Performance_Work_Statement.pdf
PDF 241 KB Posted
- Attached to
- Metrohm Ion Chromatograph Service Federal contract opportunity
- Solicitation number
- FA8125-16-Q-0029
About this file
Performance Work Statement
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Combined_Synopsis_and_Solicitation_FA8125-16-Q-0029.pdf | ||
| Appendix_A.pdf | ||
| APPENDIX_C.pdf | ||
| Wage_Determination_Rev_21.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PERFORMANCE WORK STATEMENT
FOR
ANNUAL PREVENTIVE MAINTENANCE
AND
OVER AND ABOVE
FOR
METROHM ION CHROMATOGRAPH
AFMC OC-ALC/OBCA
January 27, 2016
PWS-Ion Chromatograph-01/27/2016
1. DESCRIPTION OF SERVICES
1.1. Scope.
1.1.1. The Contractor shall provide all labor, tools, equipment, test equipment, materi-al, quality control, transportation, inspection manuals necessary to perform one (1) an-nual Preventive Maintenance (PM) on the Metrohm Ion Chromatograph on-base for the Oklahoma City-Air Logistics Complex (OC-ALC). The Contractor shall also provide Per-sonal Protective Equipment (PPE) and clothing, to include reflective clothing (belt, vest, etc); hearing and eye protection, to include prescription safety glasses; safety harness-es; fall protection equipment: lifting equipment and any incidentals necessary to perform the requirements of this Performance Work Statement (PWS). The equipment is listed in Appendix A for (On-Base) as applicable.
1.1.2. The contractor shall be responsible for ensuring all services and Original Equip-ment Manufacturer (OEM) provided under this contract are in accordance with (IAW) the terms and conditions outlined herein and conform to the manufacture’s equipment specifications and this PWS.
1.2. Preventive Maintenance (PM).
1.2.1. The objective of PM is to protect the equipment capability and investment by re-moving causes of failure, performing routine maintenance and providing adjustment to compensate for normal wear before failure occurs. The Contractor shall perform all PMs IAW the OEM specifications. The Contractor shall perform one (1) PM per year on each item listed in Appendix A. The Contractor shall provide a copy of the PM schedule to the Government Point of Contact (POC) within five (5) business days after contract award. The Contractor shall notify the Government POC, seven (7) business days prior to the scheduled PM visit.
1.3. Over and Above (O&A).
1.3.1. O&A is defined as work discovered during the course of performing the repair efforts that is within the scope of the contract and necessary in order to satisfactorily complete the contract. The Contractor shall complete O&A requirements In Accordance With (IAW) Defense Federal Acquisition Regulation Supplement (DFARS) 252.217-
7028. PGI 217.77.
1.4. Malfunction and Notification Process.
1.4.1. Upon occurrence of an equipment or system malfunction, the Government POC will contact the Contractor by telephone, email, or fax and provide the information be-low. If the Government POC notifies the Contractor via telephone, the Government POC will provide a written copy of the request by email or fax.
The equipment identification ID # a brief description of the malfunction location of equipment name and telephone number of the Government POC
1.4.1.1. Upon notification of the system malfunction, the technician shall arrive on site at the equipment location within three (3) business days or if overseas six (6) business days.
1.4.2. Equipment Evaluations.
The Contractor shall provide a written Estimate Repair Report to the Government POC by fax or email no later than (NLT) one (1) business day after the completion of the in-spection. As a minimum, the information cited on the Estimate Repair Report shall in-clude:
the equipment ID# date of evaluation description of findings and recommendations required parts and part numbers (P/N) cost of parts number of parts needed estimated labor hours required to complete the repair
Any recommendations cited shall consider:
the priority of the requested service available source for obtaining new parts the availability of the new parts shipping and delivery schedules of parts other factors which may be peculiar to the specific repair requirement
1.5. Parts and Materials.
1.5.1. The Contractor shall provide and use only new parts and material in performance of this PWS unless otherwise authorized by the CO.
1.6. Service Report.
1.6.1. Immediately upon completion of the maintenance support services and before leaving the OC-ALC, the Contractor shall provide a written Service Report to the Gov-ernment Subject Matter Expert (SME). When necessary the Government SME will for-ward the service report to the Government POC within two (2) business days of receipt.
The Contractor shall provide, by fax or email, the final service report within five (5) busi-ness days to the Government POC. As a minimum, the final service report shall contain the following information:
name of the company requested service date contract number equipment ID# description of services provided additional services recommended (if any) printed name and signature of technician who performed the services printed name and signature of on-site Government SME or Government POC start and completion dates complete breakdown of the labor cost (hours and rate) materials and parts used details of any other charges printed name and signature stating only new parts and materials were used written verification statement that a performance check to verify operational con-dition was performed and that the equipment is in working order.
1.7. Contractor Performance.
1.7.1. According to the contract’s inspection clause, the Government will evaluate the Contractor’s performance under this contract. The Government POC will participate in the administration of this contract. Any matter concerning a change to scope, prices, terms or conditions of this contract shall be referred to the CO. All services that have been performed by the Contractor during the period of this contract will be subject to re-view by the Contracting Officer or Government POC.
1.8. Corrective Action Report (CAR)/Complaint Contractor Response Time.
1.8.1. The Contractor shall provide a written response within two (2) business days which addresses the root cause, corrective action and preventive action(s) in relation to the submitted CAR or Customer Complaint.
1.9. Continuation of Essential Department of Defense (DoD) Contractor Services During Crisis.
1.9.1. This requirement has been determined not to be essential and does not require continued support during a crisis as defined in DFARS 252.237-7023.
10. Hours of Operation.
10.1. The Contractor shall perform the work required under this contract during the fol-lowing days and hours: Monday through Friday, 07:30 a.m. to 4:00 p.m.. If work hours are required outside the hours stated, the Contractor shall contact the Government POC for approval from the Contracting Officer (CO). Upon approval from the CO, the Gov-ernment SME or Government POC must be present with the Contractor.
1.10.2. These dates and hours exclude Federal Holidays, base closures due to inclem-ent weather, and furlough days, as applicable.
1.11. Contractor Personnel.
1.11.1. The Contractor shall provide the name of the Contract Manager (CM) and any alternates who shall act for the Contractor when the CM is absent. They shall be desig-nated to the CO and Government POC, in writing, within five (5) business days after the contract award date. The Contractor shall provide telephone numbers and email ad-dresses where the CM and alternates may be contacted at any time. The CM or alter-nate shall have full authority to act for the Contractor on all matters relating to operation of this contract at the OC-ALC on Tinker Air Force Base (AFB). The CM or alternate shall be available to meet on the installation with Government personnel designated by the CO to discuss problem areas. The Contractor shall provide a CM who can read, write, speak, and understand English fluently.
1.11.1.1. The Contractor and Contractor personnel shall be required to identify themselves as Contractor personnel by introducing themselves or being introduced as Contractor per-sonnel and displaying distinguishing badges or other visible identification for meetings with Government personnel. The Contractor and Contractor personnel shall identify them-selves as Contractor employees in telephone conversations and in formal and informal written correspondence.
1.11.1.2. Listing of Contractor Employees.
1.11.1.2.1. The Contractor shall provide an initial listing of Contractor employees’ names and position titles to the Government POC within five (5) business days after contract award. The Contractor shall also provide an updated listing of personnel to the Government POC when employees effecting work under this contract, status changes or position changes within five (5) business days.
1.11.1.3.1. The Contractor shall not employ persons on this contract if such employee is identified to the Contractor as a potential threat to the health, safety, security, and/or general well-being, or operational mission of the installation and its population. The Contractor shall not employ any person who is an employee of the United States (US) Government if the employment of the person would create a conflict of interest. The Contractor shall not employ any person who is an employee of the Department of the Air Force (AF), either military or civilian, unless such person seeks and receives ap-proval according to the DoD 5500.7-R Joint Ethics Regulations (JER). In addition, the Contractor shall not employ any person who is an employee of the Department of the AF if such employment would be contrary to the policies contained in Air Force Instruc-tion (AFI) 64-106, Air Force Industrial Labor Relations Activities. The Contractor shall be prohibited from employing off-duty Government POCs who are providing surveillance on any contracts/sub-contracts awarded to the Contractor. All contract personnel, de-pending on particular condition, occasion, or place or job assignment shall be required to wear professional and suitable attire. All Contractor personnel shall conduct them-selves in a professional and courteous manner. The selection, assignment, reassign-ment, transfer, supervision, management, and control of contractor personnel in perfor-mance of this PWS shall be the responsibility and prerogative of the Contractor; howev-er, the Contractor shall comply with the requirements set forth in this PWS and Tinker AFB regulations concerning the conduct of employees as referenced herein. The Con-tractor shall employ and maintain a technically trained and experienced work force.
1.12. Environmental Protection & Safety.
1.12.1. The Contractor shall be knowledgeable of and comply with all applicable feder-al, state, and local laws, regulations, instructions, and requirements regarding environ-mental protection and occupational safety and health. The Contractor shall comply with any laws, instructions or regulation changes during the term of this contract.
1.12.2. Contractors shall be compliant with the Tinker Air Force Base (AFB) Supplement to Air Force Instruction (AFI) 32-7086, “Hazardous Materials Management”, Tinker AFB procedures per Tinker AFB Instruction (TAFBI) 32-7004, “Hazardous Waste Management”, and Complex procedures per OC-ALC Sup to AFI 32-7086, “Hazardous Material Management” and OC-ALC Instruction (OC-ALCI) 32-101 “Air Quality Record Keeping Procedure”. Publications are available digitally on the e-Publishing website at www.e-publishing.af.mil for downloading or ordering.
1.12.3. Hazardous Material (HAZMAT).
1.12.3.1. If HAZMAT shall not be brought on base or used in the performance of this contract; the Contractor shall provide certification, in writing and printed on company letterhead, which states “No HAZMAT will be brought on base” or “No HAZMAT Usage”.
Said letter shall also contain the contract number for which the statement applies. This certification shall be provided to the Government POC within ten (10) business days after the contract award date. Upon the receipt of the certification by the Government POC, the requirements of this section are no longer applicable.
1.12.3.2. The Contractor shall not store chemicals or HAZMAT on Tinker AFB.
Contractors shall be compliant with HAZMAT management procedures per the OC-ALC Supplement to AFI 32-7086, “Hazardous Materials Management”. The Contractor shall maintain a log of all HAZMAT that is used on base. This usage log shall be provided to the Government POC monthly, the last business day of each month, or when the required work is completed. The Government POC will forward the records to the Unit Environmental Coordinator (UEC) NLT the fourth (4th) calendar day of the following month or the first (1st) subsequent business day.
1.12.4. Material Safety Data Sheet/Safety Data Sheet (MSDS/SDS).
1.12.4.1. Upon the Government POC’s confirmed receipt of the Contractor’s written certification which states “No HAZMAT Usage”, the requirements of this section are no longer applicable. Said certification letter shall be printed on company letterhead and contain the applicable contract number for which the services are being performed.
1.12.4.2. The Contractor shall not transport, ship or use any chemical, material or substance used in the performance of this PWS on Tinker AFB before the written http://www.e-publishing.af.mil/ approval is provided by the 72 ABW/CEIE, Natural Infrastructure Management (Environmental Compliance). The Contractor shall submit to the Government POC, ten
(10) calendar days after the contract award date, all MSDS or SDS and a completed OC-ALC Form 152, MSDS/SDS Information Sheet. The Contractor shall receive approval from the Government POC prior to shipping any chemical, material, or substance to Tinker AFB. A copy of the manufacturer MSDS/SDS shall accompany the shipment. The Contractor shall comply with the effective dates for SDS requirements IAW the Occupational Safety and Health Administration (OSHA) Hazardous Communication Standard, Title 29, Code of Federal Regulation (CFR) Part 1910.1200.
The Government POC will forward all MSDS/SDS submittals to the 72 ABW/CEIE for approval. A current manufacturer MSDS/SDS shall be submitted to the Government POC if the Contractor changes manufacturer or vendor for any chemicals that were previously approved. The Contractor shall maintain copies of the manufacturer MSDS/SDS for all chemicals. The MSDS/SDS shall be readily accessible at all times by Contractor personnel as well as Government employees.
1.12.5. Hazardous Waste (HAZWASTE).
1.12.5.1. If HAZWASTE shall not be generated during the performance of this contract;
the Contractor shall provide written certification which states that there is “No Hazardous Waste Generation”. Said certification letter shall be printed on company letterhead and contain the applicable contract number. This certification shall be provided to the Government POC within ten (10) business days after award. Upon the Government POC’s confirmed receipt of the Contractor’s written certification which states “No Hazardous Waste Generation”, the requirements of this section are no longer applicable.
1.12.5.2. The Contractor shall dispose of HAZWASTE in Government furnished waste containers located in the shop or area where the work is being performed. The Contractor shall notify the Government POC if the required waste containers are not available on site.
1.12.6. Discharges.
1.12.6.1. Any discharges into Tinker’s Industrial Waste Treatment Plant (IWTP) or sanitary sewer shall be approved and accomplished IAW the Tinker Industrial Waste Water Discharge Permit as instructed by the 72 ABW/CEIE, Natural Infrastructure Management (Environmental Compliance). The Government POC will submit the required notice of intent documentation to the UEC for the 72 ABW/CEIE approval. The Contractor shall maintain records of any written approval issued by the 72 ABW/CEIE for discharges into the IWTP and sanitary sewer.
1.12.7. Off-Site Discharges.
1.12.7.1. For discharges outside of Tinker AFB, the Contractor shall ensure waste water discharges that may contain pollutants resulting from any contracted service go to a state or federal permitted treatment facility such as a municipal Publicly Owned
Treatment Works (POTW). The Contractor shall provide a letter from the POTW to the Government POC within ten (10) calendar days after the contract award date. The letter shall state the POTW is permitted for all pollutants that the Contractor may discharge during the contracted service.
1.12.8. Spills.
1.12.8.1. Upon occurrence of any spill that could enter the storm system or cause any harmful environment effects, the Contractor shall immediately call 911 to report the incident. When possible, the Contractor shall use a base telephone to receive help from Tinker AFB 911. If using a cell phone, the Contractor shall request Tinker AFB 911.
The Contractor shall immediately report all environmental violations to the Government POC and UEC. The Contractor shall provide five (5) copies of a typed or written report about the incident within four (4) clock hours as follows:
One (1) copy to CO, two (2) copies to the Government POC, one (1) copy for the UEC, and one (1) copy for the record. The format of the report shall be left up to the Contractor; however, the report shall contain the following information.
name and contact number of the person reporting the spill date and time of incident location and source of spill substance or pollutant spilled amount spilled and rate of discharge any damages or injuries involved extent of area impacted potential hazards actions taken organizations contacted remarks section - that addresses the cause of the spill (e.g. human error, equipment, etc.) and whether 911 was called and which agencies responded.
1.12.9. Environmental Training.
1.12.9.1. Upon the Government POC’s confirmed receipt of the Contractor’s written letter which certifies “No Hazardous Waste Generation”, the requirements of this section are no longer applicable. Said certification letter shall be printed on company letterhead and contain the applicable contract number for which the services are being performed.
1.12.9.2. Contractor personnel performing duties in the service of this PWS shall have training that acquaints the person with the details of Resource Conservation Recovery Act (RCRA) regulations in 40 CFR 260 through 279; applicable state laws and regulations; DoD, AF, and local requirements. This training can be obtained through creditable training institutions or companies. All training shall be approved by the 72 ABW/CEIE, Natural Infrastructure Management (Environmental Compliance). RCRA training is available at http://www.natlenvtrainers.com/RCRA-hazardous-waste.htm;
http://www.natlenvtrainers.com/RCRA-hazardous-waste.htm http://www.skillsoft.com/catalog/detail.asl?CourseCode=esh_sah_a34_sh_enus000000 and http://www.lion.com/Storing-Hazardous-Waste-for-LQGs. The training shall be at the Contractor’s expense. Prior to obtaining training and within ten (10) calendar days after the contract award date, the Contractor shall provide the name of the training institution or company and course description to the Government POC for approval.
Once written approval is received from the Government POC, the Contractor shall provide the environmental training certificates for employees performing duties in the service of this PWS. The Contractor’s environmental training certificates shall be provided to the Government POC within thirty (30) calendar days. In addition to the required environmental training, Contractors shall be compliant with Tinker AFB procedures per Tinker AFBI 32-7004, “Hazardous Waste Management”.
1.13. Forms and Publications, TO, AFI and AFMCI.
1.13.1. The Contractor shall obtain the forms and publications expressly required to perform the work in this contract via internet at www.e-publishing.af.mil. In the event that a form or publication is not available online, the Government POC will provide the form, instruction or publication to the Contractor upon written request (e-mail is ac-ceptable) by the Contractor. In the event that laws, regulations, Technical Orders (TO’s), AFI’s, Air Force Material Command Instructions (AFMCI’s) change during the term of this contract, the Contractor is required to comply as such changes come into effect. Contractors delivering or handling official USAF records shall comply with the applicable records management regulations AFI 33-322, Chapter 3 in its entirety.
1.14. Foreign Object Damage (FOD) and Drop Object Prevention (DOP)/House-keeping and Tool Control.
1.14.1. Housekeeping.
1.14.1.1. The Contractor shall keep the work areas clean and neat IAW Industry Stand-ards, Occupational, Safety and Health Administration (OSHA), fire and safety standards and this PWS.
1.14.2. FOD and DOP.
1.14.2.1. Contractor personnel who work in or travel though areas near operational and production aircraft, engines, munitions, missiles, drones, space systems, support equipment, Aerospace Ground Equipment (AGE), trainers, and the Contactor personnel operating vehicles and equipment on flight lines, runways, taxiways, parking ramps, and in aircraft hangers and maintenance areas are required to receive the FOD/DOP train-ing and to comply with AFI 36-2232, AFMC Supplement 1, paragraph 9.2., and A4.3.4.
(Initial)/A4.3.5. (Refresher). The Contractor and Contractor personnel shall acknowledge the FOD/DOP training either by viewing the Digital Versatile Disc (DVD) provided by the COR or the You Tube site, http://www.youtube.com/watch?v=tYcbod jFPnM. The Contractor shall provide a contractor devised certificate to the COR for each employee within five (5) business days after the contract award date. The certifi-cates shall have the title of the training, the name of the person who received the train-http://www.skillsoft.com/catalog/detail.asl?CourseCode=esh_sah_a34_sh_enus000000 http://www.lion.com/Storing-Hazardous-Waste-for-LQGs http://www.youtube.com/watch?v=tYcbod%20jFPnM http://www.youtube.com/watch?v=tYcbod%20jFPnM ing, and the date of the training. The Contractor shall also ensure all new employees view the FOD/DOP training and provide a contractor devised certificate of training to the COR prior to the employees starting work in the OC-ALC shops. On an annual basis, the Contractor and Contractor personnel shall be required to review the FOD/DOP train-ing and to provide an updated contractor devised certificate of training to the COR with-in five (5) business days of the new period of performance (PoP) start date.
1.14.3. Tool Control and Accountability.
1.14.3.1. While performing contract services in or around Maintenance Production Shops, which includes ramp areas, the Contractor shall comply with AFI 21-101_AFMC Supplement 1, 21-101, Chapter 10 (all paragraphs) and OC-ALCI 21-112, paragraph
14.1. and 14.5.3. The Contractor shall provide the completed MXRIWRS Form 032 pri-or to performing work in the OC-ALC industrial areas. The MXRIWRS Form 032 is available from the Government POC. The Contractor shall provide a Contractor Tool Listing, MXRIWRS Form 032, to the Government POC within five (5) business days af-ter While performing contract services in or around Maintenance Production Shops, which includes ramp areas, the Contractor shall comply with AFI 21-101_AFMC Sup-plement 1, 21-101, Chapter 10 (all paragraphs) and OC-ALCI 21-112, paragraph 14.1.
and 14.5.3. The Contractor shall provide the completed MXRIWRS Form 032 prior to performing work in the OC-ALC industrial areas. The MXRIWRS Form 032 is available from the Government POC. The Contractor shall provide a Contractor Tool Listing, MXRIWRS Form 032, to the Government POC within five (5) business days after PM actions. The Contractor or Contractor’s personnel shall inventory the container or bag of tools at the beginning of each work day and at the end of each work day. The Con-tractor personnel shall immediately notify the Government POC of any tools that are missing or lost from the work area or container (e.g. tool or job box or tool bag). The Government POC will report any missing Contractor’s tools which have not been locat-ed within one (1) hour after notification to the appropriate Government personnel. The Contractor shall obtain the Form 32 from the Government POC. The CM shall ensure each employee on the job site receives a briefing from the Government POC about Housekeeping, FOD/DOP, and Tool Control prior to starting work in OC-ALC Industrial Areas.
1.15. Privately Owned Motor Vehicles (POV).
1.15.1. Contractor personnel shall comply with the directives pertaining to operation of POVs on Tinker AFB OK per AFMAN 31-116 (in its entirety), Motor Vehicle Traffic su-pervision. The Contractor shall comply with Tinker AFBI 24-301 (in its entirety) for the operation of POVs within Tinker AFB.
1.16. Visitor Pass.
1.16.1. The Contractor shall make contact with the Government POC seven (7) work days before arriving on Tinker AFB in order to make arrangements for a Visitors Pass(s). The Government POC will assign a sponsor for the Contractor within the or-ganization. The Contractor and the sponsor will arrange to meet at Pass and Registra-tion, Bldg 6611/Tinker Gate (South of I-40 off of Air Depot). The Contractor shall provide two forms of identification (one of which must be a picture ID) to the 72 Security Forces Squadron (72 SFS). The 72 SFS will provide an AF Form 75 (Visitors Pass) that will be valid for 30 calendar days.
1.17. Foreign National(s).
1.17.1. The Contractor shall notify the Government POC before sending a Foreign Na-tional representative to perform services. Special rules apply for foreign national(s) vis-iting a US Government facility.
1.18. Health and Safety on Government Installation.
1.18.1. In performing work under this contract on a Government installation, the Con-tractor shall comply with Federal, State, Local regulations and AFI 91-203 Air Force Consolidated Occupational Safety Instruction as established by this contract and Ap-pendix C. The Contractor shall notify the CO of any injuries that occur to Contractor personnel while on the installation. The Contractor shall notify the CO of damage to Government property or equipment during the execution of the contract.
1.19. Emergency Procedures.
1.19.1. The Contractor personnel shall follow the direction of the Government person-nel in regards to emergency procedures, i.e. fire, tornado, active shooter, bomb threats, etc. It is the responsibility of the Contractor to provide guidance and establish proce-dures for responding to an emergency for their employees. It is the Contractor’s re-sponsibility to account for their employees following an emergency evacuation. The Contractor personnel shall participate with the Government personnel in all fire and tor-nado drills at no additional cost to the Government.
1.20. Increase or Decrease of Equipment.
1.20.1. The Government reserves the right to increase or decrease the number of the 76 and 76 MXSS/MXDTAB Metrohm Ion Chromatograph to be serviced by one (1) each, through means of a modification based on the Government need during the life of the contract. The Contractor shall provide the agreed upon Metrohm Ion Chromato-graph PM services IAW the unit prices, terms and conditions agreed upon in the Basic and Option years of the contract.
1.21. Training - General.
1.21.1. The Government POC will provide training via training via slides or classroom, prior to the Contractor performing work at the OC-ALC. The Government will be re-sponsible for all approved cost associated with the training identified below. The Gov-ernment POC will document training on and maintain copies of completed AF IMT 1151, Training and Attendance Rating, as part of the contract surveillance file. For purposes of identificationand compliance with Personally Identifiable Information (PII) requirements, only the last four (4) of the Contractor employee’s Social Security Num-ber (SSN) will be input on the form.
1.21.2. The Contractor shall contact the Government POC prior to work being per-formed in order to accomplish the required training or verify the required training as listed below has been accomplished.
Contractor Required Courses Course Number
FOD and DOP Awareness Training Course Initial CHPMAS0000400SU
AFMC FOD and DOP Awareness Training Refresher CHPMAS0001301CB
Initial Fire Safety and Prevention Training CTESAF0000100SU
Refresher Fire Safety and Prevention Training Computer Based Training (CBT)
CTEMAS0002900CB
OC-ALC Environmental Accountability/Solid Waste Training, CBT MTEMAS9700138BR
OC-ALC Human Factors Training, CBT MTEMAS9700501BR
Environmental Management Systems (EMS) - General Awareness Training
MTEENV9733070BR
2. Reserved.
3. Government Furnished Property (GFP) And Services
3.1. Government Furnished Property.
3.1.1. Government Property Repair/Maintenance On-Base is not considered Gov-ernment Furnished Property (GFP). FAR Parts 45 and 52.245 plus supplements are not applicable to Government Property Repair/Maintenance On-Base. The responsible Government Organizations (76 MXSS/MXDTAB) for Government Property Re-pair/Maintenance On-Base will be responsible for the Government Property inventory, record keeping, reporting requirements (including Report of Survey), and disposal of all Government Property requiring repair/maintenance on-base during the performance of this contract.
3.1.2. GFP Exceeds $150,000 - Repair/Maintenance Off-Base. Not Applicable.
3.1.3. GFP Not Exceed $150,000 - Repair/Maintenance Off-Base. Not Applicable.
3.2. Shared Property of the Government. Not Applicable.
3.3. Government Furnished Services (GFS) are applicable during the performance of this contract. The Government will furnish the following services at Tinker AFB
(TAFB), OK:
3.3.1. Security Forces. The Government will provide general on-base security forces’ service. The security forces’ telephone numbers are 911 for emergencies, 405-734- 2000 for crimes in progress and 405-734-3737 for non-emergency calls. The off-base 911 center receives 911 cell phone calls. Cell phone callers need to advise the 911 off-base center they are on TAFB in order to be connected with the on-base 911 center.
3.3.2. Fire Emergency and Routine Services. The Government will provide general on-base fire protection services. The Contractor shall comply with fire prevention rules and regulations enforced by the TAFB Fire Prevention Branch. Call 911 for emergen-cies. For routine fire prevention matters call 405-734-3981 or 405-734-3982 and 405- 734-7964 for after hours and weekends. For routine calls to dispatch call 405-734- 7964.
3.3.3. Utilities. The Government will provide utility services. These utilities include natural gas, electricity, water, and sewer for the sole purpose of accomplishing this con-tract. If the contractor requires additional utility services, it shall be the contractor’s re-sponsibility to provide. Contractor shall use due care and diligence in efforts to con-serve utilities to reduce utility costs.
3.3.4. Refuse Collection. The Government will provide refuse collection services lim-ited to the extent provided in the Base Refuse Collection Contract(s) for the Govern-ment provided facilities. The Government will only allow non-hazardous refuse to be emptied into the nearest authorized refuse dumpster for trash collection. Do not use Government dumpsters to dispose of construction debris.
3.3.5. Workspace. The Government will provide access to the equipment and ade-quate workspace around the equipment.
3.4. Intangible Government Property. Not Applicable.
3.5. Contractor Acquired Property (CAP), Time & Material (T&M) or Fabrication.
Not Applicable.
File details come from the government source that posted it. Updated .