15R0029_PWS.docx

DOCX document 93 KB Posted

Attached to
Repair Receiver/Transmitter Federal contract opportunity
Solicitation number
FA811915R0029
Issued by
Department of the Air Force Materiel Command Lifecycle Management Center Tinker Air Force Base

About this file

PWS-Performance Work Statement

View the file

Other files for this federal contract opportunity

Other files attached to Repair Receiver/Transmitter, newest first.
File Type Posted
1494665_DID.pdf PDF
15R0029_QAIRQMT_REPORT.pdf PDF
1494663_DID.pdf PDF
1494668_DID.pdf PDF
1494666_DID.pdf PDF
15R0029_TRNSPDATA_REPORT.pdf PDF
1494664_DID.pdf PDF
1494667_DID.pdf PDF
1494670_DID.pdf PDF
15R0029_CDRL1_REPORT.pdf PDF
15R0029_CAVAFSOW.docx DOCX document
FA811915R0029.pdf PDF
15R0029_PKGRQMT_REPORT.pdf PDF
WD_1500714.pdf PDF
1494662_DIDpdf.pdf PDF
Show all 15

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PERFORMANCE WORK STATEMENT

(PWS)

For The Repair of Radar Altimeter Receiver Transmitter

PREPARATION DATE: 17 Nov 14

REVISION NUMBER: X DATE: XX XXX XX

PURCHASE REQUEST NUMBER: FD2030-15-00714

APPENDIX A

APPENDIX A

PREPARING ORGANIZATION: AFSC/448 SCMW/848 SCMG/424 SCMS TINKER AFB OK 73145

FD2030-15-00714

Table of Contents

1.DESCRIPTION OF SERVICES/GENERAL INFORMATION1
1.1.Purpose1
1.2.General Information1
1.3.Pre-Award Survey (PAS) Requirements1
1.4.Initial Production Evaluation (IPE) Requirements2
1.5.Reporting Requirements2
1.6.Quality Program and Inspection System Requirements4
1.7.Condemnation Candidates5
1.8.Special Tools (ST) and Support Equipment (SE)5
1.9.Precious Metals Recovery Program6
1.10.Nuclear Hardness Requirement7
1.11.Parts Control Program7
1.12.Counterfeit Prevention Plan8
1.13.Engineering Support12
1.14.Cannibalization of Parts12
1.15.Lead (Pb) Free Electronics12
1.16.Ozone Depleting Substances (ODS)13
1.17.Technical Order Maintenance13
1.18.Work Requirements13
1.19.Surge/Mission Essential Services16
1.20.Delivery Schedule16
1.21.Customer Service Requirements16
1.22.Safety and Health17
1.23.Manpower Reporting Language For Contract Performance Work Statements18
2.SERVICE SUMMARY19
2.1.Service Summary19
3.GOVERNMENT PROPERTY21
3.1.Government Property21
3.2.Disposition of Government Property21
3.3.Discrepancies Incident to Shipment:21
3.4.Other22
ATTACHMENT A – END ITEMS23
ATTACHMENT B – DEFINITIONS24
ATTACHMENT C – APPLICABLE DOCUMENTS26

i

FD2030-15-00714

DESCRIPTION OF SERVICES/GENERAL INFORMATION

Purpose

1.1.1. The purpose of the Performance Work Statement (PWS) is to define the repair requirements for for the Radar Altimeter Receiver/Transmitter specified in Attachment A of the PWS. The work encompasses the disassembly, cleaning, inspection, maintenance, reassembly, testing and finishing actions required to return the items to a serviceable condition. The contractor is responsible for having the repair capabilities to include appropriate technical data, repair documents, and license agreements, and special tools and equipment required to accomplish this repair. The Contractor is responsible for the scheduled delivery of a quality product.

General Information

1.1.2. Contractor employees shall identify themselves as Contractor personnel by introducing themselves or being introduced as Contractor personnel and displaying distinguishing badges or other visible identification for meetings with Government personnel. In addition, Contractor personnel shall appropriately identify themselves as Contractor employees in telephone conversations and in formal and informal written correspondence.

Pre-Award Survey (PAS) Requirements

1.1.3. A Pre-Award Survey (PAS) shall be required, but may be waived by the Government at the time of award.

1.1.4. At the time of the PAS the prospective contractor shall meet the following technical requirements (additionally, there are many other business capabilities that may be evaluated) in accordance with contract requirements. Failure to do so shall result in PAS disapproval and disapproval of the prospective contractor for this procurement action.

a. Provide data to include contractor facility capabilities, all subcontractor facility capabilities (if subcontracting is proposed), and an explanation of how contractor and subcontractor facilities will fulfill the Government’s requirements.

b. Prior to PAS, the prospective contractor shall provide a list of all special tooling and support equipment (ST/SE) required and comply with the requirements detailed in paragraph 1.8.

c. Prior to PAS, the prospective contractor shall provide a test plan for each end item to be produced. The test plan shall include all testing required by the applicable Acceptance Test Procedure and will detail how the testing will be accomplished utilizing the prospective contractor’s SE.

d. The prospective contractor shall provide the above in the form of a word processing document or spreadsheet, formatted to Microsoft Office Programs via fax or email.

Initial Production Evaluation (IPE) Requirements

1.1.5. IPE is not required for this effort.

Reporting Requirements

1.1.6. Data requirements are specified in the Contract Data Requirements List (CDRL DD Form 1423) found in Part 1, Section B, The Schedule of the Basic contract.

Paragraph
Description
CDRL
DID
Delivery Schedule
Paragraph 1.8.5
Certification Documents
A012
DI-QCIC-80798B
Upon ACO Request
Paragraph 1.8.5
CAVAF/GFM/GFE Report
A001
DID-MGMT-81634B
Annual
Paragraph 1.11.2 and 1.13.1
Engineering Change Proposal
A007
DI-CMAN-80639C
5 Days After Occurrence
Paragraph 1.11.4
DMSMS Plan
A010
DI-MISC-80711A
30 Days ARO
Paragraph 1.11.4
DMSMS Report
A013
DI-SESS-81656
Quarterly
Paragraph 1.12.1
Counterfeit Prevention Plan
A011
DI-MISC-81832
30 Days ARO
Paragraph 1.13.1
Status Reports
A008
DI-MGMT-80368A
5 Days After Occurrence
Paragraph 1.5.3
End Item Production and Component Item Consumption
A006
DI-ALSS-81220A
Quarterly
Paragraph 1.5.4
Contractor’s Corrective Action Plan
A009
DID 80501
Upon ACO Request
Paragraph 1.5.5
Meetings and Conferences
A002

A003 A004

DI-ADMIN-81249

DI-ADMIN-81373

DI-ADMIN-81250

As Requested

Paragraph 1.5.6
Depot Maintenance Production Report
A005
DI-ALSS-80728A
Monthly

1.1.7. In addition, the Contractor shall maintain a document package, in the Contractor’s format, containing the following documentation for each item produced for the contract period:

a. Quality Acceptance Documentation

b. Test Data Sheet

c. Quality Acceptance Review Documentation

d. Parts replaced listed by each serial numbered end item repaired

e. Engineering Change Proposals

f. Government Furnished Material Report

1.1.8. In addition, the Contractor shall maintain a document package, in the Contractor’s format, containing the following documentation for each item produced for the contract period:

1.1.9. The contractor shall develop and provide a corrective action plan DID 80501.

1.1.10. Meetings and Conferences

The Contractor shall support support meetings (e.g., teleconferences, Program Management Reviews (PMR), Technical Inerchange Meetings (TIM), etc… with the Government. The Contractor shall provide meeting facilities. (DI-ADMIN-81249A, CDRL A003, DI-ADMIN-81373, CDRL A004 and DI-ADMIN-81250A, CDRL A005)

1.1.11. Depot Maintenance Production

The Contractor shall develop and deliver the Depot Maintenance report for CFM. (DI-ALSS-80728A)

Quality Program and Inspection System Requirements

1.1.12. The Contractor shall establish, document and maintain a quality system as a means of ensuring that the end item conforms to specified requirements. The quality system shall be in accordance with the contract requirements.

1.1.13. When a Deficiency Report is received for an end item repaired under the terms of this contract, the Contractor shall comply with the Administrative Contracting Officer’s (ACO) directions. Guidance is provided in technical order (TO) 00-35D-54, USAF Deficiency Reporting, Investigation, and Resolution.

1.1.14. The Contractor shall support quality audits as required by the ACO. These audits could require that one or more end items be removed from the production line and subjected to any combination of inspection, testing, disassembly, or assembly, to determine that the standards of performance and technical conformance meet the requirements of this PWS. The Contractor shall be required to correct a deficient process to eliminate the cause(s) of any defects as directed by the ACO before production of the next end item.

1.1.15. The Contractor shall allow quality assurance reviews to be conducted at the site of repair at the request of the Defense Contract Management Agency (DCMA) throughout the contract period.

1.1.16. The Contractor shall allow a quality acceptance review by the DCMA representative at the site of repair for each end item generated under the terms of this contract.

1.1.17. The Contractor shall submit requests for deviation / waiver to the Procuring Contracting Officer (PCO) through the ACO In Accordance With (IAW) 1.21.1.2. Work shall not be initiated on assemblies / components affected by deviation / waiver pending approval / disapproval. Requests shall include the contract number, NSN and P/N of end item and lowest part / assembly affected, effect on cost / price and delivery schedule, description of deviation / waiver, justification for deviation / waiver, and proposed corrective action taken.

Condemnation Candidates

1.1.18. The Contractor shall report end items determined to be Beyond Economical Repair (BER) in which the repair cost will exceed 75% of the stock listed price. The Contractor shall report condemnation candidates to the PCO through the ACO within 30 calendar days of discovery. The Contractor shall not condemn reparable or recoverable items without prior approval of the PCO through the ACO. The Contractor shall ensure non-repairable items are demilitarized and disposed according to the Contractor-developed, Government-approved property procedures.

1.1.19. Contractor shall not continue repair of item exceeding BER until written approval is received from ACO/PCO.

1.1.20. As specified in the Contractor-developed, Government-approved property procedures, the disposition of condemned items will be determined on a case-by-case basis by the ACO.

1.1.21. On units approved to be condemned by the Government, the Contractor is authorized to retain serviceable parts salvaged from the condemned unit. The salvaged parts shall be retained by the Contractor for further use in repair of the same type end item. These parts will not be replenished when used up. The non-useable, scrapped parts shall be condemned IAW the Contractor-developed, Government-approved property procedures.

Special Tools (ST) and Support Equipment (SE)

1.1.22. The SE required to accomplish the scope of work to be completed on end-items under this contract is listed in the TOs and repair procedures listed in Attachment C of this PWS. If the equipment specified in the TO repair procedures is not designated as Government furnished in this contract, the Contractor shall furnish identical or substitute SE from commercial sources.

1.1.23. If the Contractor intends to substitute SE, a list of the proposed substitute SE shall be provided to the PCO with the proposal for Government approval. The Contractor shall demonstrate that substitute SE can be acquired and meets the standards stipulated in the technical data by the following actions:

1.1.23.1. Displaying drawings, schematics, or specifications which illustrate that the Contractor understands the exact nature of the work to be performed and the SE required to perform the tasks.

1.1.23.2. Explaining the capabilities of substitute SE to ensure that it is adequate to perform the specified testing requirements.

1.1.23.3. Defining how substitute SE will be designed, built, and calibrated without assistance from the Government, by an internal engineering capability, or the services of a recognized outside engineering agency as approved by the cognizant engineering activity.

1.1.24. The Contractor shall show certification documents of all calibrated SE to the ACO prior to work performed as outlined in the PWS.

1.1.25. Support Equipment Calibration Requirements. The Contractor shall ensure documentation certifying the accuracy of all calibrated SE is made available to the ACO prior to work performed. The Contractor shall ensure SE calibration is maintained throughout performance of this contract. Upon request, the Contractor shall provide certification documents (DI-QCIC-80798B) to the ACO for each SE item as follows:

a. SE part number and serial number

b. Date calibrated

c. Calibration due date

d. Calibration source

e. Calibration procedure used

f. Before and after calibration data

g. Facsimile of the current stamped calibration sticker affixed to SE item

h. Verification of full performance compliance IAW this PWS for SE items not requiring calibration.

i. Traceability to the National Institute of Standards and Technology

While GFE is in the possession of the Contractor, the Contractor shall be responsible to provide routine maintenance, calibration and minor repair of GFE to ensure the GFE is returned to the Government in the same condition as when provided, less normal wear and tear. An annual report (DI-81634B) with the quantity, condition, part number (PN) and serial number (SN) of all GFE is required.

Precious Metals Recovery Program

1.1.26. The handling and control of precious metals shall be IAW AFI23-101, Air Force Material Management.

Nuclear Hardness Requirement

1.1.27. The Contractor shall establish, document, and maintain nuclear hardness requirement program for the work associated with this PWS. If nuclear hardness requirement is or will be compromised through the work associated with this PWS, the Contractor shall notify the PCO within 15 business days of discovery, not proceed with any additional work, and wait for written instructions from the PCO.

Parts Control Program

1.1.28. The Contractor shall establish, document, and maintain a parts control program for the work associated with this PWS. Parts or material used shall be equal to or exceed the original requirements technical data.

1.1.29. The current item configuration, as described in the applicable Approved OEM parts list, shall serve as the baseline and Program Parts Selection List (PPSL) for required parts.

1.1.30. The Contractor shall maintain configuration of items worked under the scope of this contract as identified in the applicable end-item or system parts list. The Contractor shall notify the PCO via fax or e-mail of any configuration discrepancies noted between the parts list, engineering drawings, and the current configuration of the end-item. The Contractor shall obtain written authorization from cognizant engineering activity via the PCO for deviations from the parts list prior to implementation for parts that are not Class II changes. The contractors engineering department shall have the authority to prepare and approve Class II engineering change orders and minor deviations as defined by MIL-HDBK-61 concerning workload. The contractor shall submit all AFTO Class I and Class II ECO major and minor deviations to DCMA for concurrence with classifications. Copies of any approved Class II ECOs or minor deviations, shall be forwarded to the PCO through the ACO using contractors internal form in accordance with the contractors internal procedures (DI-CMAN-80639C).

1.1.31. The Contractor shall keep records to allow traceability of the sourcing of replacement parts for each end item repaired and shall be furnished for inspection upon Government request.

1.1.32. The contractor shall maintain an active role in the established B-2 Obsolescence/Diminishing Manufacturing Sources and Material Shortages (DMSMS) Working group, tracking hardware bill of materials (BOM’s) to mitigate obsolescence issues per the DMSMS plan. (DI-MISC-80711A)

Diminishing Manufacturing Sources/Material Shortage and Obsolescence The Contractor shall report all diminishing manufacturing sources/material shortages and obsolescence issues to the Government. (DI-SESS-81656)

1.1.33. Government-Industry Data Exchange Program (GIDEP). The contractor shallparticipate in the GIDEP practices described below IAW the DOD-wide practices outlined in Topic 26A of the Defense Acuisition Deskbook (DAD). The contractor shall review GIDEP ALERTs, Problen Advisories, and other GIDEP Failure Experience Reports (FER) for potential impact to hardware both in repair and delivered items. The contractor shall notify the CO, via telecom within two (2) working days of discovery, if a FER will negatively impact system performance. For FERs that identify parts or materials that are noncompliant to hardware specifications or drawings but do not affect performance requirements of production items, the contractor shall review GIDEP Dimisnishing Manufacturing Sources and Material Shortages (DMSMS) notices for applicability to the operational hardware being delivered. The contractor shall support GIDEP realted failures and/or material acquisition problems at each Program Management review (PMR) and Technical Interchange Meeting (TIM). The contractor shall support GIDEP Urgent Data Request (UDR) efforts and, when applicable, take advantage of Calibration Procedures, Metrology Documents and Technical Manuals available at no cost to GIDEP participants to reduce overall contract costs.

Counterfeit Prevention Plan

1.1.34. Counterfeit Prevention Plan (CPP). Contractors and their suppliers shall establish policies and procedures to avoid, detect, mitigate and disposition counterfeit parts and materials to prevent such parts from entering the USAF/DoD supply chain. These policies and procedures shall be documented in a CPP for submission and approval in accordance with Data Item Description (DID) (DI-MISC-81832 and CDRL A011) and accomplished for all specified contract items. DI-MISC-81832 is applicable to Parts, Material and Processes Selection (PMPS) associated with delivery of systems and assemblies to the USAF and DoD. The requirements established by DI-MISC-81832 also apply to any components procured in sustainment of such systems and assemblies. The requirements of SAE AS5553 Aerospace Standard, Counterfeit Materiel; Assuring Acquisition of Authentic and Conforming Materiel, shall also apply.

1.1.35. At a minimum, the CPP shall address:

1.1.35.1. Applicability. The Contractor shall identify all Business locations and programs to which the CPP applies. The CPP shall address (as applicable) materials, hardware, electronic parts, and procured assemblies.

1.1.35.2. Definitions. The Contractor shall utilize definitions per AS6174 to ensure consistency. Any contractor-derived definitions must be included in an appropriate CPP appendix or annex. (Ref. AS6174, paragraph 2.2, 2.3, and 2.4)

1.1.35.3. Parts Availability and Use of Parts Brokers. The Contractor shall not procure materials, systems, assemblies, subassemblies or parts from parts Brokers when available from Original Manufacturers (OM) or their Authorized Distributors. In cases where materials, systems, assemblies, subassemblies or parts are no longer available from the OM or their Authorized Distributors, procurement from Brokers may be authorized as defined by the Contractor’s policy and their CPP. (Ref. AS6174, paragraph 3.1.2.c and Appendix B)

1.1.35.4. Procurement Policies. The Contractor shall provide and implement policy directing development and implementation of business practices and procedures, and processes to prevent procurement of Counterfeit materials and parts. The Contractor shall identify the appropriate office(s), business units, functional organizations, and programs, who shall have responsibility for development, maintenance and implementation of the CPP. The CPP shall identify the specific roles and responsibility for each. (Ref. AS6174, section 3)

1.1.35.5. Risk Assessment. The contractor shall address the risk of using unknown sources and or unauthorized suppliers in the CPP. Application or technical risk assessments shall establish the affect that counterfeit parts may have on performance. Vendor or source of supply risk assessments shall establish the potential for obtaining counterfeit parts. Using any risk analysis tool acceptable to the Government, the Contractor shall conduct a risk assessment based upon item characteristics and how likely it is that a counterfeit part will be received. The contractor shall identify and describe in the CPP how parts are selected for assessment and what risk is acceptable based upon the parts design, construction, material and functional requirements. As a minimum, analysis shall be completed for flagging high risk items, such as items that are obsolete, discontinued, rare, etc. The contractor shall require completion of a trade study, documented within the CPP, that shall facilitate determining whether 100% testing of parts procured from after-market sources is more cost effective than qualification or requalification of a manufacturer. (Ref. AS6174, appendix A)

1.1.35.6. Detection and Avoidance Responsibilities. The Contractor shall establish processes for the review and approval of contractor, and applicable subcontractor, systems for the detection and avoidance of counterfeit materials whose processes shall be comparable to the processes established for contractor business systems under section 893 of the Ike Skelton National Defense Authorization Act for Fiscal Year 2011 (Public Law 111–383; 124 Stat. 4311; 10 U.S.C. 2302 note). The Contractor shall flow down such requirements and processes to their subcontractors per ODASD Memo titled “Overarching DoD Counterfeit Prevention Guidance”, dated 16 March 2012. (Ref. AS6174, paragraph 3.1, appendix B)

1.1.35.7. Testing and Verification. The Contractor shall establish and accomplish testing and verification processes for items not received from an original equipment manufacturer, original component manufacturer, or authorized distributor that are identified as having high risk for counterfeit potential. These processes apply to prime contracts, and to subcontracts or suppliers below the prime contracts. The Contractor shall provide a list of acceptable test facilities if the subcontractor or supplier does not have the capability to perform required testing. Submittal of Certificates of Compliance indicating the parts are not counterfeit shall be acceptable for verification of testing. (Ref. AS6174, paragraph 3.1)

1.1.35.8. Configuration Identification and Traceability. The Contractor shall identify and control the configurations of all systems, assemblies, subassemblies and parts, and enable mechanisms to provide traceability of parts. The Contractor shall report to the Government when control of the configurations of all systems, assemblies, subassemblies and parts, and mechanisms to provide traceability of parts are not possible. The Contractor shall identify the specific systems, assemblies, subassemblies and parts beyond the Contractors’ control. The Contractor shall be responsible for detecting and avoiding the use or inclusion of counterfeit materials and parts, to include procured assemblies and subassemblies, in such products and shall be responsible for the rework or corrective action that may be required to resolve the use or inclusion of counterfeit materials and parts. The cost of rework or corrective action that may be required to remedy the use or inclusion of such parts are not allowable costs under Department contracts , unless: a) the contractor has established a counterfeit avoidance/detection system approved by the DoD, b) the counterfeit parts were procured from a DoD-accredited trusted supplier or provided as government property, and c) the contractor has provide timely notification to the government. (Ref. AS6174, appendix A, B, and C)

1.1.35.9. Counterfeit Notification and Reporting. The Contractor shall report in writing to the Procuring Activity within 30 calendar days of determining any end item, component, part, or material contained in supplies purchased by the Department of Defense, or purchased by a contractor or subcontractor for delivery to, or on behalf of, the Department, contains counterfeit electronic parts or suspect counterfeit electronic parts for the purpose of investigation and notification of the Air Force Office of Special Investigations (AFOSI). The Procuring Contracting Officer (PCO) shall coordinate reporting to the appropriate Program Management/Item Management, System Engineering Management, the AFMC Discrepant Materiel Reporting Program (DMRP) Office in 406 SCMS/GULAB, and the AFOSI. Additionally, the Contractor shall within the same 30 day period ensure all suspected or confirmed counterfeit items are entered into the Government-Industry Data Exchange Program (GIDEP) system, which will serve as the DoD central reporting repository. (Ref. AS6174, paragraph 3.1.7, appendix G)

1.1.35.10. Counterfeit Prevention Training. The Contractor shall provide appropriate training and shall require all personnel working procurement within their company, to include at a minimum their supply chain management specialists, receiving inspectors, and engineers, to complete said training. The Contractor shall determine the appropriate training required. Training may be developed in-house or may be other Industry accepted training. The CPP shall describe and list the training provided by the contractor to their personnel.

Engineering Support

1.13.1 Engineering support shall be provided as requested by the PCO. Engineering support shall be funded as unprogrammed workload and is not considered part of an item’s repair price. These engineering assignments may include such tasks as First Article Inspections, obsolescence resolution, reverse engineering studies on hardware or software, etc. which are depot type activities in support of the assigned workloads. The contractor and the Government shall mutually agree-upon task descriptions, level of effort (LOE) and the cost of the work to be performed. Expected outputs from this requirement shall be reported in Engineering Change Proposal (ECPs) in accordance with DI-CMAN-80639C and Status Reports in accordance with DI-MGMT-80368A .

Cannibalization of Parts

1.1.36. The Contractor shall request authorization from the PCO to cannibalize subassemblies or parts between inducted unserviceable assets in order to expedite repair when a particular repair is constrained for lack of materials that are not, and will not be immediately available. Cannibalization requests will be subject to the review and approval of the cognizant engineering activity. Such cannibalization actions will only be considered upon exhaustion of all other sources of materials. The Contractor shall not initiate any cannibalization action unless such action will satisfy all material requirements for the item in question. The Contractor shall not remove any piece parts from serviceable units. The Contractor shall replace, at the Contractor’s expense, all cannibalized subassemblies with repaired or new subassemblies and replace all cannibalized parts with new parts. The Contractor shall ensure the contract delivery schedule is not negatively affected by the removal of any subassemblies or parts from any inducted end item.

Lead (Pb) Free Electronics

1.1.37. The use of lead (Pb) solder and/or components/assemblies in the repair of the subject items is considered a potential safety risk and is therefore discouraged. The contractor shall provide case-by-case notifications to the cognizant engineering activity via the PCO if lead (Pb) solder and/or components/assemblies must be considered, and will assist the cognizant engineering activity in assessing the risk associated with the use of such materials. The contractor shall obtain approval from the PCO before proceeding.

1.1.38. When approved lead (Pb) solder and/or components/assemblies are used in the repair of the subject items, the contractor shall ensure the affected items are marked in accordance with IPC J-STD-609, "Marking, Symbols and Labels of Leaded and Lead-Free Terminal Finish Materials Used in Electronic Assembly.”

Ozone Depleting Substances (ODS)

1.1.39. This PWS is not requiring the use of a Class 1 ozone depleting substance (ODS) in the performance of the contract. The Contractor is authorized to use a suitable substitute for any Class 1 ODS which may be required by the specifications or Technical Data of this PWS. The Contractor shall immediately identify the substitute by written notification to the PCO.

Technical Order Maintenance

1.1.40. This section is not applicable.

Work Requirements

1.1.41. The Contractor shall repair the items specified in Attachment A of this PWS. The work encompasses the disassembly, cleaning, inspection, maintenance, reassembly, ATP troubleshooting and testing and to finishing actions required to return the items to a serviceable condition. The work shall be accomplished IAW documents as specified in Attachment C. In the event that a situation develops where the instructions conflict with the pertinent manual, this PWS shall take precedence. Additional TOs, directives and other publications listed in Attachment C will be used as guidance to support the repair stipulated in this PWS.

1.1.42. The Contractor shall replace any component parts that do not meet specified inspection requirements, or if there is any doubt as to its serviceability or longevity at the Contractor’s expense. This includes any part requiring replacement due to catastrophic failure, fatigue failure, or normal deterioration. The Contractor is advised to include the cost of replacing a percentage of each recoverable part in their repair cost proposal.

1.1.42.1. If the Contractor is not a Government Engineer approved source of repair for a recoverable part, this part shall be replaced with a new part per paragraph 1.11.5 or repaired by a Government Engineer approved source. The Contractor may propose their repair procedure along with substantiating documents for evaluation and possible approval for repair of the recoverable part. The Contractor shall submit the request for evaluation to the cognizant engineering office through the PCO for approval. The Government will not be responsible for any costs associated with development of any repair procedures unless it has been negotiated and approved by the PCO.

1.1.43. Over and Above will be considered for missing components or for work not covered by the line items for the basic work under the contract but within the general scope of the contract. Identification of missing part(s) must be revealed within 2 business days after induction for repair and reported to the PCO through the ACO in the form of a Supply Discrepancy Report using SF 364. The Contractor shall obtain approval from the PCO prior to performing over and above.

1.1.44. End Item Identification and Marking:

1.1.44.1. Permanently and legibly mark each repaired end item with the Contractor's identification. This identification shall include the Contractor's CAGE and the date of repair. The identification shall be permanently affixed to the end item by stamp, stencil, or similar means.

1.1.44.2. Item Unique Identification (IUID) will be added to the end item in accordance with the following:

a. Specification requirements for IUID marking will be contained in the applicable repair technical order, Specific Work Requirements appendix, approved engineering drawing, or a Government provided Engineering Order (EO) (AF Forms 3925, 3926 and 3927) as applicable.

b. IUID markings are required for the end-item only. IUID for subcomponents is only required if specifically identified in the applicable repair technical order, Specific Work Requirements appendix, approved engineering drawing, or a Government provided EO.

c. For items that do not have IUID marking specifications as stated in paragraph b., the Contractor shall develop the marking specifications in accordance with the current revision of MIL-STD-130. Location and marking method shall be approved by 424 SCMS engineering before implementation. If the Contractor cannot meet the terms and conditions in the contract for IUID, the Contractor will contact the PCO/ACO for determination.

d. IUID markings currently in place on items undergoing repair shall be protected from damage or removal during repair. Verify 2-D matrix IUID markings are readable per TO 00-25-260. Should IUID marking be rendered unreadable during repair, the Contractor shall notify 424 SCMS engineering and the PCO/ACO for determination of how to replace the IUID mark.

e. The Contractor shall submit the required and applicable contingent data for Legacy items to the IUID Registry per the data submission procedures at http://www.acq.osd.mil/dpap/pdi/uid/data_submission_information.html.

f. The Contractor shall submit IUID data for new manufactured items that require IUID based on the DFARS clause 252.211-7003, Item Identification and Valuation, as prescribed in DFARS Subpart 211.274

1.1.45. Quality Acceptance and Processing:

1.1.45.1. The Contractor shall support quality acceptance inspections of each end item and shall be performed prior to packaging and transportation. Quality acceptance will be performed by DCMA at the repair site. Quality acceptance documentation for each end-item shall be maintained by the Contractor as part of the item document package.

1.1.45.2. Each end item identified as serviceable shall be delivered to the Government defect free.

1.1.45.3. Following quality acceptance by the DCMA, the Contractor shall notify the Production Management Specialist (PMS) via email or fax of the completion of repaired end- items. The PMS will provide ship-to addresses/instructions to the Contractor via email or fax for each item produced. Within one business day of shipment, the Contractor shall provide proof of shipment through delivery of an accepted WAWF Receiving Report to the PMS. The Receiving Report shall include the carrier and tracking number.

1.1.46. Shipping Documentation:

1.1.46.1. The Contractor shall insure that the appropriate tag is attached to each serviceable end-item generated.

a. Serviceable tag is DD Form 1574/1574-1 (Yellow).

b. Unserviceable (repairable) tag is DD Form 1577-2/1577-3 (Green).

c. Unserviceable (condemned) tag is DD Form 1577/1577-1 (Red).

1.1.46.2. Shipments under this contract shall be by Commercial Bill of Lading (CBL) by the fastest traceable means.

1.1.46.3. The Contractor shall reimburse the Government for packaging and shipping costs for items returned to the contractor for correction of quality deficiencies.

Surge/Mission Essential Services

1.1.47. In the event that the Department of Defense (DoD) experiences an unplanned spike or sudden increase in demand, due to major theater warfare or a national emergency (also known as surge), and invokes surge, the Contractor shall work to meet and sustain this demand for quantity levels above and beyond normal peacetime requirements. After being notified by the PCO of the surge demand in writing, the Contractor may see additional orders and/or will see the priority status elevated on current orders. The Contractor shall implement their procedures to support the surge demand.

1.1.48. The Contractor shall notify the PCO advance and be given the opportunity to negotiate any expedite charges that might apply at the time of surge. Contractual requirements for production of this contract are addressed in Part I of basic contract. The schedule and surge requirements shall be on a best-effort basis.

1.1.49. The Contractor shall prepare for the continuation of essential DoD services during crisis IAW Defense Federal Acquisition Regulation Supplement (DFARS) 252.237.7023. The contractor shall establish and provide a written plan to ensure continued support during a crisis. The plan shall be submitted with the contractor's proposal.

Delivery Schedule

1.1.50. The Contractor shall meet the contractual delivery schedule.

Customer Service Requirements

1.1.51. Information Requests: The Contractor shall ensure responses to requests for information and data are only provided to customers authorized by the PCO in the performance of official duties. All requests between the Government and the Contractor shall go through the Procuring Contracting Officer (PCO). Exceptions are found in 1.21.1.2.

1.1.51.1. Information requests shall contain a subject line, nature of the request and an expected/requested response date and time. The request must be identified as “EMERGENCY”, “URGENT” or “ROUTINE” IAW paragraph 1.21.2 of this PWS so that a response is provided within the specified timeframes. A log will be maintained by the PCO or an appointed Government Representative. The log will be used to track all requests and evaluate response times.

1.1.51.2. Contractor requests for engineering and/or technical related problems or issues shall be submitted on an AFMC Form 202, Nonconforming Technical Assistance Request and Reply. All AFMC Form 202s shall be sent directly to 424 SCMS Cognizant Engineer with an information copy to the ACO and PCO.

1.1.52. Response Times for Information Requests: All requests for information initiated by the Government or Contractor shall be in writing and submitted electronically via e-mail or fax. Requests for information shall be answered within the following timeframes:

a. Emergency and Work-Stoppage- Respond within two (2) business days.

b. Urgent- Respond within five (5) business days.

c. Routine- Respond within ten (10) business days.

Safety and Health

1.1.53. While performing work under this contract the contractor shall comply with all applicable federal, state and local regulations regarding occupational safety and health. The contractor shall notify the Contracting Officer (CO), within eight (8) hours of any damage to government property where the dollar value exceeds $500,000.00 and within two business days, for any damage to government property less than $500,000.00 during the execution of the contract. Mishap notifications shall contain, as a minimum, the following information:

a. Contract, Contract Number, Name and Title of Person(s) Reporting

b. Date, Time and exact location of accident/incident

c. Brief Narrative of accident/incident (Events leading to accident/incident)

d. Cause of accident/incident, if known

e. Estimated cost of accident/incident (material and labor to repair/replace)

f. Nomenclature of equipment and personnel involved in accident/incident

g. Corrective actions (taken or proposed)

h. Other pertinent information

If requested by the designated CO, the contractor shall immediately secure the mishap scene/damaged property and impound pertinent maintenance and training records, until released by the Procuring Safety Office. Contractors will not dispose of contract data related to a mishap until notified to do so by the CO.

SERVICE SUMMARY

Service Summary

1.1.54. Contractor performance shall be measured and assessed, using the Performance Requirements listed in Table 2-1. The Contractor service requirements are summarized into performance requirements that relate directly to the mission essential items. The performance threshold requirements describe the minimum acceptable levels of service for each requirement. In the event the performance requirement is not met, the Contractor shall be given time after notification to correct the unacceptable performance, if such correction is possible. The Contractor shall immediately take corrective action in accordance with the performance threshold(s). In cases where the Contractor fails to implement corrective action, the PCO will take appropriate measures.

1.1.55. Service Summary (SS) Requirements: The Contractor shall ensure the performance and threshold requirements are achieved as identified in Table 2-1.

1.1.56. Surveillance Methods: The PMS, DCMA Quality Assurance Representatives (QAR) and PCO will exercise surveillance over the performance requirements. The absence of any contract requirement from the SS shall not detract from this enforceability nor limit the rights or remedies of the Government under any other provision of the contract. The Contractor shall support the PMS, DCMA QAR, and PCO surveillance methods as identified below:

a. Periodic Inspection of Process or Output

b. Random Sampling of Recurring Service Output

c. 100 Percent Inspection of Output

d. Customer Observation or Complaint.

1.1.56.1. The Government will use the methods contained in the Quality Assurance Surveillance Plan (QASP) to evaluate the Contractor’s performance for the listed program objectives. The PMS, DCMA QAR, and/or PCO will monitor Contractor performance to determine if it meets the contract thresholds as set forth in the performance measures and this PWS.

2.1 SERVICE SUMMARY TABLE

Performance Requirements
PWS Para
Performance Threshold

Requirements

SS-1. All requests for information initiated by the Government or Contractor shall be in writing and submitted electronically via e-mail or fax.
1.21.2
Emergency and Work Stoppage Requests – respond within 2 business days

Urgent Requests – respond within 5 business days Routine Requests – respond within 10 business days

SS-2. Each end-item identified as serviceable shall be delivered to the Government defect free.
1.18.5.2

100% of all end items shall perform without defect for one year of repair

SS-3. Data requirements are specified in the Contract Data Requirements List (CDRL DD Form 1423) found in Part 1, Section B, The Schedule of the Basic contract
1.5.1
100% inspection of data input in CAV AF (Commercial Asset Visibility Air Force) and review of furnished reports.
SS-4. The Contractor shall meet the contractual delivery schedule.
1.20.1
100% of all end items are returned to the Government IAW the delivery schedule.
SS-5. Discrepancies incident to shipment include misidentified items, variations in quantity, non-requisitioned items, lost or damaged parcel post, and items in dubious condition. These discrepancies shall be reported and resolved using the DoD web-based application WebSDR
2.4.1
100% inspection of GFP and

GFM.

1.1.57. Contractor Performance Evaluation: The Contractor shall understand that the evaluation of performance will occur when the PMS evaluates the service of the Contractor to determine whether or not it meets the performance measures of the contract.

a. SS-1through SS-5: The Contractor's failure to meet the requirement for this item shall result in the possibility of an unsatisfactory or marginal under the Contractor Performance Assessment Review (CPAR).

GOVERNMENT PROPERTY

Government Property

1.1.58. The Contractor shall furnish all material, support equipment, tools, test equipment, and services except as listed below. No Government Furnished Property will be provided other than the units to be repaired. Government Furnished Material will not be provided.

Disposition of Government Property

1.1.59. These instructions apply to all Government owned property. Within 90 calendar days prior to contract expiration, the Contractor shall submit a letter to the PCO requesting disposition instructions in the transfer of Government furnished property (GFP). A listing identifying GFP shall include the NSN, part number/CAGE, noun, quantity, condition code, and dollar value, and the list shall be submitted through the PCO to the PMS for disposition instructions.

1.1.60. If a follow-on contract is being awarded or, is in the negotiation or solicitation stage, the existing GFP may be retained to the extent required to phase support on the current contract and/or the follow-on contract.

1.1.61. The Contractor shall comply with preservation, packaging, and packing instruction as specified in the basic contract and/or on the AFMC Form 158 (Packaging Requirements).

1.1.62. The Contractor shall comply with the Transportation Data on the DD Form 1653 and Transportation Appropriations Form when returning government property.

Discrepancies Incident to Shipment:

1.1.63. Discrepancies incident to shipment include misidentified items, variations in quantity, non-requisitioned items, lost or damaged parcel post, and items in dubious condition. These discrepancies shall be reported and resolved using the DoD web-based application WebSDR link is https://www2.transactionservices.dla.mil/websdr/home.asp This system of reporting a Supply Discrepancy Report (SDR), formerly called Report of Discrepancy (ROD), has been developed in compliance with DoD regulations 4140.1-R and 4000.25-M Volume 2, which requires automated SDR processing. In those situations where the SDR initiator is unable to gain access to the AF WebSDR, continued use of manual forms is permitted. A copy of the form will be forwarded through the CAO and Quality Assurance (QA) activity for corrective action.

1.1.64. Transportation discrepancies and item transaction discrepancies shall be coordinated with the DCMA Property Administrator and ACO within 2 business days upon discovery for corrective action utilizing the AF WebSDR submittal.

1.1.65. The Contractor shall process a SDR (SF Form 364) for contract line items received with missing components (Missing On Induction, (MOI)) within 2 business days upon discovery in accordance with AFJMAN 23-215. An electronic copy of MOI SDR form shall be submitted to the ACO and PCO within 2 business days of discovery.

1.1.66. Misdirected shipments of GFP shall be reported by written notification to the Property Administrator (PA) within 2 business days. The PA will issue disposition instructions for the misdirected items. Misdirected items received by the Contractor which are not part of this contract will not be receipted into CAV AF.

Other

1.1.67. The Contractor shall not obtain GFP through the utilization of requisition codes assigned exclusively to this contract for any other contracts.

1.1.68. The Contractor shall not transfer or use GFP charged to this contract to any other contract, Contractor, or activity without the advance approval of the PMS through the PCO.

1.1.69. The Contractor shall replace GFP that has been removed by the USAF to fulfill other more urgent requirements. If any item so removed by the government is still required to complete the contract, the Contractor shall take appropriate action to replace the removed item.

ATTACHMENT A – END ITEMS

END ITEM

RECEIVED AS

END ITEM

TO BE DELIVERED AS

END ITEM NO
NATIONAL

STOCK NO(S)

PART NO(S)
NATIONAL

STOCK NO(S)

PARTS NO(S)

1
5841-01-319-1380FW
HG7170AB02
5841-01-319-1380FW
HG7170AB02

ATTACHMENT B – DEFINITIONS

The following definitions are applicable to this PWS:

a) End Item: An end item is a complete piece of Government equipment as listed in Government supply catalogs and suitable for government storage and issue.

b) Initial Production Evaluation (IPE): An IPE is a planned Government review of early production items and processes to evaluate a Contractor’s capability to complete the work stipulated in the contract and in accordance with (IAW) the technical order (TO), and other guidance stipulated in this PWS.

c) Cannibalization: Authorized removals of a specific assembly, subassembly, or part from one weapon system, system, support system, or equipment end-item for installation on another end-item to meet priority mission requirements with an obligation to replace the removed item.

d) Administrative Contracting Officer (ACO): A contracting officer assigned the responsibility for the post award functions related to the administration of a government contract in the field. The ACO is normally located in the Defense Contract Management Agency (DCMA) office. The ACO is responsible for ensuring the Contractor performs in accordance with the terms of the contract.

e) Procuring Contracting Officer (PCO): The individual authorized to enter into contracts for supplies and services on behalf of the Government by formal advertising or negotiation and who is responsible for overall procurement of the contract.

f) Technical Order (TO): An Air Force publication that gives specific technical directives and information with respect to the inspection, storage, operation, modification, and maintenance of given items and equipment.

g) Support Equipment (SE): All equipment called out in applicable technical orders required for end item and component test, repair, and / or modification.

h) Serviceable: Capable of meeting the requirements and performing the function for which designed or modified, and meets all test requirements established by the technical order and PWS.

i) Repair: An end item repair is the action taken to return the end item to a serviceable condition by replacing all exposed consumable items and only the damaged recoverable parts that do not meet the TO inspection criteria. Repair consists of end item testing to determine deficiencies, disassembly as required to support maintenance actions required, thorough cleaning, refurbishment or replacement of all disturbed components not meeting inspection criteria, replacement of all soft parts (seal, gaskets, etc.) exposed during repair, re-assembly of assemblies and subassemblies, performance of all adjustments and alignments, test and calibration of subassemblies and end-items and final inspection (e.g., safety wiring, painting, affixing of decals) IAW the applicable TOs and approved test documents to restore the end item to a serviceable condition.

j) Defect: Any nonconformance of a characteristic with specified requirements.

k) Product Quality Deficiency: A defect or nonconforming condition. Included are deficiencies in design, specification, material, manufacturing, and workmanship.

l) Product Quality Deficiency Report: The SF 368 form or format used to record and transmit product quality deficiency data.

m) Consumable Part: Piece parts that are replaced 100% at each repair event

n) Recoverable Part: Parts that are not replaced at every repair event.

ATTACHMENT C – APPLICABLE DOCUMENTS

USAF Technical Orders

TO NUMBER
DATE
TITLE

00-5-1, Chapters 1-3

On- line version is considered most up-to-date
AF Technical Order System

http://www.tinker.af.mil/technicalorders/index.asp

00-5-3 Chapters 1-4

On- line version is considered most up-to-date
Technical Order Life Cycle Management

http://www.tinker.af.mil/technicalorders/index.asp

00-35D-54 Chapters 1-4

On- line version is considered most up-to-date
USAF Material Deficiency Reporting and Investigating System

http://www.tinker.af.mil/technicalorders/index.asp

00-25-260
On- line version is considered most up-to-date
Asset Marking and Tracking Item Unique Identification (IUID) Marking Procedures

http://www.robins.af.mil/library/technicalorders.asp

12P4-4-36-4-WA-1
On- line version is considered most up-to-date
TECHNICAL MANUAL ILLUSTRATED PARTS BREAKDOWN DEPOT MAINTENANCE RADAR ALTIMETER RECEIVER/TRANSMITTER HG7170AB02 HONEYWELL , INC.
12P4-4-36-3-WA-1
On- line version is considered most up-to-date
OVERHAUL INSTRUCTIONS, DEPOT MAINTENANCE, RADAR ALTIMETER RECEIVER/TRANSMITTER, HG7170AB02, HONEYWELL INC., (MANUAL PREPARED BY NORTHROP GRUMMAN CORPORATION), F33657-87-C-2000, F33657-99-D-0028

Military…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .