Attachment___11-_AFMC_Form_260_1377-01-212-8583ES.pdf
PDF 96 KB Posted
- Attached to
- CARTRIDGE, IMPULSE Federal contract opportunity
- Solicitation number
- FA8213-18-Q-3006
About this file
AFMC Form 260 1377-01-212-8583ES
View the file
Other files for this federal contract opportunity
Show all 24
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FIRST ARTICLE REQUIREMENTS 1. DATE
24 APR 2018(AFMCI 64-110, AFMCI 23-102 and FAR Part 9, Sub Part 9.3)(Additional Instructions on Page 3)
2. PR / MIPR NUMBER 3. CAGE / REFERENCE NUMBER
06331 / 3215-2
4. NSN
1377012128583ES
5. FIRST ARTICLE QUANTITY
THE FIRST ARTICLE IS 6 UNIT(S) OF LOT / ITEM EA
AND WILL BE: PART OF PRODUCTION QUANTITY X IN ADDITION TO PRODUCTION QUANTITY
6. ARTICLES
X WILL WILL NOT SERVE AS A MANUFACTURING STANDARD
7. LONG LEAD TIME ITEMS
REQUIRED X NOT REQUIRED
(See FAR 52.209-3 OR -4, alternate II)
8. SPECIAL REQUIREMENT/PRODUCTION FACILITIES (See FAR 52.209-3 OR -4 Alternate I)
X REQUIRED NOT REQUIRED
"The First Article offered must be manufactured at the facilities in which that item is to be produced under the contract, or if the First Article is a component not manufactured by the contractor, such component must be manufactured at the facilities in which the component is to be produced for the contract. A certification to this effect must accompany each First Article which is offered."
9. TEST / INSPECTION REQUIREMENTS
A. X CONTRACTOR TESTING
GOVERNMENT TESTING
Performance or other characteristics which the First Articles must meet are
Items to be functioned and meet performance requirements of current government-approved ATP. Successful FAT results and FAT report approval required prior to manufacturing of deliverable production items IAW contract requirements.
B. The detailed technical requirements for First Article approval tests are contained in
Latest government-approved revision of TP-3215 and MIL-C-83124. 6 EA units shall be tested according to ATP for all tests normally performed for lot acceptance.
(Cite Spec and Para number)
C. X TEST PLAN REQUIRED
Number of days for government approval / disapproval 30 days.
D. Contractor's notification to ACO and cognizant engineer
(Requesting Activity) of test time and location due 10 days prior to start of testing.
E. X TEST REPORT REQUIRED
(1) Forwarded to
AFLCMC/EBHJ
6044 Dogwood Ave, Building 1256
Hill AFB, UT 84056 and submitted in WAWF,DODAAC FA8213
(2) Government written notice of approval / disapproval due 30 days after receipt of contractor's report.
F. FIRST ARTICLE DELIVERY
(1) Due within calendar days from date contract.
(2) Notify calendar days prior to shipment.
(3) Delivered to government at
N/A Contractor Test
(Set Forth Consignee and Address)
(4) Government written notice of approval / disapproval within days after receipt of first article package.
G. Estimated cost of government testing / inspection evaluation.
¤0.0000
Page 1 of 2AFMC IMT 260, 20020830, V-3 Version 1Generated by PRPS using Jasper Reports on 22 May 2018
FIRST ARTICLE REQUIREMENTS 1. DATE
24 APR 2018(AFMCI 64-110, AFMCI 23-102 and FAR Part 9, Sub Part 9.3)(Additional Instructions on Page 3)
10. DISPOSITION OF FIRST ARTICLES
Approved First Articles will be forwarded to
X 6 (insert quantity) First Articles will be expended in testing. Residual components of disapproved First Articles will be returned to the contractor
X will be retained by vendor pending disposition instructions from the contractor.
First Articles will be installed on aircraft/equipment to determine proper fit/function. Approved article will remain on the aircraft/equipment and will not be forwarded to USAF Supply, but will be considered part of the contract quantity.
Disapproved First Articles will be returned to the contractor will be retained by pending disposition instructions from the contractor.
On purchase requests designated as direct shipments the following disposition will apply. (NOTE: Always applicable on Foreign Military Sales (FMS)).
a. Approved First Articles will be returned to the contractor for shipment with production item.
b. Disposition of disapproved First Articles will remain the same as marked above.
Other Disposition:
11. CONDITION(S) FOR WAIVER OF FIRST ARTICLE APPROVAL
a. Offerors who have previously furnished production quantities of the same or similar article to the prime contractor for delivery to the Government, DoD, Air Force.
b. Offerors currently in production of the same or similar article for a Government, DoD, Air Force contract and who have received First Article approval under the existing contract.
c. Offerors who have previously furnished production quantities of the same or similar articles to the Government, DoD, Air Force, provided articles thus furnished, have exhibited satisfactory performance in service in the opinion of the Air Force.
d. X Provided not more than 60 months have elapsed since completion of the contract.
e. First Article testing will not be waived.
f. X See Remarks in block 12 below.
NOTE TO BUYER: UNDER CONDITIONS A AND C ABOVE, THE COGNIZANT ENGINEERING ACTIVITY WILL DECIDE WHETHER OR NOT THE ITEM HAS EXHIBITED SATISFACTORY PERFORMANCE IN SERVICE AND PREPARE AND RETAIN SUPPORTING DOCUMENTATION TO FULLY JUSTIFY THIS DECISION. THE BUYER MUST SOLICIT DUAL PRICES (That is, both with and without requirement for first article approval) AND MUST FURNISH THE COGNIZANT ENGINEERING ACTIVITY WITH THE FOLLOWING INFORMATION ON THE PREVIOUSLY SUPPLIED ARTICLE:
A. PROCURING OFFICE B. CONTRACT NUMBER C. DATE OF CONTRACT D. SPECIFICATION NUMBER AND REVISION
12. REMARKS
Tanner, Matthew WNAME: 24 APR 2018DATE:
Any request to waive FAT requirement by contractor shall be submitted by vendor with supporting data and reviewed and approved/disapproved by cognizant engineer prior to contract award.
13. COGNIZANT ENG ORGANIZATION RESPONSIBLE FOR APPROVING TEST
(Name, Organization, Phone)
Tanner, Matthew W
AFLCMC / EBHJ
801-777-2926
777-2926
14. COGNIZANT ENG ORGANIZATION RESPONSIBLE FOR CONDUCTING
TEST (Name, Organization, Phone)
Page 2 of 2AFMC IMT 260, 20020830, V-3 Version 1Generated by PRPS using Jasper Reports on 22 May 2018
File details come from the government source that posted it.