SOW.pdf

PDF 178 KB Posted

Attached to
Remanufacture Power Drive Unit Controller Federal contract opportunity
Solicitation number
FA8119-15-R-0002
Issued by
Department of the Air Force Materiel Command Lifecycle Management Center Tinker Air Force Base

About this file

Statement of Work

View the file

Other files for this federal contract opportunity

Other files attached to Remanufacture Power Drive Unit Controller, newest first.
File Type Posted
J A6.302-1.pdf PDF
FA811915R0002_______0001.pdf PDF
CDRL.pdf PDF
DID81832.pdf PDF
DID81534.pdf PDF
DID81373.pdf PDF
CAVAF.pdf PDF
DID80639C.pdf PDF
ItemDescription.pdf PDF
form158.pdf PDF
form1653.pdf PDF
DID81249A.pdf PDF
DID81250A.pdf PDF
DID80728A.pdf PDF
DID80711A.pdf PDF
FA811915R0002.pdf PDF
DID81656.pdf PDF
IUID.pdf PDF
DID81634B.pdf PDF
Show all 19

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

APPENDIX A

Statement of Work

(SOW)

For Control Surface, Guided Missile

Power Drive Unit Controller (PDUC)

PREPARATION DATE: 24 Dec 14

REVISION NUMBER: 1 DATE: 16 Mar 15

FD2030-15-00776

PREPARING ORGANIZATION: AFSC/448 SCMW/848 SCMG/424 SCMS TINKER AFB OK 73145

Table of Contents

1. DESCRIPTION OF WORK/GENERAL INFORMATION

1.1. Purpose

1.2. General Information

1.3. Pre-Award Survey (PAS) Requirements

1.4. Initial Production Evaluation (IPE) Requirements

1.5. Reporting Requirements

1.6. Quality Program and Inspection System Requirements

1.7. Precious Metals Recovery Program

1.8. Parts Control Program

1.9. Counterfeit Prevention Plan

1.10. Lead (Pb) Free Electronics

1.11. Ozone Depleting Substances (ODS)

1.12. Technical Order Maintenance

1.13. Work Requirements

1.14. Surge

1.15. Delivery Schedule

1.16. Customer Service Requirements

1.17. Safety and Health

2. GOVERNMENT PROPERTY

2.1. Government Property

2.2. Disposition of Government Property

2.3. Discrepancies Incident to Shipment:

2.4. Other

ATTACHMENT A – END ITEMS

ATTACHMENT B – DEFINITIONS

ATTACHMENT C – APPLICABLE DOCUMENTS

i

1. DESCRIPTION OF WORK/GENERAL INFORMATION

1.1. Purpose

1.1.1. The purpose of the Statement of Work (SOW) is to define the remanufacture requirements for the items specified in Attachment A of the PWS. The work encompasses the disassembly, cleaning, inspection, maintenance, reassembly, testing and finishing actions required to return the items to a serviceable condition. The contractor is responsible for having the remanufacture capabilities to include appropriate technical data, remanufacture documents, and license agreements, required to accomplish this remanufacture. The Contractor is responsible for the scheduled delivery of a quality product.

1.2. General Information

1.2.1. Contractor employees shall identify themselves as Contractor personnel by introducing themselves or being introduced as Contractor personnel and displaying distinguishing badges or other visible identification for meetings with Government personnel. In addition, Contractor personnel shall appropriately identify themselves as Contractor employees in telephone conversations and in formal and informal written correspondence.

1.3. Pre-Award Survey (PAS) Requirements

1.3.1. PAS shall be waived.

1.4. Initial Production Evaluation (IPE) Requirements

1.4.1. IPE shall be waived.

1.5. Reporting Requirements

1.5.1. Data requirements are specified in the Contract Data Requirements List (CDRL DD Form 1423) found in Part 1, Section B, The Schedule of the Basic contract.

1.5.2. In addition, the Contractor shall maintain a document package, in the

Contractor’s format, containing the following documentation for each item produced for the contract period:

a. Quality Acceptance Documentation

b. Test Data Sheet

c. Quality Acceptance Review Documentation

d. Parts replaced listed by each serial numbered end item repaired

e. Engineering Change Proposals

1.5.3. The Contractor shall support meetings (e.g., teleconferences, Program Management Reviews (PMR), Technical Interchange Meetings (TIM), etc.) with the Government. The Contractor shall provide meeting facilities. (DI-ADMN- 81249A, CDRL A003, DI-ADMN-81373, CDRL A004 and DI-ADMN-81250A, CDRL A005)

1.6. Quality Program and Inspection System Requirements

1.6.1. The Contractor shall establish, document and maintain a quality system as a means of ensuring that the end item conforms to specified requirements. The quality system shall be in accordance with the contract requirements.

1.6.2. When a Deficiency Report is received for an end item remanufactured under the terms of this contract, the Contractor shall comply with the Administrative Contracting Officer’s (ACO) directions. Guidance is provided in Technical Order (TO) 00-35D-54, USAF Deficiency Reporting, Investigation, and Resolution.

1.6.3. The Contractor shall report any Government Furnished Material (GFM), if applicable, for the work accomplished as outlined in this PWS, that is damaged or otherwise unsuitable for use to the ACO using a Supply Discrepancy Report (SDR), SF Form 364 (formerly, Report of Discrepancy (ROD)) within 30 calendar days of discovery.

1.6.4. The Contractor shall support quality audits as required by the ACO. These audits could require that one or more end items be removed from the production line and subjected to any combination of inspection, testing, disassembly, or assembly, to determine that the standards of performance and technical conformance meet the requirements of this PWS. The Contractor shall be required to correct a deficient process to eliminate the cause(s) of any defects as directed by the ACO before production of the next end item.

1.6.5. The Contractor shall allow quality assurance reviews to be conducted at the site of remanufacture at the request of the Defense Contract Management Agency (DCMA) throughout the contract period.

1.6.6. The Contractor shall allow a quality acceptance review by the DCMA representative at the site of remanufacture for each end item generated under the terms of this contract.

1.6.7. The Contractor shall submit requests for deviation / waiver to the Procurement

Contracting Officer (PCO) through the ACO In Accordance With (IAW) 1.16.2.

Work shall not be initiated on assemblies / components affected by deviation / waiver pending approval / disapproval. Requests shall include the contract number, NSN and P/N of end item and lowest part / assembly affected, effect on cost / price and delivery schedule, description of deviation / waiver, justification for deviation / waiver, and proposed corrective action taken.

1.7. Precious Metals Recovery Program

1.7.1. The handling and control of precious metals shall be IAW AFMAN 23-101, Air

Force Materiel Management.

1.8. Parts Control Program

1.8.1. The Contractor shall establish, document, and maintain a parts control program for the work associated with this PWS. Parts or material used shall be equal to or exceed the original requirements technical data.

The current item configuration, as described in the applicable Approved OEM parts list, shall serve as the baseline and Program Parts Selection List (PPSL) for required parts.

1.8.2. The Contractor shall maintain configuration of items worked under the scope of this contract as identified in the applicable end-item or system parts list. The Contractor shall notify the PCO via fax or e-mail of any configuration discrepancies noted between the parts list, engineering drawings, and the current configuration of the end-item. The Contractor shall obtain written authorization from cognizant engineering activity via the PCO for deviations from the parts list prior to implementation for parts that are not Class II changes. The contractors engineering department shall have the authority to prepare and approve Class II engineering change orders and minor deviations as defined by MIL-HDBK-61 concerning workload. The contractor shall submit all AFTO Class I and Class II ECO major and minor deviations to DCMA for concurrence with classifications. Copies of any approved Class II ECOs or minor deviations, shall be forwarded to the PCO through the ACO using contractors internal form in accordance with the contractors internal procedures (DI-CMAN-80639C).

1.8.3. The Contractor shall keep records to allow traceability of the sourcing of replacement parts for each end item repaired and shall be furnished for inspection upon Government request.

1.8.4. The contractor shall maintain an active role in the established B-2

Obsolescence/Diminishing Manufacturing Sources and Material Shortages (DMSMS) Working group, tracking hardware bill of materials (BOM’s) to mitigate obsolescence issues per the DMSMS plan. DI-MISC-80711A

Diminishing Manufacturing Sources/Material Shortage and Obsolescence The Contractor shall report all diminishing manufacturing sources/material shortages and obsolescence issues to the Government. (DI-SESS-81656)

1.8.5. Government-Industry Data Exchange Program (GIDEP). The contractor shall participate in the GIDEP practices described below in accordance with the DOD-wide practices outlined in Topic 26A of the Defense Acquisition Deskbook (DAD).

The contractor shall review GIDEP ALERTs, Problem Advisories, and other GIDEP Failure Experience Reports (FER) for potential impact to hardware both in repair and delivered items. The contractor shall notify the PCO, via telecon within two

(2) working days of discovery, if a FER will negatively impact system performance. For FERs that identify parts or materials that are noncompliant to hardware specifications or drawings but do not affect performance requirements of production items, the contractor shall dispose of them through its internal quality assurance processes. The contractor shall review GIDEP Diminishing Manufacturing Sources and Material Shortages (DMSMS) notices for applicability to the operational hardware being delivered. The contractor shall identify GIDEP related failures and/or material acquisition problems at each Program Management Review (PMR) and Technical Interchange Meeting (TIM). The contractor shall support GIDEP Urgent Data Request (UDR) efforts and, when applicable, take advantage of the Calibration Procedures, Metrology Documents, and Technical Manuals available at no cost to GIDEP participants to reduce overall contract costs.

1.9. Counterfeit Prevention Plan

1.9.1. Counterfeit Prevention Plan (CPP). Contractors that supply electronic parts or systems that contain electronic parts shall establish policies and procedures to avoid, detect, mitigate and disposition counterfeit electronic parts to prevent such parts from entering the USAF/DoD supply chain. These policies and procedures shall be documented in a CPP for submission and approval in accordance with Data Item Description (DID) (DI-MISC-81832 and ) and accomplished for all specified contract items.

DI-MISC-81832 is applicable to Parts, Material and Processes Selection (PMPS) associated with delivery of systems and assemblies to the USAF and DoD. The requirements established by DI-MISC-81832 also apply to electronics components procured in sustainment of such systems and assemblies. The requirements of the recently DoD-adopted SAE 5553, Aerospace Standard, Counterfeit Electronics Parts; Avoidance, Detection, Mitigation, and Disposition shall also apply. This plan should be IAW the latest policy in the Defense Federal Acquisition Regulation Supplement

(DFARS).

1.10. Lead (Pb) Free Electronics

1.10.1. The use of lead (Pb) solder and/or components/assemblies in the repair of the subject items is considered a potential safety risk as described by the Reduction of Hazardous Substance (ROHS) requirements. Therefore, if lead (Pb) solder and/or components/assemblies are used in the repair of the subject items, the contractor shall ensure the affected items are marked in accordance with IPC J- STD-609, "Marking, Symbols and Labels of Leaded and Lead-Free Terminal Finish Materials Used in Electronic Assembly.”

1.10.2. Mixing of incompatible metals can reduce the reliability and can possibly lead to the formation of Tin-Whiskers in electronic assemblies. Therefore, all touch-up, rework, or repair of printed circuit assemblies shall be performed with the solder and component finish composition used to manufacture the original assembly .

The vendor shall refer to the fabrication drawings to determine the material alloy and rosin type to be used in the repair process. Any deviation requests must be approved by the PCO. The use of Lead Free in lieu of Tin Lead solder is prohibited in the repair process. Use TO 00-25-259 as a guide.

1.11. Ozone Depleting Substances (ODS)

1.11.1. This PWS is not requiring the use of a Class 1 ozone depleting substance (ODS) in the performance of the contract. The Contractor is authorized to use a suitable substitute for any Class 1 ODS which may be required by the specifications or Technical Data of this PWS. The Contractor shall immediately identify the substitute by written notification to the PCO.

1.12. Technical Order Maintenance

1.12.1. Commercial repair manuals to be maintained via contractors internal quality system.

1.13. Work Requirements

1.13.1. The Contractor shall remanufacture the items specified in Attachment A of this PWS. The work encompasses the disassembly, cleaning, inspection, maintenance, reassembly, ATP troubleshooting and testing and finishing actions required to return the items to a serviceable condition. The work shall be accomplished IAW contractor’s latest remanufacturing documents and/or documents as specified in Attachment C. In the event that a situation develops where the instructions conflict with the pertinent manual, this PWS shall take precedence. Additional TOs, directives and other publications listed in Attachment C will be used as guidance to support the repair stipulated in this

PWS.

1.13.2. The Contractor shall remove all component parts from the item assembly and replace with new quality component parts at the Contractor’s expense. Item testing will be accomplished at Tinker Air Force Base government item repair facility.

1.13.3. Over and Above will be considered for work not covered by the line items for the basic work under the contract but within the general scope of the contract. The

Contractor shall obtain approval from the PCO prior to performing over and above.

1.13.4. End Item Identification and Marking:

1.13.4.1. Permanently and legibly mark each repaired end item with the Contractor's identification. This identification shall include the Contractor's CAGE and the date of remanufacture. The identification shall be permanently affixed to the end item by stamp, stencil, or similar means.

1.13.4.2. Item Unique Identification (IUID) will be added to the end item in accordance with the following:

a. Specification requirements for IUID marking will be contained in the, Specific Work Requirements appendix, approved engineering drawing, or a Government provided Engineering Order (EO) (AF Forms 3925, 3926 and 3927) as applicable.

b. IUID markings are required for the end-item only. IUID for subcomponents is only required if specifically identified in the, Specific Work Requirements appendix, approved engineering drawing, or a Government provided EO.

c. For items that do not have IUID marking specifications as stated in paragraph b., the Contractor shall develop the marking specifications in accordance with the current revision of MIL-STD-

130. Location and marking method shall be approved by 424 SCMS engineering before implementation. If the Contractor cannot meet the terms and conditions in the contract for IUID, the Contractor will contact the PCO/ACO for determination.

d. IUID markings currently in place on items undergoing remanufacture shall be protected from damage or removal during remanufacture. Verify 2-D matrix IUID markings are readable per TO 00-25-260. Should IUID marking be rendered unreadable during repair, the Contractor shall notify 424 SCMS engineering and the PCO/ACO for determination of how to replace the IUID mark.

e. The Contractor shall submit the required and applicable contingent data for Legacy items to the IUID Registry per the data submission procedures at http://www.acq.osd.mil/dpap/pdi/uid/data_submission_informatio n.html.

http://www.acq.osd.mil/dpap/pdi/uid/data_submission_information.html http://www.acq.osd.mil/dpap/pdi/uid/data_submission_information.html

f. The Contractor shall submit IUID data for remanufactured items that require IUID based on the DFARS clause 252.211-7003, Item Identification and Valuation, as prescribed in DFARS Subpart 211.274

1.13.5. Quality Acceptance and Processing:

1.13.5.1. The Contractor shall support quality acceptance inspections of each end item and shall be performed prior to packaging and transportation. Quality acceptance will be performed by DCMA at the repair site. Quality acceptance documentation for each end-item shall be maintained by the Contractor as part of the item document package.

1.13.5.2. Each end item identified as serviceable shall be delivered to the Government defect free.

1.13.5.3. Following quality acceptance by the DCMA, the Contractor shall notify the Production Management Specialist (PMS) via email or fax of the completion of remanufactured end-items. The PMS will provide ship-to addresses/instructions to the Contractor via email or fax for each item produced. Within one business day of shipment, the Contractor shall provide proof of shipment through delivery of an accepted WAWF Receiving Report to the PMS. The Receiving Report shall include the carrier and tracking number.

1.13.6. Shipping Documentation:

1.13.6.1. The Contractor shall insure that the appropriate tag is attached to each serviceable end-item generated.

a. Serviceable tag is DD Form 1574/1574-1 (Yellow).

b. Unserviceable (repairable) tag is DD Form 1577-2/1577-3 (Green).

c. Unserviceable (condemned) tag is DD Form 1577/1577-1 (Red).

1.13.6.2. Shipments under this contract shall be by Commercial Bill of Lading

(CBL) by the fastest traceable means.

1.13.6.3. The Contractor shall reimburse the Government for packaging and shipping costs for items returned to the contractor for correction of quality deficiencies.

1.14. Surge

1.14.1. In the event that the Department of Defense (DoD) experiences an unplanned spike or sudden increase in demand, due to major theater warfare or a national emergency (also known as surge), and invokes surge, the Contractor shall work to meet and sustain this demand for quantity levels above and beyond normal peacetime requirements. After being notified by the PCO of the surge demand in writing, the Contractor may see additional orders and/or will see the priority status elevated on current orders. The Contractor shall implement their procedures to support the surge demand.

1.14.2. The Contractor shall notify the PCO advance and be given the opportunity to negotiate any expedite charges that might apply at the time of surge.

Contractual requirements for production of this contract are addressed in Part I of basic contract. The schedule and surge requirements shall be on a best-effort basis.

1.15. Delivery Schedule

1.15.1. The Contractor shall meet the contractual delivery schedule.

1.16. Customer Service Requirements

1.16.1. Information Requests: The Contractor shall ensure responses to requests for information and data are only provided to customers authorized by the PCO in the performance of official duties. All requests between the Government and the Contractor shall go through the Procuring Contracting Officer (PCO).

Exceptions are found in 1.16.1.2.

1.16.1.1. Information requests shall contain a subject line, nature of the request and an expected/requested response date and time. The request must be identified as “EMERGENCY”, “URGENT” or “ROUTINE” IAW paragraph 1.16.2 of this PWS so that a response is provided within the specified timeframes. A log will be maintained by the PCO or an appointed Government Representative. The log will be used to track all requests and evaluate response times.

1.16.1.2. Contractor requests for engineering and/or technical related problems or issues shall be submitted on an AFMC Form 202, Nonconforming Technical Assistance Request and Reply. All AFMC Form 202s shall be sent directly to 424 SCMS Cognizant Engineer with an information copy to the ACO and PCO.

1.16.2. Response Times for Information Requests: All requests for information initiated by the Government or Contractor shall be in writing and submitted electronically via e-mail or fax. Requests for information shall be answered within the following timeframes:

a. Emergency Respond within two (2) business days.

b. Urgent- Respond within five (5) business days.

c. Routine- Respond within ten (10) business days.

1.17. Safety and Health

1.17.1. While performing work under this contract the contractor shall comply with all applicable federal, state and local regulations regarding occupational safety and health. The contractor shall notify the Contracting Officer (CO), within eight (8) hours of any damage to government property where the dollar value exceeds $500,000.00 and within two business days, for any damage to government property less than $500,000.00 during the execution of the contract. Mishap notifications shall contain, as a minimum, the following information:

a. Contract, Contract Number, Name and Title of Person(s) Reporting

b. Date, Time and exact location of accident/incident

c. Brief Narrative of accident/incident (Events leading to accident/incident)

d. Cause of accident/incident, if known

e. Estimated cost of accident/incident (material and labor to repair/replace)

f. Nomenclature of equipment and personnel involved in accident/incident

g. Corrective actions (taken or proposed)

h. Other pertinent information

If requested by the designated CO, the contractor shall immediately secure the mishap scene/damaged property and impound pertinent maintenance and training records, until released by the Procuring Safety Office. Contractors will not dispose of contract data related to a mishap until notified to do so by the CO.

2. GOVERNMENT PROPERTY

2.1. Government Property

2.1.1. The Contractor shall furnish all material, support equipment, tools, test equipment, and services except as listed below. No Government Furnished Property will be provided other than the units to be repaired. Government Furnished Material will not be provided except as noted in paragraph 1.13.2 of this PWS.

2.2. Disposition of Government Property

2.2.1. These instructions apply to all Government owned property. Within 90 calendar days prior to contract expiration, the Contractor shall submit a letter to the PCO requesting disposition instructions in the transfer of Government furnished property (GFP). A listing identifying GFP shall include the NSN, part number/CAGE, noun, quantity, condition code, and dollar value, and the list shall be submitted through the PCO to the PMS for disposition instructions.

2.2.2. If a follow-on contract is being awarded or, is in the negotiation or solicitation stage, the existing GFP may be retained to the extent required to phase support on the current contract and/or the follow-on contract.

2.2.3. The Contractor shall comply with preservation, packaging, and packing instruction as specified in the basic contract and/or on the AFMC Form 158 (Packaging Requirements).

2.2.4. The Contractor shall comply with the Transportation Data on the DD Form 1653 and Transportation Appropriations Form when returning government property.

2.3. Discrepancies Incident to Shipment:

2.3.1. The Contractor shall report discrepancies incident to shipment which include misidentified items, variations in quantity, non-requisitioned items, lost or damaged parcel post, and items in dubious condition within 5 business days of discovery. The Contractor shall report and resolve the discrepancies using the DoD web-based application WebSDR link located within the CAV AF system described in the CAV AF SOW. This system of reporting a Supply Discrepancy Report (SDR), formerly called a Report of Discrepancy (ROD), has been developed in compliance with DoD regulations 4140.1-R and 4000.25-M Volume 2, which requires automated SDR processing. In those situations where the SDR initiator is unable to gain access to the AF WebSDR, continued use of manual forms (SF Form 364) is permitted. A copy of the form shall be forwarded through the PCO and DCMA QAR activity for corrective action.

2.3.2. Transportation discrepancies and item transaction discrepancies shall be coordinated with the DCMA Property Administrator and ACO within 2 business days upon discovery for corrective action utilizing the AF WebSDR submittal.

2.3.3. The Contractor shall process a SDR (SF Form 364) for contract line items received with missing components (Missing On Induction, (MOI)) within 2 business days upon discovery in accordance with AFJMAN 23-215. An electronic copy of MOI SDR form shall be submitted to the ACO and PCO within 2 business days of discovery.

2.3.4. Misdirected shipments of GFP shall be reported by written notification to the

Property Administrator (PA) within 2 business days. The PA will issue disposition instructions for the misdirected items. Misdirected items received by the Contractor which are not part of this contract will not be receipted into CAV AF.

2.4. Other

2.4.1. The Contractor shall not obtain GFP through the utilization of requisition codes assigned exclusively to this contract for any other contracts.

2.4.2. The Contractor shall not transfer or use GFP charged to this contract to any other contract, Contractor, or activity without the advance approval of the PMS through the PCO.

2.4.3. The Contractor shall replace GFP that has been removed by the USAF to fulfill other more urgent requirements. If any item so removed by the government is still required to complete the contract, the Contractor shall take appropriate action to replace the removed item.

ATTACHMENT A – END ITEMS

END ITEM

RECEIVED AS

END ITEM

TO BE DELIVERED AS

END

ITEM

NO

NATIONAL

STOCK NO(S) PART NO(S)

NATIONAL

STOCK NO(S) PARTS NO(S)

1 1420-01-366-0907 739452B 1420-01-366-0907 or 6110-01-317-2372

739452B or 464-10010-3

ATTACHMENT B – DEFINITIONS

The following definitions are applicable to this PWS:

a) End Item: An end item is a complete piece of Government equipment as listed in Government supply catalogs and suitable for government storage and issue.

b) Initial Production Evaluation (IPE): An IPE is a planned Government review of early production items and processes to evaluate a Contractor’s capability to complete the work stipulated in the contract and in accordance with (IAW) the technical order (TO), and other guidance stipulated in this PWS.

c) Cannibalization: Authorized removals of a specific assembly, subassembly, or part from one weapon system, system, support system, or equipment end-item for installation on another end-item to meet priority mission requirements with an obligation to replace the removed item.

d) Administrative Contracting Officer (ACO): A contracting officer assigned the responsibility for the post award functions related to the administration of a government contract in the field. The ACO is normally located in the Defense Contract Management Agency (DCMA) office. The ACO is responsible for ensuring the Contractor performs in accordance with the terms of the contract.

e) Procurement Contracting Officer (PCO): The individual authorized to enter into contracts for supplies and services on behalf of the Government by formal advertising or negotiation and who is responsible for overall procurement of the contract.

f) Technical Order (TO): An Air Force publication or Contractors Commercial manual that gives specific technical directives and information with respect to the inspection, storage, operation, modification, and maintenance of given items and equipment or publication prescribing Technical Order maintenance.

g) Support Equipment (SE): All equipment called out in applicable repair instructions required for end item and component test, repair, and / or modification.

h) Serviceable: Capable of meeting the requirements and performing the function for which designed or modified, and meets all test requirements established by the technical order and PWS.

i) Repair: An end item repair is the action taken to return the end item to a serviceable condition by replacing all specific listed or non-performing consumable items and only the damaged recoverable parts that do not meet the TO inspection criteria. Repair consists of end item testing to determine deficiencies, disassembly as required to support maintenance actions required, thorough cleaning, refurbishment or replacement of all disturbed components not meeting inspection criteria, replacement of all soft parts (seal, gaskets, etc.) exposed during repair, re-assembly of assemblies and subassemblies, performance of all adjustments and alignments, test and calibration of subassemblies and end-items and final inspection (e.g., safety wiring, painting, affixing of decals) IAW the applicable TOs and approved test documents to restore the end item to a serviceable condition.

j) Defect: Any nonconformance of a characteristic with specified requirements.

k) Product Quality Deficiency: A defect or nonconforming condition. Included are deficiencies in design, specification, material, manufacturing, and workmanship.

l) Product Quality Deficiency Report: The SF 368 form or format used to record and transmit product quality deficiency data.

m) Consumable Part: Detail item that in itsef is not repairable .

n) Recoverable Part: Parts that are not replaced at every repair event.

ATTACHMENT C – APPLICABLE DOCUMENTS

USAF Technical Orders

TO NUMBER DATE TITLE

00-5-1, Chapters 1-3

On- line version is considered most up-to-date

AF Technical Order System http://www.tinker.af.mil/technicalorders/index.asp

00-5-3 Chapters 1-4

On- line version is considered most up-to-date

Technical Order Life Cycle Management http://www.tinker.af.mil/technicalorders/index.asp

00-35D-54 Chapters 1-4

On- line version is considered most up-to-date

USAF Material Deficiency Reporting and Investigating System http://www.tinker.af.mil/technicalorders/index.asp

00-25-260 On- line version is considered most up-to-date

Asset Marking and Tracking Item Unique Identification (IUID) Marking Procedures http://www.robins.af.mil/library/technicalorders.asp

00-25-259 On- line version is considered most up-to-date

Standard Maintenance Practices Miniture/Microminature (2M) Electronic Assembly repair http://www.robins.af.mil/library/technicalorders.asp

Military Specifications, Standards, Handbooks, and Government Standards

NUMBER DATE TITLE

MIL-STD-130N 16 Nov 2012 Identification Marking of U.S. Military Property

MIL-HDBK-61 7 Feb 2001 Configuration Management Guidance

AS5553 16 Nov 2012 Overarching DOD Counterfeit Prevention Guidance

Industry Publications

NUMBER DATE TITLE

Forms

FORM NUMBER DATE FORM TITLE

SF 364 Feb 1980 Report of Discrepancy (ROD)

SF 368 Jun 2007 Product Quality Deficiency Report (PQDR)

AFMC 158 Apr 2003 Packaging Requirements

AF 3925 Jan 2004 Engineering Order http://www.e-publishing.af.mil/shared/media/epubs/AF3925.XFD

AF 3926 Jan 2004 Engineering Order (Continuation Sheet) http://www.e-publishing.af.mil/shared/media/epubs/AF3926.XFD

AF 3927 Jan 2004 Engineering Order, Parts List Changes http://www.e-publishing.af.mil/shared/media/epubs/AF3927.XFD

AFMC 202 Mar 2006 Non Conforming Technical Assistance Request and Reply

AFMC 807 Apr 2008 Recommended Quality Assurance Provisions and Special Inspection Requirements

DD1574 Oct 1988 Serviceable Tag - Material

DD1574-1 Oct 1966 Serviceable Label - Material

DD1577 Oct 1966 Unserviceable (Condemned) Tag - Materiel

DD1577-1 Oct 1966 Unserviceable (Condemned) Label - Materiel

DD1577-2 Oct 1966 Unserviceable (Repairable) Tag - Materiel

DD1577-3 Oct 1966 Unserviceable (Repairable) Label - Materiel

DD1653 Apr 1999 Transportation Data for Solicitations

Other Publications for Information Purposes Only Note: These publications are for information purposes only.

Air Force Manuals

NUMBERS DATE TITLE

AFMAN 23-110

Vol 1 Part 4 Vol 6 Chap 4

On- line version is considered most up-to-date

USAF Supply Manual http://www.e-publishing.af.mil/shared/media/epubs/afman23- 110.pdf

AFJMAN 23-215 On- line version is considered most up-to-date

Reporting of Supply Discrepancies http://www.e-publishing.af.mil/shared/media/epubs/AFJMAN23- 215.pdf

1. DESCRIPTION OF WORK/GENERAL INFORMATION
1.1. Purpose
1.2. General Information
1.3. Pre-Award Survey (PAS) Requirements
1.4. Initial Production Evaluation (IPE) Requirements
1.5. Reporting Requirements
1.6. Quality Program and Inspection System Requirements
1.7. Precious Metals Recovery Program
1.8. Parts Control Program
1.9. Counterfeit Prevention Plan
1.10. Lead (Pb) Free Electronics
1.11. Ozone Depleting Substances (ODS)
1.12. Technical Order Maintenance
1.13. Work Requirements
1.14. Surge
1.15. Delivery Schedule
1.16. Customer Service Requirements
1.17. Safety and Health
2. GOVERNMENT PROPERTY
2.1. Government Property
2.2. Disposition of Government Property
2.3. Discrepancies Incident to Shipment:
2.4. Other
ATTACHMENT A – END ITEMS
ATTACHMENT B – DEFINITIONS
ATTACHMENT C – APPLICABLE DOCUMENTS

File details come from the government source that posted it. Updated .