01_AIR_SPEC_21_50070.pdf

PDF 167 KB Posted

Attached to
SELECTOR, MODE Federal contract opportunity
Solicitation number
FA8213-21-R-3018
Issued by
Department of the Air Force Materiel Command Lifecycle Management Center Hill Air Force Base

About this file

This document outlines specifications for an ammunition contract opportunity. The contractor shall provide selectors, actuators, AND gates, and primers with advanced shipment notices and packing documentation. Key requirements include item marking, shelf life tracking of energetic materials under 24 months, leak testing, lot acceptance testing plans, and failure analysis reports. The opportunity involves B-1B aircraft life support devices totaling 360 units to be delivered to Tinker Air Force Base by 30 June 2022. Safety and handling requirements address explosives and hazardous materials transportation.

View the file

Other files for this federal contract opportunity

Other files attached to SELECTOR, MODE, newest first.
File Type Posted
03_ADCSOW.pdf PDF
09_CADPAD_Item_Marking_Instruction_Ver.pdf PDF
JQRS_mode_selector.pdf PDF
Repair_Rework_20_8_20_P1.pdf PDF
FA821321R3018.RTF RTF text file
CDRLs_6_17_2020_p7.pdf PDF
SPI_012374417_Mode_Selector.pdf PDF
SPI_012715483_AND_Gates.pdf PDF
06_Item_Descriptions.pdf PDF
JQRSANDGateTypII.pdf PDF
JQRSANDGateTypeIII.pdf PDF
02_REPSHIP.pdf PDF
07_QALI.pdf PDF
Show all 13

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AIRMUNITION SPECIFICATION

FD2020-21-50070

23 Jun 2020

NSN: 1377012374417ES, 1377012715483ES, 1377012715484ES, 1377012715485ES

1. The contractor shall provide an advanced Report of Shipment (REPSHIP) to the consignee no later than 24 hours prior to the shipment arrival, and for ammunition shipments no later than two hours after shipment departure. A REPSHIP shall include all the following data in accordance with Attachment 1.

2. Department of Defense Identification Code (DODIC): SY14 - 1377012374417ES, MU99 -

1377012715483ES, MU98 - 1377012715484ES, MU97 - 1377012715485ES

3. Government Furnished Material:

Stock Number: 1377011163197ES Part Number: 851AS250 Noun: PVU-2/A Primer Quantity: TBD

4. Ammunition Data Cards (ADC) shall be filled out; input in accordance with Attachment 2, Statement of Work – Ammunition Data Cards; and state quantity/serial number of lot acceptance test units in the remarks block. One hard copy of the ADC shall accompany shipments to each shipping location. CDRL (DI-MISC-80043B)

5. Items shall be marked in accordance with CAD/PAD Item Marking Instruction Version 1.5, 1 May 2019, reference attachment.

6. Shelf Life Code marking NOT required per MIL-STD-129.

7. Hazard Classification Information:

Hazard Class Division: 1.4 Storage Compatibility Group: S DOT Marking: RELEASE DEVICES, EXPLOSIVE DOT Class: 1.4S DOT Label: Explosive 1.4S UN Serial Number: 0173 UN Proper Shipping Name: RELEASE DEVICES, EXPLOSIVE NEW: NSN 1377012374417ES - 0.001300 lbs, NSN 1377012715483ES, 1377012715484ES, 1377012715485ES - 0.000300 lbs

Net Explosive Weight NEW for all packaging/shipping documents shall reflect the NEW identified above per JHCS or IHC. If NEW is altered to adjust item performance and is greater than the weight listed, an ECP shall be submitted to the government prior to manufacturing or at least 60 days prior to shipping and shall include the SDS (formerly MSDS) and applicable supporting documentation.

8. All Engineering Change Proposals (ECPs), Notice of Revisions (NORs), and Request For Variances (RFVs formerly RFD/RFWs) affecting the approved product baseline configuration, acceptance test procedures, or manufacturing process of any item(s) on this contract shall be in accordance with EIA-649-B. Major ECPs with NORs and Critical/Major RFVs shall be submitted to the responsible Government Engineering Authority for review/disposition by CCB.

Minor/Administrative ECPs with NORs and Minor RFVs shall be processed by the:

COGNIZANT GOVERNMENT ENGINEER

ECPs -- CDRL (DI-SESS-80639D) NORs – CDRL (DI-SESS-80642D) RFVs – CDRL (DI-SESS-80640D)

Distribution Statement: B, Reason: Administrative or Operational (ref. DoD 5230.24)

9. Item(s) must pass both gross and fine leak checks. MIL-STD-883K(2), Method 1014.16 may be used as guidance. The existing leak rate limit established for this item(s) will remain the same.

Contractor shall generate a Lot Acceptance Test Plan (LATP/ATP) with an analysis or test results showing compliance for Hill AFB engineering approval at least 90 days prior to commencement of Lot Acceptance Testing allowing for 30 days approval time after submission.

CDRL (DI-QCIC-80553A)

10. Lot Acceptance Test Requirements are: IAW latest Government approved ATP. Contractor

11. The contractor shall furnish a Lot Acceptance Test/Inspection Report in WAWF

CDRL: (DI-NDTI-80809B)

12. LOT ACCEPTANCE TEST: In the event of an end item failure, the contractor shall notify the PCO/ACO and Air Force Engineering Organization within 1 business day.

Air Force Engineering Organization: AFLCMC/EBHJ Organization E-mail: devin.swanson@us.af.mil

13. In the event of test failure(s), a Failure Analysis and Corrective Action Report with proposed corrective actions/recommendations is required. CDRL: (DI-SESS-80255B)

14. If Hexanitrostilbene (HNS) explosive material is used in the manufacture of this item, the HNS shall meet the requirements of Government Document WS5003F (or latest revision), Purchase Description of HNS Explosive; and maximum particle size shall not exceed 250 microns.

15. The age of the energetic materials and components (i.e. ALL explosives, propellants, pyrotechnics, cartridges, and/or initiators) used in the manufacture of these items or sub-components shall not exceed 24 months based on the original manufacturing date. All energetic materials and components must be traceable to the original DoD qualified manufacturer and compliant with the ITAR part 120 and 121 (http://www.pmddtc.state.gov/regulations_laws/itar.html).

16. Raw (non-blended) ingredients & materials used in blended/mixed energetic materials such as, but not limited to: fuels, oxidizers, binders, curatives, sensitizers, plasticizers, stabilizers etc., http://www.pmddtc.state.gov/regulations_laws/itar.html shall not exceed 24 months since date of manufacture and comply with original manufacture’s Specification or MIL-STD. The government may waive the energetic and constituent material requirements listed above or portions thereof, on a case-by-case basis (when acceptable to the government) provided the contractor furnishes all details of the reason for the waiver and the age, lot numbers, traceability, and other pertinent information/ test data and Certificate of Analysis/ Conformance (COA/COC) of the subject materials or components. The waiver shall be submitted as a RFV and may be subject to, but not limited to, conditions such as sensitivity testing, stabilizer and analysis and/or dehumidification at vendor’s cost; therefore, vendor must plan accordingly. RFV not required provided vendor has approved energetic material and constituent management and recertification plan approved by HAFB technical authority for this specific contract and contract is executed with materials in compliance with said plan.

Recertification test data for materials shall be provided by vendor upon request at no additional charge to the government. All raw ingredients, materials and components must be traceable to the original DoD qualified manufacturer and compliant with the ITAR part 120 and 121.

17. Percussion primers shall have been certified/recertified by performing sensitivity (all-fire/no fire) and dud testing per applicable specification within the past 24 months unless they are Navy certified and have a 2 year certification. Primers shall be stored in a temperature and humidity controlled environment and in a sealed container with desiccant from time of primer manufacturing, shipping, storage and through final installation in end item. All primers shall be X-rayed in top and side views for critical defects prior to use.

18. This item is designated as a Critical Safety Item (CSI). Documentation for critical characteristics may be found in the contract, TDP, assembly/inspection procedures or QALI.

MRB approval authority shall be retained by government engineer. Other characteristics requiring inspection or special oversight from DCMA: See attached QALI.

19. Approval from government engineer is required prior to rework and repair of nonconforming material (see Attachment 5, Clause ES7034)

20. Contracts involving ammunition and explosives (AE) will contain:

- DFARS Title 48 Part 252.223-7002, Safety Precautions for Ammunition and Explosives

- DFARS Title 48 Part 252.223-7003, Change in Place of Performance - Ammunition and Explosives Additionally, if the scope of work includes air shipment of explosives, the safety specification should require contractor compliance with:

- AFMAN 24-204(I), Preparing Hazardous Materials for Military Air Shipments

File details come from the government source that posted it. Updated .