Statement of Work
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Solicitation_FA8125-17-Q-0125.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STATEMENT OF WORK
(SOW)
For Vertical Machining Center
For
76 CMXG
PREPARING ORGANIZATION:
OC-ALC/OBCA
PREPARATION DATE:
22 August 2017
1. SCOPE
The Contractor shall provide all labor, tools, equipment, material, parts, quality control, transportation, and inspection manuals necessary to perform the onsite installation, setup and startup training of one (1) Vertical Machining Center in building 9001 Post E-35 for the Oklahoma City-Air Logistics Complex (OC-ALC).
The Contractor shall provide delivery, install, and 3 days of basic training with 1-5 Tinker operators. Tinker AFB will provide forklift to unload and place machine in shop location. Tinker AFB will also provide utilities within 20’ of the machine install.
2. ITEM DESCRIPTION
76 CMXG is requesting one (1) Vertical Machining Center (VMC). Vendor shall deliver, install, and train on the startup with the government point of contact.
Construction:
X, Y, Z Linear Way Construction
Table: minimum 36 inch x 14 inch
Travel Size: VMC minimum of X;30 inch x Y;20 inch x Z;20 inch
Rapid Traverse Rate: minimum of 1,400 inch per minute
Cutting Feed Rate: minimum of 833 inch per minute
Contouring Feed Rate: minimum 1,200 inches per minute
Accuracy, positioning - +/- .0002
Accuracy, repeatability - +/- .0002
Maximum spindle speed: minimum 12,000 RPM, 90 ft-lb @ 2000 rpm
Spindle Motor: 30 HP Vector Drive, Inline Direct Drive, CT Taper
Table Capacity: minimum 1,500 pounds
Tool Changer - 24-position/CAT40 Side Mount Tool Changer with double arm gripper
Tool-to-Tool (avg): 1.6s Controller:
4 axis simultaneous axis control
Graphic Dry-Run mode
Advanced pocket milling
Tool life management
USB input output interface
Pulse handle feed
Feed/speed/rapid override
1 GB program memory
Ethernet Interface
Power Failure Detection module
Rigid Tapping
55-gallon (208 liter) 360 degree flood coolant system
Electronic Thermal Compensation to compensate for the expansion and contraction of each linear axis
Additional Requirements:
Fully enclosed guarding
High Speed Machining
4th Axis Drive and Wiring
Thru Spindle Coolant: 300psi
Thru-Tool Air Blast
Coolant Tank Oil Skimmer
High Intensity LED Lighting
Enclosure Exhaust System
Automatic Coolant Filter System
Programmable Coolant Nozzle
Chip Auger
11 Button Remote Jog Handle w/ 2.8" color graphic display
Wireless Intuitive Probing: Includes o Macros o Spindle Orientation o Coordinate Rotation and Scaling
32 GB on-board solid state expanded program memory
Visual Part Programming: Conversational operating system utilizing full color graphics & templates
Power Requirements:
V/4801-3 phase 60Hz transformer Tools List:
Qty 2: Integral Keyless Drill Chuck (0-5/16”)
Qty 2: Integral Keyless Drill Chuck (3/32” – 1/2”)
Qty 2: Tension/Compression Tap Holder Coolant-thru (#0-9/16”)
Qty 2: Tension/Compression Tap Holder Coolant-thru (5/16”-7/8”)
Qty 4: 1/8”d X 1.38”L Stubby Endmill Holder
Qty 6: 1/8”d X 2.36”L Standard Endmill Holder
Qty 8: 1/4"d X 2.50”L Standard Endmill Holder
Qty 2: 3/8"d X 2.50”L Standard Endmill Holder
Qty 2: 3/8"d X 4.00”LStandard Endmill Holder
Qty 4: 1/2"d X 2.50”L Standard Endmill Holder
Qty 4: 1/2"d X 4.00”L Standard Endmill Holder
Qty 4: 5/8"d X 3.00”L Standard Endmill Holder
Qty 4: 3/4"d X 3.00”L Standard Endmill Holder
Qty 4: 1"d X 2.00”L Stubby Endmill Holder
Qty 4: 1"d X 4.00”L Standard Endmill Holder
Qty 4: 1 1/4"d X 4.00”L Standard Endmill Holder
Qty 2: Shell Mill Holder ¾”d X 1.75”L
Qty 2: Shell Mill Holder ¾”d X 4.00”L
Qty 2: Shell Mill Holder 1”d X 1.75”L
Qty 2: TG Collet Chuck (150TG) 6.00”L
Qty 6: TG Collet Chuck (100TG) 3.50”L0
Qty 6: TG Collet Chuck (75TG) 3.00”L
Qty 2: TG Collet Wrench (150TG)
Qty 2: TG Collet Wrench (100TG)
Qty 2: TG Collet Wrench (75TG)
Qty 2: 40-Taper Spindle Clean equipment with cleaning blades
Qty 48: Retention Knobs (Coolant Thru)
Qty 4: 6” Kurt Vice
Qty 4: 6” Parallel Set (10 pair)
3. EMERGENCY PROCEDURES
The Contractor personnel shall follow the direction of the Government personnel with regard to emergency procedures, such as fire; tornado, active shooter, bomb threats, or other emergency. It is the responsibility of the Contractor to provide guidance and establish procedures for its employees to respond to an emergency. It is the Contractor’s responsibility to account for their employees following an emergency evacuation. The Contractor personnel shall participate with the Government personnel in all fire and tornado drills at no additional cost to the Government.
4. HEALTH & SAFETY ON GOVERNMENT INSTALLATIONS
While performing work under this contract the Contractor shall comply with all applicable federal, state and local regulations regarding occupational safety and health. During the execution of the contract, the Contractor shall notify the CO, COR, and Government Contract Administrator (CA) within one (1) business day of any damage to Government property in which the dollar value exceeds $500,000.00 and within two (2) work days, for any damage to Government property less than $500,000.00.
Mishap notifications shall contain, as a minimum, the following information:
• Contract, Contract Number, Name and Title of Person(s) Reporting
• Date, Time and exact location of accident/incident
• Brief Narrative of accident/incident (Events leading to accident/incident)
• Cause of accident/incident, if known
• Estimated cost of accident/incident (material and labor to repair/replace)
• Nomenclature of equipment and personnel involved in accident/incident
• Corrective actions (taken or proposed)
• Other pertinent information
If requested by the designated CO, the Contractor shall immediately secure the mishap scene/damaged property and impound pertinent maintenance and training records, until released by the Procuring Safety Office. Contractors will not dispose of contract data related to a mishap until notified to do so by the CO.