FA8213-22-R-3018.pdf
PDF 92 KB Posted
- Attached to
- Canopy Actuated Release Bolt (CARB) Federal contract opportunity
- Solicitation number
- FA8213-22-R-3018
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Attachment 5 - Packaging SOW.pdf | ||
| Attachment 1 - CDRLs.pdf | ||
| Attachment 7 - REPSHIP.pdf | ||
| Attachment 8 - Item Description.pdf | ||
| Attachment 2 - ADC SOW.pdf | ||
| Attachment 3 - CADPAD Item Marking Instruction.pdf | ||
| Attachment 9 - EDLs.pdf | ||
| Attachment 6 - SPI F010855974.pdf | ||
| Attachment 4 - Air Specification.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AUTHORIZED FOR LOCAL REPRODUCTION STANDARD FORM 1447 (REV. 8/2016)
PREVIOUS EDITION NOT USABLE Prescribed by GSA - FAR (48 CFR) 53.214(d)
23. ACCOUNTING AND APPROPRIATION DATA
SEE SCHEDULE
24. TOTAL AWARD AMOUNT (For Government Use Only)
TELEPHONE NUMBER
UNIQUE ENTITY
IDENTIFIER
CHECK IF REMITTANCE IS DIFFERENT AND PUT SUCH ADDRESS IN OFFER
NO COLLECT CALLS
4. SOLICITATION NUMBER
FA8213-22-R-3018
X
6.SOLICITATION ISSUE DATE
8. THIS ACQUISITION IS UNRESTRICTED OR SET ASIDE: % FOR
SMALL BUSINESS WOMEN-OWNED SMALL BUSINESS (WOSB)
ELIGIBLE UNDER THE WOSB PROGRAM
HUBZONE SMALL
BUSINESS EDWOSB
SERVICE-DISABLED VETERAN-
OWNED SMALL BUSINESS NAICS: 325920
8(A) SIZE STANDARD: 750
DATE SIGNED
28. UNITED STATES OF AMERICA (Signature of Contracting Officer)
26. AWARD OF CONTRACT: YOUR OFFER ON SOLICITATION NUMBER
SHOWN IN BLOCK 4 INCLUDING ANY ADDITIONS OR CHANGES WHICH
ARE SET FORTH HEREIN, IS ACCEPTED AS TO ITEMS:
FMS REQUIREMENT
ROUTINE.
Subject to the terms and conditions stated herein, the Contractor agrees to hold its offered prices firm for 120 days.
EXPEDITED DELIVERY AT NO ADDITIONAL COST TO THE GOVERNMENT IS AUTHORIZED.
Sources: United Technologies Aerospace Systems (UTAS), CAGE: 17610;
Pacific Scientific Energetic Material Company (PSEMC), CAGE: 54181.
Award will be based on LPTA (Lowest Price Technically Acceptable).
Clause 52.232-18 “Subject to Availability of Funds” is applicable.
TW = Taiwan, MU = Oman, SN = Singapore, BE = Belgium, PT = Portugal, TK = Turkey, DE = Denmark, BA = Bahrain, JO = Jordan, MO = Morocco, GR = Greece, PK = Pakistan, AE = UAE, NE = Netherlands, TH = Thailand, EG = Egypt, CI = Chile.
22.
AMOUNT
16. AUTHORITY FOR USING OTHER THAN 10 USC 2304 41 USC 253
FULL AND OPEN COMPETITION (c) ( ) (c) ( )
DATE SIGNED
27. SIGNATURE OF OFFEROR/CONTRACTOR
20.
UNIT
21.
UNIT PRICE
19.
QUANTITY
13. CONTRACTOR OFFEROR CODE FACILITY CODE
11. IF OFFER IS ACCEPTED BY THE GOVERNMENT WITHIN * ___ CALENDAR DAYS (60 CALENDAR DAYS UNLESS OFFEROR
INSERTS A DIFFERENT PERIOD) FROM THE DATE SET FORTH IN BLOCK 9 ABOVE, THE CONTRACTOR AGREES TO HOLD
ITS OFFERED PRICES FIRM FOR THE ITEMS SOLICITED HEREIN AND TO ACCEPT ANY RESULTING CONTRACT SUBJECT TO
THE TERMS AND CONDITIONS STATED HEREIN. *120
RATING
DO: A6
3. AWARD/EFFECTIVE DATE
FA8213
2. CONTRACT NUMBER
X
17.
ITEM NUMBER
12. ADMINISTERED BY CODE
Total
SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK: 14 EFT:T
SCD:B
NAME AND TITLE OF SIGNER (Type or Print) NAME OF CONTRACTING OFFICER
5. SOLICITATION TYPE
SEALED BIDS NEGOTIATED
(IFB) (RFP)
15. PROMPT PAYMENT DISCOUNT
25. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN 1
COPIES TO ISSUING OFFICE. CONTRACTOR AGREES TO FURNISH AND DELIVER ALL ITEMS SETFORTH OR OTHERWISE
IDENTIFIED ABOVE AND ON ANY CONTINUATION SHEETS SUBJECT
THE TERMS AND CONDITIONS SPECIFIED HEREIN.
10. ITEMS TO BE PURCHASED (Brief Description)
SUPPLIES SERVICES Explosives Manufacturing
9. (Agency Use) Solicitation: Offers will be received at the Issuing office until * on * . Late offers are subject to late proposal provisions incorporated herein. All offers are subject to such provisions, representations certifications and specifications as are attached or incorporated by reference.*
3-JUN-2022 3:00PM
18.
SCHEDULE OF SUPPLIES/SERVICES
14. PAYMENT WILL BE MADE BY CODE
(SEE ESP CLAUSE 252.232-7003.)
X
7. ISSUED BY CODE
DEPARTMENT OF THE AIR FORCE, DIRECTORATE OF CONTRACTING
AFLCMC EBHK
6072 FIR AVENUE BLDG 1233
HILL AIR FORCE BASE UT 84056-5820
BUYER: Patrick Robello/AFLCMC patrick.robello.1@us.af.mil Phone: (801) 775- 2371
X
1. THIS CONTRACT IS A RATED ORDER UNDER DPAS
(15 CFR 700)SOLICITATION/CONTRACT
BIDDER/OFFEROR TO COMPLETE BLOCKS 11, 13, 15, 21, 22, & 27.
J
STANDARD FORM 1447 (REV. 8/2016) BACK
NO RESPONSE FOR REASONS CHECKED
TYPE OR PRINT NAME AND TITLE OF SIGNER
SIGNATURENAME AND ADDRESS OF FIRM (Include Zip Code)
WE DO NOT DESIRE TO BE RETAINED ON THE MAILING LIST FOR FUTURE PROCUREMENT OF THE TYPE OF
ITEMS INVOLVED
WE DO
OTHER (Specify)
UNABLE TO IDENTIFY THE ITEM(S)
CANNOT COMPLY WITH SPECIFICATIONS CANNOT MEET DELIVERY REQUIREMENT
DO NOT REGULARILY MANUFACTURE OR SELL THE TYPE OF ITEMS
INVOLVED
DATE AND LOCAL TIME 3 JUN 2022 3:00 PM
SOLICITATION NUMBER FA821322R3018
FROM: AFFIX
STAMP
HERE
TO:
ATTN: Patrick K Robello/AFLCMC
DEPARTMENT OF THE AIR FORCE, DIRECTORATE OF CONTRACTING
AFLCMC EBHK
6072 FIR AVENUE BLDG 1233
HILL AIR FORCE BASE UT 84056-5820
FA8213-22-R-3018
PART I - THE SCHEDULE
SECTION B
SUPPLIES OR SERVICES AND PRICES/COSTS
DCMA and DFAS are required to withhold payment IAW DFAR 252.227-7030 until CDRL A001, A005 & A006 have been delivered and/or approved by Hill AFB.
Canopy Actuated Release Bolt
Item No.
GROUP STOCK NO P/N CAGE
Group 001 Alternate 1377-01-085-5974 ES 2502300-1 Group 002 Alternate 1377-01-461-9131 ES 2-502300-1 54181 Or
NSN: 1337-01-085-5974 ES
Canopy Actuated Release Bolt (CARB) ACFT EJECTION SYS (LIFE SUPPORT) BALLISTIC DEVICE. PREDOINANT MATL HIGH STRENGTH STEEL WITH EXPLOSIVE CHARGE OF
.0018 LBS. LENGTH 3.15 IN DIAMETER 1.25 IN AND IS BALLISTIC INITIATED.
DODIC: SP87
Manufacturer Part Number 17610 2-652100-2 54181 2-502300-1 Priority: R ROUTINE.
Limitations of Liability: Other Than High Value Item
Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring
ISO 9001-2008 2008
Buy American Act/Balance of Payments Program
Physical Item Markings IAW CAD/PAD Item Marking Instructions version 1.5 dated 1 May 2019.
Applicable SPI Number: F010855974
USAF
Item No.
0001AA
USAF
Firm Fixed Price Quantity U/I Unit Price Amount
190 EA
CLIN ACRN ACRN Total
0001AA AV
GROUP STOCK NO P/N CAGE
Group 001 Alternate 1377-01-461-9131 ES 2502300-1 Or
SAME
Same as basic item above
DODIC: SP87
Manufacturer Part Number 17610 2-652100-2 54181 2-502300-1 Associated Document(s) Line Item(s)
FD20202250057 0002
Priority: R ROUTINE.
Limitations of Liability: Other Than High Value Item
Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Transportation From Continental United States CONUS (CONUS) Sources
TYPE / SHIP TO CODE F.O.B.
C FV2172 ORIGIN
Type / Ship To PACRN Mark For
C FV2172 PAA 09 ACCT
Type / Ship To Quantity (U/I) On or Before _ Req No / Pri
Required Delivery
C FV2172 190 30 MAR 2023
Proposed Delivery
C FV2172 190
BAHRAIN - BA-D-CAG
Item No.
0001AB
Firm Fixed Price Quantity U/I Unit Price Amount
BAHRAIN - BA-D-CAG
7 EA
CLIN ACRN ACRN Total
0001AB AB
GROUP STOCK NO P/N CAGE
Group 001 Alternate 1377-01-085-5974 ES 2502300-1 Group 002 Alternate 1377-01-461-9131 ES 2-502300-1 54181 Or
SAME
Same as basic item above
DODIC: SP87
Manufacturer Part Number 17610 2-652100-2 54181 2-502300-1 Associated Document(s) Line Item(s)
FD20202250056 0002
Priority: R ROUTINE.
Limitations of Liability: Other Than High Value Item
Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
TYPE / SHIP TO CODE F.O.B.
* DBAA00 ORIGIN
Type / Ship To PACRN Mark For
* DBAA00 PAA DBAA00
Type / Ship To Quantity (U/I) On or Before _ Req No / Pri
Required Delivery
* DBAA00 7 EA 30 MAR 2023 DBAA9410405305
Proposed Delivery
* DBAA00 7 EA
PAKISTAN - PK-D-CDP
Item No.
0001AC
Firm Fixed Price Quantity U/I Unit Price Amount
10 EA
PAKISTAN - PK-D-CDP
CLIN ACRN ACRN Total
0001AC AC
GROUP STOCK NO P/N CAGE
Group 001 Alternate 1377-01-085-5974 ES 2502300-1 Group 002 Alternate 1377-01-461-9131 ES 2-502300-1 54181 Or
SAME
Same as basic item above
DODIC: SP87
Manufacturer Part Number 17610 2-652100-2 54181 2-502300-1 Associated Document(s) Line Item(s)
FD20202250056 0003
Priority: R ROUTINE.
Limitations of Liability: Other Than High Value Item
Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
TYPE / SHIP TO CODE F.O.B.
* DPK002 ORIGIN
Type / Ship To PACRN Mark For
* DPK002 PAA DPK200
Type / Ship To Quantity (U/I) On or Before _ Req No / Pri
Required Delivery
* DPK002 10 EA 30 MAR 2023 DPK28410425309
Proposed Delivery
* DPK002 10 EA
UAE - AE-D-CAA
Item No.
0001AD
Firm Fixed Price Quantity U/I Unit Price Amount
1 EA
CLIN ACRN ACRN Total
0001AD AD
UAE - AE-D-CAA
GROUP STOCK NO P/N CAGE
Group 001 Alternate 1377-01-085-5974 ES 2502300-1 Group 002 Alternate 1377-01-461-9131 ES 2-502300-1 54181 Or
SAME
Same as basic item above
DODIC: SP87
Manufacturer Part Number 17610 2-652100-2 54181 2-502300-1 Associated Document(s) Line Item(s)
FD20202250056 0004
Priority: R ROUTINE.
Limitations of Liability: Other Than High Value Item
Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
TYPE / SHIP TO CODE F.O.B.
* DAER00 ORIGIN
Type / Ship To PACRN Mark For
* DAER00 PAA DAER00
Type / Ship To Quantity (U/I) On or Before _ Req No / Pri
Required Delivery
* DAER00 1 EA 30 MAR 2023 DAER2410505301
Proposed Delivery
* DAER00 1 EA
TAIWAN - TW-D-CAQ
Item No.
0001AE
Firm Fixed Price Quantity U/I Unit Price Amount
5 EA
CLIN ACRN ACRN Total
0001AE AA
GROUP STOCK NO P/N CAGE
Group 001 Alternate 1377-01-085-5974 ES 2502300-1
TAIWAN - TW-D-CAQ
Group 002 Alternate 1377-01-461-9131 ES 2-502300-1 54181 Or
SAME
Same as basic item above
DODIC: SP87
Manufacturer Part Number 17610 2-652100-2 54181 2-502300-1 Associated Document(s) Line Item(s)
FD20202250056 0005
Priority: R ROUTINE.
Limitations of Liability: Other Than High Value Item
Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
TYPE / SHIP TO CODE F.O.B.
* DTWV00 ORIGIN
Type / Ship To PACRN Mark For
* DTWV00 PAA DTWV00
Type / Ship To Quantity (U/I) On or Before _ Req No / Pri
Required Delivery
* DTWV00 5 EA 30 MAR 2023 DTWV2410715304
Proposed Delivery
* DTWV00 5 EA
TAIWAN - TW-D-CBD
Item No.
0001AF
Firm Fixed Price Quantity U/I Unit Price Amount
68 EA
CLIN ACRN ACRN Total
0001AF AE
GROUP STOCK NO P/N CAGE
Group 001 Alternate 1377-01-085-5974 ES 2502300-1 Group 002 Alternate 1377-01-461-9131 ES 2-502300-1 54181 Or
SAME
TAIWAN - TW-D-CBD
Same as basic item above
DODIC: SP87
Manufacturer Part Number 17610 2-652100-2 54181 2-502300-1 Associated Document(s) Line Item(s)
FD20202250056 0006
Priority: R ROUTINE.
Limitations of Liability: Other Than High Value Item
Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
TYPE / SHIP TO CODE F.O.B.
* DTW004 ORIGIN
Type / Ship To PACRN Mark For
* DTW004 PAA DTW700
Type / Ship To Quantity (U/I) On or Before _ Req No / Pri
Required Delivery
* DTW004 68 EA 30 MAR 2023 DTW78410985308
Proposed Delivery
* DTW004 68 EA
NETHERLANDS - NE-D-CAY
Item No.
0001AG
Firm Fixed Price Quantity U/I Unit Price Amount
1 EA
CLIN ACRN ACRN Total
0001AG AF
SAME
Same as basic item above
DODIC: SP87
Manufacturer Part Number 17610 2-652100-2 54181 2-502300-1
NETHERLANDS - NE-D-CAY
Associated Document(s) Line Item(s)
FD20202250056 0007
Priority: R ROUTINE.
Limitations of Liability: Other Than High Value Item
Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
TYPE / SHIP TO CODE F.O.B.
* DNE002 ORIGIN
Type / Ship To PACRN Mark For
* DNE002 PAA DNEM00
Type / Ship To Quantity (U/I) On or Before _ Req No / Pri
Required Delivery
* DNE002 1 EA 30 MAR 2023 DNEM8410345302
Proposed Delivery
* DNE002 1 EA
JORDAN - JO-D-CBY
Item No.
0001AH
Firm Fixed Price Quantity U/I Unit Price Amount
4 EA
CLIN ACRN ACRN Total
0001AH AG
GROUP STOCK NO P/N CAGE
Group 001 Alternate 1377-01-085-5974 ES 2502300-1 Group 002 Alternate 1377-01-461-9131 ES 2-502300-1 54181 Or
SAME
Same as basic item above
DODIC: SP87
Manufacturer Part Number 17610 2-652100-2 54181 2-502300-1 Associated Document(s) Line Item(s)
FD20202250056 0008
JORDAN - JO-D-CBY
Priority: R ROUTINE.
Limitations of Liability: Other Than High Value Item
Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
TYPE / SHIP TO CODE F.O.B.
* DJOB00 ORIGIN
Type / Ship To PACRN Mark For
* DJOB00 PAA DJOB00
Type / Ship To Quantity (U/I) On or Before _ Req No / Pri
Required Delivery
* DJOB00 4 EA 30 MAR 2023 DJOB9410345307
Proposed Delivery
* DJOB00 4 EA
PORTUGAL - PT-D-CAQ
Item No.
0001AJ
Firm Fixed Price Quantity U/I Unit Price Amount
4 EA
CLIN ACRN ACRN Total
0001AJ AH
GROUP STOCK NO P/N CAGE
Group 001 Alternate 1377-01-085-5974 ES 2502300-1 Group 002 Alternate 1377-01-461-9131 ES 2-502300-1 54181 Or
SAME
Same as basic item above
DODIC: SP87
Manufacturer Part Number 17610 2-652100-2 54181 2-502300-1 Associated Document(s) Line Item(s)
FD20202250056 0009
Priority: R ROUTINE.
PORTUGAL - PT-D-CAQ
Limitations of Liability: Other Than High Value Item
Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
TYPE / SHIP TO CODE F.O.B.
* DPTM00 ORIGIN
Type / Ship To PACRN Mark For
* DPTM00 PAA DPTM00
Type / Ship To Quantity (U/I) On or Before _ Req No / Pri
Required Delivery
* DPTM00 4 EA 30 MAR 2023 DPTM9410345310
Proposed Delivery
* DPTM00 4 EA
OMAN - MU-D-CAA
Item No.
0001AK
Firm Fixed Price Quantity U/I Unit Price Amount
3 EA
CLIN ACRN ACRN Total
0001AK AJ
GROUP STOCK NO P/N CAGE
Group 001 Alternate 1377-01-085-5974 ES 2502300-1 Group 002 Alternate 1377-01-461-9131 ES 2-502300-1 54181 Or
SAME
Same as basic item above
DODIC: SP87
Manufacturer Part Number 17610 2-652100-2 54181 2-502300-1 Associated Document(s) Line Item(s)
FD20202250056 0010
Limitations of Liability: Other Than High Value Item
OMAN - MU-D-CAA
Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
TYPE / SHIP TO CODE F.O.B.
* DMUD00 ORIGIN
Type / Ship To PACRN Mark For
* DMUD00 PAA DMUD00
Type / Ship To Quantity (U/I) On or Before _ Req No / Pri
Required Delivery
* DMUD00 3 EA 30 MAR 2023 DMUD9410345314
Proposed Delivery
* DMUD00 3 EA
THAILAND - TH-D-CBT
Canopy Actuated Release Bolt Item No.
0001AL
Firm Fixed Price Quantity U/I Unit Price Amount
15 EA
CLIN ACRN ACRN Total
0001AL AK
GROUP STOCK NO P/N CAGE
Group 001 Alternate 1377-01-085-5974 ES 2502300-1 Group 002 Alternate 1377-01-461-9131 ES 2-502300-1 54181 Or
SAME
Same as basic item above
DODIC: Z3CBT
Manufacturer Part Number 17610 2-652100-2 54181 2-502300-1 Associated Document(s) Line Item(s)
FD20202250056 0011
THAILAND - TH-D-CBT
Canopy Actuated Release Bolt
Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
TYPE / SHIP TO CODE F.O.B.
* DTH003 ORIGIN
Type / Ship To PACRN Mark For
* DTH003 PAA DTH400
Type / Ship To Quantity (U/I) On or Before _ Req No / Pri
Required Delivery
* DTH003 15 EA 30 MAR 2023 DTH48410405303
Proposed Delivery
* DTH003 15 EA
DENMARK - DE-D-CAE
Canopy Actuated Release Bolt Item No.
0001AM
Firm Fixed Price Quantity U/I Unit Price Amount
18 EA
CLIN ACRN ACRN Total
0001AM AL
GROUP STOCK NO P/N CAGE
Group 001 Alternate 1377-01-085-5974 ES 2502300-1 Group 002 Alternate 1377-01-461-9131 ES 2-502300-1 54181 Or
SAME
Same as basic item above
DODIC: SP87
Manufacturer Part Number 17610 2-652100-2 54181 2-502300-1 Associated Document(s) Line Item(s)
FD20202250056 0012
DENMARK - DE-D-CAE
Canopy Actuated Release Bolt
Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
TYPE / SHIP TO CODE F.O.B.
* DDED00 ORIGIN
Type / Ship To PACRN Mark For
* DDED00 PAA DDED00
Type / Ship To Quantity (U/I) On or Before _ Req No / Pri
Required Delivery
* DDED00 18 EA 30 MAR 2023 DDED9410405306
Proposed Delivery
* DDED00 18 EA
SINGAPORE - SN-D-CAH
Item No.
0001AN
Firm Fixed Price Quantity U/I Unit Price Amount
22 EA
CLIN ACRN ACRN Total
0001AN AM
GROUP STOCK NO P/N CAGE
Group 001 Alternate 1377-01-085-5974 ES 2502300-1 Group 002 Alternate 1377-01-461-9131 ES 2-502300-1 54181 Or
SAME
Same as basic item above
DODIC: SP87
Manufacturer Part Number 17610 2-652100-2 54181 2-502300-1 Associated Document(s) Line Item(s)
FD20202250056 0013
SINGAPORE - SN-D-CAH
Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
TYPE / SHIP TO CODE F.O.B.
* DSNH00 ORIGIN
Type / Ship To PACRN Mark For
* DSNH00 PAA DSNH00
Type / Ship To Quantity (U/I) On or Before _ Req No / Pri
Required Delivery
* DSNH00 22 EA 30 MAR 2023 DSNH9410405307
Proposed Delivery
* DSNH00 22 EA
BELGIUM - BE-D-CYK
Item No.
0001AP
Firm Fixed Price Quantity U/I Unit Price Amount
3 EA
CLIN ACRN ACRN Total
0001AP AN
GROUP STOCK NO P/N CAGE
Group 001 Alternate 1377-01-085-5974 ES 2502300-1 Group 002 Alternate 1377-01-461-9131 ES 2-502300-1 54181 Or
SAME
Same as basic item above
DODIC: SP87
Manufacturer Part Number 17610 2-652100-2 54181 2-502300-1 Associated Document(s) Line Item(s)
FD20202250056 0014
BELGIUM - BE-D-CYK
Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
TYPE / SHIP TO CODE F.O.B.
* DBE002 ORIGIN
Type / Ship To PACRN Mark For
* DBE002 PAA DBEP00
Type / Ship To Quantity (U/I) On or Before _ Req No / Pri
Required Delivery
* DBE002 3 EA 30 MAR 2023 DBEP8410405308
Proposed Delivery
* DBE002 3 EA
MOROCCO - MO-D-CBN
Item No.
0001AQ
Firm Fixed Price Quantity U/I Unit Price Amount
23 EA
CLIN ACRN ACRN Total
0001AQ AP
GROUP STOCK NO P/N CAGE
Group 001 Alternate 1377-01-085-5974 ES 2502300-1 Group 002 Alternate 1377-01-461-9131 ES 2-502300-1 54181 Or
SAME
Same as basic item above
DODIC: MU22
Manufacturer Part Number 17610 2-652100-2 54181 2-502300-1 Associated Document(s) Line Item(s)
FD20202250056 0015
MOROCCO - MO-D-CBN
Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
TYPE / SHIP TO CODE F.O.B.
* DMO001 ORIGIN
Type / Ship To PACRN Mark For
* DMO001 PAA DMOA00
Type / Ship To Quantity (U/I) On or Before _ Req No / Pri
Required Delivery
* DMO001 23 EA 30 MAR 2023 DMOA8410405316
Proposed Delivery
* DMO001 23 EA
SINGAPORE - SN-D-CAH
Item No.
0001AR
Firm Fixed Price Quantity U/I Unit Price Amount
2 EA
CLIN ACRN ACRN Total
0001AR AM
GROUP STOCK NO P/N CAGE
Group 001 Alternate 1377-01-085-5974 ES 2502300-1 Group 002 Alternate 1377-01-461-9131 ES 2-502300-1 54181 Or
SAME
Same as basic item above
DODIC: SP87
Manufacturer Part Number 17610 2-652100-2 54181 2-502300-1 Associated Document(s) Line Item(s)
FD20202250056 0016
SINGAPORE - SN-D-CAH
Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
TYPE / SHIP TO CODE F.O.B.
* DSNT00 ORIGIN
Type / Ship To PACRN Mark For
* DSNT00 PAA DSNT00
Type / Ship To Quantity (U/I) On or Before _ Req No / Pri
Required Delivery
* DSNT00 2 EA 30 MAR 2023 DSNT2410405323
Proposed Delivery
* DSNT00 2 EA
TURKEY - TK-D-CAV
Item No.
0001AS
Firm Fixed Price Quantity U/I Unit Price Amount
27 EA
CLIN ACRN ACRN Total
0001AS AQ
GROUP STOCK NO P/N CAGE
Group 001 Alternate 1377-01-085-5974 ES 2502300-1 Group 002 Alternate 1377-01-461-9131 ES 2-502300-1 54181 Or
SAME
Same as basic item above
DODIC: SP87
Manufacturer Part Number 17610 2-652100-2 54181 2-502300-1 Associated Document(s) Line Item(s)
FD20202250056 0017
TURKEY - TK-D-CAV
Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
TYPE / SHIP TO CODE F.O.B.
* DTK002 ORIGIN
Type / Ship To PACRN Mark For
* DTK002 PAA DTKC00
Type / Ship To Quantity (U/I) On or Before _ Req No / Pri
Required Delivery
* DTK002 27 EA 30 MAR 2023 DTKC8410425334
Proposed Delivery
* DTK002 27 EA
EGYPT - EG-D-CAA
Item No.
0001AT
Firm Fixed Price Quantity U/I Unit Price Amount
50 EA
CLIN ACRN ACRN Total
0001AT AR
GROUP STOCK NO P/N CAGE
Group 001 Alternate 1377-01-085-5974 ES 2502300-1 Group 002 Alternate 1377-01-461-9131 ES 2-502300-1 54181 Or
SAME
Same as basic item above
DODIC: SP87
Manufacturer Part Number 17610 2-652100-2 54181 2-502300-1 Associated Document(s) Line Item(s)
FD20202250056 0018
EGYPT - EG-D-CAA
Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
TYPE / SHIP TO CODE F.O.B.
* DEG005 ORIGIN
Type / Ship To PACRN Mark For
* DEG005 PAA DEG200
Type / Ship To Quantity (U/I) On or Before _ Req No / Pri
Required Delivery
* DEG005 50 EA 30 MAR 2023 DEG28N10605316
Proposed Delivery
* DEG005 50 EA
GREECE - GR-D-QCE
Item No.
0001AU
Firm Fixed Price Quantity U/I Unit Price Amount
18 EA
CLIN ACRN ACRN Total
0001AU AS
GROUP STOCK NO P/N CAGE
Group 001 Alternate 1377-01-085-5974 ES 2502300-1 Group 002 Alternate 1377-01-461-9131 ES 2-502300-1 54181 Or
SAME
Same as basic item above
DODIC: SP87
Manufacturer Part Number 17610 2-652100-2 54181 2-502300-1 Associated Document(s) Line Item(s)
FD20202250056 0019
GREECE - GR-D-QCE
Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
TYPE / SHIP TO CODE F.O.B.
* DGRQ00 ORIGIN
Type / Ship To PACRN Mark For
* DGRQ00 PAA GRQ00
Type / Ship To Quantity (U/I) On or Before _ Req No / Pri
Required Delivery
* DGRQ00 18 EA 30 MAR 2023 DGRQ9410625316
Proposed Delivery
* DGRQ00 18 EA
CHILE - CI-D-CAW
Item No.
0001AV
Firm Fixed Price Quantity U/I Unit Price Amount
10 EA
CLIN ACRN ACRN Total
0001AV AT
GROUP STOCK NO P/N CAGE
Group 001 Alternate 1377-01-085-5974 ES 2502300-1 Group 002 Alternate 1377-01-461-9131 ES 2-502300-1 54181 Or
SAME
Same as basic item above
DODIC: SP87
Manufacturer Part Number 17610 2-652100-2 54181 2-502300-1 Associated Document(s) Line Item(s)
FD20202250056 0020
CHILE - CI-D-CAW
Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
TYPE / SHIP TO CODE F.O.B.
* DCI004 ORIGIN
Type / Ship To PACRN Mark For
* DCI004 PAA DCIF00
Type / Ship To Quantity (U/I) On or Before _ Req No / Pri
Required Delivery
* DCI004 10 EA 30 MAR 2023 DCIF8410425304
Proposed Delivery
* DCI004 10 EA
UAE - AE-D-CAA
Canopy Actuated Release Bolt Item No.
0001AW
Firm Fixed Price Quantity U/I Unit Price Amount
1 EA
CLIN ACRN ACRN Total
0001AW AU
GROUP STOCK NO P/N CAGE
Group 001 Alternate 1377-01-085-5974 ES 2502300-1 Group 002 Alternate 1377-01-461-9131 ES 2-502300-1 54181 Or
SAME
Same as basic item above
DODIC: SP87
Manufacturer Part Number 17610 2-652100-2 54181 2-502300-1 Associated Document(s) Line Item(s)
FD20202250056 0021
UAE - AE-D-CAA
Canopy Actuated Release Bolt
Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
TYPE / SHIP TO CODE F.O.B.
* DAER00 ORIGIN
Type / Ship To PACRN Mark For
* DAER00 PAA DAER00
Type / Ship To Quantity (U/I) On or Before _ Req No / Pri
Required Delivery
* DAER00 1 EA 30 MAR 2023 DAER2410405319
Proposed Delivery
* DAER00 1 EA
DATA
Item No.
Not Separately Priced Quantity U/I Unit Price
1 LO NSP
DATA
DATA
DATA IAW DD 1423-1 ATTACHED TO BASIC
ITEM TITLE
A001 Ammunition Data Card (ADC) A002 Engineering Change Proposal (ECP) A003 Notice of Revision (NOR) A004 Request for Variance (RFV) A005 Lot Acceptance Test Plan A006 Test/Inspection Report A007 Failure Summary & Analysis Report
Associated Document(s) Line Item(s)
FD20202250056 0022
FD20202250057 0003
Type / Ship To Quantity (U/I) On or Before _ Req No / Pri
Required Delivery
B IAW1423 1 LO 30 MAR 2023
Proposed Delivery
B IAW1423 1 LO
ITEM TITLE
A001 Ammunition Data Card (ADC) A002 Engineering Change Proposal (ECP) A003 Notice of Revision (NOR) A004 Request for Variance (RFV) A005 Lot Acceptance Test Plan A006 Test/Inspection Report A007 Failure Summary & Analysis Report Not Separately Priced Delivery Schedule: IAW DD1423
SHIP TO / PLACE OF PERFORMANCE
TYPE/CODE: B IAW1423
IAW DD1423
MARK FOR: (See Individual Line Item) REQUISITION NUMBER: (See Individual Line Item) REQUISITION PRIORITY: (See Individual Line Item)
AWARD NUMBER:
TYPE/CODE: C FV2172
649 MUNS MXW
6024 PINE LANE
BLDG 1377 BAY 2
HILL AIR FORCE BASE UT 84056-5707
UNITED STATES
MARK FOR: (See Individual Line Item) REQUISITION NUMBER: (See Individual Line Item) REQUISITION PRIORITY: (See Individual Line Item)
AWARD NUMBER:
TYPE/CODE: I AW DD1423-1
MARK FOR: (See Individual Line Item) REQUISITION NUMBER: (See Individual Line Item) REQUISITION PRIORITY: (See Individual Line Item)
AWARD NUMBER:
SHIP TO (FOREIGN MILITARY SALES)
TYPE/CODE: * DAER00
SUPPLEMENTAL ADDRESS CODE: DXXCAA
FMS CASE CODE/LOA: AE-D-CAA
MAPAC SHIP TO CODE: DAER00
MAPAC MARK FOR: DAER00
REQUISITION NUMBER: (See Individual Line Item) REQUISITION PRIORITY: (See Individual Line Item)
AWARD NUMBER:
TYPE/CODE: * DBAA00
SUPPLEMENTAL ADDRESS CODE: DXXCAG
FMS CASE CODE/LOA: BA-D-CAG
MAPAC SHIP TO CODE: DBAA00
MAPAC MARK FOR: DBAA00
REQUISITION NUMBER: (See Individual Line Item) REQUISITION PRIORITY: (See Individual Line Item)
AWARD NUMBER:
TYPE/CODE: * DBE002
SUPPLEMENTAL ADDRESS CODE: DZ2CYK
FMS CASE CODE/LOA: BE-D-CYK/003
MAPAC SHIP TO CODE: DBE002
MAPAC MARK FOR: DBEP00
REQUISITION NUMBER: (See Individual Line Item) REQUISITION PRIORITY: (See Individual Line Item)
AWARD NUMBER:
TYPE/CODE: * DCI004
SUPPLEMENTAL ADDRESS CODE: DZ4CAW
FMS CASE CODE/LOA: CI-D-CAW/005
MAPAC SHIP TO CODE: DCI004
MAPAC MARK FOR: DCIF00
REQUISITION NUMBER: (See Individual Line Item) REQUISITION PRIORITY: (See Individual Line Item)
AWARD NUMBER:
TYPE/CODE: * DDED00
SUPPLEMENTAL ADDRESS CODE: DXXCAE
FMS CASE CODE/LOA: DE-D-CAE/003
MAPAC SHIP TO CODE: DDED00
MAPAC MARK FOR: DDED00
REQUISITION NUMBER: (See Individual Line Item) REQUISITION PRIORITY: (See Individual Line Item)
AWARD NUMBER:
TYPE/CODE: * DEG005
SUPPLEMENTAL ADDRESS CODE: DZ5CAA
FMS CASE CODE/LOA: EG-D-CAA/003
MAPAC SHIP TO CODE: DEG005
MAPAC MARK FOR: DEG200
REQUISITION NUMBER: (See Individual Line Item) REQUISITION PRIORITY: (See Individual Line Item)
AWARD NUMBER:
TYPE/CODE: * DGRQ00
SUPPLEMENTAL ADDRESS CODE: DZ5CAA
FMS CASE CODE/LOA: GR-D-QCE/098
MAPAC SHIP TO CODE: DGRQ00
MAPAC MARK FOR: GRQ00
REQUISITION NUMBER: (See Individual Line Item) REQUISITION PRIORITY: (See Individual Line Item)
AWARD NUMBER:
TYPE/CODE: * DJOB00
SUPPLEMENTAL ADDRESS CODE: DXXCBY
FMS CASE CODE/LOA: JO-D-CBY/002
MAPAC SHIP TO CODE: DJOB00
MAPAC MARK FOR: DJOB00
REQUISITION NUMBER: (See Individual Line Item) REQUISITION PRIORITY: (See Individual Line Item)
AWARD NUMBER:
TYPE/CODE: * DMO001
SUPPLEMENTAL ADDRESS CODE: DZ1CBN
FMS CASE CODE/LOA: MO-D-CBN/002
MAPAC SHIP TO CODE: DMO001
MAPAC MARK FOR: DMOA00
REQUISITION NUMBER: (See Individual Line Item) REQUISITION PRIORITY: (See Individual Line Item)
AWARD NUMBER:
TYPE/CODE: * DMUD00
SUPPLEMENTAL ADDRESS CODE: DXXCAA
FMS CASE CODE/LOA: MU-D-CAA/003
MAPAC SHIP TO CODE: DMUD00
MAPAC MARK FOR: DMUD00
REQUISITION NUMBER: (See Individual Line Item) REQUISITION PRIORITY: (See Individual Line Item)
AWARD NUMBER:
TYPE/CODE: * DNE002
SUPPLEMENTAL ADDRESS CODE: DZ2CAY
FMS CASE CODE/LOA: NE-D-CAY/001
MAPAC SHIP TO CODE: DNE002
MAPAC MARK FOR: DNEM00
REQUISITION NUMBER: (See Individual Line Item) REQUISITION PRIORITY: (See Individual Line Item)
AWARD NUMBER:
TYPE/CODE: * DPK002
SUPPLEMENTAL ADDRESS CODE: DZ2CDP
FMS CASE CODE/LOA: PK-D-CDP
MAPAC SHIP TO CODE: DPK002
MAPAC MARK FOR: DPK200
REQUISITION NUMBER: (See Individual Line Item) REQUISITION PRIORITY: (See Individual Line Item)
AWARD NUMBER:
TYPE/CODE: * DPTM00
SUPPLEMENTAL ADDRESS CODE: DXXCAQ
FMS CASE CODE/LOA: PT-D-CAQ/001
MAPAC SHIP TO CODE: DPTM00
MAPAC MARK FOR: DPTM00
REQUISITION NUMBER: (See Individual Line Item) REQUISITION PRIORITY: (See Individual Line Item)
AWARD NUMBER:
TYPE/CODE: * DSNH00
SUPPLEMENTAL ADDRESS CODE: DXXCAH
FMS CASE CODE/LOA: SN-D-CAH/001
MAPAC SHIP TO CODE: DSNH00
MAPAC MARK FOR: DSNH00
REQUISITION NUMBER: (See Individual Line Item) REQUISITION PRIORITY: (See Individual Line Item)
AWARD NUMBER:
TYPE/CODE: * DSNT00
SUPPLEMENTAL ADDRESS CODE: DXXCAH
FMS CASE CODE/LOA: SN-D-CAH/001
MAPAC SHIP TO CODE: DSNT00
MAPAC MARK FOR: DSNT00
REQUISITION NUMBER: (See Individual Line Item) REQUISITION PRIORITY: (See Individual Line Item)
AWARD NUMBER:
TYPE/CODE: * DTH003
SUPPLEMENTAL ADDRESS CODE: Z3CBT
FMS CASE CODE/LOA: TH-D-CBT/001
MAPAC SHIP TO CODE: DTH003
MAPAC MARK FOR: DTH400
REQUISITION NUMBER: (See Individual Line Item) REQUISITION PRIORITY: (See Individual Line Item)
AWARD NUMBER:
TYPE/CODE: * DTK002
SUPPLEMENTAL ADDRESS CODE: DZ2CAV
FMS CASE CODE/LOA: TK-D-CAV/001
MAPAC SHIP TO CODE: DTK002
MAPAC MARK FOR: DTKC00
REQUISITION NUMBER: (See Individual Line Item) REQUISITION PRIORITY: (See Individual Line Item)
AWARD NUMBER:
TYPE/CODE: * DTW004
SUPPLEMENTAL ADDRESS CODE: DZ4CBD
FMS CASE CODE/LOA: TW-D-CBD/001
MAPAC SHIP TO CODE: DTW004
MAPAC MARK FOR: DTW700
REQUISITION NUMBER: (See Individual Line Item) REQUISITION PRIORITY: (See Individual Line Item)
AWARD NUMBER:
TYPE/CODE: * DTWV00
SUPPLEMENTAL ADDRESS CODE: DXXCAQ
FMS CASE CODE/LOA: TW-D-CAQ/001
MAPAC SHIP TO CODE: DTWV00
MAPAC MARK FOR: DTWV00
REQUISITION NUMBER: (See Individual Line Item) REQUISITION PRIORITY: (See Individual Line Item)
AWARD NUMBER:
PART I - THE SCHEDULE
SECTION C
DESCRIPTION/SPECIFICATIONS/STATEMENT OF WORK
SPECIFICATIONS, STANDARDS AND DRAWINGS (MAY 1993)
(IAW FAR 11.201)
Specifications, standards or drawings (as applicable) are furnished/listed below or are listed in Section J herein. The contractor shall perform in accordance with those specifications and/or the attachments listed in Section J:
ITEM NR SPECIFICATIONS, STANDARDS AND/OR ATTACHMENTS
PART I - THE SCHEDULE
SECTION F
DELIVERIES OR PERFORMANCE
52.247-34 F.O.B. DESTINATION (NOV 1991)
(IAW FAR 47.303-6(c))
Ship in Place and Temporary Storage of FMS Munitions Items
SHIP IN PLACE (SIP) is authorized for FMS items ONLY, upon notification of successfully passed Lot Acceptance Testing.
Within 5 working days after SIP, the contractor is to request GBL and shipping instructions using SIRs, and the contractor is to e-mail DCMA and Hill AFB PCO the following for each CLIN entered into SIRs:
Contract Number:
CLIN:
Date CLIN Entered into SIRs:
SIRs Number:
The contractor can submit the final invoice for the CLIN using WAWF Receiving Report once the CLIN has shipped in place. The requirement for "Evidence of Shipment" shall be postponed until after receipt of the clear text shipping instructions. The Contractor shall store and safeguard the units in bonded storage at no change in contract price while waiting for shipping instructions. After CLIN is shipped in place, the items shipped are Government Property. Proper care and handling of the Government Property include the shipment of items to country as directed by the Government.
Government Property: For FMS items that have shipped in place and still have not shipped to country after 30 days, the contractor shall provide DCMA and Hill AFB PCO a monthly report listing the contract number, CLIN, quantity, NSN, and REQN for the stored items.
When shipped in place CLIN ships from the contractor's facility to ultimate destination, the contractor is to provide the dd1149 document to Hill AFB PCO. The dd1149s shall be provided to the Contracting Officer within 10 days after shipment.
PART I - THE SCHEDULE
SECTION G
CONTRACT ADMINISTRATION DATA
ACCOUNTING AND APPROPRIATION DATA (AUG 1998)
Accounting and Appropriation Chargeable ACRN Funds Citation Amount Chargeable
AA 9711X8242 .0002 4F X LC HN CCAQTW 20M4R1 63681 001000 503000 F03000 $0.00
PSR: 581854 FSR: 069247 DSR: 119489
AB 9711X8242 .0002 4F X LC HN CCAGBA 20M4R1 63681 005000 503000 F03000 $0.00
PSR: 358895 FSR: 059174 DSR: 119493 CIN: F2DCDE2039A1010000AB
AC 9711X8242 .0002 4F X 47 HN CCDPPK 20M4R1 63681 007000 503000 F03000 $0.00
PSR: 731308 FSR: 086358 DSR: 119582
AD 9711X8242 .0002 4F X 47 HN CCAAAE 20M4R1 63681 002000 503000 F03000 $0.00
PSR: G73103 FSR: 078829 DSR: 119604 CIN: F2DCDE2039A1010000AD
AE 9711X8242 .0002 4F X LC HN CCBDTW 20M4R1 63681 001000 503000 F03000 $0.00
PSR: 510729 FSR: 068446 DSR: 119637
AF 9711X8242 .0002 4F X 47 HN CCAYNE 20M4R1 63681 001000 503000 F03000 $0.00
PSR: G44828 FSR: 076674 DSR: 119672
AG 9711X8242 .0002 4F X LC HN CCBYJO 20M4R1 63681 002000 503000 F03000 $0.00
PSR: 499417 FSR: 063343 DSR: 270190
AH 9711X8242 .0002 4F X LC HN CCAQPT 20M4R1 63681 001000 503000 F03000 $0.00
PSR: 650944 FSR: 023066 DSR: 119753
AJ 9711X8242 .0002 4F X LC HN CCAAMU 20M4R1 63681 003000 503000 F03000 $0.00
PSR: 571579 FSR: 061943 DSR: 119787
AK 9711X8242 .0002 4F X LC HN CCBTTH 20M4R1 63681 001000 503000 F03000 $0.00
PSR: 510711 FSR: 068402 DSR: 119836
AL 9711X8242 .0002 4F X LC HN CCAEDE 20M4R1 63681 003000 503000 F03000 $0.00
PSR: 578621 FSR: 062137 DSR: 119865
AM 9711X8242 .0002 4F X 47 HN CCAHSN 20M4R1 63681 001000 503000 F03000 $0.00
PSR: E57022 FSR: 049032 DSR: 119924
AN 9711X8242 .0002 4F X 47 HN CCYKBE 20M4R1 63681 003000 503000 F03000 $0.00
PSR: G46933 FSR: 056871 DSR: 120106
AP 9711X8242 .0002 4F X 47 HN CCBNMO 20M4R1 63681 002000 503000 F03000 $0.00
PSR: 320907 FSR: 060941 DSR: 120341
AQ 9711X8242 .0002 4F X LC HN CCAVTK 20M4R1 63681 001000 503000 F03000 $0.00
PSR: 499371 FSR: 063299 DSR: 120388
AR 9711X8242 .0002 4F X LC HN CCAAEG 20M4R1 63681 003000 503000 F03000 $0.00
PSR: 363529 FSR: 059178 DSR: 120502
AS 9711X8242 .0002 4F X LC HN CQCEGR 20M4R1 63681 098000 503000 F03000 $0.00
PSR: 510735 FSR: 068649 DSR: 120570
AT 9711X8242 .0002 4F X LC HN CCAWCI 20M4R1 63681 005000 503000 F03000 $0.00
PSR: 571570 FSR: 061936 DSR: 120617
AU 9711X8242 .0002 4F X 47 HN CCAAAE 20M4R1 63681 001000 503000 F03000 $0.00
PSR: G44820 FSR: 064071 DSR: 120636
AV 57 23011 . H8 2 LC HN 355101 4E27A1 63681 78070F 503000 F03000 $0.00
PSR: C36513 FSR: 093074
ACRN TOTAL $ 0.00
PART II - CONTRACT CLAUSES
SECTION I
CONTRACT CLAUSES
252.209-7009 ORGANIZATIONAL CONFLICT OF INTEREST--MAJOR DEFENSE ACQUISITION
PROGRAM (MAY 2019)
(IAW DFARS 209.571-8(b))
52.215-14 INTEGRITY OF UNIT PRICES -- ALTERNATE I (OCT 1997)
(IAW FAR 15.408(f)(2))
252.223-7002 SAFETY PRECAUTIONS FOR AMMUNITION AND EXPLOSIVES (MAY 1994)
(IAW DFARS 223.370-5)
252.223-7003 CHANGE IN PLACE OF PERFORMANCE--AMMUNITION AND EXPLOSIVES
(DEC 1991)
(IAW DFARS 223.370-5)
252.227-7030 TECHNICAL DATA--WITHHOLDING OF PAYMENT (MAR 2000)
(IAW DFARS 227.7103-6(e)(2), DFARS 227.7104(e)(4))
(a) the Contracting Officer may until such data is accepted by the Government, withhold payment to the Contractor of ten percent (10%) of the total contract price or amount
PART III - LIST OF DOCUMENTS, EXHIBITS, AND OTHER ATTACHMENTS
SECTION J
LIST OF ATTACHMENTS
Form Number Description/File Name Date Number of Pages 1453 Attachment 1 - CDRLs 14SEP2021 6
Attachment 2 - ADC SOW 00JAN2018 3
Attachment 3 - CADPAD Item Marking Instruction 01MAY2019 10
Attachment 4 - Air Specification 01OCT2021 4
Attachment 5 - Packaging SOW 00JAN2019 2
DD2169 Attachment 6 - SPI F010855974 UNDATED 5
Attachment 7 - REPSHIP 11MAR2014 1
Attachment 8 - Item Description UNDATED 2
Attachment 9 - EDLs UNDATED 2
PART IV - REPRESENTATIONS AND INSTRUCTIONS
SECTION K
REPRESENTATIONS, CERTIFICATIONS, AND OTHER STATEMENTS
OF OFFERORS OR RESPONDENTS
52.225-20 PROHIBITION ON CONDUCTING RESTRICTED BUSINESS OPERATIONS IN
SUDAN--CERTIFICATION (AUG 2009)
(IAW FAR 25.1103(d))
52.247-53 FREIGHT CLASSIFICATION DESCRIPTION (APR 1984)
(IAW FAR 47.305-9(b)(1))
FOR FREIGHT CLASSIFICATION PURPOSES, OFFEROR DESCRIBES THIS COMMODITY AS
PART IV - REPRESENTATIONS AND INSTRUCTIONS
SECTION L
INSTRUCTIONS, CONDITIONS, AND NOTICES TO OFFERORS OR RESPONDENTS
SECTION L
INSTRUCTIONS, CONDITIONS, AND NOTICES TO RESPONDENTS FOR PROPOSAL PREPARATION
USING LOWEST PRICE BETWEEN APPROVED SOURCES PROCEDURES
1.0. GENERAL INSTRUCTIONS
1.1. This acquisition is restricted to qualified sources: a qualification package is required for new sources. See FAR Clause 52.209-1 for qualification requirements. PROPOSALS WILL NOT BE CONSIDERED IF A QUALIFICATION PACKAGE IS NOT SUBMITTED AND ACCEPTED BY THE
AIR FORCE ENGINEER PRIOR TO AWARD.
1.2. The Contracting Officer (“CO”) has determined there is a probability of adequate price competition in this acquisition. Upon examination of the initial offers, the CO will review this determination and if, in the CO’s opinion, adequate price competition exists, no additional cost information will be requested and certification under FAR 15.406-2 will not be required.
However, if at any time during this competition, the CO determines that adequate price competition no longer exists, offerors may be required to submit information to the extent necessary for the CO to determine the reasonableness and affordability of the price.
2.0 SPECIFIC INSTRUCTIONS
2.1. Instructions to the Offerors (ITO):
This section of the ITO provides general guidance for preparing proposals as well as specific instructions on the format and content of the proposal. The offeror’s proposal must include all data and information requested by the ITO and must be submitted in accordance with these instructions. The offeror shall be compliant with the requirements as stated in this solicitation. Non-conformance with the instructions provided in the ITO may result in an unfavorable proposal evaluation.
2.2. Include Sufficient Detail:
The proposal shall be clear, concise, and shall include sufficient detail for effective evaluation and for substantiating the validity of stated claims.
2.3. Proposal Acceptance and Validity Dates:
The proposal acceptance period is specified in Section A of the model contract/solicitation.
The offer shall make a clear statement in Section A of the proposal documentation that the proposal is valid until this date.
3.0 GENERAL INFORMATION
3.1. Point of Contact:
The buyer is the sole point of contact for this acquisition. If needed, written requests for clarification may be sent to the buyer at the address located in Section A of the model contract/solicitation.
3.2. Discrepancies:
If an offeror believes that the requirements in these instructions contain an error, omission, or are otherwise unsound, the offeror shall immediately notify the buyer in writing with supporting rationale. The offeror is reminded that the Government reserves the right to award this effort based on the initial proposal, as received, without discussion.
3.3. Debriefings:
The CO will promptly notify offerors of any decision to exclude them from the competition IAW FAR 15.503, whereupon they may request and receive a debriefing. Offerors desiring debriefing must make their request IAW the requirements of FAR 15.505 or 15.506, as applicable.
4.0 EVALUTION CRITERIA
4.1. Approved Source Proposal:
The contractor has to be an approved source by time of award in order to be considered.
4.2. Price Proposal
Completion of the RFP, Section B Schedule will represent the price proposal.
5.0 CONTRACT DOCUMENTATION
5.1 Solicitation/Representation and Certifications:
The purpose of this section is to provide information to the Government for preparing the contract document and supporting file. The offeror’s proposal shall include a signed copy of the solicitation, and Sections A through K.
This includes:
Section A – Solicitation/Contract Form: Completion of block 13 and signature and date for block 27 of the SF1449. Signature by the offeror on the SF 1449 constitutes an offer, which the Government may accept.
Section B – Supplies or Services and Costs/Prices: All pricing information shall be addressed in Section B – The Schedule of the RFP. Information shall be limited to Contract Line Item Number (CLIN), Sub-CLIN, including unit and extended pricing as specified in Section B.
Section F – Deliveries or Performance: Completion of Section B delivery requirements by providing an accurate, realistic delivery date for each CLIN/Sub-CLIN as required by Clause 52.211-8.
Section I – Contract Clauses: Complete Clause all clauses requiring contractor fill-in.
5.2 Exceptions to Terms and Conditions:
Offerors are required to meet all solicitation requirements, including terms and conditions, and representations and certifications. Failure to meet a requirement MAY result in an offeror being ineligible for award. Offerors must clearly identify any exception to the solicitation terms and conditions and provide complete accompanying rationale. Each exception shall be specifically related to each paragraph and/or specific part of the solicitation to which the exception is taken. Provide rationale in support of the exception and fully explain its impact, if any, on the performance, schedule, cost and specific requirements of the solicitation. Failure to comply with the terms and conditions of the solicitation MAY result in the offeror being ineligible for award.
PART IV - REPRESENTATIONS AND INSTRUCTIONS
SECTION M
EVALUATION FACTORS FOR AWARD
SECTION M
EVALUATION FACTORS FOR AWARD
1.0 GENERAL INFORMATION
1.1 Basis for Contract Award:
This acquisition will utilize Lowest Price between approved sources. Technical tradeoffs will not be made and no additional credit will be given for exceeding acceptability. Award will be made to the acceptable offeror with the lowest evaluated cost or price, which is deemed responsible in accordance with the Federal Acquisition Regulation and whose proposal conforms to the solicitation requirements. The solicitation requirements include all stated terms, conditions, representations, certifications, and all other information required by Section L of this solicitation. The Government reserves the right to award without discussions, therefore, each initial offer should contain the offeror’s best terms from a price and technical standpoint. The government does, however, reserve the right to conduct discussions if determined necessary by the Contracting Officer.
1.2 Number of Contracts Awarded:
The Government intends to select one contractor for award, however; the Government reserves the right to award no contract at all, depending on the quality of the proposals, prices submitted and the availability of funds.
1.3 Correction Potential of Proposals:
The Government will consider, throughout the evaluation, the “correction potential” of any proposal uncertainty. The judgment of such “correction potential” is within the sole discretion of the Government. If an aspect of an offeror’s proposal not meeting the Government’s requirements is not considered correctable, the offeror may be eliminated from the competitive range.
2.0 EVALUATION FACTORS
2.1. List factors and Subfactors:
The Government will evaluate for acceptability the factors described below:
Factor 1—The contractor has to be a qualified source by the time of contract award in accordance with the source qualification requirements referenced in Section J of the solicitation.
Factor 2—Cost/Price: Completion of the RFP, Section B Schedule will represent the price proposal.
2.2. Evaluation Methodology:
Only approved offerors will be considered for award. Then, price will be evaluated and the proposals will be listed from lowest to highest price based on the total evaluated price.
Award will be made to the lowest evaluated priced proposal.
2.3 Total Evaluated Price (TEP)
The Government will develop the TEP. It will be calculated as the sum of the price CLIN’s as identified in Part 1 – The Schedule, Section B, Supplies or Services.
3.0 PRE-AWARD SURVEY
The Government may conduct a pre-award survey (PAS) as part of this source selection. Results of the PAS (if conducted) will be evaluated to determine each offerors’ capability to meet the requirements of the solicitation.
4.0 SOLICITATION REQUIREMENTS, TERMS AND CONDITIONS
Offerors are required to meet all solicitation requirements, such as terms and conditions, and representations and certifications, in addition to those identified as evaluation factors or sub-factors. Failure to meet a requirement may result in an offer being ineligible for award. Offerors must clearly identify any exception to the solicitation terms and conditions and provide complete accompanying rationale.
File details come from the government source that posted it. Updated .