ES7034.doc

DOC document 26 KB Posted

Attached to
INPUT CARTRIDGE Federal contract opportunity
Solicitation number
FA821319R3016
Issued by
Department of the Air Force Materiel Command Lifecycle Management Center Hill Air Force Base

About this file

Rework and Repair of Nonconforming Materials

View the file

Other files for this federal contract opportunity

Other files attached to INPUT CARTRIDGE, newest first.
File Type Posted
FA821319R3016.pdf PDF
AirSpec.doc DOC document
012717161.pdf PDF
012700860.pdf PDF
CADPADIMI.doc DOC document
BidSets.doc DOC document
REPSHIP11Mar14.doc DOC document
ItemDescription.pdf PDF
JQRS.pdf PDF
PHST-SOW.pdf PDF
Form158.pdf PDF
QALI.pdf PDF
012340719.pdf PDF
EDLs.pdf PDF
ADCSOWJan2018.doc DOC document
CDRLs.pdf PDF
Show all 16

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Attachment 5

(ES7034)

REWORK AND REPAIR OF NONCONFORMING MATERIAL

Jan 2012 (version)

(a) Rework and Repair are defined as follows:

(1) Rework - The reprocessing of nonconforming material to make it conform completely to the drawings, specifications or contract requirements.

(2) Repair - The reprocessing of nonconforming material in accordance with approved written procedures and operations to reduce, but not completely eliminate, the nonconformance. The purpose of repair is to bring nonconforming material into a usable condition. Repair is distinguished from rework in that the item after repair still does not completely conform to all of the applicable drawings, specifications or contract requirements.

(b) Rework procedures along with the associated inspection procedures shall be documented by the Contractor and submitted to the Government Quality Assurance Representative (QAR) for review prior to implementation. Rework procedures are subject to the QAR's disapproval.

(c) Repair procedures shall be documented by the Contractor and submitted on a Request for Deviation/Waiver, DD Form 1694, to the Contracting Officer for review and written approval prior to implementation.

(d) Whenever the Contractor submits a repair or rework procedure for Government review, the submission shall also include a description of the cause for the nonconformances and a description of the action taken or to be taken to prevent recurrence.

(e) The rework or repair procedure shall also contain a provision for reinspection which will take precedence over the Technical Data Package requirements and shall, in addition, provide the Government assurance that the reworked or repaired items have met reprocessing requirements.

(f) Rework and repair is a supply chain flow-down requirement that applies to contractors and their suppliers, vendors or subcontractors.

(ES7034)

File details come from the government source that posted it.