VTE__PWS_14May2015.doc

DOC document 161 KB Posted

Attached to
Elevator Maintenance Federal contract opportunity
Solicitation number
FA8201-15-R-0011
Issued by
Department of the Air Force Materiel Command Lifecycle Management Center Hill Air Force Base

About this file

New Statement of Work Please disregard previous Statement of Work

View the file

Other files for this federal contract opportunity

Other files attached to Elevator Maintenance, newest first.
File Type Posted
VTE__PWS_14May2015_(Revision_1).doc DOC document
Elevator_Wage_Determination.docx DOCX document
WD_05.docx DOCX document
Bid_Schedule.xlsx XLSX spreadsheet

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PERFORMANCE WORK STATEMENT (PWS)

FOR

VERTICAL TRANSPORTATION EQUIPMENT INSPECTION, MAINTENANCE, AND REPAIR SERVICES

75 CES/CEOS

Hill AFB, and at Little Mountain, UT

05 February 2015

TABLE OF CONTENTS

1. Description of Services …………………………………………………………………………….. 3

2. Reports/ Documentation……………………………………………………………………………. 5

3. Warranty………………………………………………………………………………………..……. 5

4. Government Furnished Property and Services ……………………………………………………6

5. Changes to Requirements ……………………………………………………………………...….. 6

6. Services Summary ………………………………………………………………………………….. 7

7. General Information ……………………………………………………………………………….. 8

8. Appendices

Appendix A: Estimated Workload …………………………………………………...………. 14 Appendix B: List of Vertical Transportation Equipment …………………………..………. 15 Appendix C: List of Publications ……………………………………………………..….……17 Appendix D: Contractor Full Time Equivalent Reporting …..………………….…..……….18

1. DESCRIPTION OF SERVICES The contractor shall provide all management, tools, supplies, equipment, parts and labor necessary to inspect, maintain, and repair the real property vertical transportation equipment (VTE) at Hill AFB and at Little Mountain, Utah, in a manner that will ensure continuous and safe operation. The term “VTE” in this Performance Work Statement (PWS) includes all equipment listed in Appendix B including freight and passenger elevators, wheelchair lifts., incline lift, vertical platform lift. All work conducted on VTE will be in accordance with prescribed standards to ensure full compliance with American National Standards Institute (ANSI) and American Society of Mechanical Engineers (ASME) . American Society of Mechanical Engineers ASME A17.1, Safety Code for Elevators and Escalators, ASME A17.2.1, Inspector's Manual for Electric Elevators, ASME A17.2.2, and Inspector’s Manual for Hydraulic Elevators, NFPA 70, National Electric Code, Occupational Safety and Health Administration Standards (OSHA), and the recommendations of the original equipment manufacturer (OEM).

1.1. INSPECTIONS. The contractor shall inspect each VTE identified in Appendix B as per the schedule for inspections provided by the contractor as per para 1.1.1. Inspection findings are to be reported to the Contracting Officer Representative (COR) as per para 2.

1.1.1. FREQUENCY OF INSPECTIONS. The contractor shall develop and submit to the Government a written Maintenance Control Program (MCP) for each VTE within ten (10) business days after contract award to cover the basic contract and any option periods. The MCP shall, at a minimum, include required inspections, timelines/frequencies for inspections, and maintenance to be performed. The contractor shall perform inspections and maintenance of all VTE in accordance with the MCP. The MCP shall ensure compliance with minimum code requirements. The contractor shall provide an updated MCP to the Contracting Officer (CO) and to the COR if at any time during the performance period the MCP must be updated. The contractor shall receive approval from the CO prior to implementation of MCP changes.

1.1.2. POSTING OF INSPECTION. The contractor shall affix a Record of Inspection to each VTE. The Record of Inspection shall indicate at a minimum the Contractor’s company name, the Contractor’s contact information, the name of the inspector, the date of inspection, and the date of next schedule inspection.

1.1.3. ANNUAL INSPECTIONS. The contractor shall perform necessary inspections and tests as required under ANSI/ASME A17 and ANSI Code A-17.1 Appendix N, using a Qualified Elevator Inspector (QEI). The first annual test shall include the five (5) year test for all traction and roped hydraulic elevators regardless of due date. The three (3) year test shall be scheduled in conjunction with the annual test two years following the first annual test.

1.2 PREVENTIVE MAINTENANCE. While performing the scheduled inspection the contractor shall perform all required preventive maintenance on all equipment identified in appendix B. All maintenance, repair, and replacement of damaged, broken, or worn parts are to be done in a manner that ensures that the equipment may be operated safely. Maintenance, repair, and replacement are actions to restore equipment to a state in which it may safely perform its required operations as installed in accordance with the manufacturer’s recommendations. The maintenance work shall be in accordance with the commercial practices or manufacturer’s specifications and shall be intended to maintain the VTE in safe and reliable operating condition until the next scheduled maintenance.

1.2.1. MINOR REPAIR COST UP TO $50.00. The contractor shall perform all minor repairs identified during scheduled preventive maintenance that are necessary to keep the VTE in a safe and reliable operational condition until the next scheduled maintenance. The contractor shall be responsible for all cost of repairs including labor, equipment, tools, materials, supplies, and parts up to $50.00 per unit. Repairs, including labor, parts and materials, costing $50.00 or less shall be accomplished without prior approval by the government. The contractor shall ensure that all repair work is completed within two (2) days of its commencement; however, the contractor is encouraged to keep equipment downtime to a minimum. The contractor shall provide a copy of the repair report to the COR as per para 2.

1.2.2. MAJOR REPAIR COST EXCEEDING $50.00 If the repair work, including parts and labor, exceeds $50.00 the contractor shall provide a written repair cost estimate to the COR within two (2) business days of finding the deficiency requesting authorization to proceed. The written repair cost estimate shall include, at a minimum, the following: the estimated cost of material, the specified time needed to complete repairs, and the projected time the equipment will be out of service. The contractor shall be financially compensated for material and labor costs only if COR authorization to proceed with the repair work is granted. The contractor shall ensure all major repair work commences within three (3) days of COR approval. The contractor shall ensure that all repair work is completed within seven (7) days of its commencement; however, the contractor is encouraged to keep equipment downtime to a minimum. The contractor shall provide a copy of the repair report to the COR as per para 2.

1.3 REPAIR SERVICE CALLS. The contractor shall provide service calls at the request of the COR. Service calls are classified as routine or emergency depending on the situation. Service calls are unscheduled actions to repair and restore VTE to a state in which it may safely perform its required operations as installed in accordance with the manufacturer’s recommendations. All repair and replacement of damaged, broken, or worn parts are to be done in a manner that ensures that the equipment may be operated safely. The repair work shall be in accordance with the commercial practices or manufacturer’s specifications and shall be intended to maintain the VTE in safe and reliable operating condition. The contractor must notify the customer (facility manager) and the COR of all projected downtime and estimated time of repair.

1.3.1. ROUTINE SERVICE CALLS. Service calls will be classified as routine when the work or adjustments do not qualify as an emergency call. The contractor shall respond to routine repair service calls within one (1) business day upon notification by the COR. The contractor shall provide the COR with an estimated cost of repair, including parts and labor, within two (2) business day from the time the contractor reports to the work location and surveys the repairs. The written repair cost estimate shall include, at a minimum, the following: the estimated cost of parts and labor, the specified time needed to complete repairs, and the projected time the equipment will be out of service. The contractor shall be financially compensated for material and labor costs only if COR authorization to proceed with the repair work is granted. The contractor shall ensure all major repair work commences within three (3) days after notice to proceed from the COR or as otherwise approved by the COR. The contractor shall ensure that all repair work is completed within seven (7) days of its commencement; however, the contractor is encouraged to keep equipment downtime to a minimum. The contractor shall provide a copy of the repair report to the COR as per para 2.

1.3.2. EMERGENCY SERVICE CALLS. Emergency calls are defined as calls made for services when a VTE system fails and constitutes a danger to personnel, threatens to damage property, or threatens to disrupt base activities, operations, and/or missions. The contractor shall respond to emergency repair service calls within two (2) hours upon notification by the COR. The contractor shall provide the COR with an estimated cost of repair, including parts and labor, within two (2) business day from the time the contractor reports to the work location and surveys the repairs. The written repair cost estimate shall include, at a minimum, the following: the estimated cost of parts and labor, the specified time needed to complete repairs, and the projected time the equipment will be out of service. The contractor shall be financially compensated for material and labor costs only if COR authorization to proceed with the repair work is granted. The contractor shall ensure all major repair work commences within three (3) days after notice to proceed from the COR or as otherwise approved by the COR. The contractor shall ensure that all repair work is completed within seven (7) days of its commencement; however, the contractor is encouraged to keep equipment downtime to a minimum. The contractor shall provide a copy of the repair report to the COR as per para 2.

2. REPORTS/ DOCUMENTATION The contractor shall prepare and submit a written report to the COR within ten (10) business days of the following month of all scheduled inspections, maintenance, and any repairs accomplished during the previous month as per para 2.1 and 2.2.

2.1. INSPECTION AND MAINTENANCE CHECKLIST. The contractor shall develop and submit to the Government a written Inspection/Maintenance Checklist within ten (10) days after contract award. The Checklist shall identify those items on the VTE that are inspected and maintained to ensure the VTE is maintained in safe and reliable operating condition until the next scheduled inspection/maintenance. The report shall, at a minimum, identify each VTE, the location of the VTE, maintenance work performed, non-reimbursed repairs needed and completed, date of inspection, date of next scheduled inspection, name of inspector, and overall condition of the VTE.

2.2. REPAIR REPORT. The contractor shall submit a written report to the COR documenting reimbursable repairs accomplished to include, but not limited to, mechanical, electrical, control, and safety deficiencies found, actual parts replaced, parts cost, and man-hours per repair.

3. WARRANTY The contractor shall warrant all contractor installed parts and all contractor workmanship for a period of one year from the date of acceptance by the government. The contractor shall repair or replace, at his expense, any materials that become defective during the warranty period. Warranties shall not apply where the damage or failed materials results from abuse or neglect by the government.

4. GOVERNMENT FURNISHED PROPERTY AND SERVICES All reasonable quantities of utilities will be available to the contractor without charge. Any temporary lines and connections that may be required shall be installed, maintained and removed by the contractor at his expense and in a manner satisfactory to the COR.

5. CHANGES TO REQUIREMENTS As requirements change, the government may add/drop VTE listed in Appendix B. The government shall notify the contractor a minimum of ten (10) days in advance of any additions or subtractions. As a result of any changes, Appendix B of the PWS will be updated and the new PWS will be added to the contract. If the number of VTE requiring inspection increases, then the contractor shall provide a proposal for any addition cost for the current year and any option years that are left on the contract. The proposal will be negotiated by the contractor and the contracting officer to determine an acceptable maintenance schedule and cost.

6. SERVICES SUMMARY

Table 1. Performance objectives and performance thresholds

Performance Objective
PWS Para
Performance Threshold
VTE is maintained in accordance with current industry and government standards
1.3
Performance is acceptable when 95% of VTE have received industry and government standard periodic maintenance by the end of the scheduled month.

Contractor submits a written report within ten (10) business days of the following month of all scheduled inspections and maintenance.

2
Performance is acceptable when 90% or more of reports are received within ten (10) business days of the following month.

Contractor response time to routine repair service calls shall be within one (1) business day after notification per call.

1.3.1
Performance is acceptable when contractor responds to repair service calls within one (1) business day after notification per call 95% of the time.

Contractor response time to emergency repair service calls shall be within two (2) hours after notification per call.

1.3.2
Performance is acceptable when contractor responds to repair service calls within two (2) hours after notification per call 95% of the time.

7. GENERAL INFORMATION

7.1. SECURITY REQUIREMENTS

7.1.1 SECURITY REQUIREMENTS. Much of the VTE is located in a controlled area. For the security of the area and the safety of others, the contractor shall prohibit the entrance of persons other than the contractor’s employees into work areas when not engaged in performance of the contract. This does not apply to Government personnel directly assigned to this area. The contractor and his employees shall be required to submit applications for security clearances and identification to the Contracting Office Representative. All personnel of the contractor must be able to obtain and maintain a security clearance to Hill AFB and at Little Mountain, Utah. The contractor shall comply with all requirements and procedures in accordance with FAR 5352.242-9000, Contractor Access to Air Force Installations. The contractor shall contact the Contracting Office Representative for appropriate forms prior to starting work; reference the following two paragraphs below. All documentations shall be submitted at the pre-performance conference. All contract vehicles shall be clearly marked on each side with a magnetic or painted sign of the company name.

7.2. QUALITY CONTROL

7.2.1. QUALITY CONTROL PROGRAM. In compliance with the clause entitled “Inspection of Services”, 52.246–4, the contractor shall establish a complete Quality Control Program to ensure the requirements of this contract are provided as specified. The contracting officer will notify the contractor of acceptance or required modifications to the plan before the contract start date. The contractor shall make appropriate modifications (at no additional costs to the government) and obtain acceptance of the plan by the contracting officer before the start of the first operational performance period.

7.3. QUALITY ASSURANCE

7.3.1. QUALITY ASSUANCE. The government will periodically evaluate the contractor’s performance by appointing a representative(s) to monitor performance to ensure services are received. The government representative will evaluate the contractor’s performance through intermittent on–site inspections of the contractor's quality control program and receipt of complaints from base personnel. The government may inspect each task as completed or increase the number of quality control inspections if deemed appropriate because of repeated failures discovered during quality control inspections or because of repeated customer complaints. Likewise, the government may decrease the number of quality control inspections if merited by performance. The government will also investigate complaints received from various customers located on the installation. The contractor shall be responsible for initially validating customer complaints. However, the Contracting Office Representative shall make final determination of the validity of customer complaint(s) in cases of disagreement with customer(s).

7.3.2. CONTRACTING OFFICER REPRESENTATIVE (COR). The Contracting Officer Representative (COR) is the authorized government representative who will perform assessments of the contractor’s performance. Subsequent to contract award, the identity of the COR, with a letter defining their duties and authority will be promptly furnished to the successful bidder/offeror.

7.3.3. The COR or alternate will inform the contracting officer in person when discrepancies occur and will request corrective action. The COR or alternate will make a notation of the discrepancy on their surveillance checklist with the date and time the discrepancy was noted and will request the contract manager (or authorized representative) to initial the entry on the checklist. The contracting officer shall follow the requirements of the FAR 52.212–4, Contract Terms and Conditions for Commercial Items (Feb 2007), for contractors failure to correct nonconforming services.

7.3.4. Any matter concerning a change to the scope, prices, terms or conditions of this contract shall be referred to the Contracting Officer and not to the COR.

7.3.5. The services to be performed by the contractor during the period of this contract shall at all times and places are subject to review by the Contracting Officer or authorized representative.

7.4 PHYSICAL SECURITY

7.4.1. The contractor shall be responsible for safeguarding all government property provided for contractor use. At the close of each work period, government facilities, property, and materials shall be secured.

7.4.2. KEY CONTROL. The contractor shall establish and implement methods of ensuring that all keys/key cards issued to the contractor by the government are not lost or misplaced and are not used by unauthorized persons.

7.4.2.1. In the event keys, other than master keys, are lost or duplicated, the contractor shall, notify the Contracting Officer immediately. A report shall be submitted to the Security Manager and Security Forces.

7.4.2.2. The contractor shall prohibit the use of keys issued by the government by any persons other than the contractor’s employees. The contractor shall prohibit the opening of secured areas by contractor employees to permit entrance of persons other than contractor’s employees engaged in the performance of assigned work in those areas, or personnel authorized entrance by the Contracting Officer.

7.5 HOURS OF OPERATION

7.5.1. NORMAL HOURS OF OPERATION. The contractor shall perform the services required under this contract during the following hours: 0700 – 1630 Monday through Friday, except for recognized federal holidays.

7.5.2. RECOGNIZED HOLIDAYS. The contractor is not required to provide service on the following days: New Year’s Day, Martin Luther King Day, Presidents Day, Memorial Day, Independence Day, Labor Day, Columbus Day, Veterans Days, Thanksgiving Day and Christmas Day. If the holiday falls on Saturday, it is observed on Friday. If the holiday falls on a Sunday, it is observed on Monday.

7.5.3. EMERGENCY SERVICES. On occasion, services may be required to support an activation or exercise of contingency plans outside the normal duty hours described above. The contractor’s responsibilities for emergency support are described in paragraph 1 (Description of Services).

7.5.4. CONTINUATION OF ESSENTIAL DOD CONTRACTOR SERVICES DURING CRISIS IAW DODI 3020.37 As the real property vertical transportation equipment (VTE) Facilities at Hill AFB and at Little Mountain, Utah, are essential to aircraft repair and maintenance, it is essential that the maintenance and repair of the freight and passenger elevators, escalators, wheelchair/ incline lift, vertical platform lift, as described in paragraph 1 (Description of Services) be accomplished during a crisis. The contractor shall supply a contingency plan for providing these services during crisis conditions as defined in DODI 3020.37 PARA E2.1.1.

7.6 CONSERVATION OF UTILITIES

7.6.1. The contractor shall instruct employees in utilities conservation practices. The contractor shall be responsible for operating under conditions which prevent the waste of utilities which include the following:

7.6.2. Lights shall be used only in areas where and when work is actually being performed.

7.6.3. Mechanical equipment controls for heating, ventilation, and air conditioning systems shall not be adjusted by the contractor or by contractor employees unless authorized.

7.6.4. Water faucets or valves shall be turned off after the required use has been accomplished.

7.6.5 Government telephones shall be used only for official government business.

7.7 RECORDS

7.7.1. The contractor shall be responsible for creating, maintaining, and disposing of only those government required records that are specifically cited in this PWS, Applicable Publications and Forms. If requested by the Government, the contractor shall provide the original record or a reproducible copy of any such record within five working days of receipt of the request.

7.8 ENVIRONMENTAL CONTROLS

7.8.1. GREEN PROCUREMENT

7.8.1.1. Section 6002 of the Resource Conservation and Recovery Act of 1976 (RCRA) and Executive Order 13101 requires the use of recycled and recovered products identified in the Environment Protection Agency’s Comprehensive Procurement Guidelines. Contractors at Hill AFB and at Little Mountain, Utah, shall assist in compliance with this EO through the:

(a) Use of products with post-consumer recycled content. Paper used in the office should contain 30% post consumer recycled paper.

(b) Use of products that are recyclable

(c) Use of low toxicity or non-toxic products

(d) Use and installation of low-maintenance products

The following items are currently listed for Vehicular Products and Miscellaneous in the EPA Guidelines:

1. Engine coolants

2. Re-built vehicular parts

3. Re-refined lubricating oil

4. Retread tires

5. Sorbents

6. Printing and Writing.

Other Recyclable Materials: The following items shall be recycled: metal beverage containers, glass (clear, brown, green), office paper, newspaper, corrugated fiberboard/cardboard/paperboard, wood and plastics. Contractor may recycle materials not listed above with prior coordination of the CO or COR, and the 75 CES/CEV QRP Manager at 801-777-8791.

All recyclable items shall be stored, shipped and disposed of in accordance with federal and local environmental regulations.

See http: www.epa.gov/epaoswer/non-hw/procure/products.htm for additional items. The contractor is required to use these recycled or recovered products unless they cannot be procured within a reasonable period of time, at reasonable prices, or the product(s) do not meet technical or performance standards. EPA Guidelines are the minimum requirement. The contractor is encouraged to use other materials and products not listed but commonly used in industry. The contractor shall maintain records and submit an annual report to the Contracting Officer along with the annual certification required by FAR 52.223-9 Certification and Estimate of Percentage of Recovered Material Content for EPA Designated Items upon completion of the basic year and COMPLIANCE WITH LAWS AND REGULATIONS: The contractor shall be knowledgeable of and comply with all applicable Interstate, Federal, State, and Local laws, regulations, and requirements regarding environmental protection. In the event environmental laws/regulations change during the term of this contract, the contractor is required to comply as such laws come into effect. If there is an increase or decrease in cost as a result of the change, the contractor shall inform the Contracting Officer pursuant to notice requirements and negotiate a modification to the contract.

7.8.2. MATERIAL STORAGE AND USE. The contractor shall follow manufacturer’s guidelines and professional recommendations for control of humidity, temperature, cleanliness, and materials handling. This includes hazardous materials.

7.8.3. NOTIFICATION OF ENVIRONMENTAL SPILLS. If the contractor spills of releases any substance contained in 40 CFR 302 in the environment, the contractor or its employee shall immediately report the incident to the Hill AFB Fire Department at 777-1911. The liability for the spill or release of such substances rests solely with the contractor and its agent. The contractor shall dispose of all oils, hydraulic fluids and other hazardous waste in accordance with federal, state and local regulations, and dispose of trash or debris off government property in accordance with the same.

7.9 GOVERNMENT OBSERVATIONS

7.9.1. Government personnel, other than contracting officers (COs) and contracting officer representatives (CORs), may from time–to–time, with CO coordination, observe contractor operations. However, these personnel may not interfere with contractor performance or make any changes to the contract.

7.10 SAFETY REQUIREMENTS In performing work under this contract, the contractor shall:

7.10.1. Conform to the safety requirements contained in the contract for all activities related to the accomplishment of the work.

7.10.2. Take such additional immediate precautions as the contracting officer may reasonably require for safety and mishap prevention purposes.

7.10.3. Develop and provide at the start of the orientation period or the start of the first operational performance period (if there is no orientation period) a safety plan for the protection of government facilities and property and to provide a safe work environment for contractor personnel.

7.10.4. Provide protection to government property to prevent damage during the period of time the property is under the control or in possession of the contractor.

7.10.5. Include a clause in all subcontracts to require subcontractors to comply with the safety provisions of this contract as applicable.

7.10.6. Record and report promptly (within one hour) to the contracting officer or designated government representative (GR), all available facts relating to each instance of damage to government property or injury to either contractor or government personnel.

7.10.7. In the event of an accident/mishap, take reasonable and prudent action to establish control of the accident/mishap scene, prevent further damage to persons or property, and preserve evidence until released by the accident/mishap investigative authority through the contracting officer.

7.10.8. If the government elects to conduct an investigation of the accident/mishap, the contractor shall cooperate fully and assist government personnel in the conduct of investigation until the investigation is completed.

7.11 SPECIAL QUALIFICATIONS

7.11.1. The contractor shall abide by the Service Contract Act Labor Laws under FAR 52.222-41 and 52.222-43, Fair Labor Standards Act and Service Contract Act. (Multiple-Year and Option Contracts)

7.11.2. The contractor shall be certified by appropriate state of local elevator licenses for electrical and hydraulics type elevator. The mechanics must be certified though the National Elevator Industry Education Program (NEIEP) or technicians must be certified through the National Association Elevator Contractors (NAEC) or 5 years’ experience in elevator maintenance. Electricians must be certified through the National Electric Code and licensed by one of the 50 United States. Person performing maintenance must have participated in a certification program within the last 12 months, and maintain must their licenses and certifications throughout the duration of the contract. Contractor shall submit certifications/licenses on the employees that will be working on Hill Air Force Base and at Little Mountain, Utah. Contractor shall send copies of the renewed licenses and certifications throughout the contract period of performance to the Contracting Officer.

7.12 PHASE OUT

7.12.1. If there is a change in contractor or if the operation reverts to in–house, the incumbent contractor will provide familiarization, to the government or the follow–on contractor, whichever the case may be. During the phase–out familiarization period, the incumbent will be fully responsible for the operation of one month.

7.12.2. The government reserves the right to conduct site visits in all contractor operated facilities in conjunction with the solicitation of offers for the follow–on contract. In the event the follow–on contract is awarded to other than the incumbent, the incumbent contractor will cooperate to the extent required to permit an orderly change over to the successful contractor. With regard to the successor contractor’s access to incumbent employees, a recruitment notice may be placed in each facility.

7.13 PUBLICATIONS

7.13.1 . Compliance with all publications, regulations and operating instructions provided by the Government is required when:

7.13.2. The publications prescribe in Appendix “D” outline USAF policies, use of materials, procedures and processes applicable to the work requirements.

7.13.3. The contractor is required to acquire and work on the latest version of the publication.

7.14 SECURITY REQUIREMENTS For servicing of freight and passenger elevators, incline lift, vertical platform lift / located in restricted access areas, the using organization shall provide suitable escort personnel for the contractor.

8. APPENDICES

APPENDIX A:

Estimated Workload

ITEM
NAME
ESTIMATED QUANTITY
1
Passenger Elevators
23
2
Freight Elevators
12
3
Wheelchair Lifts
6
4
Estimated number of repair service calls per month
10
5
Estimated number of emergency calls per year
6

APPENDIX B:

List of Vertical Transportation Equipment

Item
Bldg
Location
Type (Hydraulic or Cable)
Capacity (Lbs.)
Lifts (Stops)
Use
Manufacturer
1
1
Hydraulic
1,200
2
Passenger
All Pro Elevators
2
5
#1
Hydraulic
4,000
2
Passenger
US Elevator
3
5
#2
Hydraulic
1,200
2
Passenger
Carson Elevator
4
5
#3

Horseshoe

Screw-Drive
750
2
Incline Lift
National Wheel-O-Vator

(Wheelchair)

5
10
Hydraulic
1,200
10
Passenger
Elevator Sve & Mfg.
6
50
Hydraulic
5,000
2
Freight
Montgomery
7
100
West Side

Outside

Screw-Drive
450
2
Incline Lift
National

Wheel-O-Vator

(Wheelchair)

8
120
Hydraulic
2,100
3
Passenger
Schindler
9
214
Hydraulic
2,500
2
Passenger
Carson
10
214
Hydraulic
5,000
2
Freight
Montgomery
11
225
Hydraulic
2,000
3
Passenger
Montgomery
12
225
Hydraulic
10,000
2
Freight
Montgomery
13
225
Hydraulic
1,000
2
Freight
Otis
14
238
#1 SE Side
Hydraulic
4,000
2
Passenger
Carson
15
238
#2 West Side
Need to get information
750
3
Passenger
Caron Elevator
16
238
#3
Hydraulic
4,500
2 Front/Rear/MRL
Passenger
ThyssenKrupp
17
265
Hydraulic
2,500
2
Passenger
Schindler
18
501
Lt. Mtn
Hydraulic
2,000
4
Freight
Rotary Lift Co.
19
503
Center
Hydraulic
4,500
2
Passenger
Carson
20
503
Bay A
Hydraulic
5,000
3
Passenger
Schindler
21
503
Bay A
Hydraulic
6,000
3
Freight
Schindler
22
503
Dock

Bay B

Hydraulic
8,000
2
Freight
Carson Elevator
23
505
Hydraulic
8,000
2
Freight
Carson
24
505
Hydraulic
2,000
2
Passenger
Montgomery
25
507
Hydraulic
4,000
2
Passenger
All Pro Elevator
26
509
Hydraulic
750
2
Incline Lift
Accessibility Lift PAL (Wheelchair)
27
533
Hydraulic
4,500
2
Passenger
Carson Elevator
28
593
Hydraulic
500
2
Vertical Lift
American Stair Glide (Wheelchair)
29
593
Hydraulic
3,000
3
Passenger
Kimball Elevator
30
688
Hydraulic
2,000
2
Passenger
Carson Elevator
31
843
Bay G
Hydraulic
1,400
2
Passenger
Access Industries (LULA)
32
843
Bay J
Hydraulic
1,400
2
Passenger
Flexi-Lift (LULA)
33
849
Hydraulic
3,000
4
Freight
Dover
34
1102
Hydraulic
750
3
Incline Platform Lift
National Wheelovator

(Wheelchair)

35
1289
Hydraulic
2,000
2
Passenger
Montgomery
36
1515
West Hallway
Hydraulic
2,500
2
Passenger
Thyssenkrupp
37
1515
SW Corner
Hydraulic
2,500
2
Passenger
Thyssenkrupp
38
1515
Hydraulic
3,500
2
Freight
Montgomery
39
1515
East Hallway
Hydraulic
10,000
2
Freight
Thyssenkrupp
40
1515
Hydraulic
10,000
2
Freight
Thyssenkrupp
41
1515
Hydraulic
750
2
Vertical lift
National wheel-o-vator

APPENDIX C:

List of Publications

ASME A17.1, Safety Code for Elevators and Escalators

ASME A17.2.1, Inspector's Manual for Electric Elevators

ASME A17.2.2, Inspector's Manual for Hydraulic Elevators

ASME A17.2.3, Inspector's Manual for Escalators and Moving Walks

NFPA 70, National Electric Code

ASME publications may be ordered by contacting:

The American Society of Mechanical Engineers

22 Law Drive6

Fairfield, NJ 07004

Phone 800-843-2763

FAX 973-882-1717

E-mail Infocentral@asme.org website http://www.asme.org/catalog/

APPENDIX D:

Contactor Full-Time Equivalent Reporting The contractor shall report ALL contractor labor hours (including subcontractor labor hours) required for performance of services provided under this contract for the MILSATCOM Configuration Management Support via a secure data collection site. The contactor is required to completely fill in all required data fields at http://www.ecmra.mil. Reporting inputs will be for the labor executed during the period of performance for each government fiscal year (FY), which runs 1 October through 30 September. While inputs may be reported any time during the FY, all data shall be reported no later than 31 October of each calendar year. Contractors may direct questions to the CMRA help desk.

*Reporting Period: Contractors are required to input data by 31 October of each year. However, due to the delayed implementation, input of FY12 data is required by 31 Mar 13.

*Uses and safeguarding of Information: Information from the secure web site is considered to be proprietary in nature when the contract number and contractor identity are associated with the direct labor hours and direct labor dollars. At no time will any data be released to the public with the contactor name and contract number associated with the data.

*User Manuals: Data for Air Force service requirements must be input at the Air Force CMRA link. However, user manuals for government personnel and contractors are available at the Army CMRA link at http://www.ecmra.mil.

� The quantity of elevators listed may be added to or subtracted from based on the needs of the government.

File details come from the government source that posted it. Updated .