Attahcment_7_EDR.doc

DOC document 44 KB Posted

Attached to
SOLICITATION Acces Doors for A-10 Federal contract opportunity
Solicitation number
FA8212-19-R-0002
Issued by
Department of the Air Force Materiel Command Lifecycle Management Center Hill Air Force Base

About this file

EDR

View the file

Other files for this federal contract opportunity

Other files attached to SOLICITATION Acces Doors for A-10, newest first.
File Type Posted
EDR.pdf PDF
EDL.pdf PDF
FA821219R0002Amend01.pdf PDF
Attachment_5_SOW_pckg.pdf PDF
Attachment_7_.pdf PDF
FA821219R0002.pdf PDF
Attachment_2_PKG._Rqmt.pdf PDF
Attachment_4_SPI_ATTACH.pdf PDF
Attachment_3_Tranportation_data.pdf PDF
Attachment_6_Itm_dsc._NSN_9211.pdf PDF
Attachment_1_CDRL.pdf PDF
Attachment_1_CDRL.pdf PDF
Attachment_6_EDL.pdf PDF
Attachment_8_SQSS.pdf PDF
FA821219Q0007.pdf PDF
Attachment_3_Transportation.pdf PDF
Attachment_2_packaging.pdf PDF
Attachment_4_SOW_for_packaging.docx DOCX document
Attachment_5_Item_Description.pdf PDF
Show all 19

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

REV:

ENGINEERING DATA REQUIREMENTS

(ATTACHMENT “A”)

NOTE: MILITARY SPECIFICATIONS STANDARDS WILL NOT BE FURNISHED IN THE BID SET.

1. THE FOLLOWING INSTRUCTIONS ARE FURNISHED FOR THE MANUFACTURE OF:

XXXXXXXXXXXXXXXX

2. PART NUMBER:

3. NATIONAL STOCK NUMBER:

1234-12-123-1234FG

4. THE FOLLOWING SPECIFICATIONS/STANDARDS, ETC, WILL BE USED IN LIEU OF THE DATA INDICATED. THE SUPERSEDED DATA WILL NOT BE FURNISHED UNLESS SO INDICATED.

REV:
ENGINEERING DATA REQUIREMENTS

(ATTACHMENT “A”)

NOTE: MILITARY SPECIFICATIONS / STANDARDS WILL NOT BE FURNISHED IN THE BID SET.

1.THE FOLLOWING INSTRUCTIONS ARE FURNISHED FOR THE MANUFACTURE OF:

SST REMOTE CONTROL UNIT

2. PART NUMBER:

8502534P1

3. NATIONAL STOCK NUMBER:

4920-01-555-5319WF

Deviations from specifications identified in drawings or this document are not authorized without prior approval by 416 SCMS/GUMAA Engineering.

IUID (Item Unique Identifier) requirements and expectations which the contractor must ensure are complied with.

a. Contractors drawings shall be changed or supplemented by contractor for IUID compliance.

b.. Label shall contain all data on existing label, (if existing label is to be replaced), only delete existing label with government engineering permission.

c. Use HRI (Human Readable) and Machine Readable Matrix. (USAF not equiped to read barcode).

d. IUID Matrix needs to be highly visible, in a location easily accessible.

e. IUID marking must be permanent.

f. MIL-STD-130, ISO 15434, ISO 15415, and ISO 15418, (Part Marking as per MIL-STD-130 in lieu of FPS-3008)

i. IUID marking specifications.

1. Minimum 1/8 inch lettering on Human readable to include:

a. Cage (17V)

b. P/N (1P)

c. Serial Number (IS)

2. Minimum 1/4 inch square on Machine Readable 2D Matrix -construct 2 - to include

a. Cage (17V)

b. P/N (1P)

c. Serial Number (IS)

Counterfeit Prevention

1. Counterfeit Prevention Plan (CPP). Contractors that supply electronic parts or systems that contain electronic parts shall establish policies and procedures to avoid, detect, mitigate and disposition counterfeit electronic parts to prevent such parts from entering the USAF/DoD supply chain. These policies and procedures shall be documented in a CPP for submission and approval in accordance with Data Item Description (DID) DI-MISC-81832 and accomplished for all specified contract items. DI-MISC-81832 is applicable to Parts, Material and Processes Selection (PMPS) associated with delivery of systems and assemblies to the USAF and DoD. The requirements established by DI-MISC-81832 also apply to electronics components procured in sustainment of such systems and assemblies. The requirements of the recently DoD-adopted SAE 5553, Aerospace Standard, Counterfeit Electronics Parts; Avoidance, Detection, Mitigation, and Disposition shall also apply.

2.0. At a minimum, the CPP shall address:

2.1. Applicability. The Contractor shall identify all Business locations and programs to which the CPP applies. The CPP shall address materials, hardware, electronic parts, and procured assemblies.

2.2. Definitions. The Contractor shall utilize definitions per AS 5553 to ensure consistency. Any contractor-derived definitions must be included in an appropriate CPP appendix or annex. (Ref. AS5553, paragraph 3, 3.1, 3.2, 3.3, appendix H)

2.3. Parts Availability and Use of Parts Brokers. The Contractor shall not procure materials, systems, assemblies, subassemblies or parts from parts Brokers when available from Original Manufacturers (OM) or their Authorized Distributors. In cases where materials, systems, assemblies, subassemblies or parts are no longer available from the OM or their Authorized Distributors, procurement from Brokers may be authorized as defined by the Contractor’s policy and their CPP. (Ref. AS5553, paragraph 4.1.1, 4.1.2.e., appendix A)

2.4. Procurement Policies. The Contractor shall provide and implement policy directing development and implementation of business practices and procedures, and processes to prevent procurement of Counterfeit materials and parts. The Contractor shall identify the appropriate office(s), business units, functional organizations, and programs, who shall have responsibility for development, maintenance and implementation of the CPP. The CPP shall identify the specific roles and responsibility for each. (Ref. AS5553, paragraph 4.1.2, 4.1.3, appendix B, C, D)

2.4.1. Risk Assessment. The contract shall address the risk of using unknown sources and or unauthorized suppliers in the CPP. Application or technical risk assessments shall establish the effect that counterfeit parts may have on performance. Vendor or source of supply risk assessments shall establish the potential for obtaining counterfeit parts. Using any risk analysis tool acceptable to the Government, the Contractor shall conduct a risk assessment based upon item characteristics and how likely it is that a counterfeit part will be received. The contractor shall identify and describe in the CPP how parts are selected for assessment and what risk is acceptable based upon the parts design, construction, material and functional requirements. As a minimum, analysis shall be completed for flagging high risk items, such as items that are obsolete, discontinued, rare, etc. The contractor shall require completion of a trade study, documented within the CPP, that shall facilitate determining whether 100% testing of parts procured from after-market sources is more cost effective than qualification or requalification of a manufacturer. (Ref. AS5553, paragraph 4.1.2, 4.1.3, appendix B, C, D)

2.5. Detection and Avoidance Responsibilities. The Contractor shall establish processes for the review and approval of contractor and applicable subcontractor systems for the detection and avoidance of counterfeit electronic parts and suspect counterfeit electronic parts, which processes shall be comparable to the processes established for contractor business systems under section 893 of the Ike Skelton National Defense Authorization Act for Fiscal Year 2011 (Public Law 111–383; 124 Stat. 4311; 10 U.S.C. 2302 note). The Contractor shall flow down such requirements and processes to their subcontractors per ODASD Memo titled “Overarching DoD Counterfeit Prevention Guidance”, dated 16 March 2012. (Ref. AS5553, paragraph 4.1.4, 4.1.5, appendix E)

PREPARED BY:

RICHARD TILTON

OFFICE SYMBOL:

GBMAF

DATE:

20080411

13PREPARED BY:

Curtis Blanco

OFFICE SYMBOL:

416 SCMS / GUEAA

DATE:

13Dec2016,Tue

HILL AFB FORM 462 Page 2 of 2

File details come from the government source that posted it.