FA812615Q0063_Amendment_0004.pdf

PDF 53 KB Posted

Attached to
Tensile Tester Federal contract opportunity
Solicitation number
FA8126-15-Q-0063
Issued by
Department of the Air Force Materiel Command Air Force Sustainment Center

About this file

Amendment 0004

View the file

Other files for this federal contract opportunity

Other files attached to Tensile Tester, newest first.
File Type Posted
Brand_Name_Justification_Redacted.pdf PDF
FA812615Q0063_Amendment_0003.pdf PDF
FA812615Q0063_Amendment_0002.pdf PDF
FA812615Q0063_Amendment.pdf PDF
FA812615Q0063_Solicitation.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

F3YCEB5022A002

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

To update the technical evaluation factor in clause 52.212-2 and to extend the solicitation closing date.

1. CONTRACT ID CODE PAGE OF PAGES

J 1 8

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 30-Mar-2015

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X FA8126-15-Q-0063

X 9B. DATED (SEE ITEM 11)

17-Feb-2015

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

30-Mar-2015

CODE

AFSC/PZIMB

CORI L. DAVIS/405-739-3311

3001 STAFF DR 2AF68A

TINKER AFB OK 73145

FA8126 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

FA8126-15-Q-0063

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION SF 1449 - CONTINUATION SHEET

SOLICITATION/CONTRACT FORM

The required response date/time has changed from 24-Mar-2015 11:00 AM to 01-Apr-2015 10:00 AM.

The following have been modified:

52.212-2 (Addendum) EVALUATION--COMMERCIAL ITEMS (JAN 1999)

General Information:

1. Basis for Contract Award:

This acquisition will utilize Lowest Price Technically Acceptable (LPTA) source selection procedures IAW FAR 15.101-2, as supplemented. Technical tradeoffs will not be made and no additional credit will be given for exceeding acceptability. Award will be made to the acceptable Offeror with the lowest evaluated cost or price, which is deemed responsible IAW the FAR and whose proposal conforms to the solicitation requirements. The solicitation requirements include all stated terms, conditions, representations, certifications, and all other information required by FAR 52.212-1 of this solicitation. The Government reserves the right to award without discussions. Therefore, each initial offer should contain the offerors best terms from a price and technical standpoint. However, the Government reserves the right to conduct discussion if determined necessary by the contracting officer.

2. Number of Contracts to be Awarded:

The Government intends to select one contractor for the award. However, the government reserves the right to award no contract at all, depending on the quality of the proposals and prices submitted and the availability of funds,

3. Rejection of Unreasonable offers:

The Government may reject any proposal that is evaluated to be unrealistic in terms of program commitments, including contract terms and conditions, or unrealistically high or low cost/price when compared to government estimates, such that the proposal is deemed to reflect an inherent lack of competence or failure to comprehend the complexity and risks of the program.

4. Correction Potential of Proposal:

The Government will consider, throughout the evaluation, the” correction potential” of any proposal uncertainty. The judgment of such” correction potential” is within the sole discretion of the government. If an aspect of an offerors proposal not meeting the government requirements in not considered correctable, the Offeror may be eliminated from the competitive range.

5. Evaluation Factor:

Factor 1—Technical Proposal Factor 2—Cost/Price

a. Evaluation Methodology:

Only those offerors determined to be technically acceptable, either initially or as a result of discussions will be considered. The price will be evaluated and the proposal will be listed from lowest to highest based on the total evaluated price either initially or as a result of discussion. Award will be made to the lowest evaluated priced proposal meeting the acceptability standard for the non-cost factors.

Factor 1—Technical proposal:

b. Technical Factors:

Acceptable—the proposal meets specified minimum technical evaluation requirements necessary for acceptable contract performance

Unacceptable—the proposal fails to meet specified minimum technical evaluation requirements necessary for contract performance. Proposal with an unacceptable rating are not awardable.

Technical acceptability will be based on an evaluation of proposal against the criteria stated below and other technical specification in the item description. Offerors are required to present all the information as stated in the Instructions to offerors, FAR 52.212-1. The minimum technical evaluation requirements are met when the Offerors proposal thoroughly substantiates all the following essential criteria:

“CONTRACTOR MUST PROVIDE IN WRITING A DETAILED APPROACH AND PROCESS TO

ENSURE ALL TECHNICAL ASPECTS OF THE TECHNICAL EVALUATION CRITERIAL ARE

MET, IN ORDER TO BE CONSIDERED TECHNICALLY ACCEPTABLE. A STATEMENT OF “I

CONCUR” OR “CONCUR” WILL NOT BE ACCEPTED”.

The Offeror is technically acceptable when they have met the following criteria:

A SFM-300KN (Model Number) UNITED "SMART 1" Floor Model Electromechanical Testing Machine

. LOAD FRAME CONSTRUCTION:

. Capacity: 300 KN

. Solid State Electronics.

. Drive System: Ball Screw Type.

. Solid State Servo and Motor Controls.

. 1,525mm (60") Crosshead travel (excluding grips and fixtures).

. 560mm (22") Clearance between columns.

. Protective Screw Covers: Non-Metallic.

. Anti-Backlash System.

. Crosshead Guidance System:

maximum lateral motion 0.25mm (0.010") over full crosshead travel.

. No release of load under power failure.

. Frame Stiffness:

800 KLbf/inch (140 KN/mm) deflection.

. "Emergency Stop" Control and Mechanical Limit Switches.

. 1,220mm (48") Wide Control Console for Computer CPU and Monitor.

. CROSSHEAD SPEEDS:

. One Standard Range.

Any speed within allowed range is selectable.

TEST: 0.0017 to 500 mm/min (0.00007 to 20"/min) RETURN: 500 mm/min (20"/min) . Force Range: 6,750 Lbf at 20"/min.

. Crosshead Speed Accuracy: +/- 0.1% of set speed, all loads.

. United USB Controller plus Computer for SMARTSeries computer-controlled testing systems.

. Controller serves as the hardware interface between United testing machine and personal computer.

. USB Connection.

. 6 Channels.

. Controller Specifications . Intel CORE i5 Processor . Microsoft Windows 7 Professional Version

. 4 GB DDR3 RAM

. 500 GB Serial ATA Hard Drive,8MB Cache . 19-inch LCD Monitor . 16x Slimline DVD +/- RW Drive . Enhanced graphics and audio . Integrated Broadcom Gigabit LAN 10/100/1000 . USB Keyboard and Optical Mouse Monitor 20 inch or better.

. 10 External USB Ports . Requires DATUM Version 5 Materials Testing Software available separately.. Pre-Load, Test, Stop and Return Operation initiated with one keystroke.

. Pre-Load Force, Test and Return speeds may be pre-set.

. JOG controls allow fast, accurate crosshead set-up.

. Automatic Stop or Return following sample break.

. Graphic Display in real time.

Load (or stress) vs extension.

Load measurements meet ASTM-E4 down to 1.0% of load cell capacity.

Accuracy: +/- 0.001% of Range.

+/- 0.4 % of Reading.

Extension from crosshead.

Accuracy: +/- 0.001/12" Travel Resolution: 0.000025" Steps.

Repeatability: +/- 0.000025".

Extension from Extensometers down to 12.5 micro strain steps.

. Operator selectable measurement units.

. Data Console (specific configuration subject to change) . Operation and Maintenance Manual.

. Load cell, grips and accessories not included but available separately.

. POWER REQUIREMENTS:

220V, 60Hz, 20A, Single Phase.

. DIMENSIONS (Width x Depth x Height) Load Frame:

914mm x 686mm x 2388mm (36" x 27" x 96") Console:

1170mm x 660mm x 710mm (46" x 26" x 28")

. WEIGHT

Load Frame: 432 Kg (950 lbs) Console: 50 Kg (110 lbs) Computer/Monitor/Keyboard: 21 Kg (46 lbs)

1" Wide Deluxe Action Wedge Grips 30K Capacity:

150 kN (33,750 Lbf) . Insert Width: 25.4 mm (1").

. Moveable bodies, uses stationary inserts.

. Sure grip unit with handwheel.

. Quick release connectors and pins.

. 1.156" Diameter Quick Release - Male Standard.

. 1"-14 Male Threads Optional (No Charge).

. Inserts available separately.

1" Wide Flat Grip Inserts, 0 to 1/4" . Set of 4 for DA-1 Grips Only.

Universal, Quick Release 10K to 30K Lbf . Capacity:10K to 30K . 1.156" Diameter.

(TM,FM If they have QR)(And STM,SFM)

Load Cell . Capacity 60K Lbf (266.9 KN) . Drawbar Mount Load Cell.

. Thread Mount.

. Universal (Tension & Compression).

. 12-Pin Connector.

. Self-Identifying.

. Range: 1% to 100% of Rated Capacity.

Load Cell . Capacity 20K Lbf (89 KN) . Pin Mount Cell.

. Quick Release Mount (.5 inch Pin Dia).

. Universal (Tension & Compression).

. 12-Pin Connector.

. Self-Identifying.

. Range: 1% to 100% of Rated Capacity.

Load Cell . Capacity 5K Lbf (22.2 KN) . Pin Mount Cell.

. Quick Release Mount (.5 inch Pin Dia).

. Universal (Tension & Compression).

. 12-Pin Connector.

. Self-Identifying.

. Range: 1% to 100% of Rated Capacity.

Load Cell . Capacity 50 Lbf (222 N) . Pin Mount Cell.

. Quick Release Mount (.5 inch Pin Dia).

. Universal (Tension & Compression).

. 12-Pin Connector.

. Self-Identifying.

. Range: 1% to 100% of Rated Capacity. UNITED Load Cell.

Load Cell Capacity 20 Lbf (89 N) . Pin Mount Cell.

. Quick Release Mount (.5 inch Pin Dia).

. Tension Only.

. 12-Pin Connector.

. Self-Identifying.

. Range: 1% to 100% of Rated Capacity.

Environmental Chamber . Temperature Range: -148 Deg F to +600 Deg F.

(-100 Deg C to 315 Deg C) Note: Ln2 required to reach - 100 Deg C.

. Temperature Control: +/- 10 Deg F typical (+/- 4 Deg F after stabilization).

. Window: 5-1/4" x 7-1/4".

. Internal Workspace: 9"W x 20"H x 20"D.

( 229mm W X 598mm H X 598mm D ) . Internal Light.

. Solid State digital proportioning controller.

. Over-temp safety switch.

. Quartz insulated heater elements.

. Indicating lights for low and high heat, cooling and fan.

. Door Fan Switch.

. Double Articulating Door.

. Adjustable Height floor stand.

. Heating: Electrical Resistance.

. Cooling: Co2 or Ln2.

. Insulation: High Density Ceramic Fiber.

. Inner liner: Stainless Steel.

. PULL RODS REQUIRED.

POWER REQUIREMENTS: 208-240V, 60Hz, 40A, Single Phase.

DIMENSIONS:

13"W x 40"D x 24"H (Chamber).

38"W x 39"D x 79"H (Floor Stand).

WEIGHT: 275 lbs.

CUSTOMER TO SPECIFY Co2 or Ln2 COOLING

WHEN PLACING ORDER.

Pull Rods 60K (300 kN) . Capacity: 60K (300 kN).

. Stainless Steel.

Installation & Training . Machine setup and on-site training at customer's facility.

. Customer is responsible for setting machine in place at desired plant location.

. Training includes hardware and software

(where applicable).

Quick Release Adapter 1"-14 Male . Adapts existing grips and fixtures with 1"-14 internal threads to current QR machines.

. Two (2) Adapters, 1"-14 Male Threads to

1.156 Diameter Quick Release Male.

. Two (2) Jam Nuts, 1"-14.

. Two (2) Jam Nuts, 1-1/4"-12.

. (1 set) . Two 1/2" QR Pins.

Factor 2—Cost/Price:

c. Cost/price Evaluation: the offerors cost/price proposal will be evaluated for award purposes by adding the total prices for basic requirements (basic award)

Total Evaluated Price: Price analysis will be will be performed to determine the reasonableness of the offerors price proposal. Reasonableness will be based on the total evaluated price. The total evaluated price will be calculated price will be calculated as the sum of the contract line item number (CLIN) unit/extended prices plus other associated factors such as: first article testing costs transportation cost, price evaluation adjustments for Small Disadvantage Business Concerns, and application of labor hours to labor hours rate etc...

Unreasonably Low Cost or Price: Unreasonably low proposed costs or prices, initially or subsequently, may be grounds for eliminating a proposal from competition either on the basis that the Offeror does not understand the requirement or the Offeror has made unrealistic proposal

Unbalance Pricing: offerors are cautioned against submitting an offer that contains unbalanced pricing. Unbalanced pricing exists when, despite an acceptable total evaluated price, the price of one or more CLIN is significantly over or understated as indicated by the application of cost or price analysis techniques offers that are determined to be unbalanced may be rejected if the contracting officer determines that the lack of balance poses and unacceptable risk to the Government.

6. Determination of Contractor Responsibility:

To be eligible for award, an Offeror must be determined responsible. A Determination of Contractor Responsibility will be conducted IAW FAR 9.1 (CCR, EPLS, and ORCA). Past performance information may be gathered from both government such as PPIRS, CPARS, and commercial sources. Offerors will not be penalized if no past performance is available. Past performance will either be satisfactory, neutral, or unsatisfactory. Offerors rated as unsatisfactory equals a determination of non-responsibility. Any unsatisfactory rating given to a small business will be referred to the Small Business Administration pursuant to FAR 15.101-2(b) and 19.6 for resolution. An Offeror who receives a determination of non-responsibility will not be eligible to receive the contract award.

7. Past Performance:

Past performance information may be gathered from both the government such as PPIRS, CPARS, and commercial source. Offerors will not be penalized if no past performance information is available. Past performance will either be satisfactory, neutral, or unsatisfactory, where satisfactory equals neutral or determination of responsibility, and unsatisfactory equals a determination of non-responsibility. Any unsatisfactory rating given to a small business will be referred to the Small Business Administration pursuant to FAR 15.101-2(b) and 19.6 for resolution.

8. Discussion:

It is the government’s intent to award without discussions: therefore, it is imperative that offerors submit their initially. However, if during the evaluation period, it is determined to be in the best interest of government to hold discussions, Offeror responses to evaluation notice (EN), and the final proposal revisions (FPR) will be considered in making the source selection decision. If a request for FPR is issued, Offeror responses to ENs must be included in the FPR in order to be considered in the final evaluation.

9. Solicitation requirement, terms and condition:

Offeror are required to meet all solicitation requirements, such as terms and conditions, representations and certifications, and technical requirements, in addition to those identified as evaluation factors or sub-factors, and all technical specification of the item description. Failure to meet a requirement may result in an offer being ineligible for award. Offerors must clearly identify any exception to the solicitation terms, condition and provide complete accompanying rationale. In the case that a discrepancy exist between the Instruction to Offeror and the evaluation factors for award, the evaluation criteria in 52.212-2 take precedence.

(End of provision)

(End of Summary of Changes)

The following items are applicable to this modification:

AMENDMENT DESCRIPTION

The following items are applicable to this modification:

AMENDMENT DESCRIPTION

The purpose of this amendment is to extend the solicitation closing date and to update the technical evaluation factor in clause 52.212-2.

First: The solicitation closing date is hereby changed as follows:

From: 24 March 2015 at 11:00 A.M. Central time.

To: 01 April 2015 at 10:00 A.M. Central time.

Second: To update the technical evaluation factor in clause 52.212-2.

Third: All other terms remain unchanged and in full force and effect.

File details come from the government source that posted it. Updated .