subcontracts, which were evaluated during negotiations:
Subcontracts
52.244-5 COMPETITION IN SUBCONTRACTING (DEC 1996)
(IAW FAR 44.204(c))
52.244-6 SUBCONTRACTS FOR COMMERCIAL ITEMS (NOV 2020)
(IAW FAR 44.403)
252.244-7001 CONTRACTOR PURCHASING SYSTEM ADMINISTRATION--BASIC (MAY 2014)
(IAW DFARS 244.305-71)
52.245-1 GOVERNMENT PROPERTY (JAN 2017)
(IAW FAR 45.107(a), DFARS 237.7003(c), DFARS 245.107)
52.245-9 USE AND CHARGES (APR 2012)
(IAW FAR 45.
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .