SQS_SectionC.pdf

PDF 83 KB Posted

Attached to
F-16 Limiter, Electrical Federal contract opportunity
Solicitation number
FA8212-20-R-0003
Issued by
Department of the Air Force Materiel Command Air Force Sustainment Center

View the file

Other files for this federal contract opportunity

Other files attached to F-16 Limiter, Electrical, newest first.
File Type Posted
FA821220R0003_______0002.pdf PDF
FA821220R0003_______0001.pdf PDF
A001_FATR.pdf PDF
Packaging_Requirements.pdf PDF
B001_CPP.pdf PDF
DD254_SOLICITATION.pdf PDF
PackagingSOW.pdf PDF
FA821220R0003$R_260.pdf PDF
FA821220R0003.pdf PDF
EDL.pdf PDF
EDR.pdf PDF
IUIDChecklist.pdf PDF
SectionL.pdf PDF
SectionM.pdf PDF
Show all 14

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

NSN:

P/N, Noun:

Application:

SECTION C:

MANUFACTURING QUALIFICATION REQUIREMENTS

5895015158924

VDX1859, 588R499H01, MD-202XOOSG

Receiver Protector F16 Radar

1. QUALIFICATION REQUIREMENTS THAT MUST BE SATISFIED TO BECOME A QUALIFIED SOURCE

a. Prequalification Natice/Sources Saqght: The offeror shall notify the appropriate government Small Business Office or, if responding to a solicitation, the contracting officer in the appropriate government contracting office, of intent to qualify as a source for this Receiver Protector.

b. Facilities, Testing, and Inspection Capabilities: The offeror must certify to the government that they have, or have access to, the required facilities and equipment to manufacture, inspect, test, package, and store the item. The offeror shall make their facilities, equipment, tooling, and personnel available for evaluation and inspection by the government.

c. Data Verification: The offerer must verify that he. has a complete data package. This verification must include a complete list of all procedures, drawings, and specifications, including change notices, in the offeror's possession including, at a minimum Communication & Power Industries (88236) drawing VDX1859. The offerer may also be required to produce copies of all applicable procedures, drawings, or specifications.

d. Manufacture/Process Verification: The offeror must manufacture this item to conform to the government requirements as prescribed within the ESA-approved engineering/technical data package. The offeror must show compliance with Unique Identification (UID) requirements in accordance with DFARS 211.274 as prescribed within the ESA-approved engineering/technical data package. The offerer must provide, at their own expense, data ~hawing the results of all quality, performance, and environmental evaluations conducted by the offerorto show compliance with the government requirements as prescribed by 416 SCMS/GUEAA. The offerer shall also identify its sources for materials and its standards for internally used processes.

e. Test and Evaluation and/or Verification: The offerer, at their own expense, shall prepare and submit to 416 SCMS/GUEAA for their prior approval, a qualification test plan/procedure detailing how they intend to verify compliance with all performance, environmental, mechanical, and quality assurance requirements identified by drawing VDX1859. After completion of the approved qualification testing, the offeror shall be required to submit a complete test report of the results to 416 SCMS/GUEAA for their review and approval prior to the contract award. The government retains the right to exercise the option to inspect the testing processes, including on-site witnessing of any or all documented testing. To allow accomplishing this, the offeror shall notify the government at least 30 days in advance of the occurrence of any testing that will be used as a basis for qualification. The offeror's facilities shall be made available for government inspection during these tests.

27 Mar 2019

Note; Government cannot test the qualification article at the unit level but can test in the next higher assemblies.

Section C 1/3

P/Nc Noun:

MANUFACTURING QUALIFICATION REQUIREIYIENTS

5895015158924

VDX1859, 588R499H01, MD-202X005G

Receiver Protector

Application: F16 Radar

I. Qualification Article Verification: The offeror must provide, at their own expense, a pre-contract award qualification article for evaluation by the government. This article must comply with all of the requirements of drawing VDX1859. This article shall be subjected to a form, fit, and function evaluation to demonstrate compatibility with the weapon system and to evaluate the manufacturing capability of the offerer. Offerors will be notified whether or not their qualification article passed or failed the required qualification testing within 60 days of submitting a product for qualification testing. Note that successful completion of the qualification testing does not guarantee any contract award. If the offerer is deemed qualified and awarded the contract, a post-contract award first article exhibit may be required to verify production capability.

g. Qualification Requirement Cost Estimate: Estimated likely costs for testing and evaluation, which will be incurred by the potential offering party to become qualified: $125000.00.

h. Qualification Time Completion Estimate: It is the estimate of the engineering support activity that completion of this qualification effort should require 365 days. This is based on complexity of the Receiver Protector and other factors.

i. Qualification Time Limitation: An offerer may not be denied the opportunity to submit and have considered an offer for a contract if the offerer can demonstrate to the satisfaction of the contracting officer that the offerer {or its product) meets these standards for qualification or can meet them before the date specified for award of the contract. The award will not be delayed to provide the vendor with an opportunity to demonstrate its ability to meet the standards specified in this qualification requirement.

j. Evaluation of Proposals Not Previously Qualified: The offeror must be fully qualified in order to be eligible for a contract award. Therefore, the offerer must fulfill all of the requirenients stated, in writing, in the qualification requirement before the date specified for award of the contract. Once all requirements are met, the offerer will be listed as an approved source for this item. Approval, however, does not guarantee subsequent contract award.

27 Mar2019 Section C 2/3

P/N:

Noun:

MANUFACTURING QUALIFICATION REQUIREMENTS

5895015158924

VDX1859, 588R499H01, M0-2D2X005G

Receiver Protector Application: F16 Radar

2. SOURCE QUALIFICATION WAIVER REQUIREMENTS

Sources who meet any of the following source Qualification Waiver Criteria (QWC) may apply for a waiver of all or part of the qualification requirements. If a waiver is granted and the offeror is awarded a contract, the offeror may still be required to provide a post-contract award first article exhibit to verify production capability:

a. QWC1: The potential source submits written certification that the articles have been supplied to the government or original equipment manufacturer (e.g., DD Form 250, Material Inspection and Receiving Report, Purchase Order invoice, etc.).

b. QWC2: A source qualified to provide an assembly is usually qualified to provide subassemblies, major components, and items of that assembly.

c. QWC3: A source qualified to provide earlier dash numbers of a basic P/N may be qualified to provide other dash numbers of that same basic P/N, provided there is no increase in complexity, criticality, or other relevant requirements.

d. QWC4: A source qualified to provide a similar or like item can be qualified to provide the required item. However, for approval, the engineering authority must verify that there is no increase in complexity, criticality, or other requirements over that of the similar item. At a minimum, the source shall provide a complete set of drawings for the similar item and written proof, such as purchase orders, shipping documents, etc., to show that the similar item was provided to the original equipment manufacturer or DoD.

e. QWCS: A source previously qualified to provide an item, but which has been purchased, sold, merged, absorbed, reformed, split, etc., may qualify ifit can be established that the qualification is currently with the requester and that the requester has the same or equivalent facilities, tooling, equipment, personnel, and utilizes the original forging, castings, etc., in the manufacturing process.

27 Mar 2019 Section C 3/3

File details come from the government source that posted it. Updated .