Amendment.doc
DOC document 54 KB Posted
- Attached to
- Articulating Boom Lift Federal contract opportunity
- Solicitation number
- FA8126-16-Q-0111
About this file
Under clause 52.212-2 item J has been amended
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Item_Description_Commodity.docx | DOCX document | |
| Item_Description_Commodity.docx | DOCX document | |
| Solicitation.doc | DOC document | |
| Item_Description_Commodity.docx | DOCX document |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 1449 - CONTINUATION SHEET
The following have been modified:
52.212-2 EVALUATION--COMMERCIAL ITEMS (OCT 2014)
(a) The Government will award a contract resulting from this solicitation to the responsible offeror whose offer conforming to the solicitation will be most advantageous to the Government, price and other factors considered. The following factors shall be used to evaluate offers:
| ITEM |
| SPECIFIC REQUIREMENT |
| ACCEPTABLE |
| NON-ACCEPTABLE |
| REMARKS |
| a |
| Unit shall have a diesel engine with 4WD |
| b |
| Unit shall have a 45 foot platform height |
| c |
| Unit shall have a 4 foot articulating jib |
| d |
| Unit shall have a 500 pound max capacity |
| e |
| Unit shall have proportional controls |
| f |
| Unit shall have a tilt light and alarm |
| g |
| Unit shall have external fall arrest platform/protection to leave platform while at working height |
| h |
| Unit shall have foam filled tires |
| i |
| Unit shall have “Soft Touch” system to prevent platform contacting and damaging aircraft |
| j |
| Unit shall have a 7500W generator w/a power cable |
All offerors will be evaluated for technical acceptability, deemed either acceptable or unacceptable according to the requirements in the attached item description. Only technically acceptable offers will be considered for award.
Evaluation Criteria:
1) Technical Acceptabilty
2) Price
Factors 1 and 2, when combined, are of equal importance.
(b) A written notice of award or acceptance of an offer, mailed or otherwise furnished to the successful offeror within the time for acceptance specified in the offer, shall result in a binding contract without further action by either party. Before the offer's specified expiration time, the Government may accept an offer (or part of an offer), whether or not there are negotiations after its receipt, unless a written notice of withdrawal is received before award.
PART AND MATERIALS:
The Contractor shall provide and use only new parts and materials in performance of this requirement unless otherwise authorized by the Contracting Officer.
(End of provision) (End of Summary of Changes)
File details come from the government source that posted it. Updated .