PWSAmerex150lbHalonFireExt.docx
DOCX document 69 KB Posted
- Attached to
- 150 lB AMEREX HALON BOTTLES Federal contract opportunity
- Solicitation number
- FA8125-16-Q-0048
About this file
PWS
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Halon_Bottles_solicitation.doc | DOC document | |
| SGFPAtch1AppendixB-Amerex150lbHalonFireExt-033016.pdf | ||
| new_wage_determination.txt | TXT text file |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PERFORMANCE WORK STATEMENT
FOR REFURBISHMENT
OF THE
AMEREX 150 lb. WHEELED HALON FIRE BOTTLES
31 MAR 2016
PREPARED BY:
OC-ALC/OBCA
Section One
1.1 Scope: The Contractor shall provide all labor, tools, equipment, test equipment, material, parts, quality control, transportation and inspection manuals necessary to perform the one time refurbishment service of Amerex 150lb Wheeled Halon Bottle Fire Extinguishers for the Oklahoma City–Air Logistics Complex (OC-ALC). The equipment is listed in Attachment #1, Appendix B (Off-Base).
1.1.1 The Contractor shall be responsible for insuring all services, parts and Original Equipment Manufacturer (OEM) components provided under this contract are in accordance with (IAW) the terms and conditions outlined herein, conform to the manufacturer’s equipment specifications and this PWS.
1.2 Known Problems: 76 AMXG has ninety (90) Amerex 150lb Wheeled Halon Bottle Fire Extinguishers that have been deemed high risk failures or no longer serviceable by the annual inspectors. These units need immediate full refurbishment due to missing paint and surface rusting.
1.3 Requested Services: The Contractor shall refurbish ninety (90) Amerex 150lb Wheeled Halon Bottle Fire Extinguishers. Refurbishment services requires pick-up and delivery and reconditioning, valve overhaul, bead/sand blasting and repainting, new labels, hydrostatic testing of the cylinder and hose, and two (2) new solid rubber tires each. The refurbishment of flight line extinguishers shall be accomplished IAW Department of Transportation, Compressed Gas Association, Manufacturer and Technical Order requirements.
1.3.1 The Contracting Officer Representative (COR) shall be verify that the Amerex 150lb Wheeled Halon Bottle Fire Extinguishers are released to the contractor’s possession without the units containing any Halon.
1.3.2 Upon return of the Amerex 150lb Wheeled Halon Bottle Fire Extinguishers, the COR and contractor will confirm that the extinguishers are returned to Tinker Air Force Base empty.
1.4 Halon Management: The contractor may neither provide halon from its own stocks nor may the contractor purchase halon to charge Air Force fire extinguishers.
1.4.1 The contractor must return to the Government all unused or excess halon. The contractor will not dispose of – or otherwise transfer– any U.S. government-owned halon. The installation – not the contractor – will be responsible for returning all halon to the Air Force Defense Reserve stockpile.
1.5 Six Year Complete Maintenance: . Every six years extinguishers shall be emptied and subjected to applicable complete maintenance procedures. When the applicable maintenance procedures are performed during periodic recharging or hydrostatic testing, the six year requirement shall begin from that date. The 6-Year Complete Maintenance must be performed in accordance with TO 13F4-4-101 (Kidde models) and TO 13F4-4-121 (Amerex Models).
1.5.1 Extinguishers requiring 6-year Complete Maintenance shall be emptied. The Halon 1211 shall be captured using a Defender 2000 closed recovery system (GFM) and re-used. Note: Halon 1211 will be procured using Department of Defense (DoD) processes established in AFI 32-7086. No Halon 1211 will be obtained from commercial sources under this purchase order.
1.5.1.1 All extinguishers subjected to Six-Year Complete Maintenance shall be weighed to ensure the unit has been properly recharged. The re-service weight shall be within gross weight limits identified in the applicable TO.
1.6 Parts and Materials: The Contractor shall provide and use only new parts and material in performance of this PWS unless otherwise authorized by the CO.
1.7 Service Report: The Service Report shall accompany the invoice and will itemize all services that the contractor performed. This report shall be a columnar report, in a comma-delimited text file, electronic spreadsheet file, or other computer-readable electronic format, listing the following data for each extinguisher serviced during the reporting/invoice period.
· Date
· Tracking number or serial number of the extinguisher (from inventory record)
· Type of Service (e.g. initial fill, annual service maintenance, six-year complete maintenance, hydrostatic testing, corrective maintenance/recharging, refurbishment, transfer to government, and salvage preparation)
1.8 Off-Site Repair: The Contractor shall provide written documentation via email which supports a request and schedule to remove from the premises any system, sub-system or peripheral. Said written documentation and request shall include, as a minimum, the information listed below.
· contract number
· part number, OC #, S/N, as applicable
· description of the part, OC #, S/N, as applicable
· corresponding estimate repair report number
· scheduled pick-up date
1.8.1 The Contractor will coordinate with the COR a pick-up schedule forty-eight (48) hours prior to arriving at Tinker Air Force Base
1.8.2 When determined necessary by the COR to transport items to the Contractor’s off-site facility for repair, the Contractor shall arrange for the scheduling, refurbishment of the failed item, and provide the appropriate transportation data to the COR. The COR will process the required transportation documents and arrange for transportation of the item from the to the appropriate holding location for packaging and transporting to the designated off-site facilities by contractor provided transportation Attachment #1, Appendix B.
1.8.3 The Contractor shall load units onto the contractor provided transportation when taking the Fire Extinguishers off base for repair.
1.9 Return of Equipment: Upon completion of the approved repair, the Contractor shall conduct a performance check on the repaired equipment to verify it is restored to operational condition. The Contractor shall provide documentation that the performance check has been completed and the equipment is in working order IAW 1.7, Service Report, of this PWS. The Contractor shall return the repaired equipment to the Government within the timeframe identified on the Estimate Repair Report.
1.10 Delivery: The Contractor shall transport all serviced quipment by the fastest and most traceable method in order to arrive within five (5) business days after the repair completion date.
1.10.1 The Contractor will coordinate with the COR a delivery schedule forty-eight (48) hours prior to arriving at Tinker Air Force Base
1.10.2 The Contractor shall unload the refurbished units upon return of equipment to Tinker Air Force Base.
1.11 Transport Documentation: The Contractor shall provide to the COR, the date equipment was placed in transit, transportation identification information and include contract number on the transit paper work with a Free On Board (FOB) Destination. The delivery to address is listed below.
ATTN: SURVEILLANCE COR #/Contract No: _____________
OC-ALC/OBC
Bldg. 2121 Holding Area Tinker AFB, OK 73145-3052
1.12 Quality Assurance: According to the contract’s inspection clause, the Government will evaluate the Contractor’s performance under this contract. The COR will participate in the administration of this contract. Any matter concerning a change to the scope, prices, terms, or conditions of this contract shall be referred to the CO. All services to be performed by the Contractor during the period of this contract will be subject to review by the CO or COR.
1.13 Corrective Action Report (CAR)/Complaint Contractor Response Time: The Contractor shall provide a written response within two (2) business days which addresses the root cause, corrective action, and preventive actions in relation to the submitted CAR or Customer Complaint.
1.14 Maintenance Documentation: The Contractor shall notify the Government Subject Matter Expert (SME) upon completion of each PM/RM/Repair/or similar requirement, IAW OC-ALC Operating Instruction (OI) 21-203, Chapter 1, 2, and 3, as applicable.
1.15 Continuation of Essential Department of Defense (DoD) Contractor Services During Crisis: This requirement has been determined not to be essential and does not require continued support during a crisis as defined in DFARS 252.237-7023.
1.16 Hours of Operation: The Contractor shall perform the work required under this contract during the following days and hours: Monday through Friday, 8:00am-3:45pm. If work hours are required outside the hours stated, the Contractor shall contact the COR for approval from the CO. Upon approval from the CO, the Government Subject Matter Expert (SME) or COR must be present with the Contractor.
1.16.1 These dates and hours exclude Federal Holidays, base closures due to inclement weather, and furlough days, as applicable.
1.17 Special Qualifications: The Contractor shall provide personnel with the following special qualifications: Authorized Amerex Dealer
1.18 Contractor Personnel: The Contractor shall provide the name of the Contract Manager (CM) and any alternates who shall act for the Contractor when the CM is absent. They shall be designated to the CO and COR, in writing, within five (5) business days after the contract award date. The Contractor shall provide telephone numbers and email addresses where the CM and alternates may be contacted at any time. The CM or alternate shall have full authority to act for the Contractor on all matters relating to operation of this contract at the OC-ALC on Tinker Air Force Base (AFB). The Contractor shall provide a CM who can read, write, speak, and understand English fluently.
1.19 Environmental Certification: The Government will ensure the part or equipment is cleaned, drained and purged before it is transferred to the Contractor for repair. The Government will provide written certification of such to the Contractor prior to shipment or pick up of the part or equipment. The written certification will be printed on organization letterhead and include a statement which specifies the part or equipment is certified to be cleaned, drained and purged. In addition, as a minimum, said letter will contain the description of the part or equipment, make, model, serial number, and OC number, if applicable. This certification will be provided to the COR three (3) business days prior to the pick-up or shipment of the part or equipment. The COR will, in turn, provide it to the Contractor no later than (NLT) two (2) business days prior to the pick-up or shipment of the part or equipment.
1.19.1 The Contractor shall ensure and provide written certification that the repaired Fire Extingushers are cleaned to remove all hazardous contaminants, dirt, shavings, oil, or grease, and drained and purged to remove all fluids, oils and liquids before returning to Tinker AFB. Certification shall be on company letterhead with a statement which specifies the part or equipment is certified to be clean, drained and purged. In addition, as a minimum, said letter shall contain description of part or equipment, make, model, serial number, and OC number (if applicable). This certification shall be provided to the GPOC two (2) business days prior to the return of the part or equipment.
1.20 Forms, Technical Orders (T.O.), AFI, Air Force Material Command Instructions (AFMCI), and Publications: The Contractor shall obtain the forms and publications expressly required to perform the work in this contract via the internet at www.e-publishing.af.mil. In the event a form or publication is not available online, the COR will provide the form, instruction, or publication to the Contractor upon the Contractor’s written request (e-mail is acceptable). In the event, laws, regulations, T.O.’s, AFI’s, or AFMCI’s change during the term of this contract, the Contractor shall be required to comply as the changes come into effect. Contractors delivering or handling official United States Air Force (USAF) records shall comply with the applicable records management regulations in AFI 33-322, Chapter 3, in its entirety.
1.21 Privately Owned Motor Vehicles (POV): Contractor personnel shall comply with the directives pertaining to operation of POVs on Tinker AFB per AFMAN 31-116, in its entirety, “Motor Vehicle Traffic Supervision”. The Contractor shall comply with Tinker AFBI 24-302, in its entirety for the operation of POVs within Tinker AFB.
1.22 Visitors Pass: The Contractor shall contact the COR seven (7) business days before arriving on Tinker AFB in order to make arrangements for Visitors Passes. The COR will assign a sponsor for the Contractor from within the organization. The Contractor and the sponsor shall arrange to meet at Pass and Registration, Building 6611 at the Tinker Gate which is South of I-40 off of Air Depot. The Contractor shall provide two (2) forms of identification, one of which shall be a picture ID, to the 72 SFS. The 72 SFS will provide an AF Form 75, Visitors Pass, which will be valid for up to thirty (30) calendar days.
1.23 Foreign Nationals: The Contractor shall notify the COR before sending a Foreign National representative to perform services. Special rules apply for foreign nationals visiting a US Government facility.
1.24 Safety and Health on Government Installations: While performing work under this contract the Contractor shall comply with all applicable federal, state, and local and the specific Air Force regulations (as applicable) regarding occupational safety and health addressed in the PWS. During the execution of the contract the Contractor shall notify the CO, COR, and Government Contract Administrator (CA) within one (1) business day of any damage to Government property where the dollar value exceeds $500,000.00 and within two (2) work days, for any damage to Government property less than $500,000.00. The Contractor shall notify the (CO) within one (1) business day of any injury to contract personnel which occurs while on a Government installation.
Mishap notifications shall contain, as a minimum, the following information:
· Contract, Contract Number, Name and Title of Person(s) Reporting
· Date, Time and exact location of accident/incident
· Brief Narrative of accident/incident (Events leading to accident/incident)
· Cause of accident/incident, if known
· Estimated cost of accident/incident (material and labor to repair/replace)
· Nomenclature of equipment and personnel involved in accident/incident
· Corrective actions (taken or proposed)
· Other pertinent information
1.24.1 If requested by the designated CO, the Contractor shall immediately secure the mishap scene/damaged property and impound pertinent maintenance and training records, until released by the Procuring Safety Office. Contractors will not dispose of contract data related to a mishap until notified to do so by the CO.
1.24.2 Applicable Regulations and Air Force Instructions:
29 CFR 1910 OSHA Standards for General Industry AFI 91-203 Air Force Consolidated Occupational Safety Instruction AFI 91-207 THE US AIR FORCE TRAFFIC SAFETY PROGRAM 12 Sep 2013
AFI 31-218 AIR FORCE MOTOR VEHICLE TRAFFIC SUPERVISION
1.24.3 While on a government installation the Contractor shall be required to follow applicable installation traffic safety regulations and any applicable safety requirements required by the work center supervisor as it pertains to execution of the contract while in the work center; these may include but are not limited to general personal protective equipment such as safety glasses, hearing protection, and hard hats. The Contractor shall comply with base/shop emergency procedures for fire, tornado etc.
1.25 Emergency Procedures: The Contractor personnel shall follow the direction of the Government personnel with regard to emergency procedures, such as fire, tornado, active shooter, bomb threats, or other emergency. It is the responsibility of the Contractor to provide guidance and to establish procedures for its employees to respond to an emergency. It is the Contractor’s responsibility to account for their employees following an emergency evacuation. The Contractor personnel shall participate with the Government personnel in all fire and tornado drills at no additional cost to the Government.
1.26 Training – General: The Government COR will provide training via slides, video, or classroom prior to the Contractor performing work at the OC-ALC. The Government will be responsible for all approved costs associated with the training identified below. The COR will document training on and maintain copies of the completed AF IMT 1151, Training Attendance and Rating, as part of the contract surveillance file. For purposes of identification and compliance with Personally Identifiable Information (PII) requirements, only the last four (4) of the contractor employee’s Social Security Number (SSN) will be input on the form.
1.26.1 The Contractor shall contact the COR prior to work being performed in order to accomplish the required training or to verify the required training as listed below has been completed:
| Contractor Required Courses |
| Course Number |
| FOD and DOP Awareness Training Course Initial |
| CHPMAS0000400SU |
| AFMC FOD and DOP Awareness Training Refresher |
| CHPMAS0001301CB |
| Initial Fire Safety and Prevention Training |
| CTESAF0000100SU |
| OC-ALC Environmental Accountability/Solid Waste Training, CBT |
| MTEMAS9713800BR |
| Environmental Management Systems (EMS) - General Awareness Training |
| MTEENV9733070BR |
| Lockout/Tagout Course for Others, CBT |
| CTEMAS0003002CB |
Section Two
Performance Assessment Reserved
Section Three
Government Furnished Property (GFP) And Services
3.1. Government Furnished Property.
3.1.1 Government Property Repair/Maintenance On-Base.
Not Applicable.
3.1.2. GFP Exceeds $150,000 – Repair/Maintenance Off-Base.
In Accordance With (IAW) FAR Part 45 Rewrite June 2007 – FAR 45.107(d), the Government Property Clause(s) are applicable when the GFP requires repair/maintenance off-base and the cumulative acquisition cost of all the GFP going off-base exceeds the Simplified Acquisition Threshold (SAT) $150,000. The Contractor shall ensure all GFP is secured at the close of each workday. The Government retains title to all GFP, until the Government properly disposes of the GFP as authorized by law or regulation. This GFP shall not be used for the performance of any other contract. The applicable Government Property clauses will be cited in the solicitation/contract. The GFP is identified in the Scheduled Government Furnished Property (SGFP) Attachment #1, Appendix B.
3.1.2.1. Shipment to Contractor or Pick up by Contractor. In Accordance With PWS Section 1.
3.1.2.2. Return Shipment or Delivery to Government. In Accordance With PWS Section 1.
3.1.2.3. Loss of Government Property. IAW the Government Property contract clauses.
3.1.2.4. GFP Identification Labels. When applicable, the Contractor shall clearly label (without damaging) GFP to distinguish it from Contractor Furnished Property IAW with the contract terms and conditions and this PWS.
3.1.3. GFP Not Exceed $150,000 – Repair/Maintenance Off-Base. Not Applicable.
3.2. Shared Property of the Government. Not Applicable
3.3. Government Furnished Services (GFS) are applicable during the performance of this contract. The Government will furnish the following services at Tinker AFB (TAFB), OK:
3.3.1. Security Forces. The Government will provide general on-base security forces’ service. The security forces’ telephone numbers are 911 for emergencies, 405-734-2000 for crimes in progress and 405-734-3737 for non-emergency calls. The off-base 911 center receives 911 cell phone calls. Cell phone callers need to advise the 911 off-base center they are on TAFB in order to be connected with the on-base 911 center.
3.3.2. Fire Emergency and Routine Services. The Government will provide general on-base fire protection services. The Contractor shall comply with fire prevention rules and regulations enforced by the TAFB Fire Prevention Branch. Call 911 for emergencies. For routine fire prevention matters call 405-734-3981 or 405-734-3982 and 405-734-7964 for after hours and weekends. For routine calls to dispatch call 405-734-7964.
3.4. Intangible Government Property. Not Applicable
3.5. Contractor Acquired Property (CAP), Time & Material (T&M), and Cost Contract Line Items (Including Fabrication). Not Applicable.
File details come from the government source that posted it. Updated .