Performance Work Statement (PWS)
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Solicitation_Released_from_CO.docx | DOCX document | |
| F100_CDRL_(96.4_KB).msg | MSG file | |
| F100_M2M_Final_Solicitation_Revision_prior_to_release.docx | DOCX document | |
| F100_CDRL_(21.3_KB).msg | MSG file | |
| Wage_Determination_12-29-2015.pdf | ||
| F100_CDRL_(113_KB).msg | MSG file | |
| AppendixB(Narrative)-F100M2M-Property102516.docx | DOCX document | |
| GFPList-Atch1-AppendixB-F100M2M-102516.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PERFORMANCE WORK STATEMENT
(PWS)
For Application of PWA-46 Tungsten Carbide Coating – LW-IN40
F100-PW-100(3), -100, -220, & -220E –
1st, 2nd & 3rd Compressor In-let Fan Rotor Blades
29 Feb 2016
PREPARING ORGANIZATION: 76 PMXG TINKER AFB OK 73145
For Guidance Only SECTION I – Description Of Services.
1.1 The purpose of this requirement is to apply proprietary coating PWA-46 (Hardface) on Mid-span of the F100-PW-100-200/220/220E 1st, 2nd, and 3rd Stage Compressor In-Let Fan Rotor Blades.
1.1.1 The contractor shall provide all labor, tools, equipment, test equipment, material, parts, quality control, transportation, inspection manuals, personal protective equipment and clothing including reflective clothing (belt, vest, etc), hearing and eye protection including prescription safety glasses, safety harnesses, fall protection equipment, lifting equipment and any incidentals necessary to apply proprietary coating PWA-46 (Hardface) on the Mid-span of the 76 Maintenance Wing (MXW) government owned F100-PW-100-200/220/220E 1st, 2nd, and 3rd Stage Compressor In-Let Fan Rotor Blades. All work/services are to be performed as called for in the Performance Work Statement (PWS).
1.1.2 All blades will be shipped to the contractors in sets. The part numbers on the blades are for each, and two of the same part numbers make a set. The contractor shall invoice via Wide Area Workflow (WAWF) using the set part number (PN) and national stock number (NSN) as follows:
F100 – 100/200/220/220E 1st Stage PN 4081931 two each make PN 4081941, NSN 2840-01-503-0962NZ(Set) 2nd Stage PN 4081972 two each make PN 4081982, NSN 2840-01-503-0963NZ(Set) 3rd Stage PN 4084013 two each make PN 4084093, NSN 2840-01-434-6916NZ(Set)
1.1.3 The 76 PMXG will perform all requirements up to the application of PWA-46 to include peening on the airfoil and midspan. The contractor shall perform application of PWA 46 coating process on the midspan surface and any surface finish requirements. Any and all operations after the contractors application of PWA-46 will be performed by the 76 PMXG (i.e. airseals, anti-galling, and moment weighing). The contractor may clean the blades IAW SPOP 18.
1.1.4 The contractor shall ensure all requirements in this PWS are accomplished IAW the latest versions of the documents listed in PWS paragraph 1.2 if it does not impact cost and delivery schedules or if a conflict does not arise in implementation of the new procedures. If any of the preceding conditions occur, the contractor shall provide a written evaluation, along with specific backup data and estimated cost data for those changes which impact the contractor’s performance to the Procurement Contracting Officer (PCO) within ten (10) workdays after receipt of an updated publication. The contractor shall not incorporate these publication changes until approved by the PCO. In the event there are conflicts between two or more referenced documents, the contractor shall provide written evaluation, along with specific backup data to the PCO within ten (10) workdays after knowledge of the conflict. Resolution of the conflict will be provided by the PCO. In addition, the contractor shall immediately implement those publication changes that result in no change in contract price or delivery or have no conflicts.
1.2 Government Documents.
1.2.1. The contractor shall obtain the forms and publications expressly required to perform the work in this contract via the internet at www.e-publishing.af.mil. In the event that a form or publication is not available online, 76 PMXG will provide the form, instruction, or publication to the contractor upon written request (e-mail is acceptable) by the contractor. In the event that laws, regulations, Technical Orders, Air Force Instructions, Air Force Material Command Instructions change during the term of this contract, the contractor shall comply as such changes come into effect as required in 1.1.4 above.
1.2.2 USAF Technical Orders.
| Publication Number |
| Title |
| Basic Date |
| Latest Chg Number |
| Latest Chg Date |
| 33B-1-1 |
| Nondestructive Inspection |
| 1Oct1997 |
| 3 |
| 1 Mar 2000 |
1.2.3 Industry Documents.
| Publication Number |
| Title |
| Basic Date |
| Latest Chg Number |
| Latest Chg Date |
| ISO/ANSI/ASQC Q9001: |
| Quality Systems – Model for Quality Assurance in Production, Installation and Servicing |
| 2008 |
| N/A |
| N/A |
| ASTM D 3951 |
| Commercial Packaging |
1.2.4. Pratt & Whitney Documents.
| Publication Number |
| Title |
| Basic Date |
| Latest Chg Number |
| Latest Chg Date |
TO 2J-F100-13-6
WP 334 00
TECHNICAL PROCEDURES -- BLADE, COMPRESSOR ROTOR (STAGES 1 THRU’ 3) - INSPECTION
ENG, MOD F100-PW-100(3), -200,-220 & -220E (PRATT & WHITNEY)
| 01 Feb 2007 |
| 12 |
| 01 Oct 15 |
TO 2J-F100-13-6
WP 417 00
TECHNICAL PROCEDURES –BLADES, COMPRESSOR ROTOR (STAGES 1 THRU 3) – REPAIR
ENG MOD F100-PW-100(3),-200, -220 & 220E (PRATT & WHITNEY)
| 01 Feb 2007 |
| 12 |
| 01 Oct 15 |
T.O 2J-F100-13-2
WP 004 00
TECHNICAL PROCEDURES
INLET/FAN MODULE – SCHEDULED MAINTENANCE
ENG MOD F100-PW-100(3) & 200 (PRATT & WHITNEY)
| 1 Feb 07 |
| 13 |
| 01 Jun 16 |
| TO 2-1-111 |
| STANDARD MAINTENANCE PROCEDURES P&W AIRCRAFT ENGINES |
| 15 Feb 1990 |
| 64 |
| 15 Oct 15 |
1.3 General Requirements.
1.3.1 Compliance with Laws and Regulations.
The contractor shall be knowledgeable of and comply with all applicable Federal, State, and Local laws, regulations, and requirements regarding environmental protection. In the event environmental laws and regulations change during the term of this contract, the contractor shall comply with such laws as they come into effect.
1.3.2 Quality System Requirements
The contractor shall develop and maintain a quality management system in compliance with ISO/ANSI/ASQ Q9001:2008, AS9100, NATO AQAP 2070 or equivalent Quality systems – Model for quality assurance in production, installation and servicing, as a minimum. The contractor shall design their quality program to promptly detect and correct assignable conditions adverse to quality. The contractor shall make available the quality system procedures, planning, and other documentation and data that comprise the quality system to 76 PMXG for review upon request.
1.3.3 Deficiency Investigation Report (CDRL) --DI-ALSS-81534
The contractor shall investigate suspect defective items IAW TO 2-1-111 & PWA 46 and submit findings to include root causes and corrective actions as appropriate. The report shall be submitted within 60 days after receipt of the Product Quality Deficiency Report (PQDR) Exhibit. (CDRL A001)
1.3.4 Measuring and Test Equipment (M&TE)
The contractor shall use only National Institute of Standards and Testing (NIST) traceable gages. The contractor shall ensure M&TE and measurement standards are labeled to indicate calibration status. The contractor shall ensure the label, as a minimum, specific date calibrated (day, month, and year, Julian date or equivalent) and the specific calibration due date. The contractor shall affix tamper resistant seals to operator accessible control or adjustments on M&TE and measurement stands that, if moved, shall affect the calibration.
1.3.5 Handling of Government Property
The contractor shall handle all Government property received at the overhaul site in accordance with the applicable technical data, and shall maintain constant care over these items while in their possession.
1.3.6 Material Review Board (MRB)(CDRL) –DI-ILSS-80386
The contractor is authorized to establish and convene an MRB to evaluate any non-conforming material and/or parts. Board members shall consist of representatives from the contractor’s quality, production control, and engineering (industrial product support or design), DCMA Quality Assurance Representative (QAR). The contractor shall prepare a report within 30 calendar days after entering MRB pool detailing the non-conformance to include PN, NSN, and SN. The PCO will provide disposition instructions. (CDRL A002)
1.4 Technical Requirements
The contractor shall apply the PWA-46, LW-IN40-Tungsten carbide Coating on the F100-PW-220 & 220E 3rd Stage Compressor Rotor Blades in IAW the USAF technical orders identified in Section 1.2.1 and deliver coated parts IAW the basic contract.
1.4.1 Receiving
The contractor shall perform an “as received” inspection to determine the serviceability or reparable condition of the F-108/CFM 56-2A/2B engine component using 2J-F108-13-72-21-01-200-001. The contractor shall prepare a Report of Discrepancy (ROD), SF 364, and forward to the shipping activity for corrective action to prevent reoccurrence. The contractor shall submit discrepancy reports IAW Appendix B.
1.4.2 Process Repairs
The contractor shall be responsible for performing and certifying all repairs required in this PWS IAW the qualification procedures. The contractor shall validate but shall not certify sub-vendors; the Government shall certify any and all sub vendors
1.4.3 DCMA reserves the right to audit any process, excluding proprietary processes, at any time during the duration of this contract.
1.4.4 Plasma Spray Requirements
The contractor shall apply PWA 46 LW-IN40-Tungsten Carbide, IAW T.O 2J-F100-13-6, WP 417 00, 2J-F100-53-6, WP 415 00, 2J-F100-13-2, WP 004 00 & T.O 2-1-111. The contractor shall apply sufficient plasma spray coating to meet T.O. coating thickness requirements and surface finish.
1.4.4.1 Plasma Spray Testing for Production Lots:
The contractor shall perform metallurgical examination and tensile bond strength testing as per Standard Maintenance Procedures T.O. 2-1-11 and PWA-46 per 12 hour shift or at any change in set up. The contractor shall provide the reports in accordance with Section 1.4.9.
1.4.4.2 The contractor shall perform the following laboratory test IAW PWA-46.
· Metallurgical examination of one flat panel. Microstructure examination shall include porosity, oxides content, media entrapment, unmelt, voids, and thickness requirement
· Hardness Coupon
· Tensile bond strength testing shall be conducted to determine the tensile strength per coating.
· Microstructure, hardness, and tensile bond bars geometry shall meet standard testing procedures for PWA-46. The contractor shall ensure the bars sprayed to represent the same geometry as the production hardware .
1.4.5 Plasma Spray Production Acceptance Criteria:
The contractor shall use PWA-46 for acceptance/ reject criteria of the plasma spray coating. The contractor shall inspect the coated blades IAW PWA-46 and LW-IN40. The contractor shall ensure the coating adheres to the base metal and shall be a uniform, continuous surface free of spalling, chipping, flaking, cracking, or other imperfections detrimental to the usage of the coating. Any indication of oil seepage from the coating shall be cause for rejection. The contractor shall ensure coated fan blades meet the final dimensional requirements of T.O. 2J-F100-13-6, WP 417 00 & T.O. 2J-F100-53-6, WP 415 00.The contractor shall remove non-conforming coating per the applicable tech data and reprocess the part through the repair.
1.4.6 Tooling:
Tooling and/or alternative tooling to that specified by the OEM and/or within the applicable U.S. Government Technical Orders may be developed and applied as required to produce the specified completed part characteristics. Final results required by the Performance Work Statement and/or contract will not be impacted.
1.4.7 Coating Material Source Control:
The contractor shall purchase Plasma spray materials from Government approved sources listed below:
| Material |
| Vendor |
| Cage Code |
| Address |
LW-IN40
Tungsten Carbide Praxair
North Haven, CT Indianapolis, IN Charlotte, NC
1.4.8 Repair Documents (CDRL) – DI-MISC-81356
The contractor shall provide a “Certificate of Conformance” (CoC) for each part repaired. The contractor shall ensure the CoC provides details on how the contractor controls the quality of the part, and shall certify that the part was handled and repaired according to all applicable technical data. The contractor shall provide the following CoC details for the repair, which only consists of the application of the PWA Hard facing on the F100-PW-200/220 & 220E 3rd Stage Compressor In-Let Fan Rotor Blades, with each part shipped:
| • | Inspection and all lab results as listed in 1.4.6 |
| • | Material COC for all D-GunTM coatings IAW 1.4.5 |
The contractor shall provide a sample copy of the CoC for PCO approval prior to production. (CDRL A003)
1.4.9 Records and Reports
The contractor shall prepare records and reports outlined in this PWS for each part and shall keep records and reports on file for five years. The Government reserves the right to request and view any records at any time.
1.4.10 Delivery
The contractor shall meet or exceed the delivery schedule. The PCO may at any time during performance under this contract, by written authorization through the ACO, authorize fast transportation for the total contract quantity or any portion thereof. Transportation for end items on this contract are authorized to ship via air/land utilizing a Government approved carrier. Once PCO authorization for Fast Transportation has been received, the contractor shall ship end items by one of the following methods:
(1) Domestic Shipments – Ship overnight/Next Day Service
(2) International Shipments – Ship via a carrier providing door-to-door priority service, to include delivery within two to three work days, and customs clearance, to final destination.
1.4.11 Transportation Information
The contractor shall provide the transportation information IAW Appendix B.
1.5 Production Problems
1.5.1 The contractor shall report any potential production slippage or work stoppages to the Administrative Contracting Officer (ACO), PCO, and the PMS Production Management Specialist (PMS) at the managing ALC. If problems are not resolved, the contractor shall report them to the ACO.
1.5.2 Process Reassessment:
During the duration of the contract if any of the following changes to the plasma spray process take place after the initial setup, the contractor shall halt production and notify OC-ALC/76 PMXG.
1. Gas flow changes of 10% or more.
2. Power changes of 5% or more.
1.5.3. Production Report (CDRL) – DI-ALSS-80728A
The contractor shall submit the Depot Maintenance Production Report in accordance with referenced CDRL. (CDRL A004)
1.5.4 Continuation of Essential DoD Contractor Services During Crisis This requirement has been determined not to be Mission essential and does not require continued support during a crisis as defined in DoDI 3020.37, E2.1.1 and E2.1.3.
1.5.5 Green/Affirmative Procurement Determination
Green/Affirmative Procurement has been determined not to be applicable to this PWS.
1.6 Contractor Manpower Reporting
The contractor shall report ALL contractor labor hours (including subcontractor labor hours) required for performance of services provided under this contract for the United States Air Force via a secure data collection site. The contractor is required to completely fill in all required data fields at http://www.ecmra.mil.
Reporting inputs will be for the labor executed during the period of performance for each Government fiscal year (FY), which runs 1 October through 30 September. While inputs may be reported any time during the FY, all data shall be reported no later than 31 October* of each calendar year. Contractors may direct questions to the CMRA help desk.”
*Reporting Period: Contractors are required to input data by 31 October of each year.
Uses and Safeguarding of Information: Information from the secure web site is considered to be proprietary in nature when the contract number and contractor identity are associated with the direct labor hours and direct labor dollars. At no time will any data be released to the public with the contractor name and contract number associated with the data.
User Manuals: Data for Air Force service requirements must be input at the Air Force CMRA link. However, user manuals for government personnel and contractors are available at the Army CMRA link at http://www.ecmra.mil.
1.7 Safety and Health
While performing work under this contract the contractor shall comply with all applicable federal, state and local regulations regarding occupational safety and health. The contractor shall notify the Contracting Officer (CO), within eight (8) hours of any damage to government property where the dollar value exceeds $500,000.00 and within two workdays, for any damage to government property less than $500,000.00 during the execution of the contract.
Mishap notifications shall contain, as a minimum, the following information:
a. Contract, Contract Number, Name and Title of Person(s) Reporting
b. Date, Time and exact location of accident/incident
c. Brief Narrative of accident/incident (Events leading to accident/incident)
d. Cause of accident/incident, if known
e. Estimated cost of accident/incident (material and labor to repair/replace)
f. Nomenclature of equipment and personnel involved in accident/incident
g. Corrective actions (taken or proposed)
h. Other pertinent information
If requested by the designated CO, the contractor shall immediately secure the mishap scene/damaged property and impound pertinent maintenance and training records, until released by the Procuring Safety Office. Contractor shall not dispose of contract data related to a mishap until notified to do so by the CO.
SECTION II – SERVICES SUMMARY.
2.1 Performance Requirements
The contractor service requirements are summarized into performance requirements that relate directly to mission critical items. The performance requirement threshold briefly describes the minimum acceptable levels of service for each requirement. These requirements are critical to the mission success. The Government will use the surveillance methods contained in the Quality Assurance Surveillance Plan (QASP) to evaluate the contractor’s performance for the requirements listed below. In the event the requirement is not met, and is correctable, the contractor shall immediately take corrective action in accordance with the performance threshold(s).
0. Service Summary (SS) Requirements The contractor shall ensure the performance objectives and performance requirement thresholds identified in Table 2-1 (below) are achieved.
0. Surveillance The assigned QAR will use the surveillance methods contained in the QASP to evaluate the contractor’s performance to determine if it meets the performance thresholds listed in this PWS.
Table 2-1
| Performance Objective |
| Reference Paragraph |
| Performance Threshold |
| SS-1 |
| The contractor shall investigate suspect defective items IAW TO 2-1-111 and submit finds to include root causes and corrective actions as appropriate. The contractor shall prepare a report within 30 work days after entering MRB pool detailing the non-conformance include PN, NSN, and Serial Number (SN). A “Certificate of Conformance” shall be provided by the contractor to the Government for each part. The contractor shall submit the Depot Maintenance Production Report in accordance with CDRL. |
| 1.3.3 |
1.3.6 1.4.8 1.5.3 Required 10 working days after entering MRB pool. At least 98% of information must be accurate.
| SS-2 |
| The contractor shall meet or exceed the delivery schedule. |
| 1.4.10 |
| Assets shall be returned within 21 days calendar days from receipt. |
| SS-3 |
| The contractor shall develop and maintain a quality management system in compliance with ISO/ANSI/ASQ Q9001:2001, Quality systems – Model for quality assurance in production, installation and servicing, as a minimum. The contractor’s quality program shall be designed to promptly detect and correct assignable conditions adverse to quality. |
The contractor shall apply the PWA-46, LW-IN40- Tungsten carbide Coating on the F100-PW-200/220 & 220E 1st thru 3rd Stage Compressor Rotor Blades in IAW the USAF technical orders identified in Section 1.2.2 and deliver coated parts IAW the basic contract.
1.3.2 1.4 No more than 2 defects per delivery
SS-4
| The contractor shall provide the transportation information IAW Appendix B. |
| 1.4.11 |
| 100% Compliance |
3 SECTION III – Government Furnished Property and Services.
See Appendix B.