Vacuum Anchor Performance Work Statement

View the file

Other files for this federal contract opportunity

Other files attached to Vacuum Anchor PM/RM, newest first.
File Type Posted
Amendment_0001.pdf PDF
FA8125-16-R-0019.pdf PDF
Appendix_B_Vacuum_Anchor_Repair_and_Certification.pdf PDF
Appendix_A_Vacuum_Anchor_Repair_and_Certification_Batteries.pdf PDF
Wage_Determination.pdf PDF
Appendix_A_Vacuum_Anchor_Repair_and_Certification.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PERFORMANCE WORKS STATEMENT

FOR

The Preventive Maintenance and Vacuum Anchor Repair and Certification Service Contract for 76 AMXG

25 MAY 2016

OC-ALC/OBCA

Tinker Air Force Base, OK

Section One

1.1 Scope: The Contractor shall provide all labor, tools, equipment, test equipment, material, parts, quality control, transportation and inspection manuals necessary to perform the Preventive Maintenance/Remedial Maintenance for the Oklahoma City–Air Logistics Complex (OC-ALC). The equipment is listed in Appendix B.

1.1.1 The Contractor shall be responsible for insuring all services, parts and Original

Equipment Manufacturer (OEM) components provided under this contract are in accordance with (IAW) the terms and conditions outlined herein, conform to the manufacturer’s equipment specifications and this PWS.

1.2 Preventive Maintenance (PM): The objective of PM is to protect the equipment capability and investment by removing causes of failure, performing routine maintenance and providing adjustment to compensate for normal wear before failure occurs. The Contractor shall perform all PM’s IAW the OEM specifications. The Contractor shall perform one (1) PM’s per year on each item listed in Appendix B. The Contractor shall perform a Test, Teardown, & Evaluation (TT&E) during the course of the PM to determine if any components are needed for repair. The Subject Matter Expert (SME) shall provide a copy of the PM schedule to the Contracting Officer Representative (COR) and the Contractor within five (5) business days after contract award. The SME shall notify the COR and the Contractor seven (7) business days prior to each scheduled PM shipment.

1.3 Equipment Evaluations: The Contractor shall provide a written Estimate Repair Report to the COR by fax or email no later than (NLT) two (2) business days after the completion of the inspection and determination that the cost will be above thirty (30) percent above the cost of recertification. As a minimum, the information cited on the Estimate Repair Report shall include:

• the equipment ID#

• date of evaluation

• description of findings and recommendations

• required parts and part numbers (P/N)

• cost of parts

• number of parts needed

• estimated labor hours required to complete the repair

Any recommendations cited shall consider:

• the priority of the requested service

• available source for obtaining new parts

• the availability of the new parts

• shipping and delivery schedules of parts

• other factors which may be peculiar to the specific repair requirement

1.4 Authorizations for Repair Actions: Authorization above and beyond the agreed upon thirty (30) percent can only be authorized by the Contracting Officer (CO). The COR will coordinate any repair actions with the Government Subject Matter Expert (SME) and the CO in order to obtain the approval to proceed. The Contractor shall ensure all repair actions have the documented CO approval, in writing, before initiating any repair or ordering parts. The Contractor shall demonstrate to the Government SME that the repairs have been completed.

1.5 Calibration: The Contractor shall provide commercial calibration and certification each

Vacuum Anchor for the Vacuum Anchor Repair and Certification Service Contract.

1.5.1 The calibration of the equipment and the associated calibration certificate must meet

International Organization for Standardization (ISO) 17025 requirements. The Contractor shall place a calibration sticker on each Vacuum Anchor after the calibration is completed.

1.5.2 Certificate of Traceability: The Contractor shall provide to the COR, a Calibration Certificate of Traceability for each Vacuum Anchor. The Calibration Certificate shall meet ISO 17025. The certificate shall include the following information as a minimum:

a. The title, e.g. “Calibration Report” or “Calibration Certificate”.

b. The name and address of the laboratory and the location of where the calibration was completed if it is different from the equipment location of Bldg. 3001, Post W- 43, OC-ALC, Tinker Air Force Base (AFB), Oklahoma (OK).

c. Unique identification of the calibration report or certificate (e.g., the serial number) on each page as an identifier to ensure the page is recognized as a part of the calibration report or certificate. Each page of the calibration report or certificate shall also be numbered, if applicable, as page one (1) of XX pages.

The end of the report or certificate shall be annotated clearly on the last page “End of the Calibration Report/Certificate”.

d. The name and address of the customer. Note: A requirement for the name and address may be waived with customer coordination/concurrence.

e. Identification of the method used to perform the calibration of the equipment.

Note: The calibration report or certificate shall identify the method used in a manner similar to the following examples: A calibration procedure number; an American Society for Testing and Materials (ASTM), International Electro-technical Commission (I EC) or other standard specification, or a narrative description of the method used (i.e. compared with laboratory standard X at 10 points (between 10% and 100% of full scale).

f. A description of the condition of the equipment and an unambiguous identification of items calibrated.

g. The date of the receipt of calibration items where this is critical to the validity and application of the results and the dates the calibration was performed.

h. Reference to the sampling plan and procedures used by the laboratory or other bodies where these are relevant to the validity or application of the results. Note:

The calibration report of certificate might not reference a sampling plan as sampling plans rarely apply to calibration; sampling plans normally are used in testing laboratories.

i. The calibration results with, where appropriate, the units of measurement. Note:

Units of measurement would be appropriate if needed by the User (calibration factors, correction factors, etc.) to operate the Test, Measurement and Diagnostic Equipment (TMDE).

j. The printed names and functions as well as the legible signatures or equivalent identification of the persons authorizing the calibration report or certificate.

k. Where relevant, a statement to the effect that the results relate only to the items calibrated.

l. The conditions (e.g., environmental) under which the calibrations were completed which may have an influence on the measurement results.

m. The uncertainty of measurement or a statement of compliance with an identified metrological specification or clauses thereof. Note: A calibration report or certificate which contains a statement of compliance to the original manufacturer’s specifications (with any exceptions or limitations noted) may satisfy this requirement.

n. Evidence that the measurements are traceable to the National Institute of Standards Technology (NIST). This evidence shall be so stated on the calibration report or certificate.

1.5.3 Completion of Calibration Services: The Contractor, upon completion of the calibration services, shall demonstrate to the COR and Government Subject Matter Expert (SME) that all aspects of the system are calibrated and are properly functioning IAW the manufacturer’s specifications, industry standards and this PWS.

1.6 Over and Above (O&A): O&A is defined as work discovered during the course of performing the repair efforts that is within the scope of the contract and necessary in order to satisfactorily complete the contract. The Contractor shall complete O&A requirements In Accordance With (IAW) Defense Federal Acquisition Regulation Supplement (DFARS) 252.217-7028. PGI 217.77.

1.7 Parts and Materials: The Contractor shall provide and use only new parts and material in performance of this PWS unless otherwise authorized by the CO.

1.8 Service Report: Immediately upon completion of the maintenance support, the

Contractor shall provide a written Service Report to the Government SME. When necessary the Government SME will forward the service report to the COR within two

(2) business days of receipt. The Contractor shall provide, by fax or email, the final service report within five (5) business days to the COR. As a minimum, the final service report shall contain the following information:

• name of the company

• requested service date

• contract number

• equipment ID#

• description of services provided

• additional services recommended (if any)

• printed name and signature of technician who performed the services

• printed name and signature of on-site Government SME or COR

• start and completion dates

• complete breakdown of the labor cost (hours and rate)

• materials and parts used

• details of any other charges

• printed name and signature stating only new parts and materials were used

• written verification statement that a performance check to verify operational condition was performed and that the equipment is in working order.

1.9 Increase of Equipment: The Government reserves the right to increase the number of the Vacuum Anchors to be serviced by 20%, through means of a modification based on the Government need during the life of the contract. The Contractor shall provide the agreed upon Vacuum Anchor PM/RM services IAW the unit prices, terms and conditions agreed upon in the Basic and Option years of the contract.

1.10 Off-Site Repair: RM of the equipment shall be completed at the location of the equipment. The Contractor shall not remove from the premises any system, sub-system or peripheral at any time in order to affect repair without the written consent of the Government.

1.10.1 The Contractor shall provide written documentation via email which supports a request to remove from the premises any system, sub-system or peripheral. Said written documentation and request shall include, as a minimum, the information listed below.

• contract number

• part number, OC #, S/N, as applicable

• description of the part, OC #, S/N, as applicable

• corresponding estimate repair report number

1.10.2 When determined necessary by the COR to ship items to the Contractor’s off-site facility for repair, the Contractor shall arrange for the scheduling, repair of the failed item and provide the appropriate shipping data to the COR. The COR will process the required shipping documents and arrange for transportation of the item to the appropriate shipping bay for packaging, shipment, and transporting to the designated off-site facilities Free on Board (FOB) destination Appendix B.

1.11 Return of Equipment: Upon completion of the approved repair, the Contractor shall conduct a performance check on the repaired equipment to verify it is restored to operational condition. The Contractor shall provide documentation that the performance check has been completed and the equipment is in working order IAW paragraph 1.8, Service Report, of this PWS. The Contractor shall return the repaired equipment to the Government within the timeframe identified on the Estimate Repair Report.

1.12 Delivery: The Contractor shall ship all repaired and non-repairable equipment by the fastest and most traceable method in order to arrive within five (5) business days after the repair completion date.

1.13 Shipping: The Contractor shall provide to the COR, the date equipment was shipped out, shipment identification information and include contract number on the shipping paper work with a Free On Board (FOB) Destination. The ship to address is listed below.

ATTN: SURVEILLANCE COR #/Contract No: _____________

OC-ALC/OBC

Bldg. 3001 Staff Dr. Door G70 Post N68 Tinker AFB, OK 73145-3052

1.14 Quality Assurance: According to the contract’s inspection clause, the Government will evaluate the Contractor’s performance under this contract. The COR will participate in the administration of this contract. Any matter concerning a change to the scope, prices, terms, or conditions of this contract shall be referred to the CO. All services to be performed by the Contractor during the period of this contract will be subject to review by the CO or COR.

1.15 Corrective Action Report (CAR)/Complaint Contractor Response Time: The

Contractor shall provide a written response within two (2) business days which addresses the root cause, corrective action, and preventive actions in relation to the submitted CAR or Customer Complaint.

1.16 Maintenance Documentation: The Contractor shall notify the Government Subject

Matter Expert (SME) upon completion of each PM/RM/Repair/or similar requirement, IAW OC-ALC Operating Instruction (OI) 21-203, Chapter 1, 2, and 3, as applicable.

1.17 Continuation of Essential Department of Defense (DoD) Contractor Services During

Crisis: This requirement has been determined not to be essential and does not require continued support during a crisis as defined in DFARS 252.237-7023.

1.18 Special Qualifications: At the time of proposal the contractor shall provide personnel with the following special qualifications: Proof that the Contractor is identified on the Qualified Distributor List from the Original Equipment Manufacturer.

1.19 Contractor Personnel: The Contractor shall provide the name of the Contract Manager

(CM) and any alternates who shall act for the Contractor when the CM is absent. They shall be designated to the CO and COR, in writing, within five (5) business days after the contract award date. The Contractor shall provide telephone numbers and email addresses where the CM and alternates may be contacted at any time. The CM or alternate shall have full authority to act for the Contractor on all matters relating to operation of this contract at the OC-ALC on Tinker Air Force Base (AFB). The Contractor shall provide a CM who can read, write, speak, and understand English fluently.

1.20 Environmental Certification: The Government will ensure the part or equipment is clean, drained and purged before it is transferred to the Contractor for repair. The Government will provide written certification of such to the Contractor prior to shipment or pick up of the part or equipment. Certification will be on letterhead with a statement which specifies the part or equipment is certified to be clean, drained and purged. In addition, as a minimum, said letter will contain description of the part or equipment, make, model, serial number, and OC number (if applicable). This certification will be provided to the COR three (3) business days prior to the pick-up or shipment of the part or equipment. The COR will, in turn, provide it to the Contractor within two (2) business days prior to the pick-up or shipment of the part or equipment.

1.20.1 The Contractor shall ensure and provide written certification that the repaired Vacuum

Anchor is cleaned to remove all hazardous contaminants, dirt, shavings, oil, or grease, and drained and purged to remove all fluids, oils and liquids before returning to Tinker AFB. Certification shall be on company letterhead with a statement which specifies the part or equipment is certified to be clean, drained and purged. In addition, as a minimum, said letter shall contain description of part or equipment, make, model, serial number, and OC number (if applicable). This certification shall be provided to the COR two (2) business days prior to the return of the part or equipment.

1.21 Environmental Training: Upon COR receipt of the “No Hazardous Waste Generation” certification, the requirements of this section no longer apply.

1.21.1 Contractor personnel performing duties in the service of this PWS shall have training that acquaints the person with the details of Resource Conservation Recovery Act (RCRA) regulations in 40 CFR 260 through 279; applicable State Laws and regulations; DoD, Air Force and local requirements. This training can be obtained through creditable training institutions or companies. All training shall be approved by 72 ABW/CEIE, Natural Infrastructure Management (Environmental Compliance). RCRA training is available at http://www.natlenvtrainers.com/RCRA-hazardous-waste.htm;

http://www.skillsoft.com/catalog/detail.asp?CourseCode=esh_sah_a34_sh_enus000000 and http://www.lion.com/Storing-Hazardous-Waste-for-LQGs at the Contractor’s expense. Prior to obtaining training, the Contractor shall provide the name of the training institution or company and course description to the COR for approval within ten (10) calendar days after contract award date. Once written approval is received from the COR, the Contractor shall provide the environmental training certificates for employees performing duties in the service of this PWS to the COR, within thirty (30) calendar days after contract award date. In addition to the required environmental training, Contractors shall be compliant with Tinker AFB procedures per TAFBI 32-7004, “Hazardous Waste Management”.

1.22 Forms, Technical Orders (T.O.), AFI, Air Force Material Command Instructions

(AFMCI), and Publications: The Contractor shall obtain the forms and publications expressly required to perform the work in this contract via the internet at www.e-publishing.af.mil. In the event a form or publication is not available online, the COR will provide the form, instruction, or publication to the Contractor upon the Contractor’s written request (e-mail is acceptable). In the event, laws, regulations, T.O.’s, AFI’s, or http://www.skillsoft.com/catalog/detail.asp?CourseCode=esh_sah_a34_sh_enus000000 http://www.e-publishing.af.mil/ http://www.e-publishing.af.mil/

AFMCI’s change during the term of this contract, the Contractor shall be required to comply as the changes come into effect. Contractors delivering or handling official United States Air Force (USAF) records shall comply with the applicable records management regulations in AFI 33-322, Chapter 3, in its entirety.

1.23 Safety and Health off Government Installations: While performing work under this contract the Contractor shall comply with all applicable federal, state and local regulations regarding occupational safety and health. During the execution of the contract, the Contractor shall notify the CO, COR, and Government Contract Administrator (CA) within one (1) business day of any damage to Government property in which the dollar value exceeds $500,000.00 and within two (2) work days, for any damage to Government property less than $500,000.00.

Mishap notifications shall contain, as a minimum, the following information:

• Contract, Contract Number, Name and Title of Person(s) Reporting

• Date, Time and exact location of accident/incident

• Brief Narrative of accident/incident (Events leading to accident/incident)

• Cause of accident/incident, if known

• Estimated cost of accident/incident (material and labor to repair/replace)

• Nomenclature of equipment and personnel involved in accident/incident

• Corrective actions (taken or proposed)

• Other pertinent information

If requested by the designated CO, the Contractor shall immediately secure the mishap scene/damaged property and impound pertinent maintenance and training records, until released by the Procuring Safety Office. Contractors will not dispose of contract data related to a mishap until notified to do so by the CO.

1.24 Contractor Manpower Reporting (CMR): The Contractor shall report ALL contractor labor hours, to include sub-contractor labor hours, required for the performance of the services provided under this contract via a secure data collection site. The Contractor is required to completely fill in all required data fields at the website http://www.ecmra.mil.

The Contractor shall report all labor hours executed during the Period of Performance (PoP) for each Government Fiscal Year (FY) which runs from 1 October through 30 September the following year. Although the labor hours executed may be completed any time during the FY, all data shall be completed no later than (NLT) 31 October of each calendar year. Contractors may direct questions to the CMR help desk email listed at http://www.ecmra.mil.

Section Two

Performance Assessment http://www.ecmra.mil/ http://www.ecmra.mil/

The Contractor shall be aware that in the absence of any contract requirement from the Service Summary (SS) does not detract from its enforceability nor limit the rights or remedies of the Government under any other provision of the contract. The Contractor shall ensure the following SS requirements are accomplished:

Service Summary (SS) Table 2-1

SS PERFORMANCE OBJECTIVE PWS

PARA.

PERFORMANCE

THRESHOLD

SS 1

Preventive Maintenance (PM): The objective of PM is to protect the equipment capability and investment by removing causes of failure, performing routine maintenance and providing adjustment to compensate for normal wear before failure occurs. The Contractor shall perform all PM’s IAW the OEM specifications. The Contractor shall perform one (1) PM’s per year on each item listed in Appendix B. The Contractor shall perform a Test, Teardown, & Evaluation (TT&E) during the course of the PM to determine if any components are needed for repair. The Subject Matter Expert (SME) shall provide a copy of the PM schedule to the Contracting Officer Representative (COR) and the Contractor within five (5) business days after contract award. The SME shall notify the COR and the Contractor seven

(7) business days prior to each scheduled PM shipment.

1.2 100% Compliance

SS 2

Equipment Evaluations: The Contractor shall provide a written Estimate Repair Report to the COR by fax or email no later than (NLT) two (2) business days after the completion of the inspection and determination that the cost will be above thirty (30) percent above the cost of recertification. As a minimum, the information cited on the Estimate Repair Report shall include:

• the equipment ID#

• date of evaluation

• description of findings and recommendations

• required parts and part numbers (P/N)

• cost of parts

• number of parts needed

• estimated labor hours required to complete

1.3 100% Compliance

PARA.

PERFORMANCE

THRESHOLD

the repair

Any recommendations cited shall consider:

• the priority of the requested service

• available source for obtaining new parts

• the availability of the new parts

• shipping and delivery schedules of parts

• other factors which may be peculiar to the specific repair requirement

SS 3

Authorizations for Repair Actions:

Authorization above and beyond the agreed upon thirty (30) percent can only be authorized by the Contracting Officer (CO). The COR will coordinate any repair actions with the Government Subject Matter Expert (SME) and the CO in order to obtain the approval to proceed. The Contractor shall ensure all repair actions have the documented CO approval, in writing, before initiating any repair or ordering parts. The Contractor shall demonstrate to the Government SME that the repairs have been completed.

1.4 100% Compliance

SS 4

Calibration: The Contractor shall provide commercial calibration and certification each Vacuum Anchor for the Vacuum Anchor Repair and Certification Service Contract.

1.5 100% Compliance

SS 5

Certificate of Traceability: The Contractor shall provide to the COR, a Calibration Certificate of Traceability for each Vacuum Anchor. The Calibration Certificate shall meet ISO 17025. The certificate shall include the following information as a minimum:

a. The title, e.g. “Calibration Report” or “Calibration Certificate”.

b. The name and address of the laboratory and the location of where the calibration was completed if it is different from the equipment location of Bldg. 3001, Post W- 43, OC-ALC, Tinker Air Force Base (AFB), Oklahoma (OK).

c. Unique identification of the calibration report or certificate (e.g., the serial number) on each page as an identifier to ensure the page is recognized as a part of the calibration report or certificate. Each page of the

1.5.2 100% Compliance

PERFORMANCE

THRESHOLD

calibration report or certificate shall also be numbered, if applicable, as page one (1) of XX pages. The end of the report or certificate shall be annotated clearly on the last page “End of the Calibration Report/Certificate”.

d. The name and address of the customer. Note: A requirement for the name and address may be waived with customer coordination/concurrence.

e. Identification of the method used to perform the calibration of the equipment. Note: The calibration report or certificate shall identify the method used in a manner similar to the following examples: A calibration procedure number; an American Society for Testing and Materials (ASTM), International Electro-technical Commission (I EC) or other standard specification, or a narrative description of the method used (i.e. compared with laboratory standard X at 10 points (between 10% and 100% of full scale).

f. A description of the condition of the equipment and an unambiguous identification of items calibrated.

g. The date of the receipt of calibration items where this is critical to the validity and application of the results and the dates the calibration was performed.

h. Reference to the sampling plan and procedures used by the laboratory or other bodies where these are relevant to the validity or application of the results. Note: The calibration report of certificate might not reference a sampling plan as sampling plans rarely apply to calibration; sampling plans normally are used in testing laboratories.

i. The calibration results with, where appropriate, the units of measurement. Note: Units of measurement would be appropriate if needed by the User (calibration factors, correction factors, etc.) to operate the Test, Measurement and Diagnostic Equipment (TMDE).

j. The printed names and functions as well as the legible signatures or equivalent identification of the persons authorizing the calibration report or certificate.

k. Where relevant, a statement to the effect that the results relate only to the items calibrated.

l. The conditions (e.g., environmental) under which the calibrations were completed which may have an influence on the measurement results.

m. The uncertainty of measurement or a statement of compliance with an identified metrological specification or cl1.1.3auses thereof. Note: A calibration report or certificate which contains a statement of compliance to the original manufacturer’s specifications (with any exceptions or limitations noted) may satisfy this requirement.

n. Evidence that the measurements are traceable to the National Institute of Standards Technology (NIST).

This evidence shall be so stated on the calibration report or certificate.

SS 6 Completion of Calibration Services: The Contractor, upon completion of the calibration 1.5.3 100% Compliance

PERFORMANCE

THRESHOLD

services, shall demonstrate to the COR and Government Subject Matter Expert (SME) that all aspects of the system are calibrated and are properly functioning IAW the manufacturer’s specifications, industry standards and this PWS.

SS 7

Service Report: Immediately upon completion of the maintenance support, the Contractor shall provide a written Service Report to the Government SME. When necessary the Government SME will forward the service report to the COR within two

(2) business days of receipt. The Contractor shall provide, by fax or email, the final service report within five (5) business days to the COR. As a minimum, the final service report shall contain the following information:

• name of the company

• requested service date

• contract number

• equipment ID#

• description of services provided

• additional services recommended (if any)

• printed name and signature of technician who performed the services

• printed name and signature of on-site Government SME or COR

• start and completion dates

• complete breakdown of the labor cost (hours and rate)

• materials and parts used

• details of any other charges

• printed name and signature stating only new parts and materials were used

• written verification statement that a performance check to verify operational condition was performed and that the equipment is in working order.

1.8 100% Compliance

SS 8 Off-Site Repair: RM of the equipment shall be 1.10 100% Compliance

PERFORMANCE

THRESHOLD

completed at the location of the equipment. The Contractor shall not remove from the premises any system, sub-system or peripheral at any time in order to affect repair without the written consent of the Government.

SS 9

The Contractor shall provide written documentation via email which supports a request to remove from the premises any system, sub-system or peripheral.

Said written documentation and request shall include, as a minimum, the information listed below.

• contract number

• part number, OC #, S/N, as applicable

• description of the part, OC #, S/N, as applicable

• corresponding estimate repair report number

1.10.1 100% Compliance

SS 10

Return of Equipment: Upon completion of the approved repair, the Contractor shall conduct a performance check on the repaired equipment to verify it is restored to operational condition. The Contractor shall provide documentation that the performance check has been completed and the equipment is in working order IAW paragraph 1.8, Service Report, of this PWS. The Contractor shall return the repaired equipment to the Government within the timeframe identified on the Estimate Repair Report.

1.11 100% Compliance

SS 11

Delivery: The Contractor shall ship all repaired and non-repairable equipment by the fastest and most traceable method in order to arrive within five (5) business days after the repair completion date.

1.12 100% Compliance

SS 12

Shipping: The Contractor shall provide to the COR, the date equipment was shipped out, shipment identification information and include contract number on the shipping paper work with a Free On Board (FOB) Destination. The ship to address is listed below.

1.13 100% Compliance

PERFORMANCE

THRESHOLD

ATTN: SURVEILLANCE COR #/Contract No:

OC-ALC/OBC

Bldg. 3001 Staff Dr. Door G70 Post N68 Tinker AFB, OK 73145-3052

SS 13

Corrective Action Report (CAR)/Complaint Contractor Response Time: The Contractor shall provide a written response within two (2) business days which addresses the root cause, corrective action, and preventive actions in relation to the submitted CAR or Customer Complaint.

1.15 100% Compliance

SS 14

Maintenance Documentation: The Contractor shall notify the Government Subject Matter Expert (SME) upon completion of each PM/RM/Repair/or similar requirement, IAW OC-ALC Operating Instruction (OI) 21-203, Chapter 1, 2, and 3, as applicable.

1.16 100% Compliance

SS 15

Contractor Personnel: The Contractor shall provide the name of the Contract Manager (CM) and any alternates who shall act for the Contractor when the CM is absent. They shall be designated to the CO and COR, in writing, within five (5) business days after the contract award date. The Contractor shall provide telephone numbers and email addresses where the CM and alternates may be contacted at any time. The CM or alternate shall have full authority to act for the Contractor on all matters relating to operation of this contract at the OC-ALC on Tinker Air Force Base (AFB). The Contractor shall provide a CM who can read, write, speak, and understand English fluently.

1.19 100% Compliance

SS 16

The Contractor shall ensure and provide written certification that the repaired Vacuum Anchor is cleaned to remove all hazardous contaminants, dirt, shavings, oil, or grease, and drained and purged to remove all fluids, oils and liquids before returning to Tinker AFB. Certification shall be on company letterhead with a statement which specifies the part or equipment is certified to be clean, drained and purged. In addition, as a minimum, said letter shall contain description of part or equipment, make, model, serial number, and OC number (if applicable). This certification shall be provided to

1.20.1 100% Compliance

PERFORMANCE

THRESHOLD

the COR two (2) business days prior to the return of the part or equipment.

Section Three

Government Furnished Property (GFP) And Services

3.1. Government Furnished Property.

3.1.1. Government Property Repair/Maintenance On-Base. Not Applicable

3.1.2. GFP Exceeds $150,000 - Repair/Maintenance Off-Base. In Accordance With (IAW) FAR Part 45 Rewrite June 2007 – FAR 45.107(d), the Government Property Clause(s) are applicable when the GFP requires repair/maintenance off-base and the cumulative acquisition cost of all the GFP going off-base exceeds the Simplified Acquisition Threshold (SAT) $150,000. The Contractor shall ensure all GFP is secured at the close of each workday. The Government retains title to all GFP, until the Government properly disposes of the GFP as authorized by law or regulation. This GFP shall not be used for the performance of any other contract. The applicable Government Property clauses will be cited in the solicitation/contract.

The GFP is identified in Attachment #_ Appendix B.

3.1.2.1. Shipment to Contractor or Pick up by Contractor. In Accordance With PWS Section 1.

3.1.2.2. Delivery to Government. In Accordance With PWS Section 1.

3.1.2.3. Loss of Government Property. IAW the Government Property contract clauses.

3.1.2.4. GFP Identification Labels. When applicable, the Contractor shall clearly label (without damaging) GFP to distinguish it from Contractor Furnished Property IAW with the contract terms and conditions and this PWS.

3.1.3. GFP Not Exceed $150,000 - Repair/Maintenance Off-Base. Not Applicable

3.2. Shared Property of the Government. Not Applicable

3.3. Government Furnished Services (GFS). Not Applicable

3.4. Intangible Government Property. Not Applicable

3.5. Contractor Acquired Property (CAP), Time & Material (T&M) or Fabrication. Not Applicable.

OC-ALC/OBCA
Tinker Air Force Base, OK
3.1.2. GFP Exceeds $150,000 - Repair/Maintenance Off-Base. In Accordance With (IAW) FAR Part 45 Rewrite June 2007 – FAR 45.107(d), the Government Property Clause(s) are applicable when the GFP requires repair/maintenance off-base and the cumulative ac...
3.1.3. GFP Not Exceed $150,000 - Repair/Maintenance Off-Base. Not Applicable
3.2. Shared Property of the Government. Not Applicable
3.3. Government Furnished Services (GFS). Not Applicable
3.5. Contractor Acquired Property (CAP), Time & Material (T&M) or Fabrication. Not Applicable.