A18-095_Additive_Manufacturing_System_SOW_July_11,_2018.docx

DOCX document 41 KB Posted

Attached to
Additive Manufacturing System Federal contract opportunity
Solicitation number
FA8125-18-R-0019
Issued by
Department of the Air Force Materiel Command Lifecycle Management Center Tinker Air Force Base

About this file

Statement of Work (SOW)

View the file

Other files for this federal contract opportunity

Other files attached to Additive Manufacturing System, newest first.
File Type Posted
FA8125-18-R-0019.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

STATEMENT OF WORK

FOR

A18-095 RAPID PROTOTYPE SYSTEM INSTALLATION

PREPARED BY:

OC-ALC/OBCA

08 June 2018

1. SCOPE

1.1 The Contractor shall provide all labor, equipment, parts, consumables, transportation, and any other items necessary to provide a turn key (mission ready when Contractor leaves) installation for the Additive Manufacturing System that at the Oklahoma City-Air Logistics Complex (OC-ALC), Tinker AFB. This shall be accomplished in accordance with (IAW) this Statement of Work.

2. BACKGROUND

2.1 The new additive manufacturing system will reduce new tool development time and cost by allowing for the rapid manufacture of prototypes, both for form/fit tests (for tools that will be made of metal) and also for functional tests (for tools that can be made of plastic). It would also provide the capability of manufacturing tools in-house without needing to go to an outside vendor, with a production time measured in hours rather than days or weeks. By having such rapid turnover in prototype/tool production, AMXG Engineering can better meet our customer needs, allowing them to get the best new tools they need faster, allowing them to get jets out on time, back to the warfighter.

3. Requirements

3.1 Item Description

3.1.1 One (1) each Additive Manufacturing System with a minimum:

· Build area of at least 14” x 14” x 14” (XYZ)

· Unit size of no more than 80” in height and 71” maximum width

· Capabale of printing in materials including, but not limited to: ABS, ASA, PC, Nylon, and Ultem 9085

· Must include at least 100 cubic inches each of: ABS, ASA, PC, Nylon, and Ultem filament.

· Additional 1500 cubic inches of PC filament

· Consumables required to use all the included filament; support material, printing foundations, and at least two years worth of maintenance supplies (such as grease, oils, cleaning fluids)

· Wash stations for removing soluble supports

3.2 Installation

3.2.1 The contractor shall provide an updated list of facility requirements no less than 30 days before receipt of the machine(s) by the Government. This list shall include the electrical requirements (including the connector model number) of all machines proposed in the contract, as well as any other connections required (e.g., air, water, secondary power).

3.2.2 The contractor shall be responsible for uncrating the machine(s) as well as moving the machine(s) to the install location (from a distance of no more than 100 feet) using their own equipment.

3.2.3 The contractor shall be responsible for any leveling of the machine(s).

3.3.4 The contractor shall connect the machine(s) to all of the required ports (electrical, air, etc.) to be provided by the Government within 8 feet of the install location.

3.3.5 The contractor shall be aware that no internet connection will be supplied at the install location. If an internet connection is needed for installation, the contractor shall be responsibvle of providing their own means of internet.

3.3.6 The contractor shall demonstrate to the government that the system is fully operational as part of the installation and provide documentation, signed and dated by the installer and user, assuring the government that the installation is complete and the system is operational.

3.3 Training

3.3.1 The Contractor shall provide two (2) days of training to six (6) personnel on the operation of the Additive Manufacturing Machine and the applicable software at Building 2211 Post G8..

4. GENERAL REQUIREMENTS

4.1 Hours of Operation: The Contractor shall perform the work required under this contract during the following days and hours: Monday through Friday, 8:00am to 4:00pm. If work hours are required outside the hours stated, the Contractor shall contact the Government POC for approval from the CO. Upon approval from the CO, the Government Subject Matter Expert (SME) or Government POC must be present with the Contractor.

4.1.1 These dates and hours exclude Federal Holidays, base closures due to inclement weather, and furlough days, as applicable.

4.2 Environmental Protection & Safety: The Contractor shall be knowledgeable of and comply with all applicable federal, state and local laws, regulations, instructions and requirements regarding environmental protection and occupational safety and health. The Contractor shall comply with any laws, instructions or regulation changes during the term of this contract.

4.2.1 Contractors shall be compliant Tinker Air Force Base (TAFB) Supplement to Air Force Instruction (AFI) 32-7086, “Hazardous Materials Management”, Tinker AFB procedures per Tinker Air Force Base Instruction (TAFBI) 32-7004, “Hazardous Waste Management”, and Complex procedures per Oklahoma City Air Logistics Complex (OC-ALC) Sup to AFI 32-7086, “Hazardous Material Management” and OC-ALCI 32-101 “Air Quality Record Keeping Procedure”. Publications are available digitally on e-Publishing website at www.e-publishing.af.mil for downloading or ordering.

4.3 Spills: Upon occurrence of any spill that could enter the storm system or cause any harmful environment effects, the Contractor shall immediately call 911 to report the incident. When possible, the Contractor shall use a base telephone to receive help from Tinker AFB 911. If using a cell phone, the Contractor shall request Tinker AFB 911. The Contractor shall immediately report all environmental violations to the GPOC and UEC. The Contractor shall provide five (5) copies of a typed or written report about the incident within four (4) clock hours as follows:

4.3.1 One (1) copy to CO, two (2) copies to the GPOC, a copy for UEC and one (1) copy for record. The format of the report shall be left up to the Contractor, but the report shall contain the following information:

1.) Name and contact number of person reporting the spill 2.) Date and time of incident 3.) Location and source of spill 4.) Substance or pollutant spilled 5.) Amount spilled and rate of discharge 6.) Any damages or injuries involved 7.) Extent of area impacted 8.) Potential hazards 9.) Actions taken 10.) Organizations contacted 11.) Remarks Section - that addresses the cause of the spill (e.g. human error, equipment, etc.) and whether 911 was called and which agencies responded.

4.4 Housekeeping: The Contractor shall keep the work areas clean and neat IAW industry standards, OSHA, fire and safety standards, and this SOW.

4.5 Foreign Object Damage (FOD) and Dropped Object Prevention: (SS) Contractor personnel who work in or travel though areas near operational and production aircraft, engines, munitions, missiles, drones, space systems, support equipment, Aerospace Ground Equipment (AGE), trainers, and the Contactor personnel operating vehicles and equipment on flight lines, runways, taxiways, parking ramps, and in aircraft hangers and maintenance areas are required to receive the FOD/DOP training and to comply with AFI 36-2650, AFMC Supplement 1, paragraph 9.2., and A4.4.4. (Initial)/A4.4.5. (Refresher). The Contractor and Contractor personnel shall acknowledge the FOD/DOP training either by viewing the Digital Versatile Disc (DVD) provided by the Government POC or the YouTube site, http://www.youtube.com/watch?v=tYcbodjFPnM.

4.5.1 The Contract Manager shall provide written certification to the Government POC for each employee within ten (10) business days after the contract award date. The certification shall have the title of the training, the name of the person who received the training, and the date of the training. The Contractor shall also ensure all new employees view the FOD/DOP training and provide written certification of training to the Government POC prior to the employees starting work in the OC-ALC shops. Every 36 Months, the Contractor and Contractor personnel shall be required to review the FOD/DOP training and to provide written certification to the Government POC.

4.6 Tool Control and Accountability: While performing contract services in or around Maintenance Production Shops, which includes ramp areas, the Contractor shall comply with AFI 21-101_AFMC Supplement 1, 21-101, Chapter 10 (all paragraphs) and OC-ALCI 21-112, paragraph 14.1. and 14.5.3. The Contractor shall provide the completed MXRIWRS Form 032 prior to performing work in the OC-ALC industrial areas. The MXRIWRS Form 032 is available from the Government POC. The Contractor shall provide a Contractor Tool Listing, MXRIWRS Form 032, to the Government POC within five (5) business days after (insert type of action, i.e. PM, RM, etc.) actions. The Contractor or Contractor’s personnel shall inventory the container or bag of tools at the beginning of each work day and at the end of each work day. The Contractor personnel shall immediately notify the Government POC of any tools that are missing or lost from the work area or container (e.g. tool or job box or tool bag). The Government POC will report any missing Contractor’s tools which have not been located within one (1) hour after notification to the appropriate Government personnel. The Contractor shall obtain the Form 32 from the Government POC. The CM shall ensure each employee on the job site receives a briefing from the Government POC about Housekeeping, FOD/DOP, and Tool Control prior to starting work in OC-ALC Industrial Areas.

4.7 Privately Owned Motor Vehicles (POV): Contractor personnel shall comply with the directives pertaining to operation of POVs on Tinker AFB per AFMAN 31-116, in its entirety, “Motor Vehicle Traffic Supervision”. The Contractor shall comply with Tinker AFBI 24-302, in its entirety for the operation of POVs within Tinker AFB.

4.8 Visitors Pass: The Contractor shall contact the Government POC seven (7) business days before arriving on Tinker AFB in order to make arrangements for Visitors Passes. The Government POC will assign a sponsor for the Contractor from within the organization. The Contractor and the sponsor shall arrange to meet at Pass and Registration, Building 6611 at the Tinker Gate which is South of I-40 off of Air Depot. The Contractor shall provide two (2) forms of identification, one of which shall be a picture ID, to the 72 SFS. The 72 SFS will provide an AF Form 75, Visitors Pass, which will be valid for up to thirty (30) calendar days.

4.9 Foreign Nationals: The Contractor shall notify the Government POC before sending a Foreign National representative to perform services. Special rules apply for foreign nationals visiting a US Government facility.

4.10 Safety and Health on Government Installations: While performing work under this contract on a Government installation, the Contractor shall comply with federal, state and local regulations, and AFI 91-203, “Air Force Consolidated Occupational Safety Instruction”, as established by this contract and Appendix C. The Contractor shall notify the CO, Government POC, and Government Contract Administrator (CA) within one (1) business day of any injuries that occur to contractor personnel while they are on the installation. The Contractor shall notify the CO, Government POC, and Government CA within one (1) business day of damage to Government property or equipment during the execution of the contract.

4.11 Emergency Procedures: The Contractor personnel shall follow the direction of the Government personnel with regard to emergency procedures, such as fire, tornado, active shooter, bomb threats, or other emergency. It is the responsibility of the Contractor to provide guidance and to establish procedures for its employees to respond to an emergency. It is the Contractor’s responsibility to account for their employees following an emergency evacuation. The Contractor personnel shall participate with the Government personnel in all fire and tornado drills at no additional cost to the Government.