Data_Item_Descriptions.pdf

PDF 787 KB Posted

Attached to
ATCALS Power Supply Federal contract opportunity
Solicitation number
FA8119-20-Q-0001
Issued by
Department of the Air Force Materiel Command Air Force Sustainment Center

View the file

Other files for this federal contract opportunity

Other files attached to ATCALS Power Supply, newest first.
File Type Posted
FA811920Q0001 P00001.pdf PDF
Performance_Work_Statement.pdf PDF
GFP.xlsx XLSX spreadsheet
FA811920Q0001.pdf PDF
CAV_AF_Reporting_Requirements.pdf PDF
Packaging_Requirements.pdf PDF
CDRL1_REPORT.pdf PDF
Transportation_Report.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DATA ITEM DESCRIPTION

Title: COMMERCIAL ASSET VISIBILITY (CAV) REPORTING

Number: DI-MGMT-81838 Approval Date: 20110914 AMSC Number: N9211 Limitation: N/A DTIC Applicable: N/A GIDEP Applicable: N/A Office of Primary Responsibility: SA/WSS 071.02 Applicable Forms: N/A

Use/relationship:

The Commercial Asset Visibility (CAV) application provides a web-based, automated method of tracking Government owned reparable assets as they flow through the repair cycle at the contractor's repair facility. The main purpose of CAV is to provide an inventory management system for reparable assets while they are at commercial repair vendors. CAV on the World Wide Web allows the contractor to report transactions as they occur. These transactions automatically update the CAV database. An integrated, relational database allows the commercial repair vendors to access their repair data to produce all of the required status and activity reports.

This Data Item Description (DID) contains the format and content preparation instructions for the data product generated by the specific and discrete task requirement, as delineated in the contract.

Requirements:

1. Format. The CAV System transactions are processed via the World Wide Web. Input formats and methodology are defined in the Contract Statement of Work.

2. Content. The Contractor reporting shall contain the following transactions, status code changes and report types, as described in the Contract Statement of Work:

A. Receipt of Asset

1) On Contract

2) Not on Contract

3) Procurement

4) "A" Condition

5) Rotable Pool

6) Loaned Asset

B. Inductions C. Items Awaiting Parts D. Re-inductions E. Completions F. Shipments

Source: http://assist.dla.mil -- Downloaded: 2019-05-06T18:27Z Check the source to verify that this is the current version before use.

DI-MGMT-81838

G. Bulk Shipments H. Proof of Shipment I. Items that are Beyond Economic Repair (BER) J. Survey/Scrap Items K. Reversals L. Report of Discrepancies M. Print DD Form 1348's N. Print Material Movement Documents O. Print CAV Inventory Labels P. Print Item Action Reports Q. Print Repair History Reports R. Print Condition Code Reports S. Print Awaiting Parts Report T. Print Proof of Shipment Reports U. Perform Item Maintenance V. Print Report of Discrepancies (RODs) W. Add and Delete Carriers

3. End of DI-MGMT-81838.

Source: http://assist.dla.mil -- Downloaded: 2019-05-06T18:27Z

Title: CONTRACT DEPOT MAINTENANCE (CDM) PRODUCTION REPORT

Number: DI-PSSS-81995 Approved Date: 20150904 AMSC Number: 9576 Limitation: N/A DTIC Applicable: No GIDEP Applicable: No Preparing Activity: 11 (AFMC/A4) Project Number: PSSS-2015-009 Applicable Forms: N/A Use/Relationship: The Contract Depot Maintenance (CDM) Production Report is a two-part report which provides the Government with monthly maintenance production figures, status and accountability of assets at the contractor facility, performance to schedule, anticipated production for the next month, and a summary of unresolved problems at the end of the report period.

a. This Data Item Description (DID) contains the format, content and preparation instructions for the data product generated by the specific and discrete task requirement as delineated in the contract.

b. This DID may be used on any depot level maintenance contract.

Requirements:

1. Format. This report shall be provided in the format of Table I.

2. Content. The report shall consist of two parts and contain the following information:

a. Part I:

(1) As of date: The year, month and day applicable to the report. Data must be through the end of the month.

(2) Block 1, Issuing/Procuring Agency. Include address and Point of Contact.

(3) Block 2, Contractor and activity address code (AAC). The name of the business and the DoDAAC assigned to your business for shipment of material.

(4) Block 3, Contract number and Program or Weapon System supported.

(5) Block 4, Government item manager or technical Point of Contact.

(6) Block A, Item identification. The National Stock Number (NSN), A-1 is the Federal Supply Class (FSC) and A-2 is the National Item Identification Number (NIIN) of the item being reported.

(7) Block B, Delivery/Call Order number. When the awarded contract is a call/delivery order type, this is the applicable order number. When an item is awarded on more than one order, it is repeated for each order until completed. If the current report completes the call, the word “completed” will be added.

(8) Block C, The contract line item number (CLIN). The CLIN assigned to the NSN in the contract.

DISTRIBUTION STATEMENT A. Approved for public release; distribution is unlimited.

Source: https://assist.dla.mil -- Downloaded: 2016-04-12T17:42Z

DI-PSSS-81995

(9) Block D, The document/voucher number the item was received under. The document number listed on the shipping documentation the item was received against.

(10) Block E, Quantity on contract or call. E-1 is the quantity of the end items to be repaired on each call/delivery order or contract quantity when orders do not apply. E-2 is the total quantity scheduled for repair cumulative to date.

(11) Block F, Reparables received. Number of reparable items received for repair. F-1 is the quantity of reparables received during the report month. F-2 is the quantity of reparables received cumulative from the start of the contract through report month.

(12) Block G, Reparables inducted into repair during report month.

(13) Block H, Reparables on hand. Number of reparables on hand waiting induction into repair.

(14) Block I, Quantity produced. The quantity produced during the month.

(15) Block J, Serviceables shipped. Serviceables shipped from repair facility. J-1 is the serviceables shipped through report month. J-2 is serviceables shipped cumulative from start of contract.

(16) Block K, Serviceables on hand. The quantity of serviceables on hand awaiting shipping action.

(17) Block L, Quantity condemned. The quantity condemned. L-1 is the quantity condemned during report month. L-2 is the quantity condemned cumulative from start of contract.

(18) Block M, Forecast to complete. The quantity of items scheduled to be produced next month.

(19) Block N, Report date. Enter date of report.

b. Part II, Production problems. Report shall be in narrative format and only required if:

(1) Previous reports production forecast was not shipped.

(2) Current forecast does not equal contract scheduled quantity.

(3) Contract anticipates a problem in the near future.

TABLE I. Contract Depot Maintenance (CDM) Production Report format.

CONTRACT DEPOT MAINTENANCE (CDM) PRODUCTION REPORT Month and As-Of Date

(YYYYMMDD)

Part I

1. ISSUED BY: 2. CONTRACTOR AND ACTIVITY ADDRESS CODE 3. CONTRACT NUMBER/PRGM/WS 4. GOVERNMENT ITEM MANAGER OR TECHNICAL POC

DURING REPORT PERIOD/TOTAL TO DATE

A.

ITEM

IDENTIFICATION

B.

DELIVERY/

CALL NUMBER

C.

CONTRACT

LINE ITEM

(CLIN)

D.

DOCUMENT/

VOUCHER

NUMBER

E.

QTY ON

CONTRACT

OR

DO/CALL

F.

REPARABLES

RECEIVED

G.

QTY

IND TO

WORK

H.

REPS ON

HAND

I.

QTY

PROD

J.

SERVICEABLES

SHIPPED

K.

SERV ON

HAND

L.

QTY

CONDEMNED

M.

FORECAST PROD

N.

REPORT DATE

FSC NIIN

1 2 1 2 3 1 2 1 2 1 2

Part II, Production Summary

End of DI-PSSS-81995.

Title: GOVERNMENT PROPERTY INVENTORY REPORT

Number: DI-MGMT-80441C Approval Date: 20171101 AMSC Number: 9865 Limitation:

DTIC Applicable: No GIDEP Applicable: No Preparing Activity: MDA Project Number: MGMT-2017-059 Applicable Forms: None

Use/Relationship: This report enables the contractor to periodically provide to the DoD Service/Agency an inventory listing of Government Property (i.e., both Government Furnished Property (GFP) and Contractor Acquired Property (CAP)) in the contractor’s possession (to include subcontractors) by contract.

This DID is applicable to all contracts where Government Property will be furnished by the Government (i.e., GFP) or acquired, fabricated, or otherwise provided by a contractor (i.e., CAP) in performance of a contract.

This DID contains the format and content preparation instructions for the data deliverable resulting from the work task described in the solicitation.

This DID supersedes DI-MGMT-80441B.

Requirements:

1. Format. The report shall be electronic .xls or .xlsx compatible.

2. Content. The report shall contain the following columns/data fields:

A. Contract Number B. Manufacturer CAGE Code (if known) C. Item Name D. Item Description E. Manufacturer Name F. Manufacturer Part Number G. Manufacturer Model Number H. Material Control Number (MCN) (if applicable) I. Serial Number J. National Stock Number (NSN) K. Quantity L. Unit of Measure M. Unit Acquisition Cost N. Location O. Sub Location (if applicable) P. Unique Item Identifier (as registered in the IUID Registry) Q. Type of Government Property (i.e., Government Furnished Property (GFP) or

Contractor Acquired Property (CAP) R. Classification of Government Property (i.e., Communication Security (COMSEC), Equipment (EQP), Material (MAT), Special Test Equipment (STE), or Special Tooling

(ST))

Source: https://assist.dla.mil -- Downloaded: 2018-05-22T20:41Z

DI-MGMT-80441C

S. Posting Reference T. Date of Transaction / Date of Acquisition U. Date Placed in Service V. Date of Last Physical Inventory W. Condition Code

END OF DI-MGMT-80441C

Source: https://assist.dla.mil -- Downloaded: 2018-05-22T20:41Z

Source: https://assist.dla.mil -- Downloaded: 2016-03-18T19:05Z

DATA ITEM DESCRIPTION I Form Approved OMB No.0704.0188

1.nTLE 2.IOENTIFICATIONNUMBER

TEST/ INSPECTION REPORT DI-NM’I-80809B

L OESCRIPTlOtVPURPOSE

3.1 The testl inspection report is used to document testl inspection results, findings, and analyses that will enable the government or contracting agency to evaluate compliance with system requirements, performance objectives, specifications, and test linspection plans.

1.APPROVALDATE 5.OFFICEOFPRIMARYRESPONSIBILITY(OPB) Ea.DTICAPPLICABLE 6b.CWIEP AppliCable

(YVMMOD)

F/AFMC-DCJP

970124

,.APPLlCAT\0NflNTER7iElAT10NSH1P

7.1 This data item description (DID) contains the format and content preparation instructions for the data product generated by the specific and discrete task requirement

I as delineated in the contract.

I

7.2 This DID is applicable to engineering (developmental ), preliminary qualification, qualification, and acceptance testing.

7.3 This DID supersedes DI-NDTI-80809A and DI-MISC-80653

1.APPROVALLIMITATION 9a.APPLICABLEFORMS 9b.AMSCNUMBER

F7231

10,PREPARATIONlNSTRUCnONS

10.1 Format. Contractor format is acceptable.

paragraph 10.2 and its subparagraphs in a manner understanding

10.2 CQnL!aL. The test/inspection report shall

applicable.

Organize the information required by that facilitates presentation and contain the following information, as

10. 2.1 Cove. and tile uaae. The following information shall appear on the outside front :over and title page:

a. Report date.

b. Report number (contractor or government)

Contractor’ s name, address, and commercia 1 and government entity code.

Contract number and contract line item number or sequence number (if applicable)

e. ‘fvpe of test/inspection (for example. first article acceptance test, aualitv con formanc-e-inspection, d-evelopmental test-, qualification test, f Identification of item tested/inspected.

9. Date or period of test/inspection.

h. Name and address of requiring government activity.

i. Security classification, downgrading and declassifying environmental Lest) .“ information, if applicable.

(Continued on page 2 )

1.DIS77UBUTIONSTATEMEW

DISTRIBUTION STATEMRNT A : APPROVED FOR PUBLIC RELBASE; DISTRIBUTION IS UNLIMITED.

ID Form 1664,APR 89 PreviOLIsedtliomwe obsdem. Page 1 of & Pages 39123

DI-NDTI-80809B

Block 10, Preparation Instructions (continued)

10.2.2 ~. The table of contents shall identify the following:

a. The title and starting page of each major section, paragraph, and apPendix of the report.

b. The page, identifying number, and title of each illustration (for example; figure, table, photograph, chart, and drawing)

10 .2.3 -ductim. The introduction shall include the following information:

10.2 .3.1 obyectlve W. The specific test/ inspection objective (s) as specified in the contract tasking document.

10. 2.3.2 L.temls) tes~. Complete identification of the item(s) testedl inspected including the following:

a. Nomenclature.

b. National stock number.

Model number, part number t and serial number :: Type of item (for example, prototype, production item, laboratory model )

e. Serial or lot number.

f. Applicable engineering changes

9. Production item specification, if applicable.

h. Date of manufacture.

10.2 .3.3 Complete inspection requirements correlated to contractual following:

Required testl inspection parameters :: Performance requirements, acceptance or environmental criteria.

10.2.4 ~. Complete test/inspection report following:

identification of the testl requirements including the compliance limits, and summary including the

a. A brief discussion of the significant test/inspection results, ObSerVati Qns, conclusions, and recommendations covered in greater detail elsewhere in the report.

b. Proposed corrective actions and schedules for failures or problems encountered.

c. Identification of deviations, departures, or limitations encountered, referenced to the contract requirements.

d. Tables, graphs, illustrations, or charts as appropriate to simplify the summary data.

10.2.5 ~. Complete identification of all documents referenced in the test finspection report including the following, as applicable:

a. Prior testf inspection reports on the same item.

b. Test /inspection plans and procedure documents

c. Prior certifications of compliance.

d. Contractor’ s file designation where test/ inspection records are maintained.

e. Input parameters used.

The applicable issue of the documents cited therein, including their approval dates and dates of any applicable amendments, notices, and revisions, shall be as specified in the contract.

Page 2 of 4 Pages

10.2.6 ~. The body of the testlinspection report shall be as follows :

10 .2.6.1 KzZL_ + de.tlflca~.

Complete identification of each item of test equipment used in the testlinspection including the following:

a.

b.

c.

d.

e.

f.

9.

10. 2.6.2

Nomenclature.

Model number.

Serial number.

Manufacturer.

Calibration status.

Accuracy data.

Comments, if applicable.

Testlinmection kuhtv mstd.b&mn and set–w. Complete description of the physical set-up used in conducting the test/inspection to include the following:

a. Location or orientation of the item.

b. Location. orientation, or settinm of test equipment and instrumentation.

c. Location, orientation, or settings of sensors and probes

d. Location or orientation of interconnections, cables, and hoop-ups.

e. Electrical power, pneumatic, fluidic, and hydraulic requirements.

Drawings, illustrations, and photographs maY be used for clarification.

10 .2.6.3 wrocedur~. Complete description of the procedures used in conducting the test/inspection to include the following:

a. Item selection and inspection that verified suitability for test/ inspection.

b. Summarized sequence of testing/inspection steps, including a description of how the item was operated during the test/inspection, and any control conditions imposed.

10 .2.6.4 A copy of all testlinspection results and analysis to include the following:

10.2.6 .4.1 ~. The actual recorded data (for example, log book entries, oscillographs, instrument readings, plotter graphs) If the recorded data is extensive, provide it in an appendix.

10. 2.6.4.2 Test/ insQec!iion resu. Identification of all testlinspection results to include the following:

a. Matrices comparing results achieved against test/inspection objectives or requirements

b. A discussion of these matrices as to their significance, and how they compare to any prior testlinspections.

Calculation examples.

;; Discussion of anomalies, deviations, discrepancies, or failures, including their impact, causes, and proposed corrective actions The discussion shall address discrepancies between design requirements and the tested/inspected Configuration.

10. 2.6.5 Conclusicxls Test/ inspection conclusions distinguished between objective and subjective to include the following:

a. The effectiveness of the testlinspection procedures in measuring item performance.

Page 3 of 4 Pages

b. The success or failure of the item to meet required test/inspection objectives.

c. The need for repeat, additional, or alternative tests linspections.

d. The need for item redesign or further development.

e. The need for improved test/inspection procedures, techniques, or facilities.

f. The adequacy and completeness of the test/inspection requirements.

10.2 .6.6 Recommendations appropriate to the test/inspection results and conclusions including the following:

a b.

c.

d.

e.

f.

9.

h.

Acceptability of the item tested/inspected (pass or fail) Additional testing/inspection required. ,.

Redesign required.

Problem resolution.

Test/inspection procedure or facility improvements Disposition of items tested/inspected.

Documentation changes required.

Testing/ inspection improvements

10.2.7 The following certifications shall be included, .as

applicable:

10.2 .7.1 A statement that the testlinspection was performed in accordance with applicable testlinspection plans and procedures, and that the results are true and accurate. The authentication shall include the signature of the contractor personnel that performed the test(s) /inspection(s) , a contractor representative authorized to make such certification, and any government witnesses

10.2 .7.2 A statement identifying those requirements not tested/inspected or measured that were previously validated.

Include identification of the data and method employed for such validation (for example, prior test/inspection, analytical verification, equivalent item, and so on) The authentication shall include the signature of a contractor representative authorized to make such authentication and any government witness.

10.2 .7.3 A statement that the item tested/ inspected either passed or failed item acceptability requirements This authentication shall include the signature of a contractor representative authorized to make such authentication and any government witness

10.2.8 Appendices shall be used to append detailed

test/inspection daia, drawings, photographs , or other documentation too voluminous to include in the main body of the report This includes referenced documentation not previously provided by the government, and test/ inspection reports from any associated test/inspection activity that may have performed some of the testing/inspecting requirements.

Page 4 of 4 Pages

TITLE: COUNTERFEIT PREVENTION PLAN

Number: DI-MISC-81832 Approval Date: 20110121 AMSC Number: 9181 Limitation:

DTIC Applicable: No GIDEP Applicable: No Office of Primary Responsibility: NRO Applicable Forms: N/A

Use/Relationship: The Counterfeit Prevention Plan will be used by the procurement activity to determine and evaluate the effectiveness of the contractor’s counterfeit protection plan and award fee.

a. This Data Item Description contains the format and content preparation instructions for the data product generated by the specific and discrete task requirements delineated in the statement of work.

b. This DID is related to Parts, Materials and Processes Selection List (PMPSL).

c. This DID is related to “As Designed” and “As Built” Parts List.

d. The Counterfeit Prevention Plan will be updated as counterfeiting methods evolve to include any new indicators, as well as new prevention processes needed (either discovered directly or provided by the Government).

Requirements:

1. The Counterfeit Prevention Plan shall be in contractor format and shall include the following, as a minimum:

a. Procurement practices and procedures to include procurement of all parts and materials from original qualified parts/materials equipment manufacturer (OEM) or it franchised/authorized distributor.

b. Procurement practices and internal processes used for exceptions to buying from

OEM or OEM franchised distributors in cases where items are no longer available including a process to qualify/certify non-OEM parts & materials.

c. Monitoring procedures to include the delivery of test results from random sampling and supply chains surveillance that does not assume any source is safe to identify possible penetration of OEM supply chain.

d. Training/certification program for receiving inspectors.

e. Process to verify counterfeit.

DI-MISC-81832

- 2 -

f. Processes to identify, store, and report counterfeit parts.

g. Process to ensure subcontracts contain the following requirements (As a minimum):

(1) Requirements to procure only from Original Equipment Manufacturer

(OEM) or OEM franchised distributors

(2) Procurement practices and internal processes used for exceptions to buying from OEM or OEM franchised distributors including a process to qualify/certify non-OEM parts & materials obtained

(3) Requirements to monitor supply (including delivery of test results from random sampling and supply chain surveillance that does not assume any source is safe) to identify possible penetration of OEM supply chain

(4) Training/certification program for receiving inspectors

(5) Process to verify counterfeit

(6) Processes to identify, store, and report counterfeit parts.

(7) Notification procedure (tailored to specific sub-contractor based on following Notification Procedure)

h. Self-audit of internal processes.

i. Monitor processes at all subcontractor levels processes and verify compliance through on-site audits.

j. Notification Procedure:

(1) Step 1: The contractor shall quarantine all suspect products pending further direction. The contractor shall provide a statement, with problem description, justifying why this is considered suspect and how it was detected. The contractor shall NOT notify the supplier that the items are suspected as being counterfeit items. However, consultation with the OEM is authorized. Make certain the parts and all members of the lot procured for use on this contract are stored in correct environmental controls. These parts need to be protected as evidence.

(2) Step 2: Contractors that identify suspect items shall immediately notify their customer that is the next link toward the prime contractor.

Notification shall be passed up the customer chain until reaching the prime contractor. The prime contractor shall immediately notify the cognizant Contracting Officer (CO) and Contracting Office Technical Representative (COTR) of all suspect items identified.

DI-MISC-81832

- 3 -

(3) Step 3: The contractor shall make certain that the original documentation is secured as evidence and maintain any and all documentation associated with the part to include:

a. Part information such as part identifying number, lot date code, manufacturer information and originator/point of contact information

b. Any information reflecting part procurement/acquisition traceability which should include a copy of the purchase order, any and all correspondence between the buyer and the supplier to include: e-mails, records of phone conversations and paper letters of correspondence

c. Part documentation from the purported original manufacturer, distributors and suppliers (certificate of compliance and certificate of conformance)

d. All visual examination and physical analysis/testing results and the technical data package showing that the parts passed the required screening and qualification tests

e. List of company products affected

(4) Step 4: Determine that the part is or is not counterfeit (Usually accomplished as part of root cause analysis of non-conforming parts and/or materials)

(5) Step 5: If the parts are found to be counterfeit, they shall be isolated and controlled pending direction from law enforcement.

(6) Step 6: The contractor shall provide any additional required information to the government’s investigation team

END OF DI-MISC-81832

Source: http://assist.dla.mil -- Downloaded: 2019-02-14T15:58Z

Source: http://assist.dla.mil -- Downloaded: 2019-02-14T15:58Z

DID_Government Property Inventory Report.pdf
AMSC Number: 9865 Limitation:
Requirements:

File details come from the government source that posted it. Updated .