VMC_SOW_FA8125-17-Q-0125.pdf

PDF 126 KB Posted

Attached to
Vertical Machining Center Federal contract opportunity
Solicitation number
FA8125-17-Q-0125
Issued by
Department of the Air Force Materiel Command Lifecycle Management Center Tinker Air Force Base

About this file

Statement of Work

View the file

Other files for this federal contract opportunity

Other files attached to Vertical Machining Center, newest first.
File Type Posted
Solicitation_FA8125-17-Q-0125.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

STATEMENT OF WORK

(SOW)

For Vertical Machining Center

For

76 CMXG

PREPARING ORGANIZATION:

OC-ALC/OBCA

PREPARATION DATE:

22 August 2017

1. SCOPE

The Contractor shall provide all labor, tools, equipment, material, parts, quality control, transportation, and inspection manuals necessary to perform the onsite installation, setup and startup training of one (1) Vertical Machining Center in building 9001 Post E-35 for the Oklahoma City-Air Logistics Complex (OC-ALC).

The Contractor shall provide delivery, install, and 3 days of basic training with 1-5 Tinker operators. Tinker AFB will provide forklift to unload and place machine in shop location. Tinker AFB will also provide utilities within 20’ of the machine install.

2. ITEM DESCRIPTION

76 CMXG is requesting one (1) Vertical Machining Center (VMC). Vendor shall deliver, install, and train on the startup with the government point of contact.

Construction:

X, Y, Z Linear Way Construction

Table: minimum 36 inch x 14 inch

Travel Size: VMC minimum of X;30 inch x Y;20 inch x Z;20 inch

Rapid Traverse Rate: minimum of 1,400 inch per minute

Cutting Feed Rate: minimum of 833 inch per minute

Contouring Feed Rate: minimum 1,200 inches per minute

Accuracy, positioning - +/- .0002

Accuracy, repeatability - +/- .0002

Maximum spindle speed: minimum 12,000 RPM, 90 ft-lb @ 2000 rpm

Spindle Motor: 30 HP Vector Drive, Inline Direct Drive, CT Taper

Table Capacity: minimum 1,500 pounds

Tool Changer - 24-position/CAT40 Side Mount Tool Changer with double arm gripper

Tool-to-Tool (avg): 1.6s Controller:

4 axis simultaneous axis control

Graphic Dry-Run mode

Advanced pocket milling

Tool life management

USB input output interface

Pulse handle feed

Feed/speed/rapid override

1 GB program memory

Ethernet Interface

Power Failure Detection module

Rigid Tapping

55-gallon (208 liter) 360 degree flood coolant system

Electronic Thermal Compensation to compensate for the expansion and contraction of each linear axis

Additional Requirements:

Fully enclosed guarding

High Speed Machining

4th Axis Drive and Wiring

Thru Spindle Coolant: 300psi

Thru-Tool Air Blast

Coolant Tank Oil Skimmer

High Intensity LED Lighting

Enclosure Exhaust System

Automatic Coolant Filter System

Programmable Coolant Nozzle

Chip Auger

11 Button Remote Jog Handle w/ 2.8" color graphic display

Wireless Intuitive Probing: Includes o Macros o Spindle Orientation o Coordinate Rotation and Scaling

32 GB on-board solid state expanded program memory

Visual Part Programming: Conversational operating system utilizing full color graphics & templates

Power Requirements:

V/4801-3 phase 60Hz transformer Tools List:

Qty 2: Integral Keyless Drill Chuck (0-5/16”)

Qty 2: Integral Keyless Drill Chuck (3/32” – 1/2”)

Qty 2: Tension/Compression Tap Holder Coolant-thru (#0-9/16”)

Qty 2: Tension/Compression Tap Holder Coolant-thru (5/16”-7/8”)

Qty 4: 1/8”d X 1.38”L Stubby Endmill Holder

Qty 6: 1/8”d X 2.36”L Standard Endmill Holder

Qty 8: 1/4"d X 2.50”L Standard Endmill Holder

Qty 2: 3/8"d X 2.50”L Standard Endmill Holder

Qty 2: 3/8"d X 4.00”LStandard Endmill Holder

Qty 4: 1/2"d X 2.50”L Standard Endmill Holder

Qty 4: 1/2"d X 4.00”L Standard Endmill Holder

Qty 4: 5/8"d X 3.00”L Standard Endmill Holder

Qty 4: 3/4"d X 3.00”L Standard Endmill Holder

Qty 4: 1"d X 2.00”L Stubby Endmill Holder

Qty 4: 1"d X 4.00”L Standard Endmill Holder

Qty 4: 1 1/4"d X 4.00”L Standard Endmill Holder

Qty 2: Shell Mill Holder ¾”d X 1.75”L

Qty 2: Shell Mill Holder ¾”d X 4.00”L

Qty 2: Shell Mill Holder 1”d X 1.75”L

Qty 2: TG Collet Chuck (150TG) 6.00”L

Qty 6: TG Collet Chuck (100TG) 3.50”L0

Qty 6: TG Collet Chuck (75TG) 3.00”L

Qty 2: TG Collet Wrench (150TG)

Qty 2: TG Collet Wrench (100TG)

Qty 2: TG Collet Wrench (75TG)

Qty 2: 40-Taper Spindle Clean equipment with cleaning blades

Qty 48: Retention Knobs (Coolant Thru)

Qty 4: 6” Kurt Vice

Qty 4: 6” Parallel Set (10 pair)

3. EMERGENCY PROCEDURES

The Contractor personnel shall follow the direction of the Government personnel with regard to emergency procedures, such as fire; tornado, active shooter, bomb threats, or other emergency. It is the responsibility of the Contractor to provide guidance and establish procedures for its employees to respond to an emergency. It is the Contractor’s responsibility to account for their employees following an emergency evacuation. The Contractor personnel shall participate with the Government personnel in all fire and tornado drills at no additional cost to the Government.

4. HEALTH & SAFETY ON GOVERNMENT INSTALLATIONS

While performing work under this contract the Contractor shall comply with all applicable federal, state and local regulations regarding occupational safety and health. During the execution of the contract, the Contractor shall notify the CO, COR, and Government Contract Administrator (CA) within one (1) business day of any damage to Government property in which the dollar value exceeds $500,000.00 and within two (2) work days, for any damage to Government property less than $500,000.00.

Mishap notifications shall contain, as a minimum, the following information:

• Contract, Contract Number, Name and Title of Person(s) Reporting

• Date, Time and exact location of accident/incident

• Brief Narrative of accident/incident (Events leading to accident/incident)

• Cause of accident/incident, if known

• Estimated cost of accident/incident (material and labor to repair/replace)

• Nomenclature of equipment and personnel involved in accident/incident

• Corrective actions (taken or proposed)

• Other pertinent information

If requested by the designated CO, the Contractor shall immediately secure the mishap scene/damaged property and impound pertinent maintenance and training records, until released by the Procuring Safety Office. Contractors will not dispose of contract data related to a mishap until notified to do so by the CO.

File details come from the government source that posted it. Updated .