QALI.pdf

PDF 137 KB Posted

Attached to
CAD/PAD Components Federal contract opportunity
Solicitation number
FA8213-17-R-3017
Issued by
Department of the Air Force Materiel Command Lifecycle Management Center Hill Air Force Base

About this file

Quality Assurance Letter of Instruction

View the file

Other files for this federal contract opportunity

Other files attached to CAD/PAD Components, newest first.
File Type Posted
FA821317R3017_______0001_SuggestedPriceBands.xlsx XLSX spreadsheet
FA821317R3017_______0001.RTF RTF text file
ES7034.pdf PDF
PACKAGING.pdf PDF
RepShipFMS.pdf PDF
NSNLIST.xlsx XLSX spreadsheet
BIDSET.doc DOC document
CDRLS.pdf PDF
SOWADC.doc DOC document
AIRSPEC.doc DOC document
SOWPACKAGING.pdf PDF
JQRS.pdf PDF
EDL.pdf PDF
SPICOMBO.pdf PDF
GFPWorksheet.pdf PDF
CADPADMARKINGINSTR.doc DOC document
Show all 16

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Contractor Name CAGE code

DCMA QAR Reviewer

Date Review Completed

Date Issued to Contractor

PR No. FD2020-

Date Contract Awarded

Final Delivery Date (FDD)

Program Name

DODIC

Part Number

The contractor is required to impose the listed below DCMA Inspection Points into the appropriate Work Orders.

All Work Orders pertaining to CRITICAL FLIGHT ITEMS must be identified on folders.

Mandatory - M: Stamp and/ or Signature on original documentation (i.e., Mfg. Planning, ATP, FAT Report, etc.)

Witness - W: GSI required to attend, may reduce level of effort after 50% of production lots found acceptable

Verification - V: Stamp and/or Signature required unless noted otherwise (may be done by written verification)

Monitor - R: Will monitor testing, may reduce to verification

Notify - N: By phone or daily schedule 24( R ) - 48 ( NR ) hours in advance

Additional requirements: (DCMA reserves the right to impose additional inspection points as deemed necessary.)

Prepared by:

Date

Concurrence Signature by QAR/DCMA:

QAR/DCMA

THIS PLANNING SHEET WILL BE UPDATED IF NECESSARY.

QUALITY ASSURANCE LETTER OF INSTRUCTION

Planning Requirements

COMMENTS

NOTICE

Engineer

Date

Sheet1

Contract No: 16-51298
Date Contract Awarded:
Final Delivery Date FDD:
Program Name:
DODIC:
undefined: V
undefined_2: M
undefined_3: V
undefined_4: M
undefined_5: W
undefined_6: V
undefined_7: M
undefined_8: M
undefined_9:
undefined_10:
undefined_11:
undefined_12:
Text19: Pacific Scientific CA
Text20: 06331
Text21:
Text22:
Text23:
Text24: 1.Inspection
Text25: 2. Leak Test
Text26: 3. X-Ray/N-Ray
Text27: 4. LAT Sample Selection
Text28: 5. LAT
Text29: 6. Preparation for Shipment
Text30: 7. AMMO Data Card Review
Text31: 8. Shippers (DD250, DD1149, Reports)
Text32: 9. Additional Requirements
Text33:
Text34:
Text35:
Text36: 1. Explosive Weight

2. Verify ATP contains both gross and fine leak checks, and gross leak and fine leak checks are performed.

3. Ensure film labeling correct. Ensure radiographic film readable/well-defined. DCMA shall not interpret film.

4. Randomly select LAT units per latest government approved ATP.

5. Prior to LAT ensure proper calibration and validation of all test equipment. Testing should occur in accordance with latest government approved ATP.

6. Ensure Paperwork is correct.

7. Verify all energetic materials: list original manufacturer, original lot no., and latest certification/recertification date < 24 months.

8. Ensure Paperwork is correct. Verify Packaging, Packing, Preservation & Marking (PPP&M)

9. Any additional requirements imposed by DCMA shall be approved by Project Engineer

2016-05-17T10:53:39-0600
ERICKSON.KURT.NMN.1387298750
Text46: 3 Aug 2016
Text49:
Type name_1:
Type name_4:
Part Number: Various
Noun: Various

File details come from the government source that posted it. Updated .