Chiller description

View the file

Other files for this federal contract opportunity

Other files attached to Trane RTAC 155 Chiller, newest first.
File Type Posted
CASS_BRAND_NAME.pdf PDF
CASS_Chiller_QA.docx DOCX document
CASS_Chiller_Amendment_0002.doc DOC document
Trane_Chiller_Site_Visit_Amendment.doc DOC document
Solicitation.pdf PDF
CASS_SOW.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CASS Chiller Installation

One (1 ea) Trane Chiller Model # RTAC-1554-UWOH-UAGN-W1TY-1CDB-NN5U-

N10A-G0EX-N

SPECIFIC REQUIREMENTS

Contractor shall provide the specified chiller to building 2122 at Tinker

AFB, OK.

New chiller shall be a Trane, Model: RTAC-1554-UWOH-UAGN-W1TY-

1CDB-NN5U-N10A-G0EX-N.

Contractor shall provide all labor, equipment, parts, consumables, transportation, and any other items and services necessary to provide a complete turn-key system.

Installation shall include integrating chiller with existing controls, building system, and other existing equipment.

Contractor shall provide start-up upon completion.

Contractor shall provide training to engineers and maintenance personnel explaining chiller controls and operation at a minimum.

The contractor shall provide a full warranty on all components and workmanship for a period of no less than one (1) year from completion date. All warranty issues and repairs must be conducted on-site at Tinker

AFB.

Decommissioning of existing chiller unit, to include:

Existing chiller is a Trane, Model: CGACD151EHNLM633CFGHNTW.

Disconnection of system piping from the existing unit.

Disconnection of electrical power from existing unit.

Disconnection of automated controls.

Crane operations to remove existing chiller.

Removal of existing unit, left on-site for DRMO pick-up