Solicitation Amendment FA812525Q00940001 SF 30.pdf

PDF 546 KB Posted

Attached to
Aircraft Jacking Manifold Hydraulic Pumping Unit Federal contract opportunity
Solicitation number
FA812525Q0094
Issued by
Department of the Air Force Materiel Command Air Force Sustainment Center

About this file

This is a Standard Form 30 Amendment of Solicitation/Modification of Contract for a Three (3) Hydraulic Pumping Unit, issued by the Oklahoma City Air Logistics Center (AFSC/PZIMA) at Tinker Air Force Base. The amendment modifies the original solicitation FA812525Q00094, extending the response due date from 18 September 2025 to 21 October 2025 and updating the estimated delivery date from 07 January 2026 to 31 August 2026.

The solicitation seeks a diesel/electric powered hydraulic pumping unit with specific technical requirements, including a welded steel housing, 12-volt battery, JP-8 aircraft fuel system, 11-gallon fuel tank, and a towable trailer chassis. The procurement will be a commercial firm fixed-price contract using simplified acquisition procedures. Award will be made to the technically acceptable vendor with the lowest total evaluated price, with the government reserving the right to award to one vendor or cancel the solicitation entirely. Vendors must be registered in the System for Award Management (SAM) and submit detailed technical and pricing proposals meeting the specified evaluation criteria.

View the file

Other files for this federal contract opportunity

Other files attached to Aircraft Jacking Manifold Hydraulic Pumping Unit, newest first.
File Type Posted
Solicitation Amendment FA812525Q00940001 SF1449.pdf PDF
Aircraft Jacking Manifold- Item description_Rev.1.pdf PDF
Solicitation - FA812525Q0094.pdf PDF
Aircraft Jacking Manifold- Item description.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

R

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended.

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of theoffer submitted;

or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE

RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER

NUMBER IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

15B. CONTRACTOR/OFFEROR

(Signature of person authorized to sign)

15C. DATE SIGNED 16B. UNITED STATES OF AMERICA

(Signature of Contracting Officer)

16C. DATE SIGNED

Previous edition unusable STANDARD FORM 30 (REV. 11/2016) Prescribed by GSA FAR (48 CFR) 53.243

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

1. CONTRACT ID CODE PAGE OF PAGES

2. AMENDMENT/MODIFICATION NUMBER 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)

6. ISSUED BY CODE 7. ADMINISTERED BY (If other than Item 6) CODE

8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X) 9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED (SEE ITEM 11)

10A. MODIFICATION OF CONTRACT/ORDER NUMBE

10B. DATED (SEE ITEM 13)

CODE FACILITY CODE

SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

Solicitation/Contract Form

The following modifications were made:

Information From To Response Due Date 18 Sep 2025 21 Oct 2025

Deliveries or Performance

Line Item 0001

The following Delivery Information modifications were made:

Ship To - DoDAAC: F3YCEB

Information From To Delivery Delivery Estimated By 07 Jan 2026. Delivery Estimated By 31 Aug 2026.

List of Attachments

The following Attachment(s) were added:

Aircraft Jacking Manifold- Item description_Rev.1

The following Attachment(s) were deleted:

Item Description

Evaluation Factors for Award

Header Miscellaneous Text (Modified):

52.212-2 EVALUATION--COMMERCIAL PRODUCTS AND COMMERCIAL SERVICES) (NOV 2021)

(a) The Government will award a contract resulting from this solicitation to the responsible offeror whose offer conforming to the solicitation will be most advantageous to the Government; price and other factors considered. The following factors shall be used to evaluate offers:

1. Basis for Contract Award:

The acquisition will be conducted and evaluated under the provisions of FAR Part 12, Commercial Items and FAR Part 13, Simplified Acquisition Procedures. In accordance with FAR 13.106-2(b)(1), the evaluation procedures established herein are within the Contracting Officer's broad discretion as applied under FAR Part

13. This acquisition will utilize Technically Acceptable and price as evaluation factors. Technical tradeoffs will not be made, and no additional credit will be given for exceeding acceptability. Award will be made to the acceptable vendor who is technically acceptable with the lowest total evaluated price and whose proposal conforms to the solicitation requirements. The solicitation requirements include all stated terms, conditions, representations, certifications, and all other information required by FAR 52.212-1 of this solicitation. The Government reserves the right to award without interchanges. However, the Government reserves the right to conduct interchanges if determined necessary by the Contracting Officer.

The responsible vendor(s) must be registered in the System for Award Management (SAM) database (available at: https://www.sam.gov/portal/public/SAM/) and submit a completed copy of the Offeror Representations and Certifications - Commercial Items with their response. Lack of registration in SAM will disqualify the vendor and declare them ineligible for award.

The Oklahoma City Air Logistics Center (AFSC/PZIMA) at Tinker Air Force Base Oklahoma intends to issue a commercial firm fixed price contract for this acquisition.

2. Number of Contracts to be Awarded:

The Government intends to select one vendor for contract award. However, the Government reserves the right to award no contract at all; depending on the quality of the proposals, prices submitted and the availability of funds, or other factors identified by the Contracting Officer.

3. Rejection of Unreasonable Offers:

The Government may reject any proposal that is evaluated to be unrealistic in terms of program commitments, including contract terms and conditions, or unrealistically high or low in cost/price when compared to Government estimates; such that the proposal is deemed to reflect an inherent lack of competence or failure to comprehend the complexity and risks of the program, item, or service.

4. Correction Potential of Proposals:

The Government will consider, throughout the evaluation, the "correction potential" of any proposal uncertainty. The judgment of such "correction potential" is within the sole discretion of the Government. If an aspect of a vendor's proposal not meeting the Governments requirements is not considered correctable, the vendor may be eliminated.

5. Evaluation Factors

FA812525Q00940001

Factor 1--Technical Proposal Factor 2--Cost/Price

a. Evaluation Methodology:

The Government will evaluate all technical factors concurrently for the three (3) lowest priced proposals. Should one of those three (3) proposals not be found technically acceptable, the next one (1) lowest priced offeror will be reviewed for technical acceptance. Then, price will be evaluated and the lowest evaluated priced proposal will be selected, either initially or as a result of clarifications.

Award will be made to the lowest evaluated priced proposal meeting the acceptability standards for the non-cost factors.

b. Technical Factor:

Acceptable - The proposal meets specified minimum technical evaluation requirements necessary for acceptable contract performance.

Unacceptable - The proposal fails to meet specified minimum technical evaluation requirements necessary for contract performance. Proposals with an unacceptable rating are not awardable.

Technical acceptability will be based on an evaluation of proposals against the criteria stated below and other technical specifications in the Item Description.

Offerors are required to present all the information as stated in the Instructions to Offerors, FAR 52.212-1. The minimum technical evaluation requirement is met when the Offeror's proposal thoroughly substantiates all the following essential criteria:

"CONTRACTOR MUST PROVIDE A WRITTEN STATEMENT TO EXPLAIN HOW THEY ARE MEETING THE TECHNICAL EVALUATION CRITERIA LISTED BELOW. A STATEMENT OF "I CONCUR" OR "CONCUR" WILL NOT BE ACCEPTED AND COULD DEEM YOUR PROPOSAL TECHNICALLY UNACCEPTABLE. THE WRITTEN STATEMENT IS ESSENTIAL FOR YOUR QUOTE TO BE RESPONSIVE AND BE REFERRED FOR TECHNICAL REVIEW."

TECHNICAL EVALUATION CRITERIA

Three (3) Hydraulic Pumping Unit, NSN: 4320-01-562-6243, Master NSN: 4320-01-524-4611

Welded steel housing, power driven, stainless steel fluid reservoir, hydraulic pumping unit. Diesel/electric powered with 1800 RPM speed operation. 12-volt direct current capacity battery. 3 hose set configuration, female connection, constructed of zinc plated steel: 2.49in, 3/8-18 (NPTF)

JP-8 aircraft fuel system

11-gallon fuel tank capacity

Housing: Metal enclosures with access panels, hinged doors, storage compartments, and weather resistant properties

Stainless steel, 56 U.S. Gallons Capacity, Fluid Specification MIL-PRF-5606, MIL-PRF-83282, MIL-PRF-85257

Diesel engine 24.0 Horsepower (HP) (continuous); 27.0 HP (intermittent); 2 cylinders, 4 cycle, in-line type, air/oil cooled

Towable Trailer Chassis

Front Steer Knuckle type with tow bars

Parking brake, hand lever assembly parking type (rear wheels)

Tires and Wheels, Four (4) pneumatic tires, 6-ply, 6 x 9, split wheel

Static Reel(s), one (1) spring rewind with 50' of cable w/clamp and plug

Manhole, one (1) stainless steel, quick opening, with a single cam latch

Battery 12 Volts Direct Current (VDC), 60 Amperes (Amps)/hour, gel-type

Electric Motor 15 HP, 380/460 Volts Alternating Current (VAC), 50/60 Hertz (Hz)

Operation maintenance manuals

Operating Speed 1500/1800 RPM

40 feet; branching to (1) 15-foot hose and (1) 85-foot hose Termination Automatic flow control valve: pressure compensated; 4000 PSI rated; unrestricted supply flow; restricted 1.00.100 return flow.

Automatic flow control valve: pressure compensated; 4000 PSI rated; unrestricted supply flow; restricted 1.00.100 return flow.

Automatic flow control valve: pressure compensated; 4000 PSI rated; unrestricted supply flow; restricted 1.00.100 return flow.

Asset Condition:

Criteria: Items crated for shipment. No physical damage to any system components (hardware, software media, documentation) as verified by visual inspection upon delivery. Verification Method: Visual inspection of all delivered items against the packing list.

Acceptance Threshold: Zero damaged components. Minor cosmetic blemishes that do not affect functionality may be accepted at the discretion of [Accepting Party Name/ Role].

System Setup:

Criteria: Successful installation and configuration of all system components according to the vendor's installation instructions and configuration guides.

All software components are correctly installed and licensed.

c. Cost/Price Factor:

Cost/Price Evaluation: The vendor's cost/price proposal will be evaluated for award purposes by adding the total price for basic requirements (basic award).

Total Evaluated Price: Price analysis will be performed to determine the reasonableness of the vendor's price proposal. Reasonableness will be based on the total evaluated price. The total evaluated price will be calculated as the sum of the Contract Line Item Numbers (CLINs) unit/extended prices plus other associated factors such as: first article testing costs, transportation costs, price evaluation adjustments for Small Disadvantaged Business Concerns, and application of labor hours to labor hour rates, etc.

Unreasonably Low Costs or Prices: Unreasonably low proposed costs or prices, initially or subsequently, may be grounds for eliminating a proposal from competition either on the basis that the offeror does not understand the requirement or the offeror has made an unrealistic proposal.

Unbalanced Pricing: Vendors are cautioned against submitting an offer that contains unbalanced pricing. Unbalanced pricing may increase performance risk and could result in payment of unreasonably high prices. Unbalanced pricing exists when, despite an acceptable total evaluated price, the price of one or more contract line items is significantly over or understated as indicated by the application of cost or price analysis techniques. The Government shall analyze offers to determine whether they are unbalanced with respect to separately priced line items or subline items. Offers that are determined to be unbalanced may be rejected if the contracting officer determines that the lack of balance poses an unacceptable risk to the Government.

6. Determination of Contractor Responsibility

To be eligible for award, a vendor must be determined responsible. A Determination of Contractor Responsibility will be conducted in accordance with FAR 9.1 (SAM and FAPIIS). A vendor who receives a determination of non-responsibility will not be eligible to receive the contract award.

7. Interchanges:

In accordance with FAR 1.102-2(c)(3) the Government shall exercise discretion, use sound business judgement, and comply with applicable laws and regulations during the course of this acquisition. It is the Government's intent to award without interchanges; therefore, it is imperative that vendors submit their best terms initially. However, if during the evaluation period; it is determined to be in the best interest of the Government to hold interchanges, the Government may conduct interchanges with one, some, or all vendors before issuing any purchase order.

Interchanges are information sharing between the Government and vendors after receipt of quotations which can be conducted to address any aspect of the quotation. Interchanges may be oral or written. Written interchanges take the form of Interchange Notices (IN)s. INs are used to accurately capture contemporaneous sharing of information. If interchanges are conducted, the Government may request final quotation revisions at the conclusion of interchanges.

8. SOLICITATION REQUIREMENTS, TERMS AND CONDITIONS

Vendors are required to meet all solicitation requirements, such as terms and conditions, representations and certifications, and technical requirements, in addition to those identified as evaluation factors or sub-factors, and all technical specifications of the item description, performance work statement or statement of work.

Failure to meet a requirement may result in an offer being ineligible for award. Vendors must clearly identify any exception to the solicitation terms and conditions and provide complete accompanying rationale. In the case that a discrepancy exist between the Instruction to Offerors (ITO) and the evaluation factors for award, the evaluation criteria in 52.212-2 will take precedence.

(End of provision)

File details come from the government source that posted it. Updated .