Performance Work Statement

View the file

Other files for this federal contract opportunity

Other files attached to Fluid Cell Press Repair, newest first.
File Type Posted
J&A_Redacted.pdf PDF
Appendix_A_Equipment_List.XLS XLS spreadsheet
Wage_Rate_Determination_Fluid_Cell_Press_Repair.pdf PDF
Combined_Synopsis_and_Solicitation_for_Fluid_Cell_Press_Repair.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PERFORMANCE WORK STATEMENT

FOR

TEST, TEARDOWN, EVALUATION AND REPAIR

76 CMXG FLUID CELL PRESS

PREPARED BY

OC-ALC/OBWK

6 JUNE 2018

Section One

1.1 Scope: The Contractor shall provide all labor, tools, equipment, test equipment, material, parts, quality control, transportation and inspection manuals necessary to perform the test, teardown, evaluation and repair on-base for the Oklahoma City–Air Logistics Complex (OC-ALC). The Contractor shall also provide Personal Protective Equipment (PPE) and clothing, to include reflective clothing (belt, vest, etc.); hearing and eye protection, to include prescription safety glasses; safety harnesses; fall protection equipment; lifting equipment and any incidentals necessary to perform the requirements of this Performance Work Statement (PWS). The equipment is listed in Appendix A.

1.1.1 The Contractor shall be responsible for insuring all services, parts and Original Equipment Manufacturer (OEM) components provided under this contract are in accordance with (IAW) the terms and conditions outlined herein, conform to the manufacturer’s equipment specifications and this PWS.

1.2 Known Problems: The press is currently down due to a vacuum leak inside the pressure vessel and the damaged working pad. The loss of vacuum to fill and evacuate oil from the bladder renders the press inoperative.

1.3 Requested Services: This service is a one-time test, teardown, evaluation and repair of Enprotech Fluid Cell Press.

1.4 Equipment Evaluations: The Contractor shall provide a written Estimate Repair Report to the Government Point of Contact (POC) by fax or email no later than (NLT) one (1) business day after the completion of the inspection. As a minimum, the information cited on the Estimate Repair Report shall include:

· the equipment ID#

· date of evaluation

· description of findings and recommendations

· required parts and part numbers (P/N)

· cost of parts

· number of parts needed

· estimated labor hours required to complete the repair

1.4.1 Any recommendations cited shall consider:

· the priority of the requested service

· available source for obtaining new parts

· the availability of the new parts

· shipping and delivery schedules of parts

· other factors which may be peculiar to the specific repair requirement

1.5 Authorizations for Repair Actions: Only the Contracting Officer (CO) can authorize repair actions. The Government POC will coordinate any repair actions with the Subject Matter Expert (SME) and the CO in order to obtain the approval to proceed. The Contractor shall ensure all repair actions have the documented CO approval, in writing, before initiating any repair or ordering parts. The Contractor shall demonstrate to the Government identified Technical point of contact/subject matter expert (POC/SME) that the repairs have been completed.

1.5.1 Once the authorization for repair action has been received from the CO, the Contractor shall order any required parts within two (2) business days and notify the Government POC, in writing, of the estimated arrival date of the parts. Upon the receipt of the parts, the Contractor shall perform the repair within five (5) business days. The Government POC will verify the receipt of the parts with the Contractor to ensure the repair is performed in a timely manner.

1.6 Parts and Materials: The Contractor shall provide and use only new parts and material in performance of this PWS unless otherwise authorized by the CO.

1.7 Service Report: Immediately upon completion of the maintenance support services and before leaving the OC-ALC, the Contractor shall provide a written Service Report to the Government Subject Matter Expert (SME) or Government POC. The Government SME will forward the service report to the Government POC within two (2) business days of receipt. The Contractor shall provide, by fax or email, the final service report within five (5) business days to the Government POC. As a minimum, the final service report shall contain the following information:

· name of the company

· requested service date

· contract number

· equipment ID#

· description of services provided

· additional services recommended (if any)

· printed name and signature of technician who performed the services

· printed name and signature of on-site Government SME or Government POC

· start and completion dates

· complete breakdown of the labor cost (hours and rate)

· materials and parts used

· details of any other charges

· printed name and signature stating only new parts and materials were used

· written verification statement that a performance check to verify operational condition was performed and that the equipment is in working order

1.8 Quality Assurance: According to the contract’s inspection clause, the Government will evaluate the Contractor’s performance under this contract. The Government POC will participate in the administration of this contract. Any matter concerning a change to the scope, prices, terms, or conditions of this contract shall be referred to the CO. All services to be performed by the Contractor during the period of this contract will be subject to review by the CO or Government POC.

1.9 Corrective Action Report (CAR)/Complaint Contractor Response Time: The Contractor shall provide a written response within two (2) business days which addresses the root cause, corrective action, and preventive actions in relation to the submitted CAR or Customer Complaint.

1.10 Maintenance Documentation: The Contractor shall notify the Government identified Technical Point of Contact (POC) upon completion of the repair action IAW OC-ALC Operating Instruction (OI) 21-203, Chapter 1, 2, and 3, as applicable.

1.11 Red Tagged Items: Red Tagged items create unsafe conditions for workplace and are noted by the annotation of a Red X in the Facilities and Equipment Management Web-Based (FEMWEB) system. A Red X indicates the equipment is considered unsafe or unserviceable and will not be used until the unsatisfactory condition is corrected and the Red X is cleared. The Contractor shall not authorize, use or direct equipment to be used until the Red “X” has been properly cleared IAW OC-ALC OI 21-203, Chapter 2.

1.12 Red X Clearance: The Contractor shall ensure the Red X’s are cleared IAW OC-ALC OI 21-203, Chapter 2. The Contractor shall immediately notify the shop supervisor or work leader in any instance where the Contractor clears a Red X in his or her assigned work area.

1.13 Red X Clearance on Equipment: Red X on Equipment will be cleared in FEMWEB by the shop supervisor, work leader, or supervisor’s designee.

1.14 Continuation of Essential Department of Defense (DoD) Contractor Services During Crisis: This requirement has been determined not to be essential and does not require continued support during a crisis as defined in DFARS 252.237-7023.

1.15 Hours of Operation: The Contractor shall perform the work required under this contract during the following days and hours: Monday through Friday, 7:00am to 4:30pm. If work hours are required outside the hours stated, the Contractor shall contact the Government POC for approval from the CO. Upon approval from the CO, the Government identified Technical POC or Government POC must be present with the Contractor.

1.15.1 These dates and hours exclude Federal Holidays, base closures due to inclement weather, and furlough days, as applicable.

1.16 Special Qualifications: The Contractor shall provide personnel with the following special qualifications: The company service technician personnel are required to be certified as factory trained by Enprotech Inc. The contractor shall provide proof of certification at the time of proposal.

1.17 Contractor Personnel: The Contractor shall provide the name of the Contract Manager (CM) and any alternates who shall act for the Contractor when the CM is absent. They shall be designated to the CO and Government POC, in writing, within five (5) business days after the contract award date. The Contractor shall provide telephone numbers and email addresses where the CM and alternates may be contacted at any time. The CM or alternate shall have full authority to act for the Contractor on all matters relating to operation of this contract at the OC-ALC on Tinker Air Force Base (AFB). The CM or alternate shall be available to meet on the installation with Government personnel designated by the CO to discuss problem areas. The Contractor shall provide a CM who can read, write, speak, and understand English fluently.

1.17.1 The Contractor and Contractor personnel shall be required to identify themselves as Contractor personnel by introducing themselves or being introduced as Contractor personnel. The Contractor personnel shall also display distinguishing badges or other visible identification for meetings with Government personnel or while performing work for the OC-ALC on Tinker AFB. The Contractor and Contractor personnel shall identify themselves as Contractor employees in telephone conversations and in formal and informal written correspondence.

1.18 Listing of Contractor Employees: The Contractor shall provide an initial listing of the Contractor employees’ names and position titles to the Government POC within five (5) business days after the contract award date. Within five (5) business days, the Contractor shall also provide an updated listing of personnel to the Government POC when employees affecting the work of this contract change status or position.

1.18.1 The Contractor shall not employ persons on this contract if such employee is identified to the Contractor as a potential threat to the health, safety, security, and/or general well-being, or operational mission of the installation and its population. The Contractor shall not employ any person who is an employee of the United States (US) Government if the employment of the person would create a conflict of interest. The Contractor shall not employ any person who is an employee of the Department of the Air Force (AF), either military or civilian, unless such person seeks and receives approval according to the DoD 5500.7-R Joint Ethics Regulations (JER). In addition, the Contractor shall not employ any person who is an employee of the Department of the AF if such employment would be contrary to the policies contained in Air Force Instruction (AFI) 64-106, Air Force Industrial Labor Relations Activities. The Contractor shall be prohibited from employing off-duty Government POC’s who are providing surveillance on any contracts/sub-contracts awarded to the Contractor. All contract personnel, depending on particular condition, occasion, or place or job assignment shall be required to wear professional and suitable attire. All Contractor personnel shall conduct themselves in a professional and courteous manner. The selection, assignment, reassignment, transfer, supervision, management, and control of Contractor personnel in performance of this PWS shall be the responsibility and prerogative of the Contractor; however, the Contractor shall comply with the requirements set forth in this PWS and Tinker AFB regulations concerning the conduct of employees as referenced herein. The Contractor shall employ and maintain a technically trained and experienced work force.

1.19 Environmental Protection and Safety: The Contractor shall be knowledgeable of and comply with all applicable federal, state, and local laws, regulations, instructions, and requirements regarding environmental protection and occupational safety and health. The Contractor shall comply with any laws, instructions, or regulation changes during the term of this contract.

1.19.1 Contractors shall be compliant with the Tinker AFB Supplement to Air Force Instruction (AFI) 32-7086, “Hazardous Materials Management”, Tinker AFB procedures per Tinker AFB Instruction (TAFBI) 32-7004, “Hazardous Waste Management”, and Complex procedures per OC-ALC Supplement to AFI 32-7086, “Hazardous Material Management” and OC-ALC Instruction (OC-ALCI) 32-101 “Air Quality Record Keeping Procedure”. Publications are available digitally on the e-Publishing website at www.e-publishing.af.mil for downloading or ordering.

1.20 Material Safety Data Sheet/Safety Data Sheet (MSDS/SDS): Upon the Government POC’s confirmed receipt of the Contractor’s written certification, which states “No HAZMAT Usage”, the requirements of this section are no longer applicable. Said certification letter shall be printed on company letterhead and contain the applicable contract number for which the services are being performed.

1.20.1 The Contractor shall not transport, ship or use any chemical, material, or substance used in the performance of this PWS on Tinker AFB before the written approval is provided by the 72 ABW/CEIE, Natural Infrastructure Management (Environmental Compliance). The Contractor shall be responsible for submitting all MSDS or SDS to the 72 ABW/CEIE. The Contractor shall comply with the effective dates for SDS requirements IAW the Occupational Safety and Health Administration (OSHA) Hazardous Communication Standard, Title 29, Code of Federal Regulation (CFR) Part 1910.1200. The Contractor shall maintain copies of the manufacturer MSDS/SDS for all chemicals. The MSDS/SDS shall be readily accessible at all times to Contractor personnel as well as Government employees.

1.21 Hazardous Material (HAZMAT): If HAZMAT shall not be brought on base or used in the performance of this contract, the Contractor shall provide certification, in writing and printed on company letterhead, which states “No HAZMAT will be brought on base” or “No HAZMAT Usage”. Said letter shall also contain the contract number for which the statement applies. This certification shall be provided to the Government POC within ten (10) business days after the contract award date. Upon the receipt of the certification by the Government POC, the requirements of this section are no longer applicable.

1.21.1 The Contractor shall not store chemicals or HAZMAT on Tinker AFB. Contractors shall be compliant with HAZMAT management procedures per the OC-ALC Supplement to AFI 32-7086, “Hazardous Materials Management”. The Contractor shall maintain a log of all HAZMAT that is used on base. This usage log shall be provided to the Government POC monthly, the last business day of each month, or when the required work is completed. The Government POC will forward the records to the Unit Environmental Coordinator (UEC) NLT the fourth (4th) calendar day of the following month or the first (1st) subsequent business day.

1.22 Air Quality Recordkeeping: Upon the Government POC’s confirmed receipt of the Contractor’s written certification, which states “No HAZMAT Usage”, the requirements of this section are no longer applicable. Said certification letter shall be printed on company letterhead and contain the applicable contract number for which the services are being performed.

1.22.1 The Contractor shall be responsible for specific recordkeeping and reporting requirements, when applicable, mandated by Tinker AFB Base Facility-Wide Operating Permit IAW OC-ALCI 32-101. The Government POC will contact the Unit Environmental Coordinator (UEC) for the environmental requirements. On a monthly basis, the Contractor shall submit all applicable records to the Government POC by no later than (NLT) the third (3rd) day of the month following the reporting period. If the third (3rd) day of the month is a weekend or holiday, the logs are required by the last business day 'PRIOR' to the third (3rd) day of the month. The Government POC will forward the records to the UEC NLT the fourth (4th) day of the following month or the first subsequent business day. The Contractor shall maintain a signed copy of the required forms on site for one (1) year IAW OC-ALCI 32-101.

1.23 Hazardous Waste (HAZWASTE): If HAZWASTE shall not be generated during the performance of this contract, the Contractor shall provide written certification, which states that there is “No Hazardous Waste Generation”. Said certification letter shall be printed on company letterhead and contain the applicable contract number. This certification shall be provided to the Government POC within ten (10) business days after the award date. Upon the Government POC’s confirmed receipt of the Contractor’s written certification, which states “No Hazardous Waste Generation”, the requirements of this section are no longer applicable.

1.23.1 The Contractor shall dispose of contaminated solid waste, spent or processed chemical solutions, used rags, and HAZWASTE in Government furnished waste containers IAW TAFBI 32-7004.

1.23.2 The Contractor shall be responsible for the Initial Accumulation Point (IAP) within the Contractor assigned space. The IAP shall be under the direct control of the Contractor who generates the waste. Before HAZWASTE accumulation begins, the Contractor shall ensure appropriate hazard labels are affixed to Government furnished waste containers as specified in 49 CFR 172.400. Management procedures for IAPs include weekly written inspections and reporting. When the HAZWASTE container has been filled, the Contractor shall seal the container, mark the Certified Filled Date (CFD) on the container label using an indelible pen, place the container at a designated pick up location, and call the Hazardous Waste Management Facility (HWMF) at 734-3285 for pick-up service. The Contractor shall ensure the HWMF picks up the container within three (3) calendar days after the CFD. If the container is not picked up within three (3) calendar days, the Contractor shall notify the Government POC, who will in turn notify the 776 MXSS/MXDEB, OC-ALC Environmental and Occupational Health Compliance.

1.23.3 The Contractor shall perform weekly written inspections using Tinker AFB IMT Form 487, Initial Accumulation Point Management Aid. Weekly is defined as one time per work week. The Contractor shall submit Tinker AFB IMT Form 487 to the Government POC on a monthly basis and by NLT the third (3rd) calendar day of the month following the reporting period. If the third (3rd) calendar day of the month is a weekend or holiday, the logs are required by the last business day 'PRIOR' to the third (3rd) calendar day. The Government POC will forward the forms to the UEC NLT the fourth (4th) calendar day of the following month or the first (1st) subsequent business day. The Contractor shall maintain a signed copy of the forms on site for one (1) year.

1.24 Discharges: Any discharges into Tinker’s industrial waste treatment plant (IWTP) or sanitary sewer shall be approved and accomplished IAW the Tinker Industrial Waste Water Discharge Permit as instructed by the 72 ABW/CEIE, Natural Infrastructure Management (Environmental Compliance). The Government POC will submit the required notice of intent documentation to the UEC for the 72 ABW/CEIE approval. The Contractor shall maintain records of any written approval issued by the 72 ABW/CEIE for discharges into the IWTP and sanitary sewer.

1.25 Spills: Upon occurrence of any spill that could enter the storm system or cause any harmful environment effects, the Contractor shall immediately call 911 to report the incident. When possible, the Contractor shall use a base telephone to receive help from Tinker AFB 911. If using a cell phone, the Contractor shall request Tinker AFB 911. The Contractor shall immediately report all environmental violations to the Government POC and UEC. The Contractor shall provide five (5) copies of a typed or written report about the incident within four (4) clock hours as follows:

1.25.1 One (1) copy to the CO, two (2) copies to the Government POC, one (1) copy for the UEC, and one (1) copy for the record. The format of the report shall be left up to the Contractor; however, the report shall contain the following information:

· name and contact number of the person reporting the spill

· date and time of incident

· location and source of spill

· substance or pollutant spilled

· amount spilled and rate of discharge

· any damages or injuries involved

· extent of area impacted

· potential hazards

· actions taken

· organizations contacted

· remarks section - that addresses the cause of the spill (e.g. human error, equipment, etc.) and whether 911 was called and which agencies responded.

1.26 Environmental Training: Upon the Government POC’s confirmed receipt of the Contractor’s written letter that certifies “No Hazardous Waste Generation”, the requirements of this section are no longer applicable. Said certification letter shall be printed on company letterhead and contain the applicable contract number for which the services are being performed.

1.26.1 Contractor personnel performing duties in the service of this PWS shall have training that acquaints the person with the details of Resource Conservation Recovery Act (RCRA) regulations in 40 CFR 260 through 279; applicable state laws and regulations; DoD, AF, and local requirements; and annual refresher classes. The Contractor shall update their personnel regarding changes to the aforementioned regulations, laws, and local requirements as they become enforceable. This training can be obtained through creditable training institutions or companies. All training will be approved by the 72 ABW/CEIE, Natural Infrastructure Management (Environmental Compliance). RCRA training is available at http://www.natlenvtrainers.com/RCRA-hazardous-waste.htm; http://www.skillsoft.com/catalog/detail.asp?CourseCode=esh_sah_a34_sh_enus000000; and http://www.lion.com/Storking-Hazardous-Waste-for-LQGS. The training shall be completed at the Contractor’s expense. Prior to obtaining training and within ten (10) calendar days after the contract award date, the Contractor shall provide the name of the training institution or the company and course description to the Government POC for approval. Once the written approval is received from the Government POC, the Contractor shall provide the environmental training certificates for employees performing duties in the service of this PWS. The Contractor’s environmental training certificates shall be provided to the Government POC within thirty (30) calendar days. Annual refresher training certificates for the supervisor and employees managing the initial accumulations points (IAPs) shall be provided to the Government POC, within ten (10) calendar days after each option year renewal. The Government POC will forward a copy of the certificates to the UEC.

1.27 Welding and Hot Work Requirements: The Contractor shall obtain an AF Form 592, USAF Welding, Cutting and Brazing Permit, prior to the use of any welding, cutting or brazing equipment. The Contractor shall contact the 72nd ABW Fire & Emergency Services Division's Fire Prevention Office at 405-734-3981 regarding all work that involves welding, cutting, brazing, soldering, tar kettles, and open flame devices. The Contractor personnel who are performing the work shall keep this form with them at all times with them while at the worksite.

1.27.1 The Contractor shall meet the requirements of OSHA Standard 29 CFR 1910.252 and NFPA Standard 51B Standard for Fire Prevention during welding, cutting, and other hot work and as well as the AF Occupational Safety and Health (AFOSH) Standard 91-5, Welding, Cutting, and Brazing.

1.28 Forms, Technical Orders (T.O.), AFI, Air Force Material Command Instructions (AFMCI), and Publications: The Contractor shall obtain the forms and publications expressly required to perform the work in this contract via the internet at www.e-publishing.af.mil. In the event a form or publication is not available online, the Government POC will provide the form, instruction, or publication to the Contractor upon the Contractor’s written request (e-mail is acceptable). In the event, laws, regulations, T.O.’s, AFI’s, or AFMCI’s change during the term of this contract, the Contractor shall be required to comply as the changes come into effect. Contractors delivering or handling official United States Air Force (USAF) records shall comply with the applicable records management regulations in AFI 33-322, Chapter 3, in its entirety.

1.29 Housekeeping: The Contractor shall keep the work areas clean and neat IAW industry standards, OSHA, fire and safety standards, and this PWS.

1.30 FOD and DOP: Contractor personnel who work in or travel though areas near operational and production aircraft, engines, munitions, missiles, drones, space systems, support equipment, Aerospace Ground Equipment (AGE), trainers, and the Contactor personnel operating vehicles and equipment on flight lines, runways, taxiways, parking ramps, and in aircraft hangers and maintenance areas are required to receive the FOD/DOP training and to comply with AFI 36-2232, AFMC Supp 1, paragraph 9.2., and A4.3.4. (Initial)/A4.3.5. (Refresher). The Contractor and Contractor personnel shall acknowledge the FOD/DOP training either by viewing the Digital Versatile Disc (DVD) provided by the Government POC or the You Tube site, http://www.youtube.com/watch?v=tYcbodjFPnM. The Contractor shall provide a Contractor devised certificate to the Government POC for each employee within five (5) business days after the contract award date. The certificates shall have the title of the training, the name of the person who received the training, and the date of the training. The Contractor shall also ensure all new employees view the FOD/DOP training and provide a Contractor devised certificate of training to the Government POC prior to the employees starting work in the OC-ALC shops. On an annual basis, the Contractor and Contractor personnel shall be required to review the FOD/DOP training and to provide an updated Contractor devised certificate of training to the Government POC within five (5) business days of the new period of performance (PoP) start date.

1.31 Tool Control and Accountability: While performing contract services in or around Maintenance Production Shops, which includes ramp areas, the Contractor shall comply with AFI 21-101_AFMC Supp 1, 21-101, Chapter 10 (all paragraphs) and OC-ALCI 21-112, paragraph 14.1. and 14.5.3. The Contractor shall provide the completed MXRIWRS Form 032 prior to performing work in the OC-ALC industrial areas. The MXRIWRS Form 032 is available from the Government POC. The Contractor shall provide a Contractor Tool Listing, MXRIWRS Form 032, to the Government POC within five (5) business days after the test, tear down, evaluation and repair actions. The Contractor or Contractor’s personnel shall inventory the container or bag of tools at the beginning of each work day and at the end of each work day. The Contractor personnel shall immediately notify the Government POC of any tools that are missing or lost from the work area or container (e.g. tool or job box or tool bag). The Government POC will report any missing Contractor’s tools which have not been located within one (1) hour after notification to the appropriate Government personnel. The Contractor shall obtain the Form 32 from the Government POC. The CM shall ensure each employee on the job site receives a briefing from the Government POC about Housekeeping, FOD/DOP, and Tool Control prior to starting work in OC-ALC Industrial Areas.

1.32 Privately Owned Motor Vehicles (POV): Contractor personnel shall comply with the directives pertaining to operation of POVs on Tinker AFB per AFMAN 31-116, in its entirety, “Motor Vehicle Traffic Supervision”. The Contractor shall comply with Tinker AFBI 24-301, in its entirety for the operation of POVs within Tinker AFB.

1.33 Contractor IDs: All Contractor badges shall be surrendered when the contract expires, are no longer needed, or when the contract personnel are no longer working under the contract or for the Contractor. The Contractor IDs expire on the last day of the current contract PoP. If the contract is extended, the Contractor and Contractor personnel shall obtain new ID badges. The requirement to obtain new badges includes the CAC ID, the DBIDS ID, and AF Form 1199C, Controlled/Restricted Area Badge.

1.33.1 All CAC cards shall be returned to the Pass and Registration, Bldg. 6611, upon the completion of the contract, when no longer needed or contract personnel are no longer working under the contract or working for the Contractor. Upon issue of the CAC by Pass and Registration, the Contractor shall be responsible for employees displaying and surrendering the card IAW the Installation Integrated Defense Plan, Tinker Plan 31-101, in its entirety. Upon five (5) calendar days of the badge being returned to Pass and Registration, the Contractor shall provide copies of the turn-in receipts to the Government POC either by US Postal Service or email.

1.33.2 Contractors are assessed a fine of $50.00 if CAC IDs, AF Form 1199C’s, AFMC Form 387s, or DBIDS IDs are lost, stolen, or not returned to the Pass and Registration, Bldg. 6611 when the badges have expired or are no longer required. The 72 Security Forces Squadron (SFS) will attempt to fine the contract if money cannot be collected from the Contractor.

1.34 Visitors Pass: The Contractor shall contact the Government POC seven (7) business days before arriving on Tinker AFB in order to make arrangements for Visitors Passes. The Government POC will assign a sponsor for the Contractor from within the organization. The Contractor and the sponsor shall arrange to meet at Pass and Registration, Building 6611 at the Tinker Gate which is South of I-40 off of Air Depot. The Contractor shall provide two (2) forms of identification, one of which shall be a picture ID, to the 72 SFS. The 72 SFS will provide an AF Form 75, Visitors Pass, which will be valid for up to thirty (30) calendar days.

1.35 Foreign Nationals: The Contractor shall notify the Government POC before sending a Foreign National representative to perform services. Special rules apply for foreign nationals visiting a US Government facility.

1.36 Health and Safety on Government Installations: While performing work under this contract on a Government installation, the Contractor shall comply with federal, state and local regulations, and AFI 91-203, “Air Force Consolidated Occupational Safety Instruction”, as established by this contract and Appendix C. The Contractor shall notify the CO, Government POC, and Government Contract Administrator (CA) within one (1) business day of any injuries that occur to Contractor personnel while they are on the installation. The Contractor shall notify the CO, Government POC, and Government Contract Administrator (CA) within one (1) business day of damage to Government property or equipment during the execution of the contract.

1.37 Emergency Procedures: The Contractor personnel shall follow the direction of the Government personnel with regard to emergency procedures, such as fire, tornado, active shooter, bomb threats, or other emergency. It is the responsibility of the Contractor to provide guidance and to establish procedures for its employees to respond to an emergency. It is the Contractor’s responsibility to account for their employees following an emergency evacuation. The Contractor personnel shall participate with the Government personnel in all fire and tornado drills at no additional cost to the Government.

1.38 Training – General: The Government POC will provide training via slides, video, or classroom prior to the Contractor performing work at the OC-ALC. The Government will be responsible for all approved costs associated with the training identified below. The Government POC will document training on and maintain copies of the completed AF IMT 1151, Training Attendance and Rating, as part of the contract surveillance file. For purposes of identification and compliance with Personally Identifiable Information (PII) requirements, only the last four (4) of the Contractor employee’s Social Security Number (SSN) will be input on the form.

1.38.1 The Contractor shall contact the Government POC prior to work being performed in order to accomplish the required training or to verify the required training as listed below has been completed:

Contractor Required Courses
Course Number
FOD and DOP Awareness Training Course Initial
CHPMAS0000400SU
AFMC FOD and DOP Awareness Training Refresher
CHPMAS0001301CB
Initial Fire Safety and Prevention Training
CTESAF0000100SU
Refresher Fire Safety and Prevention Training, Computer Based Training (CBT)
CTEMAS0002900CB
OC-ALC Environmental Accountability/Solid Waste Training, CBT
MTEMAS9713800BR
OC-ALC Human Factors Training, CBT
MTEMAS9700501BR
Environmental Management Systems (EMS) - General Awareness Training
MTEENV9733070BR
Lockout/Tagout Initial and Refresher Course for Affected Personnel, CBT
CTEMAS0003001CB

Section Two (Reserved)

Section Three

Government Furnished Property (GFP) and Services

3.1 Government Furnished Property.

3.1.1 Government Property Repair/Maintenance On-Base is not considered Government Furnished Property (GFP). FAR Parts 45 and 52.245 plus supplements are not applicable to Government Property Repair/Maintenance On-Base. The responsible Government Organizations 76 CMXG for Government Property Repair/Maintenance On-Base will be responsible for the Government Property record keeping, reporting requirements (including Report of Survey), and/or disposal of all Government Property requiring repair/maintenance on-base during the performance of this contract.

3.1.2 GFP Exceeds $150,000 - Repair/Maintenance Off-Base. Not Applicable.

3.1.3 GFP Not Exceed $150,000 - Repair/Maintenance Off-Base. Not Applicable.

3.2 Shared Property of the Government. Not Applicable.

3.3Government Furnished Services (GFS) are applicable during the performance of this contract. The Government will furnish the following services at Tinker AFB, OK:
•80psi compressed air and 480V electricity to within 50ft. of work site.
•All necessary lifting equipment along with operators to unload, dis-assemble, set up, assemble, and reload: Enprotech tools and equipment as well as customer machine components.
•Equipment with electrical services disconnected as required to remove and/or work on.

3.4 Intangible Government Property. Not Applicable.

3.5 Contractor Acquired Property (CAP) or Fabrication.

(CAP Includes Time and Material (T&M) Contractor Purchases or Fabrication). Not Applicable.

3.5.1 The PWS terms and conditions cited in this PWS for Government Property (GP) repaired on-base and Government Furnished Property (GFP) repaired off-base are applicable to CAP used in the performance of this contract.

3.5.2 The Government will reimburse the Contractor for CAP at a direct cost IAW the contract terms and conditions which includes this PWS and the Contracting Officer’s approval.

3.5.3 Title to Government Property. This PWS incorporates FAR 52.245-1(e)(1)-(3)(ii) by reference.