Performance_Work_Statement.docx

DOCX document 58 KB Posted

Attached to
Horizontal Machine Center Repair Federal contract opportunity
Solicitation number
FA8125-18-Q-0025
Issued by
Department of the Air Force Materiel Command Lifecycle Management Center Tinker Air Force Base

About this file

Performance Work Statement

View the file

Other files for this federal contract opportunity

Other files attached to Horizontal Machine Center Repair, newest first.
File Type Posted
Additional_Questions_and_Answers.pdf PDF
Attachment_3_-_Drawing_F71156.pdf PDF
FA8125-18-Q-0025_Combo_-_Amendment_1_Feb_2018.pdf PDF
Performance_Work_Statement.docx DOCX document
FA8125-18-Q-0025_Combo.doc DOC document

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Performance Work Statement (PWS) For

76 CMXG

Horizontal Machining Center TT&E

Completed by

OC-ALC/OBCA

3 October 2017

1.0 Section One

1.1 Scope: The Contractor shall provide all labor, tools, equipment, test equipment, material, parts, quality control, transportation and inspection manuals necessary to perform the Horizontal Machining Center in need of Test Tear down & Evaluate (TT&E) and repair on-base building 3001 post R35 at the Oklahoma City–Air Logistics Complex (OC-ALC). The equipment is listed in Appendix A.

1.1.1 The Contractor shall be responsible for insuring all services, parts and Original Equipment Manufacturer (OEM) components provided under this contract are in accordance with (IAW) the terms and conditions outlined herein, conform to the manufacturer’s equipment specifications and this PWS.

1.2 Known Problems: The Horizontal Machining Center has a crashed A axis and two (2) AC cooling units down. 76 MXSG technician disassembled unit but was unable to repair. OEM unable to provide further documentation for MXSG technician to continue troubleshooting. Reassembled unit and submitted for TT&E.

1.3 Requested Services: Contractor shall repair crashed A axis, replace two (2) AC cooling units, leveling of the equipment, and aligning all axis back to OEM specifications. The Contractor shall also perform TT&E of the Starrag Heckert Horizontal Machining Center model STC 1250/130 serial no. 9261. The Contractor shall determine what is needed to have the Horizontal Machining Center fully operational IAW OEM specifications.

1.4 Evaluation Report: The Contractor shall accomplish TT&E on each part to be repaired and provide in person, by fax or by e-mail an evaluation report on a contractor devised form to the Government Point of Contact (POC) and the Contracting Officer (CO) within (1) business day. As a minimum, the information cited on the evaluation report shall include:

· date of evaluation

· testing information

· repair recommendation

· required parts and part numbers

· proposed delivery schedule

· proposed firm fixed price for repair

1.4.1 The proposed firm fixed price for repair shall be broken out into the following categories:

· firm fixed price labor rate multiplied by number of labor hours proposed

· material costs

· other direct costs (if applicable)

· return shipping costs for parts to be repaired and parts that cannot be repaired

1.5 Authorizations for Repair Actions: Only the CO can authorize repair actions. The Government POC will coordinate any repair actions with the Government Subject Matter Expert (SME) and the CO in order to obtain the approval to proceed. The Contractor shall ensure all repair actions have the documented CO approval, in writing, before initiating any repair or ordering parts. The Contractor shall demonstrate to the Government SME that the repairs have been completed.

1.5.1 Once the authorization for repair action has been received from the CO, the Contractor shall order any required parts within two (2) business days and notify the Government POC, in writing, of the estimated arrival date of the parts. Upon the receipt of the parts, the Contractor shall perform the repair within five (5) business days. The Government POC will verify the receipt of the parts with the Contractor to ensure the repair is performed in a timely manner.

1.6 Service Report: Immediately upon completion of the maintenance support services and before leaving the OC-ALC, the Contractor shall provide a written Service Report to the Government SME. When necessary the Government SME will forward the service report to the Government POC within two (2) business days of receipt. The Contractor shall provide, by fax or email, the final service report within five (5) business days to the Government POC. As a minimum, the final service report shall contain the following information:

· name of the company

· requested service date

· contract number

· equipment ID#

· description of services provided

· additional services recommended (if any)

· printed name and signature of technician who performed the services

· printed name and signature of on-site Government SME or Government POC

· start and completion dates

· complete breakdown of the labor cost (hours and rate)

· materials and parts used

· details of any other charges

· printed name and signature stating only new parts and materials were used

· written verification statement that a performance check to verify operational condition was performed and that the equipment is in working order.

1.6.1 Over and Above (O&A): O&A is defined as work discovered during the course of performing the repair efforts that is within the scope of the contract and necessary in order to satisfactorily complete the contract. The Contractor shall complete O&A requirements In Accordance With (IAW) Defense Federal Acquisition Regulation Supplement (DFARS) 252.217-7028. PGI 217.77.

1.7 Maintenance Documentation: The Contractor shall notify the Government SME upon completion of each TT&E IAW OC-ALC Operating Instruction (OI) 21-203, Chapter 1, 2, and 3, as applicable.

1.8 Red Tagged Items: Red Tagged items create unsafe conditions for the workplace and are noted by the annotation of a Red X in the Facilities and Equipment Management Web-Based (FEMWEB) system. A Red X indicates the equipment is considered unsafe or unserviceable and will not be used until the unsatisfactory condition is corrected and the Red X is cleared. The Contractor shall not authorize, use or direct equipment to be used until the Red “X” has been properly cleared IAW OC-ALC OI 21-203, Chapter 2.

1.9 Red X Clearance: The Contractor shall ensure the Red X’s are cleared IAW OC-ALC OI 21-203, Chapter 2. The Contractor shall immediately notify the shop supervisor or work leader in any instance where the Contractor clears a Red X in his or her assigned work area.

1.10 Red X Clearance on Equipment: Red X on Equipment will be cleared in FEMWEB by the shop supervisor, work leader, or supervisor’s designee.

1.11 Continuation of Essential Department of Defense (DoD) Contractor Services During Crisis: This requirement has been determined not to be essential and does not require continued support during a crisis as defined in DFARS 252.237-7023.

1.12 Hours of Operation: The Contractor shall perform the work required under this contract during the following days and hours: Monday through Friday, 7am to 4pm. If work hours are required outside the hours stated, the Contractor shall contact the Government POC for approval from the CO. Upon approval from the CO, the Government SME or Government POC must be present with the Contractor.

1.12.1 These dates and hours exclude Federal Holidays, base closures due to inclement weather, and furlough days, as applicable.

1.13 Special Qualifications: The Contractor shall provide personnel with the following special qualifications:

· Starrag Technology Certification

1.14 Contractor Personnel: The Contractor shall provide the name of the Contract Manager (CM) and any alternates who shall act for the Contractor when the CM is absent. They shall be designated to the CO and Government POC, in writing, within five (5) business days after the contract award date. The Contractor shall provide telephone numbers and email addresses where the CM and alternates may be contacted at any time. The CM or alternate shall have full authority to act for the Contractor on all matters relating to operation of this contract at the OC-ALC on Tinker Air Force Base (AFB). The CM or alternate shall be available to meet on the installation with Government personnel designated by the CO to discuss problem areas. The Contractor shall provide a CM who can read, write, speak, and understand English fluently.

1.14.1 The Contractor and Contractor personnel shall be required to identify themselves as contractor personnel by introducing themselves or being introduced as Contractor personnel. The Contractor personnel shall also display distinguishing badges or other visible identification for meetings with Government personnel or while performing work for the OC-ALC on Tinker AFB. The Contractor and Contractor personnel shall identify themselves as Contractor employees in telephone conversations and in formal and informal written correspondence.

1.15 Listing of Contractor Employees: The Contractor shall provide an initial listing of names and position titles of employees who will come to Tinker Air Force Base to the Government POC within five (5) business days after the contract award date. Within ten (10) business days, the Contractor shall also provide an updated listing of personnel to the Government POC when employees affecting the work of this contract change status or position.

1.15.1 The Contractor shall not employ persons on this contract if such employee is identified to the Contractor as a potential threat to the health, safety, security, and/or general well-being, or operational mission of the installation and its population. The Contractor shall not employ any person who is an employee of the United States (US) Government if the employment of the person would create a conflict of interest. The Contractor shall not employ any person who is an employee of the Department of the Air Force (AF), either military or civilian, unless such person seeks and receives approval according to the DoD 5500.7-R Joint Ethics Regulations (JER). In addition, the Contractor shall not employ any person who is an employee of the Department of the AF if such employment would be contrary to the policies contained in Air Force Instruction (AFI) 64-106, Air Force Industrial Labor Relations Activities. The Contractor shall be prohibited from employing off-duty Government POCs who are providing surveillance on any contracts/sub-contracts awarded to the Contractor. All contract personnel, depending on particular condition, occasion, or place or job assignment shall be required to wear professional and suitable attire. All Contractor personnel shall conduct themselves in a professional and courteous manner. The selection, assignment, reassignment, transfer, supervision, management, and control of contractor personnel in performance of this PWS shall be the responsibility and prerogative of the Contractor; however, the Contractor shall comply with the requirements set forth in this PWS and Tinker AFB regulations concerning the conduct of employees as referenced herein. The Contractor shall employ and maintain a technically trained and experienced work force.

1.16 Environmental Protection & Safety: The Contractor shall be knowledgeable of and comply with all applicable federal, state and local laws, regulations, instructions and requirements regarding environmental protection and occupational safety and health. The Contractor shall comply with any laws, instructions or regulation changes during the term of this contract.

1.16.1 Contractors shall be compliant Tinker AFB Supplement to Air Force Instruction (AFI) 32-7086, “Hazardous Materials Management”, Tinker AFB procedures per Tinker Air Force Base Instruction (TAFBI) 32-7004, “Hazardous Waste Management”, and Complex procedures per OC-ALC Sup to AFI 32-7086, “Hazardous Material Management” and OC-ALCI 32-101 “Air Quality Record Keeping Procedure”. Publications are available digitally on e-Publishing website at www.e-publishing.af.mil for downloading or ordering.

1.17 Hazardous Material (HAZMAT): If no HAZMAT will be brought on base or used in performance on this contract, the contractor shall certify “No HAZMAT will be brought on base” or “No HAZMAT Usage” in writing on company letterhead. This certification shall be provided to the Government POC within ten (10) days after award. Upon Government POC receipt of the certification, the requirements of this section no longer apply. Appropriate penalties for the contractor, or administrative and disciplinary action for the later shall be assessed if found in violation of above certification.

1.17.1 The Contractor shall not store chemicals or hazardous material (HAZMAT) on Tinker AFB. Contractors shall be compliant with HAZMAT management procedures per OC-ALC Supplement to AFI 32-7086, “Hazardous Materials Management”. The Contractor shall maintain a log of all HAZMAT that is used on base. This usage log shall be provided to the Government POC monthly, the last business day of each month, or when the required work is completed. The Government POC will forward the records to the Unit Environmental Coordinator (UEC) no later than the fourth (4th) day of the following month or the first (1st) subsequent business day.

1.18 Safety Data Sheet (SDS) and Labeling: Upon Government POC receipt of the “No HAZMAT Usage” certification, the requirements of this section no longer apply.

1.18.1 The Contractor shall not transport, ship or use any chemical, material or substance used in the performance of this PWS on Tinker AFB before written approval is provided by 72 ABW/CEIE, Natural Infrastructure Management (Environmental Compliance). The Contractor shall submit to the Government POC, ten (10) calendar days after contract award date all Safety Data Sheets (SDSs) and a completed OC-ALC Form 152, SDS Information Sheet. The Contractor shall receive approval from the Government POC prior to shipping any chemical, material or substance to Tinker AFB. A copy of the manufacturer SDS shall accompany the shipment. Contractor shall comply with the effective dates for SDS requirements IAW the Occupational Safety and Health Administrations (OSHA) Hazardous Communication Standard, Title 29, Code of Federal Regulation (CFR) Part 1910.1200. The Contractor shall ensure containers of hazardous chemicals are labeled with the following information, prior to shipping to Tinker AFB IAW OSHA Hazardous Communication Standard, Title 29, CFR Part 1910.1200 (2012): product identifier; signal word; hazard statement(s); precautionary statement(s); pictogram(s); and name, address and telephone number of the chemical manufacturer, importer, or other responsible party. The Government POC will forward all SDS submittals to 72 ABW/CEIE for approval. A current manufacturer SDS shall be submitted to the Government POC if the Contractor changes manufacturer or vendor for any chemicals that were prior approved. The Contractor shall maintain copies of manufacturer SDSs for all chemicals and SDSs shall be readily accessible at all times by Contractor personnel as well as government employees.

1.19 Hazardous Waste: If no HAZWASTE will be generated during performance of this contract, the contractor shall certify “NO Hazardous Waste Generation” in writing on company letterhead. This certification shall be provided to the Government POC within ten (10) days after award. Upon Government POC receipt of the “No Hazardous Waste Generation” certification, the requirements of this section no longer apply. Appropriate penalties for the contractor, or administrative and disciplinary action for the later shall be assessed if found in violation of above certification.

1.19.1 The Contractor shall dispose of contaminated solid waste, spent or processed chemical solutions, used rags and hazardous waste in government furnished waste containers located in the shop or area the work is being performed. The Contractor shall notify the Government POC if the required waste containers are not available on site.

1.20 Discharges: Any discharges into Tinker’s industrial waste treatment plant (IWTP) or sanitary sewer shall be approved and done IAW Tinker Industrial Waste Water Discharge Permit as instructed by 72 ABW/CEIE, Natural Infrastructure Management (Environmental Compliance). Notice of intent documentation shall be provided to the Government POC within ten (10) days after award. The Government POC will submit the required notice of intent documentation to the UEC for 72 ABW/CEIE approval. The Contractor shall not discharge into IWTP and sanitary sewer prior to approval issued by 72 ABW/CEIE. The Contractor shall maintain records of written approval issued by 72 ABW/CEIE for discharges into IWTP and sanitary sewer.

1.21 Off-Site Discharges: For discharges outside of Tinker AFB, the Contractor shall ensure waste water discharges, that may contain pollutants resulting from any contracted service, go to a state or federal permitted treatment facility such as a municipal Publicly Owned Treatment Works (POTW). The Contractor shall provide a letter ten (10) calendar days after contract award date to the Government POC from the POTW that states the POTW is permitted for all pollutants that the Contractor may discharge during the contracted service.

1.22 Spills: Upon occurrence of any spill that could enter the storm system or cause any harmful environment effects, the Contractor shall immediately call 911 to report the incident. When possible, the Contractor shall use a base telephone to receive help from Tinker AFB 911. If using a cell phone, the Contractor shall request Tinker AFB 911. The Contractor shall immediately report all environmental violations to the Government POC and UEC. The Contractor shall provide five (5) copies of a typed or written report about the incident within four (4) clock hours as follows:

1.22.1 One (1) copy to CO, two (2) copies to the Government POC, a copy for UEC and one (1) copy for record. The format of the report shall be left up to the Contractor, but the report shall contain the following information:

1.) Name and contact number of person reporting the spill 2.) Date and time of incident 3.) Location and source of spill 4.) Substance or pollutant spilled 5.) Amount spilled and rate of discharge 6.) Any damages or injuries involved 7.) Extent of area impacted 8.) Potential hazards 9.) Actions taken 10.) Organizations contacted 11.) Remarks Section - that addresses the cause of the spill (e.g. human error, equipment, etc.) and whether 911 was called and which agencies responded.

1.23 Environmental Training: Upon Government POC receipt of the “No Hazardous Waste Generation” certification, the requirements of this section no longer apply.

1.23.1 Contractor personnel performing duties in the service of this PWS shall have training that acquaints the person with the details of Resource Conservation Recovery Act (RCRA) regulations in 40 CFR 260 through 279; applicable State Laws and regulations; DoD, Air Force and local requirements. This training can be obtained through creditable training institutions or companies. All training shall be approved by 72 ABW/CEIE, Natural Infrastructure Management (Environmental Compliance). RCRA training is available at http://www.natlenvtrainers.com/RCRA-hazardous-waste.htm; http://www.skillsoft.com/catalog/detail.asp?CourseCode=esh_sah_a34_sh_enus000000 and http://www.lion.com/Storing-Hazardous-Waste-for-LQGs at the Contractor’s expense. Prior to obtaining training, the Contractor shall provide the name of the training institution or company and course description to the Government POC for approval within ten (10) calendar days after contract award date. Once written approval is received from the Government POC, the Contractor shall provide the environmental training certificates for employees performing duties in the service of this PWS to the Government POC, within thirty (30) calendar days after contract award date. In addition to the required environmental training, Contractors shall be compliant with Tinker AFB procedures per TAFBI 32-7004, “Hazardous Waste Management”.

1.24 Housekeeping: The Contractor shall keep the work areas clean and neat IAW industry standards, OSHA, fire and safety standards, and this PWS.

1.25 Foreign Object Damage (FOD) and Dropped Object Prevention: Contractor personnel who work in or travel though areas near operational and production aircraft, engines, munitions, missiles, drones, space systems, support equipment, Aerospace Ground Equipment (AGE), trainers, and the Contactor personnel operating vehicles and equipment on flight lines, runways, taxiways, parking ramps, and in aircraft hangers and maintenance areas are required to receive the FOD/DOP training and to comply with AFI 36-2650, AFMC Supplement 1, paragraph 9.2., and A4.4.4. (Initial)/A4.4.5. (Refresher). The Contractor and Contractor personnel shall acknowledge the FOD/DOP training either by viewing the Digital Versatile Disc (DVD) provided by the COR or the You Tube site, http://www.youtube.com/watch?v=tYcbodjFPnM.

1.25.1 The Contract Manager shall provide written certification to the COR for each employee within ten (10) business days after the contract award date. The certification shall have the title of the training, the name of the person who received the training, and the date of the training. The Contractor shall also ensure all new employees view the FOD/DOP training and provide written certification of training to the COR prior to the employees starting work in the OC-ALC shops. Every 36 Months, the Contractor and Contractor personnel shall be required to review the FOD/DOP training and to provide written certification to the COR.

1.26 Tool Control and Accountability: While performing contract services in or around Maintenance Production Shops, which includes ramp areas, the Contractor shall comply with AFI 21-101_AFMC Supplement 1, 21-101, Chapter 10 (all paragraphs) and OC-ALCI 21-112, paragraph 14.1. and 14.5.3. The Contractor shall provide the completed MXRIWRS Form 032 prior to performing work in the OC-ALC industrial areas. The MXRIWRS Form 032 is available from the Government POC. The Contractor shall provide a Contractor Tool Listing, MXRIWRS Form 032, to the Government POC within five (5) business days after TT&E actions. The Contractor or Contractor’s personnel shall inventory the container or bag of tools at the beginning of each work day and at the end of each work day. The Contractor personnel shall immediately notify the Government POC of any tools that are missing or lost from the work area or container (e.g. tool or job box or tool bag). The Government POC will report any missing Contractor’s tools which have not been located within one (1) hour after notification to the appropriate Government personnel. The Contractor shall obtain the Form 32 from the Government POC. The CM shall ensure each employee on the job site receives a briefing from the Government POC about Housekeeping, FOD/DOP, and Tool Control prior to starting work in OC-ALC Industrial Areas.

1.27 Privately Owned Motor Vehicles (POV): Contractor personnel shall comply with the directives pertaining to operation of POVs on Tinker AFB per AFMAN 31-116, in its entirety, “Motor Vehicle Traffic Supervision”. The Contractor shall comply with Tinker AFBI 24-302, in its entirety for the operation of POVs within Tinker AFB.

1.28 Visitors Pass: The Contractor shall contact the Government POC seven (7) business days before arriving on Tinker AFB in order to make arrangements for Visitors Passes. The Government POC will assign a sponsor for the Contractor from within the organization. The Contractor and the sponsor shall arrange to meet at Pass and Registration, Building 6611 at the Tinker Gate which is South of I-40 off of Air Depot. The Contractor shall provide two (2) forms of identification, one of which shall be a picture ID, to the 72 SFS. The 72 SFS will provide an AF Form 75, Visitors Pass, which will be valid for up to thirty (30) calendar days.

1.29 Foreign Nationals: The Contractor shall notify the Government POC before sending a Foreign National representative to perform services. Special rules apply for foreign nationals visiting a US Government facility.

1.30 Safety and Health on Government Installations: While performing work under this contract the Contractor shall comply with all applicable federal, state, and local and the specific Air Force regulations (as applicable) regarding occupational safety and health addressed in the PWS. During the execution of the contract the Contractor shall notify the CO, Government POC, and Government Contract Administrator (CA) within one (1) business day of any damage to Government property where the dollar value exceeds $500,000.00 and within two (2) work days, for any damage to Government property less than $500,000.00. The Contractor shall notify the CO within one (1) business day of any injury to contract personnel which occurs while on a Government installation.

1.30.1 Mishap notifications shall contain, as a minimum, the following information:

· Contract, Contract Number, Name and Title of Person(s) Reporting

· Date, Time and exact location of accident/incident

· Brief Narrative of accident/incident (Events leading to accident/incident)

· Cause of accident/incident, if known

· Estimated cost of accident/incident (material and labor to repair/replace)

· Nomenclature of equipment and personnel involved in accident/incident

· Corrective actions (taken or proposed)

· Other pertinent information

1.30.2 If requested by the designated CO, the Contractor shall immediately secure the mishap scene/damaged property and impound pertinent maintenance and training records, until released by the Procuring Safety Office. Contractors will not dispose of contract data related to a mishap until notified to do so by the CO.

1.30.3 Applicable Regulations and Air Force Instructions:

29 CFR 1910 OSHA Standards for General Industry AFI 91-203 Air Force Consolidated Occupational Safety Instruction AFI 91-207 THE US AIR FORCE TRAFFIC SAFETY PROGRAM 12 Sep 2013

AFI 31-218 AIR FORCE MOTOR VEHICLE TRAFFIC SUPERVISION

1.30.4 While on a government installation the Contractor shall be required to follow applicable installation traffic safety regulations and any applicable safety requirements required by the work center supervisor as it pertains to execution of the contract while in the work center; these may include but are not limited to general personal protective equipment such as safety glasses, hearing protection, and hard hats. The Contractor shall comply with base/shop emergency procedures for fire, tornado etc.

1.31 Emergency Procedures: The Contractor personnel shall follow the direction of the Government personnel with regard to emergency procedures, such as fire, tornado, active shooter, bomb threats, or other emergency. It is the responsibility of the Contractor to provide guidance and to establish procedures for its employees to respond to an emergency. It is the Contractor’s responsibility to account for their employees following an emergency evacuation. The Contractor personnel shall participate with the Government personnel in all fire and tornado drills at no additional cost to the Government.

2.0 Section Two

Reserved

3.0 Section Three

3.1. Government Property Repair/Maintenance (or Similar Requirement) On-Base.

Note: Same as Government Property Incidental to Government Installation or Site.

Government Property Repair/Maintenance On-Base is not considered GFP IAW Federal Acquisition Regulation (FAR) Parts 45 and 52.245 plus supplements. The responsible Government Organizations CMXG for Government Property Repair/Maintenance On-Base will be responsible for the Government Property inventory, record keeping, reporting requirements (including Report of Survey), and disposal during the performance of this contract.

3.2. Shared Property of the Government. Not Applicable

3.3. Government Furnished Services (GFS). Government Furnished Services are applicable during the performance of this contract. The Government will furnish the following services at Tinker AFB (TAFB), OK:

3.3.1. Security Forces. The Government will provide general on-base security forces’ service. The security forces’ telephone numbers are 911 for emergencies, 405-734-2000 for crimes in progress and 405-734-3737 for non-emergency calls. The off-base 911 center receives 911 cell phone calls. Cell phone callers need to advise the 911 off-base center they are on TAFB in order to be connected with the on-base 911 center.

3.3.2. Fire Emergency and Routine Services. The Government will provide general on-base fire protection services. The Contractor shall comply with fire prevention rules and regulations enforced by the TAFB Fire Prevention Branch. Call 911 for emergencies. For routine fire prevention matters call 405-734-3981 or 405-734-3982 and 405-734-7964 for after hours and weekends. For routine calls to dispatch call 405-734-7964.

3.3.3. Workspace. The Government will provide access to the equipment and adequate workspace around the equipment.

3.4. Intangible Government Property. Not Applicable

3.5. Contractor Acquired Property (CAP), Time & Material (T&M), or Fabrication. Not Applicable