FA821319R3017.pdf
PDF 139 KB Posted
- Attached to
- SMDC/GAS Initiator Federal contract opportunity
- Solicitation number
- FA821319R3017
About this file
Solicitation FA821319R3017
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| ES7034.doc | DOC document | |
| CADPADIMI.doc | DOC document | |
| F001383770.pdf | ||
| AirSpec.doc | DOC document | |
| EDLs.pdf | ||
| F011676621.pdf | ||
| FORM158.pdf | ||
| REPSHIP11Mar14.doc | DOC document | |
| GFP.pdf | ||
| F012340719.pdf | ||
| QALI.pdf | ||
| SOW.PDF | ||
| F003493943.pdf | ||
| F010528207.pdf | ||
| BidSets.doc | DOC document | |
| CDRLs.pdf | ||
| ItemDescription.pdf | ||
| JQRS.pdf | ||
| ADCSOW.doc | DOC document |
Show all 19
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STANDARD FORM 1447 (2/2012)
Prescribed by GSA FAR (48 CFR) 53.215-1(d)
4. SOLICITATION NUMBER
FA8213-19-R-3017
X
6.SOLICITATION ISSUE DATE
19 APR 2019
8. THIS ACQUISITION IS UNRESTRICTED OR SET ASIDE: % FOR
SMALL BUSINESS WOMEN-OWNED SMALL BUSINESS (WOSB)
ELIGIBLE UNDER THE WOSB PROGRAM
HUBZONE SMALL
BUSINESS EDWOSB
SERVICE-DISABLED VETERAN-
OWNED SMALL BUSINESS NAICS CODE: 325920
8(A) SIZE STANDARD: 750
DATE SIGNED
28. UNITED STATES OF AMERICA (SIGNATURE OF CONTRACTING OFFICER)
26. AWARD OF CONTRACT: YOUR OFFER ON SOLICITATION NUMBER
SHOWN IN BLOCK 4 INCLUDING ANY ADDITIONS OR CHANGES WHICH
ARE SET FORTH HEREIN, IS ACCEPTED AS TO ITEMS:
ROUTINE.
Subject to the terms and conditions stated herein, the Contractor agrees to hold its offered prices firm for 120 days.
EXPEDITED DELIVERY AT NO ADDITIONAL COST TO THE GOVERNMENT IS AUTHORIZED.
Sources: Chemring Energetic Devices; cage (93455) Pacific Scientific Energetic Material Company; cage (06331) Universal Propulsion Company, Inc; cage (17610)
Restricted to qualified sources. In order to be considered for award, the contractor shall be an approved source by the time of award. A qualification package is required for new sources. See clause 52.209-1 and the attached source qualification statement for qualification requirements. Prospective contractors may submit an offer on supplies bearing different part numbers from those cited in the solicitation. Proposals will not be considered if a qualification package is not submitted with the proposal.
SEE LINE ITEM SCHEDULE
22.
AMOUNT
16. AUTHORITY FOR USING OTHER THAN 10 USC 2304 41 USC 253
FULL AND OPEN COMPETITION (c) ( ) (c) ( )
DATE SIGNED
27. SIGNATURE OF OFFEROR/CONTRACTOR
20.
UNIT
21.
UNIT PRICE
19.
QUANTITY
13. CONTRACTOR OFFEROR CODE FACILITY CODE
11. IF OFFER IS ACCEPTED BY THE GOVERNMENT WITHIN * ___ CALENDAR DAYS (60 CALENDAR DAYS UNLESS OFFEROR
INSERTS A DIFFERENT PERIOD) FROM THE DATE SET FORTH IN BLK 9 ABOVE, THE CONTRACTOR AGREES TO HOLD ITS
OFFERED PRICES FIRM FOR THE ITEMS SOLICITED HEREIN AND TO ACCEPT ANY RESULTING CONTRACT SUBJECT TO
THE TERMS AND CONDITIONS STATED HEREIN. *120
RATING
DO: A6
3. AWARD/EFFECTIVE DATE
FA8213
2. CONTRACT NO.
X
CHECK IF REMITTANCE IS DIFFERENT
AND PUT SUCH ADDRESS IN OFFER
17.
ITEM NO.
12. ADMINISTERED BY CODE
Total
SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK: 14 EFT:T
SCD:B
NAME AND TITLE OF SIGNER (TYPE OR PRINT) NAME OF CONTRACTING OFFICER
24. AWARD AMOUNT (FOR GOVT USE ONLY)
23. ACCOUNTING AND APPROPRIATION DATA
SEE SCHEDULE
5. SOLICITATION TYPE
SEALED BIDS NEGOTIATED
(IFB) (RFP)
15. PROMPT PAY DISCOUNT
25. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN 1
COPIES TO ISSUING OFFICE. CONTRACTOR AGREES TO FURNISH AND DELIVER ALL ITEMS SETFORTH OR OTHERWISE
IDENTIFIED ABOVE AND ON ANY CONTINUATION SHEETS SUBJECT
THE TERMS AND CONDITIONS SPECIFIED HEREIN.
10. ITEMS TO BE PURCHASED (BRIEF DESCRIPTION)
SUPPLIES SERVICES Explosives Manufacturing
9.
Solicitation: Offers will be received at the Issuing office until * on * . Late offers are subject to late proposal provisions incorporated herein. All offers are subject to such provisions, representations certifications and specifications as are attached or incorporated by reference.*
20-MAY-2019 2:00PM
18.
SCHEDULE OF SUPPLIES/SERVICES
14. PAYMENT WILL BE MADE BY CODE
(SEE ESP CLAUSE 252.232-7003.)
X
7. ISSUED BY CODE
DEPARTMENT OF THE AIR FORCE, DIRECTORATE OF CONTRACTING
AFLCMC EBHK
6072 FIR AVENUE BLDG 1233
HILL AIR FORCE BASE UT 84056-5820
BUYER: Nichole Fuit/AFLCMC nichole.fuit@us.af.mil Phone: (801) 775- 4537 No Collect Calls
X
1. THIS CONTRACT IS A RATED ORDER UNDER DPAS
(15 CFR 350)SOLICITATION/CONTRACT
BIDDER/OFFEROR TO COMPLETE BLOCKS 11, 13, 15, 21, 22, & 27.
J
SF 1447 (rev 2/2012) BACK
NO RESPONSE FOR THE REASONS CHECKED
TYPE OR PRINT NAME AND TITLE OF SIGNER
SIGNATURENAME AND ADDRESS OF FIRM (Include Zip Code)
WE DO NOT DESIRE TO BE RETAINED ON THE MAILING LIST FOR FUTURE PROCUREMENT OF THE TYPE OF
ITEMS INVOLVED
WE DO
OTHER (Specify)
CANNOT COMPLY WITH SPECIFICATIONS
CANNOT COMPLY WITH SPECIFICATIONS CANNOT MEET DELIVERY REQUIREMENT
FOLD
FOLD
FOLD FOLD
SOLICITATION NO. FA821319R3017
DUE: 20 MAY 2019 2:00 PM
FROM: AFFIX
STAMP
HERE
TO:
ATTN: Nichole Fuit/AFLCMC
DEPARTMENT OF THE AIR FORCE, DIRECTORATE OF CONTRACTING
AFLCMC EBHK
6072 FIR AVENUE BLDG 1233
HILL AIR FORCE BASE UT 84056-5820
FA8213-19-R-3017
PART I - THE SCHEDULE
SECTION B
SUPPLIES OR SERVICES AND PRICES/COSTS
DCMA and DFAS are required to withhold payment IAW DFAR 252.227-7030 until CDRL A001, A005, A006, B001 & B002 have been delivered and/or approved by Hill AFB.
SMDC/GAS INITIATOR
INFO CLIN
Item No.
GROUP STOCK NO P/N CAGE
Group 001 Alternate 1377-01-384-9246 ES 6110200 93455
1377-01-432-0349 ES 826599-1 06331
NSN: 1377-01-234-8510 ES
SMDC/GAS INITIATOR
DODIC: SQ34
Manufacturer Part Number 06331 826599-1 17610 3384200 93455 6110200 Priority: R ROUTINE.
Applicability: None ;
Buy American Act/Balance of Payments Program IUID Required: Yes Physical Item Markings:
Serial Number Required
Physical Item Markings IAW CAD/PAD Item Marking Instructions version 1.3 dated 19 Apr 2016.
Applicable SPI Number: F011676621
FIRST ARTICLE TEST PLAN
Bid A - First Article Required Item No.
0001AA
Not Separately Priced Quantity U/I Unit Price
FIRST ARTICLE TEST PLAN
Bid A - First Article Required
1 LO NSP
FATP
First Article Test Plan
TEST PLAN
IAW DD 1423-1
Associated Document(s) Line Item(s)
FD20201950002 001AA
Priority: R ROUTINE.
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Exhibit: B Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring
ISO 9001-2008 2008
IUID Required: No Type / Ship To Quantity (U/I) *ARO Contract _ Req No / Pri
Required Delivery
+ IAW1423 1 LO *30 Calendar Days
Proposed Delivery
+ IAW1423 1 LO
FIRST ARTICLE
Bid A - First Article Required Item No.
0001AB
Firm Fixed Price Quantity U/I Unit Price Amount
4 EA
CLIN ACRN ACRN Total
0001AB AA
FA
First Article
FIRST ARTICLE - SAME AS BASIC LINE ITEM ABOVE
Associated Document(s) Line Item(s)
FD20201950002 002AA
Priority: R ROUTINE.
Limitations of Liability: Other Than High Value Item
FIRST ARTICLE
Bid A - First Article Required
Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Type / Ship To Quantity (U/I) *ARO APPROVAL OF
FIRST ARTICLE TEST
PLAN REPORT
_ Req No / Pri
Required Delivery
+ TBC 4 EA *120 Calendar Days
Proposed Delivery
+ TBC 4 EA
FIRST ARTICLE TEST REPORT
Bid A - First Article Required Item No.
0001AC
Not Separately Priced Quantity U/I Unit Price
1 LO NSP
FATR
First Article Test Report
TEST REPORT
TEST REPORT IAW DD 1423-1
Associated Document(s) Line Item(s)
FD20201950002 003AA
Priority: R ROUTINE.
Limitations of Liability: Other Than High Value Item
Inspection: Origin Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Exhibit: B Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Type / Ship To Quantity (U/I) *ARO Completion of
FA testing _ Req No / Pri
FIRST ARTICLE TEST REPORT
Bid A - First Article Required Required Delivery
+ IAW1423 1 LO *30 Calendar Days
Proposed Delivery
+ IAW1423 1 LO
SMDC/GAS INITIATOR
Bid A - First Article Required Item No.
0001AD
Firm Fixed Price Quantity U/I Unit Price Amount
56 EA
CLIN ACRN ACRN Total
0001AD AA
PROD
PRODUCTION ARTICLE - SAME AS BASIC LINE ITEM ABOVE
Associated Document(s) Line Item(s)
FD20201950002 004AA
Priority: R ROUTINE.
Limitations of Liability: Other Than High Value Item
Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Applicability: None ;
Transportation From Continental United States CONUS (CONUS) Sources
TYPE / SHIP TO CODE F.O.B.
B FV2037 ORIGIN
Type / Ship To PACRN Mark For
B FV2037 B1 PDM
Type / Ship To Quantity (U/I) On or Before _ Req No / Pri
Required Delivery
B FV2037 56 EA 30 JUN 2021 Non-MilStrip
Proposed Delivery
B FV2037 56 EA
Transportation Chargeable To: F2DCAE8288NP02 5793011 H89 LCHN 355100 4E27A1 462FD 78070F 503000 F03000
SMDC/GAS INITIATOR
Bid B - First Article NOT Required Item No.
0001AE
Firm Fixed Price Quantity U/I Unit Price Amount
56 EA
CLIN ACRN ACRN Total
0001AE AA
PROD
PRODUCTION ARTICLE - SAME AS BASIC LINE ITEM ABOVE
Associated Document(s) Line Item(s)
FD20201950002 004AA
Priority: R ROUTINE.
Limitations of Liability: Other Than High Value Item
Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Applicability: None ;
Transportation From Continental United States CONUS (CONUS) Sources
TYPE / SHIP TO CODE F.O.B.
B FV2037 ORIGIN
Type / Ship To PACRN Mark For
B FV2037 B1 PDM
Type / Ship To Quantity (U/I) On or Before _ Req No / Pri
Required Delivery
B FV2037 56 EA 30 JUN 2021 Non-MilStrip
Proposed Delivery
B FV2037 56 EA
GAS/SMDC INITIATOR
INFO CLIN
Item No.
GROUP STOCK NO P/N CAGE
Group 001 Alternate 1377-01-375-8919 ES 6108100 93455
1377-01-436-8364 ES 826837-1 06331
NSN: 1377-01-244-9273 ES
GAS/SMDC INITIATOR
DODIC: MT60
Manufacturer Part Number 06331 826837-1 17610 3383100 93455 6108100 Priority: R ROUTINE.
Buy American Act/Balance of Payments Program IUID Required: Yes Physical Item Markings:
Serial Number Required
Physical Item Markings IAW CAD/PAD Item Marking Instructions version 1.3 dated 19 Apr 2016.
Applicable SPI Numbers:
NSN: 1377012449273ES SPI: F003493943
NSN: 1377013758919ES SPI: F010528207
NSN: 1377014368364ES SPI: F012340719
Item No.
0002AA
Not Separately Priced Quantity U/I Unit Price
1 LO NSP
FATP
First Article Test Plan
TEST PLAN
IAW DD 1423-1
Associated Document(s) Line Item(s)
FD20201950002 005AA
Priority: R ROUTINE.
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Exhibit: B
FIRST ARTICLE TEST PLAN
Bid A - First Article Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Type / Ship To Quantity (U/I) *ARO Contract _ Req No / Pri
Required Delivery
+ IAW1423 1 LO *30 Calendar Days
Proposed Delivery
+ IAW1423 1 LO
FIRST ARTICLE
Bid A - First Article Required Item No.
0002AB
Firm Fixed Price Quantity U/I Unit Price Amount
4 EA
CLIN ACRN ACRN Total
0002AB AA
FA
First Article
FIRST ARTICLE - SAME AS BASIC LINE ITEM ABOVE
Associated Document(s) Line Item(s)
FD20201950002 006AA
Priority: R ROUTINE.
Limitations of Liability: Other Than High Value Item
Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
FIRST ARTICLE TEST
PLAN REPORT
_ Req No / Pri
Required Delivery
+ TBC 4 EA *120 Calendar Days
Proposed Delivery
FIRST ARTICLE
Bid A - First Article Required
+ TBC 4 EA
FIRST ARTICLE TEST REPORT
Bid A - First Article Required Item No.
0002AC
Not Separately Priced Quantity U/I Unit Price
1 LO NSP
FATR
First Article Test Report
TEST REPORT
IAW DD 1423-1
Associated Document(s) Line Item(s)
FD20201950002 007AA
Priority: R ROUTINE.
Limitations of Liability: Other Than High Value Item
Inspection: Origin Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Exhibit: B Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Type / Ship To Quantity (U/I) *ARO Completion of
FA testing _ Req No / Pri
Required Delivery
+ IAW1423 1 LO *30 Calendar Days
Proposed Delivery
+ IAW1423 1 LO
GAS/SMDC INITIATOR
Bid A - First Article Required Item No.
0002AD
Firm Fixed Price Quantity U/I Unit Price Amount
112 EA
CLIN ACRN ACRN Total
0002AD AA
GAS/SMDC INITIATOR
Bid A - First Article Required
PROD
PRODUCTION ARTICLE - SAME AS BASIC LINE ITEM ABOVE
Associated Document(s) Line Item(s)
FD20201950002 008AA
Priority: R ROUTINE.
Limitations of Liability: Other Than High Value Item
Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Transportation From Continental United States CONUS (CONUS) Sources
TYPE / SHIP TO CODE F.O.B.
B FV2037 ORIGIN
Type / Ship To PACRN Mark For
B FV2037 B1 PDM
Type / Ship To Quantity (U/I) On or Before _ Req No / Pri
Required Delivery
B FV2037 112 EA 30 JUN 2021
Proposed Delivery
B FV2037 112 EA
GAS/SMDC INITIATOR
Item No.
0002AE
Firm Fixed Price Quantity U/I Unit Price Amount
112 EA
CLIN ACRN ACRN Total
0002AE AA
PROD
PRODUCTION ARTICLE - SAME AS BASIC LINE ITEM ABOVE
Associated Document(s) Line Item(s)
FD20201950002 008AA
GAS/SMDC INITIATOR
Bid B - First Article NOT Required
Limitations of Liability: Other Than High Value Item
Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
TYPE / SHIP TO CODE F.O.B.
B FV2037 ORIGIN
Type / Ship To PACRN Mark For
B FV2037 B1 PDM
Type / Ship To Quantity (U/I) On or Before _ Req No / Pri
Required Delivery
B FV2037 112 EA 30 JUN 2021
Proposed Delivery
B FV2037 112 EA
INFO CLIN
Item No.
GROUP STOCK NO P/N CAGE
Group 001 Alternate 1377-01-384-0106 ES 6110100 93455
1377-01-430-0447 ES 826590-1 06331
NSN: 1377-01-269-8061 ES
INITIATOR, PROPELLANT ACTUATED
DODIC: MT64
Manufacturer Part Number 06331 826590-1 17610 3384100 93455 6110100
Buy American Act/Balance of Payments Program
SMDC/GAS INITIATOR
INFO CLIN
IUID Required: Yes Physical Item Markings:
Serial Number Required
Physical Item Markings IAW CAD/PAD Item Marking Instructions version 1.3 dated 19 Apr 2016.
Applicable SPI Number: F001383770
Item No.
0003AA
Not Separately Priced Quantity U/I Unit Price
1 LO NSP
FATP
First Article Test Plan
TEST PLAN
IAW DD 1423-1
Associated Document(s) Line Item(s)
FD20201950002 009AA
Priority: R ROUTINE.
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Exhibit: B Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Type / Ship To Quantity (U/I) *ARO Contract _ Req No / Pri
Required Delivery
+ IAW1423 1 LO *30 Calendar Days
Proposed Delivery
+ IAW1423 1 LO
FIRST ARTICLE
Bid A - First Article Required Item No.
0003AB
Firm Fixed Price
FIRST ARTICLE
Bid A - First Article Required Quantity U/I Unit Price Amount
4 EA
CLIN ACRN ACRN Total
0003AB AA
FA
First Article
FIRST ARTICLE - SAME AS BASIC LINE ITEM ABOVE
Associated Document(s) Line Item(s)
FD20201950002 010AA
Priority: R ROUTINE.
Limitations of Liability: Other Than High Value Item
Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
FIRST ARTICLE TEST
PLAN REPORT
_ Req No / Pri
Required Delivery
+ TBC 4 EA *120 Calendar Days
Proposed Delivery
+ TBC 4 EA
FIRST ARTICLE TEST REPORT
Bid A - First Article Required Item No.
0003AC
Not Separately Priced Quantity U/I Unit Price
1 LO NSP
FATR
First Article Test Report
TEST REPORT
IAW DD 1423-1
Associated Document(s) Line Item(s)
FD20201950002 011AA
Limitations of Liability: Other Than High Value Item
FIRST ARTICLE TEST REPORT
Bid A - First Article Required
Inspection: Origin Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Exhibit: B Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Type / Ship To Quantity (U/I) *ARO Completion of
FA testing _ Req No / Pri
Required Delivery
+ IAW1423 1 LO *30 Calendar Days
Proposed Delivery
+ IAW1423 1 LO
SMDC/GAS INITIATOR
Bid A - First Article Required Item No.
0003AD
Firm Fixed Price Quantity U/I Unit Price Amount
112 EA
CLIN ACRN ACRN Total
0003AD AA
PROD
PRODUCTION ARTICLE - SAME AS BASIC LINE ITEM ABOVE
Associated Document(s) Line Item(s)
FD20201950002 012AA
Priority: R ROUTINE.
Limitations of Liability: Other Than High Value Item
Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
TYPE / SHIP TO CODE F.O.B.
SMDC/GAS INITIATOR
Bid A - First Article Required
B FV2037 ORIGIN
Type / Ship To PACRN Mark For
B FV2037 B1 PDM
Type / Ship To Quantity (U/I) On or Before _ Req No / Pri
Required Delivery
B FV2037 112 EA 30 JUN 2021
Proposed Delivery
B FV2037 112 EA
Item No.
0003AE
Firm Fixed Price Quantity U/I Unit Price Amount
112 EA
CLIN ACRN ACRN Total
0003AE AA
PROD
PRODUCTION ARTICLE - SAME AS BASIC LINE ITEM ABOVE
Associated Document(s) Line Item(s)
FD20201950002 012AA
Priority: R ROUTINE.
Limitations of Liability: Other Than High Value Item
Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
TYPE / SHIP TO CODE F.O.B.
B FV2037 ORIGIN
Type / Ship To PACRN Mark For
B FV2037 B1 PDM
Type / Ship To Quantity (U/I) On or Before _ Req No / Pri
SMDC/GAS INITIATOR
Bid B - First Article NOT Required Required Delivery
B FV2037 112 EA 30 JUN 2021
Proposed Delivery
B FV2037 112 EA
DATA
Item No.
Not Separately Priced Quantity U/I Unit Price
1 LO NSP
DATA
DATA
DATA IAW DD 1423-1
Associated Document(s) Line Item(s)
FD20201950002 013AA
Exhibit: A
SHIP TO / PLACE OF PERFORMANCE
TYPE/CODE: + IAW1423
MARK FOR: (See Individual Line Item) REQUISITION NUMBER: (See Individual Line Item) REQUISITION PRIORITY: (See Individual Line Item)
AWARD NUMBER:
TYPE/CODE: + TBC
MARK FOR: (See Individual Line Item) REQUISITION NUMBER: (See Individual Line Item) REQUISITION PRIORITY: (See Individual Line Item)
AWARD NUMBER:
TYPE/CODE: B FV2037
72 ABW LGRSMK
7150 PATROL ROAD
TINKER AIR FORCE BASE OK 73145-5000
UNITED STATES
MARK FOR: (See Individual Line Item) REQUISITION NUMBER: (See Individual Line Item) REQUISITION PRIORITY: (See Individual Line Item)
AWARD NUMBER:
PART I - THE SCHEDULE
SECTION C
DESCRIPTION/SPECIFICATIONS/STATEMENT OF WORK
SPECIFICATIONS, STANDARDS AND DRAWINGS (MAY 1993)
(IAW FAR 11.201)
Specifications, standards or drawings (as applicable) are furnished/listed below or are listed in Section J herein. The contractor shall perform in accordance with those specifications and/or the attachments listed in Section J:
ITEM NR SPECIFICATIONS, STANDARDS AND/OR ATTACHMENTS
PART I - THE SCHEDULE
SECTION E
INSPECTION AND ACCEPTANCE
FIRST ARTICLE TEST, CERTIFICATION AND DISPOSITION REQUIREMENTS
(FEB 1998)
(IAW FAR 9.308-2)
Test criteria are as follows:
Lot/Item Government Test/Inspection Requirements
Lot/Item Contractor Test/Inspection Requirements
Contractor Testing Requirements
Items to be functioned and meet performance requirements of current Government approved ATP. Successful FAT results and FAT report approval required prior to manufacturing of deliverable production items IAW contract requirements.
Disposition of the First Article shall be as follows:
Lot/Item Approved 0001 Expended in testing 0002 Expended in testing 0003 Expended in testing
Lot/Item Disapproved
52.246-2 INSPECTION OF SUPPLIES--FIXED-PRICE (AUG 1996)
(IAW FAR 46.302)
52.246-11 HIGHER-LEVEL CONTRACT QUALITY REQUIREMENT (DEC 2014)
(IAW FAR 46.311, DFARS 246.202-4(1))
(a) The Contractor shall comply with the higher-level quality standard(s) listed below. [If more than one standard is listed, the offeror shall indicate its selection by checking the appropriate block.]*
*See Individual Line Item Schedule
52.246-16 RESPONSIBILITY FOR SUPPLIES (APR 1984)
(IAW FAR 46.316)
INSPECTION AND ACCEPTANCE (SEP 1999)
(IAW FAR 46.401(b), FAR 46.503) Government Contract Quality Assurance Inspection and Acceptance will be at (Final):
[CONTRACTOR FILL-IN]
Item No(s): See schedule for items with the following code(s) listed below :
Inspection Code and Address:
Government Contract Quality Assurance Inspection and Acceptance will be at destination(s) specified herein (Final).
Item No(s): 0001AA, 0002AA, 0003AA
PART I - THE SCHEDULE
SECTION F
DELIVERIES OR PERFORMANCE
52.211-8 TIME OF DELIVERY (JUN 1997)
(IAW FAR 11.404(a)(2))
(a) The Government requires delivery to be made according to the following schedule:
DELIVERY FOR EACH ITEM IS ANNOTATED IN THE SCHEDULE (PART I SECTION B) UNDER EACH LINE ITEM.
The Government will evaluate equally, as regards time of delivery, offers that propose delivery of each quantity within the applicable delivery period specified above. Offers that propose delivery that will not clearly fall within the applicable required delivery period specified above, will be considered nonresponsive and rejected. The Government reserves the right to award under either the required delivery schedule or the proposed delivery schedule, when an offeror offers an earlier delivery schedule than required above. If the offeror proposes no other delivery schedule, the required delivery schedule above will apply.
ANNOTATE YOUR PROPOSED DELIVERY, IF ANY, UNDER THE GOVERNMENT’S DELIVERY SET FORTH UNDER EACH ITEM IN THE
SCHEDULE.
(b) Attention is directed to the Contract Award provision of the solicitation that provides that a written award or acceptance of offer mailed, or otherwise furnished to the successful offeror, results in a binding contract. The Government will mail or otherwise furnish to the offeror an award or notice of award not later than the day award is dated. Therefore, the offeror should compute the time available for performance beginning with the actual date of award, rather than the date the written notice of award is received from the Contracting Officer through the ordinary mails. However, the Government will evaluate an offer that proposes delivery based on the Contractor's date of receipt of the contract or notice of award by adding (1) five calendar days for delivery of the award through the ordinary mails, or (2) one working day if the solicitation states that the contract or notice of award will be transmitted electronically. (The term "working day" excludes weekends and U.S. Federal holidays.) If, as so computed, the offered delivery date is later than the required delivery date, the offer will be considered nonresponsive and rejected.
52.211-8 TIME OF DELIVERY -- ALTERNATE I (APR 1984)
(IAW FAR 11.404(a)(2)) If the delivery schedule is expressed in terms of specific calendar dates or specific periods and is based on an assumed date of award, the contracting officer may substitute the following paragraph (b) for paragraph (b) of the basic clause. The time may be expressed by substituting "on or before"; "during the months ..."; or "not sooner than ... or later than ..." as headings for the third column of paragraph (a) the basic clause.
(b) The delivery dates or specific periods above are based on the assumption that the Government will make award by .
Each delivery date in the delivery schedule above will be extended by the number of calendar days after the above date that the contract is in fact awarded. Attention is directed to the Contract Award provision of the solicitation that provides that a written award or acceptance of offer mailed or otherwise furnished to the successful offeror results in a binding contract.
Therefore, the offeror should compute the time available for performance beginning with the actual date of award, rather than the date the written notice of award is received from the Contracting Officer through the ordinary mails.
52.211-17 DELIVERY OF EXCESS QUANTITIES (SEP 1989)
(IAW FAR 11.703(b))
52.242-15 STOP-WORK ORDER (AUG 1989)
(IAW FAR 42.1305(b)(1))
52.242-17 GOVERNMENT DELAY OF WORK (APR 1984)
(IAW FAR 42.1305(c))
52.247-29 F.O.B. ORIGIN (FEB 2006)
(IAW FAR 47.303-1(c))
52.247-30 F.O.B. ORIGIN, CONTRACTOR'S FACILITY (FEB 2006)
(IAW FAR 47.303-2(c))
52.247-33 F.O.B. ORIGIN, WITH DIFFERENTIALS (FEB 2006)
(IAW FAR 47.303-5(c))
(a) The term "f.o.b. origin, with differentials," as used in this clause, means--
(1) Free of expense to the Government delivered--
(i) On board the indicated type of conveyance of the carrier (or of the Government, if specified) at a designated point in the city, county, and State from which the shipments will be made and from which line-haul transportation service (as distinguished from switching, local drayage, or other terminal service) will begin;
(ii) To, and placed on, the carrier's wharf (at shipside, within reach of the ship's loading tackle, when the shipping point is within a port area having water transportation service) or the carrier's freight station;
(iii) To a U.S. Postal Service facility; or
(iv) If stated in the solicitation, to any Government-designated point located within the same city or commercial zone as the f.o.b. origin point specified in the contract (the Federal Motor Carrier Safety Administration prescribes commercial zones at Subpart B of 49 CFR part 372); and
(2) Differentials for mode of transportation, type of vehicle, or place of delivery as indicated in Contractor's offer may be added to the contract price.
(b) The Contractor shall-- (1)(i) Pack and mark the shipment to comply with contract specification; or
(ii) In the absence of specifications, prepare the shipment in conformance with carrier requirements to protect the goods and to ensure assessment of the lowest applicable transportation charge;
(2)(i) Order specified carrier equipment when requested by the Government; or
(ii) If not specified, order appropriate carrier equipment not in excess of capacity to accommodate shipment;
(3) Deliver the shipment in good order and condition to the carrier, and load, stow, trim, block, and/or brace carload or truckload shipment (when loaded by the Contractor) on or in the carrier's conveyance as required by carrier rules and regulations;
(4) Be responsible for any loss of and/or damage to the goods--
(i) Occurring before delivery to the carrier;
(ii) Resulting from improper packing and marking; or
(iii) Resulting from improper loading, stowing, trimming, blocking, and/or bracing of the shipment, if loaded by the Contractor on or in the carrier's conveyance;
(5) Complete the Government bill of lading supplied by the ordering agency or, when a Government bill of lading is not supplied, prepare a commercial bill of lading or other transportation receipt. The bill of lading shall show--
(i) A description of the shipment in terms of the governing freight classification or tariff (or Government rate tender) under which lowest freight rates are applicable;
(ii) The seals affixed to the conveyance with their serial numbers or other identification;
(iii) Lengths and capacities of cars or trucks ordered and furnished;
(iv) Other pertinent information required to effect prompt delivery to the consignee, including name, delivery address, postal address and ZIP code of consignee, routing, etc.;
(v) Special instructions or annotations requested by the ordering agency for bills of lading; e.g., "This shipment is the property of, and the freight charges paid to the carrier(s) will be reimbursed by, the Government"; and
(vi) The signature of the carrier's agent and the date the shipment is received by the carrier; and
(6) Distribute the copies of the bill of lading, or other transportation receipts, as directed by the ordering agency.
(c)(1) It may be advantageous to the offeror to submit f.o.b. origin prices that include only the lowest cost to the Contractor for loading of shipment at the Contractor's plant or most favorable shipping point. The cost beyond that plant or point of bringing the supplies to the place of delivery and the cost of loading, blocking, and bracing on the type vehicle specified by the Government at the time of shipment may exceed the offeror's lowest cost when the offeror ships for the offeror's account. Accordingly, the offeror may indicate differentials that may be added to the offered price.
These differentials shall be expressed as a rate in cents for each 100 pounds (CWT) of the supplies for one or more of the options under this clause that the Government may specify at the time of shipment.
(2) These differential(s) will be considered in the evaluation of offers to determine the lowest overall cost to the Government. If, at the time of shipment, the Government specifies a mode of transportation, type of vehicle, or place of delivery for which the offeror has set forth a differential, the Contractor shall include the total of such differential costs (the applicable differential multiplied by the actual weight) as a separate reimbursable item on the Contractor's invoice for the supplies.
(3) The Government shall have the option of performing or arranging at its own expense any transportation from Contractor's shipping plant or point to carrier's facility at the time of shipment and, whenever this option is exercised, the Government shall make no reimbursement based on a quoted differential.
(4) Offeror's differentials in cents for each 100 pounds for optional mode of transportation, types of vehicle, transportation within a mode, or place of delivery, specified by the Government at the time of shipment and not included in the f.o.b. origin price indicated in the Schedule by the offeror, are as follows:
(carload, truckload, less-load, wharf, flatcar, driveaway, etc.)
52.247-34 F.O.B. DESTINATION (NOV 1991)
(IAW FAR 47.303-6(c))
52.247-58 LOADING, BLOCKING, AND BRACING OF FREIGHT CAR SHIPMENTS (APR 1984)
(IAW FAR 47.305-15(a)(2))
52.247-59 F.O.B. ORIGIN-CARLOAD AND TRUCKLOAD SHIPMENTS (APR 1984)
(IAW FAR 47.305-16(a))
52.247-61 F.O.B. ORIGIN-MINIMUM SIZE OF SHIPMENTS (APR 1984)
(IAW FAR 47.305-16(c))
52.247-65 F.O.B. ORIGIN, PREPAID FREIGHT--SMALL PACKAGE SHIPMENTS (JAN 1991)
(IAW FAR 47.303-17(f))
F.O.B. ORIGIN (OCT 1993)
(IAW FAR 47.305(b)) Any supply item applicable to this document shall be delivered F.O.B. at:
F.O.B. Address:
[CONTRACTOR FILL-IN]
HAZARDOUS CLASSIFICATION (MAY 1998)
(IAW FAR 47.305-9(c)) For the purpose of identifying commodity description and freight classification of explosives and other dangerous supplies, the following applies.
Hazardous Classification Line Item 0001
Hazardous Class Division 1.4 Storage Compatibility Group C
DOT Marking CARTRIDGES, POWER DEVICE DOT Class 1.4C DOT Label Explosive 1.4C
UN Serial No 0276
UN Proper Ship Name CARTRIDGES, POWER DEVICE Freight Classification
Line Item 0002 Hazardous Class Division 1.4
Storage Compatibility Group S DOT Marking Fuzes, Detonating
DOT Class 1.4S DOT Label Explosive 1.4S
UN Serial No 0367 UN Proper Ship Name Fuzes, Detonating
Freight Classification Line Item 0003
Hazardous Class Division 1.4 Storage Compatibility Group C
DOT Marking Cartridge, Power Device DOT Class 1.4C DOT Label Explosive 1.4C
UN Serial No 0276 UN Proper Ship Name Cartridges, Power Device
Freight Classification
PART I - THE SCHEDULE
SECTION G
CONTRACT ADMINISTRATION DATA
252.232-7006 WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (DEC 2018)
(IAW DFARS 232.7004(b), PGI 232.7004(b)(1), DFARS 212.301(f)(liii))
(a) Definitions. As used in this clause— “Department of Defense Activity Address Code (DoDAAC)” is a six position code that uniquely identifies a unit, activity, or organization.
“Document type” means the type of payment request or receiving report available for creation in Wide Area WorkFlow
(WAWF).
“Local processing office (LPO)” is the office responsible for payment certification when payment certification is done external to the entitlement system.
(b) Electronic invoicing. The WAWF system is the method to electronically process vendor payment requests and receiving reports, as authorized by DFARS 252.232-7003, Electronic Submission of Payment Requests and Receiving Reports.
(c) WAWF access. To access WAWF, the Contractor shall—
(1) Have a designated electronic business point of contact in the Central Contractor Registration at https://www.acquisition.gov ; and
(2) Be registered to use WAWF at https://wawf.eb.mil/ following the step-by-step procedures for self-registration available at this web site.
(d) WAWF training. The Contractor should follow the training instructions of the WAWF Web-Based Training Course and use the Practice Training Site before submitting payment requests through WAWF. Both can be accessed by selecting the “Web Based Training” link on the WAWF home page at https://wawf.eb.mil/ .
(e) WAWF methods of document submission. Document submissions may be via web entry, Electronic Data Interchange, or File Transfer Protocol.
(f) WAWF payment instructions. The Contractor must use the following information when submitting payment requests and receiving reports in WAWF for this contract/order:
(1) Document type. The Contractor shall use the following document type(s).
__COMBO (INVOICE + RECEIVING REPORT________
Note: If a “Combo” document type is identified but not supportable by the Contractor’s business systems, an “Invoice” (stand-alone) and “Receiving Report” (stand-alone) document type may be used instead.)
(2) Inspection/acceptance location. The Contractor shall select the following inspection/acceptance location(s) in WAWF, as specified by the contracting officer.
_See Schedule_________________________________
(3) Document routing. The Contractor shall use the information in the Routing Data Table below only to fill in applicable fields in WAWF when creating payment requests and receiving reports in the system.
Routing Data Table* Field Name in WAWF Data to be entered in WAWF Pay Official DoDAAC See Block #14 of the award document, Schedule A Issue By DoDAAC See Block #7 of the award document, Schedule A Admin DoDAAC See Block #12 of the award document, Schedule A Inspect By DoDAAC See Schedule Ship To Code See Contract Line Item Ship From Code Mark For Code See Contract Line Item Service Approver (DoDAAC) Service Acceptor (DoDAAC) Accept at Other DoDAAC LPO DoDAAC DCAA Auditor DoDAAC Other DoDAAC(s) (*Contracting Officer: Insert applicable DoDAAC information or “See schedule” if multiple ship to/acceptance locations apply, or “Not applicable.”)
(4) Payment request and supporting documentation. The Contractor shall ensure a payment request includes appropriate contract line item and subline item descriptions of the work performed or supplies delivered, unit price/cost per unit, fee (if applicable), and all relevant back-up documentation, as defined in DFARS Appendix F, (e.g.
timesheets) in support of each payment request.
(5) WAWF email notifications. The Contractor shall enter the e-mail address identified below in the “Send Additional Email Notifications” field of WAWF once a document is submitted in the system.
Dirk.Williams@us.af.mil
(g) WAWF point of contact.
(1) The Contractor may obtain clarification regarding invoicing in WAWF from the following contracting activity’s WAWF point of contact.
Dirk.Williams@us.af.mil
(2) For technical WAWF help, contact the WAWF helpdesk at 866-618-5988.
(The above Clause/Provision has been modified.)
ACCOUNTING AND APPROPRIATION DATA (AUG 1998)
Accounting and Appropriation Chargeable ACRN Funds Citation Amount Chargeable
AA 57 93011 . H8 9 LC HN 355102 4E27A1 63681 78070F 503000 F03000 $0.00
PSR: 684935 FSR: 037433 DSR: 354942 CIN: F2DCDE8086B101
Accounting and Appropriation Chargeable ACRN Funds Citation Amount Chargeable
REFERENCE:
AA CIN : F2DCDE8086B101 FD20201950002
ACRN TOTAL $ 0.00
Transportation Chargeable To: F2DCAE8288NP02 5793011 H89 LCHN 355100 4E27A1 462FD 78070F 503000 F03000
PART II - CONTRACT CLAUSES
SECTION I
CONTRACT CLAUSES
5352.201-9101 OMBUDSMAN (JUN 2016)
(IAW AFFARS 5301.9103)
(a) An ombudsman has been appointed to hear and facilitate the resolution of concerns from offerors, potential offerors, and others for this acquisition. When requested, the ombudsman will maintain strict confidentiality as to the source of the concern.
The existence of the ombudsman does not affect the authority of the program manager, contracting officer, or source selection official. Further, the ombudsman does not participate in the evaluation of proposals, the source selection process, or the adjudication of protests or formal contract disputes. The ombudsman may refer the interested party to another official who can resolve the concern.
(b) Before consulting with an ombudsman, interested parties must first address their concerns, issues, disagreements, and/or recommendations to the contracting officer for resolution. Consulting an ombudsman does not alter or postpone the timelines for any other processes (e.g., agency level bid protests, GAO bid protests, requests for debriefings, employee-employer actions, contests of OMB Circular A-76 competition performance decisions).
(c) If resolution cannot be made by the contracting officer, the interested party may contact the ombudsman, Jonna Hancey at 801 777 -6549 , FAX 801 777 -6830 , email jonna.hancey@us.af.mil . Concerns, issues, disagreements, and recommendations that cannot be resolved at the Center/MAJCOM/DRU/SMC ombudsman level, may be brought by the interested party for further consideration to the Air Force ombudsman, Associate Deputy Assistant Secretary (ADAS) (Contracting), SAF/AQC, 1060 Air Force Pentagon, Washington DC 20330-1060, phone number (571) 256-2395, facsimile number (571) 256-2431.
(d) The ombudsman has no authority to render a decision that binds the agency.
(e) Do not contact the ombudsman to request copies of the solicitation, verify offer due date, or clarify technical requirements.
Such inquiries shall be directed to the Contracting Officer.
52.202-1 DEFINITIONS (NOV 2013)
(IAW FAR 2.201)
52.203-3 GRATUITIES (APR 1984)
(IAW FAR 3.202)
52.203-5 COVENANT AGAINST CONTINGENT FEES (MAY 2014)
(IAW FAR 3.404)
52.203-6 RESTRICTIONS ON SUBCONTRACTOR SALES TO THE GOVERNMENT (SEP 2006)
(IAW FAR 3.503-2)
52.203-7 ANTI-KICKBACK PROCEDURES (MAY 2014)
(IAW FAR 3.502-3)
52.203-8 CANCELLATION, RESCISSION, AND RECOVERY OF FUNDS FOR ILLEGAL OR
IMPROPER ACTIVITY (MAY 2014)
(IAW FAR 3.104-9(a))
52.203-10 PRICE OR FEE ADJUSTMENT FOR ILLEGAL OR IMPROPER ACTIVITY (MAY 2014)
(IAW FAR 3.104-9(b))
52.203-12 LIMITATION ON PAYMENTS TO INFLUENCE CERTAIN FEDERAL TRANSACTIONS
(OCT 2010)
(IAW FAR 3.808(b))
52.203-19 PROHIBITION ON REQUIRING CERTAIN INTERNAL CONFIDENTIALITY
AGREEMENTS OR STATEMENTS (JAN 2017)
(IAW FAR 3.909-3 (b))
252.203-7000 REQUIREMENTS RELATING TO COMPENSATION OF FORMER DOD OFFICIALS
(SEP 2011)
(IAW DFARS 203.171-4(a), DFARS 212.301(f)(ii))
252.203-7001 PROHIBITION ON PERSONS CONVICTED OF FRAUD OR OTHER
DEFENSE-CONTRACT-RELATED FELONIES (DEC 2008)
(IAW DFARS 203.570-3)
252.203-7002 REQUIREMENT TO INFORM EMPLOYEES OF WHISTLEBLOWER RIGHTS
(SEP 2013)
(IAW DFARS 203.970)
52.204-4 PRINTED OR COPIED DOUBLE-SIDED ON RECYCLED PAPER (MAY 2011)
(IAW FAR 4.303)
52.204-10 REPORTING EXECUTIVE COMPENSATION AND FIRST-TIER SUBCONTRACT
AWARDS (OCT 2018)
(IAW FAR 4.1403(a))
52.204-13 SYSTEM FOR AWARD MANAGEMENT MAINTENANCE (OCT 2018)
(IAW FAR 4.1105(b))
52.204-18 COMMERCIAL AND GOVERNMENT ENTITY CODE MAINTENANCE (JUL 2016)
(IAW FAR 4.1804(c), FAR 12.301(d))
52.204-19 INCORPORATION BY REFERENCE OF REPRESENTATIONS AND CERTIFICATIONS
(DEC 2014)
(IAW FAR 4.1202(b))
52.204-21 BASIC SAFEGUARDING OF COVERED CONTRACTOR INFORMATION SYSTEMS
(JUN 2016)
(IAW FAR 4.1903)
52.204-23 PROHIBITION ON CONTRACTING FOR HARDWARE, SOFTWARE, AND SERVICES
DEVELOPED OR PROVIDED BY KASPERSKY LAB AND OTHER COVERED
ENTITIES (JUL 2018)
(IAW FAR 4.2004)
252.204-7002 PAYMENT FOR SUBLINE ITEMS NOT SEPARATELY PRICED (DEC 1991)
(IAW DFARS 204.7104-1(b)(3)(iv))
252.204-7003 CONTROL OF GOVERNMENT PERSONNEL WORK PRODUCT (APR 1992)
(IAW DFARS 204.404-70(b))
252.204-7012 SAFEGUARDING COVERED DEFENSE INFORMATION AND CYBER INCIDENT
REPORTING (OCT 2016)
(IAW DFARS 204.7304(c))
252.204-7015 NOTICE OF AUTHORIZED DISCLOSURE OF INFORMATION FOR LITIGATION
SUPPORT (MAY 2016)
(IAW DFARS 204.7403(c), DFARS 212.301(f)(ix))
52.209-1 QUALIFICATION REQUIREMENTS (FEB 1995)
(IAW FAR 9.206-2)
(a) Definition: "Qualification Requirement," as used in this clause, means a Government requirement for testing or other quality assurance demonstration that must be completed before award.
(b) One or more qualification requirements apply to the supplies or services covered by this contract. For those supplies or services requiring qualification, whether the covered product or service is an end item, the product, manufacturer, or source must have demonstrated that it meets the standards prescribed for qualification before award of this contract. The product, manufacturer, or source must be qualified at the time of award whether or not the name of the product, manufacturer, or source is actually included on a qualified products list, qualified manufacturers list, or qualified bidders list. Offerors should contact the agency activity designated below to obtain all requirements that they or their products or services, or their subcontractors or their products or services, must satisfy to become qualified and to arrange for an opportunity to demonstrate their abilities to meet the standards specified for qualification.
Item No Agency Name/Address
0001 DEPARTMENT OF THE AIR FORCE
AFLCMC EBHK
6072 FIR AVENUE BLDG 1233
HILL AIR FORCE BASE, UT 84056-5820
(801) 775-4537 nichole.fuit@us.af.mil
0002 DEPARTMENT OF THE AIR FORCE
AFLCMC EBHK
6072 FIR AVENUE BLDG 1233
HILL AIR FORCE BASE, UT 84056-5820
(801) 775-4537 nichole.fuit@us.af.mil
0003 DEPARTMENT OF THE AIR FORCE
AFLCMC EBHK
6072 FIR AVENUE BLDG 1233
HILL AIR FORCE BASE, UT 84056-5820
(801) 775-4537 nichole.fuit@us.af.mil
(c) If an offeror, manufacturer, source, product or service covered by a qualification requirement has already met the standards specified, the relevant information noted below should be provided.
Offeror's Name ______________________________
Manufacturer's Name _________________________
Source's Name ______________________________
Item Name _________________________________
Service Identification _________________________
Test Number _______________________________ (to the extent known)
(d) Even though a product or service subject to a qualification requirement is not itself an end item under this contract, the product, manufacturer, or source must nevertheless be qualified at the time of award of this contract. This is necessary whether the Contractor or a subcontractor will ultimately provide the product or service in question. If, after award, the Contracting Officer discovers that an applicable qualification requirement was not in fact met at the time of award, the Contracting Officer may either terminate this contract for default or allow performance to continue if adequate consideration is offered and the action is determined to be otherwise in the Government's best interests.
(e) If an offeror, manufacturer, source, product, or service has met the qualification requirement but is not yet on a qualified products list, qualified manufacturers list, or qualified bidders list, the offeror must submit evidence of qualification prior to award of this contract. Unless determined to be in the Government's interest, award of this contract shall not be delayed to permit an offeror to submit evidence of qualification.
(f) Any change in location or ownership of the plant where a previously qualified product or service was manufactured or performed requires reevaluation of the qualification. Similarly, any change in location or ownership of a previously qualified manufacturer or source requires reevaluation of the qualification. The reevaluation must be accomplished before the date of award.
52.209-3 FIRST ARTICLE APPROVAL--CONTRACTOR TESTING (SEP 1989)
(IAW FAR 9.308-1(a)(1), FAR 9.308-1(b)(1))
(a) The Contractor shall test ** unit(s) of Lot/Item * as specified in this contract. At least *** calendar days before the beginning of first article tests, the Contractor shall notify the Contracting Officer, in writing, of the time and location of the testing so that the Government may witness the tests.
*Lot/Item ***Calendar Days Before Test **Quantity 0001 10 4 0002 10 4 0003 10 4
(b) The Contractor shall submit the first article test report within ___**___ calendar days from the date of this contract to ___***___ marked "FIRST ARTICLE TEST REPORT: Contract No. Lot/Item No. ___*___” Within ___****___ calendar days after the Government receives the test report, the Contracting Officer shall notify the Contractor, in writing, of the conditional approval, approval, or disapproval of the first article. The notice of conditional approval or approval shall not relieve the Contractor from complying with all requirements of the specifications and all other terms and conditions of this contract. A notice of conditional approval shall state any further action required of the Contractor. A notice of disapproval shall cite reasons for the disapproval.
*Lot/Item ****Approval Days ELIN No.
0001 30 0002 30 0003 30
FA Test Report Item ***Type/Location **Calendar Days
0001AC +IAW1423 30
0002AC +IAW1423 30
0003AC +IAW1423 30
52.209-3 FIRST ARTICLE APPROVAL--CONTRACTOR TESTING -- ALTERNATE I (JAN 1997)
(IAW FAR 9.308-1(a)(2), FAR 9.308-1(b)(2))
52.209-6 PROTECTING THE GOVERNMENT'S INTEREST WHEN SUBCONTRACTING WITH
CONTRACTORS DEBARRED, SUSPENDED, OR PROPOSED FOR DEBARMENT
(OCT 2015)
(IAW FAR 9.409)
52.209-10 PROHIBITION ON CONTRACTING WITH INVERTED DOMESTIC CORPORATIONS
(NOV 2015)
(IAW FAR 9.108-5(b))
252.209-7004 SUBCONTRACTING WITH FIRMS THAT ARE OWNED OR CONTROLLED BY THE
GOVERNMENT OF A COUNTRY THAT IS A STATE SPONSOR OF TERRORISM
(OCT 2015)
(IAW DFARS 209.409)
252.209-7009 ORGANIZATIONAL CONFLICT OF INTEREST--MAJOR DEFENSE ACQUISITION
PROGRAM (OCT 2015)
(IAW DFARS 209.571-8(b))
252.209-7010 CRITICAL SAFETY ITEMS (AUG 2011)
(IAW DFARS 209.270-5)
(b) Identification of critical safety items. One or more of the items being procured under this contract is an aviation or ship critical safety item. The following items have been designated aviation critical safety items or ship critical safety items by the designated design control activity:
Line Item Description
0001 NSN: 1377012348510ES NSN: 1377013849246ES NSN:
1377014320349ES
0002 NSN: 1377012449273ES NSN: 1377013758919ES NSN:
1377014368364ES
0003 NSN: 1377012698061ES NSN: 1377013840106ES NSN:
1377014300447ES
52.211-5 MATERIAL REQUIREMENTS (AUG 2000)
(IAW FAR 11.304)
52.211-15 DEFENSE PRIORITY AND ALLOCATION REQUIREMENTS (APR 2008)
(IAW FAR 11.604(b)) This is a rated order certified for national defense, emergency preparedness, and energy program use, and the Contractor shall follow all the requirements of the Defense Priorities and Allocations System regulation (15 CFR 700).
252.211-7003 ITEM UNIQUE IDENTIFICATION AND VALUATION (MAR 2016)
(IAW DFARS 211.274-6(a)(1), DFARS 212.301(f)(xii))
(a) Definitions. As used in this clause—
“DoD recognized unique identification equivalent” means a unique identification method that is in commercial use and has been recognized by DoD. All DoD recognized unique identification equivalents are listed at http://www.acq.osd.mil/dpap/pdi/uid/iuid/equivalents.html .
“Unique item identifier type” means a designator to indicate which method of uniquely identifying a part has been used. The current list of accepted unique item identifier types is maintained at http://www.acq.osd.mil/dpap/pdi/uid/uii_types.html .
(c) Unique item identifier.
(1) The Contractor shall provide a unique item identifier for the following:
(i) Delivered items for which the Government’s unit acquisition cost is $5,000 or more, except for the following line items:
Contract Line, Subline, or Exhibit Line Item Number
Item Description
See Schedule as Applicable
(ii) Items for which the Government’s unit acquisition cost is less than $5,000 that are identified in the Schedule or the following table:
Contract Line, Subline, or Exhibit Line Item Number
Item Description
*Items less than $5000, which require UID, will be specifically identified in the schedule.
See Schedule as Applicable
(iii) Subassemblies, components, and parts embedded within delivered items, items with warranty requirements, DoD serially managed reparables and DoD serially managed nonreparables as specified in Attachment Number _____( or See Schedule as Applicable).
(iv) Any item of special tooling or special test equipment as defined in FAR 2.101 that have been designated for preservation and storage for a Major Defense Acquisition Program as specified in Attachment Number _____( or See Schedule as Applicable).
(v) Any item not included in paragraphs (c)(1)(i), (ii), (iii), or (iv) of this clause for which the contractor creates and marks a unique item identifier for traceability.
(f) The Contractor shall submit the information required by paragraphs (d) and (e) of this clause as follows:
(1) End items shall be reported using the receiving report capability in Wide Area WorkFlow (WAWF) in accordance with the clause at 252.232-7003. If WAWF is not required by this contract, and the contractor is not using WAWF, follow the procedures at http://dodprocurementtoolbox.com/site/uidregistry/ .
(2) Embedded items shall be reported by one of the following methods—
(i) Use of the embedded items capability in WAWF;
(ii) Direct data submission to…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it.