Under clause 52.212-2 item J has been amended

View the file

Other files for this federal contract opportunity

Other files attached to Articulating Boom Lift, newest first.
File Type Posted
Item_Description_Commodity.docx DOCX document
Item_Description_Commodity.docx DOCX document
Solicitation.doc DOC document
Item_Description_Commodity.docx DOCX document

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION SF 1449 - CONTINUATION SHEET

The following have been modified:

52.212-2 EVALUATION--COMMERCIAL ITEMS (OCT 2014)

(a) The Government will award a contract resulting from this solicitation to the responsible offeror whose offer conforming to the solicitation will be most advantageous to the Government, price and other factors considered. The following factors shall be used to evaluate offers:

ITEM
SPECIFIC REQUIREMENT
ACCEPTABLE
NON-ACCEPTABLE
REMARKS
a
Unit shall have a diesel engine with 4WD
b
Unit shall have a 45 foot platform height
c
Unit shall have a 4 foot articulating jib
d
Unit shall have a 500 pound max capacity
e
Unit shall have proportional controls
f
Unit shall have a tilt light and alarm
g
Unit shall have external fall arrest platform/protection to leave platform while at working height
h
Unit shall have foam filled tires
i
Unit shall have “Soft Touch” system to prevent platform contacting and damaging aircraft
j
Unit shall have a 7500W generator w/a power cable

All offerors will be evaluated for technical acceptability, deemed either acceptable or unacceptable according to the requirements in the attached item description. Only technically acceptable offers will be considered for award.

Evaluation Criteria:

1) Technical Acceptabilty

2) Price

Factors 1 and 2, when combined, are of equal importance.

(b) A written notice of award or acceptance of an offer, mailed or otherwise furnished to the successful offeror within the time for acceptance specified in the offer, shall result in a binding contract without further action by either party. Before the offer's specified expiration time, the Government may accept an offer (or part of an offer), whether or not there are negotiations after its receipt, unless a written notice of withdrawal is received before award.

PART AND MATERIALS:

The Contractor shall provide and use only new parts and materials in performance of this requirement unless otherwise authorized by the Contracting Officer.

(End of provision) (End of Summary of Changes)