About this file
IDS Amendment 0002 Rm 110
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| FA8126-17-Q-0052.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
F3YCEB7038A002
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
The purpose of this amendment is to provide Government answ ers to questions from industry.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 2
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 27-Feb-2017
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X FA812617Q0052
X 9B. DATED (SEE ITEM 11)
21-Feb-2017
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
27-Feb-2017
CODE
AFSC/PZIMB
JOHN J JUAREZ/405-739-3320
BLDG 3001, POST 2S75
TINKER AFB OK 73145
FA8126 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
FA812617Q0052
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
(End of Summary of Changes)
The following items are applicable to this modification:
QUESTIONS TO ANSWERS
1. What is the requirement for 578-35987-01 Encrypted Ethernet Tunnel Appliance w/3 TCP ports? The V5 already meets the highest encryption with the AES and the tunnel is only required if the Fiber or CAT6 leaves the enclosure not in conduit which will not be the case.
With the move to ICD 705 the requirement for encryption must now be FIPS 140-2 compliant. At the time of the quote, the V5 was not FIPS 140-2 compliant from point to point and a third party item to encrypt was being used.
2. For the SM Fiber from Control to Switch, what is this distance for both Rm 214 and BDOC side?
BDOC: 30’ cable from patch to switch.
Rm 214: 75’ cable
3. To confirm the area is requiring a VCC on the Site Commander and a SAW2 workstation? It may be cheaper to combine this into one workstation instead of two.
The purpose of the SAW2 is based on the requirement to have logs. If we can still meet the requirement for maintaining logs when combined into one workstation, I say we combine them into one.
4. What is the communication link provided between Bldg 3320 and BDOC, i.e. Fiber or RJ45 via port on network switch?
Connectivity from any SMXG facility to the BDOC will be Single-Mode Fiber primarily due to the distance.
5. Is this an office space with drop down ceiling or a warehouse space with tall ceilings?
Office space with a false ceiling.
6. What is the distance from proposed Vindicator enclosure to the power sub panel and the communications room with Fiber patch or network switch?
This is one room over. The Vindicator will be installed in Rm 214 and the communication room is in Rm 213.
7. Is there a VLAN set-up on the base network for Vindicator?
No