Performace_Work_Statement_(PWS).pdf
PDF 82 KB Posted
- Attached to
- Forward and aft rudder Power Drive Unit Federal contract opportunity
- Solicitation number
- FA8118-18-R-0018
About this file
PWS
View the file
Other files for this federal contract opportunity
Show all 26
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Appendix A
PR Number: FD2030-17-00757 PWS Form Rev Basic: 08 MARCH 2017 i
DEPARTMENT OF THE AIR FORCE
AIR FORCE SUSTAINMENT CENTER
TINKER AIR FORCE BASE, OKLAHOMA 73145
PR NO: FD2030-17-00757 DATE: 08 March 2017
AF CONTRACT NO:
PERFORMANCE WORK STATEMENT (PWS)
TYPE OF WORK: Overhaul of B-1B Forward and Aft Rudder PDU
TABLE OF CONTENTS
PREFACE SHEET......................................................................................................................... iii
REVISION SHEET ....................................................................................................................... iv
SECTION 1 GENERAL INFORMATION
1.1. DEFINITIONS
1.2. PRE-AWARD SURVEY REQUIREMENTS
1.3. INITIAL PRODUCTION EVALUATION REQUIREMENTS
1.4. REPORTING REQUIREMENTS
1.5. QUALITY PROGRAM AND INSPECTION SYSTEM REQUIREMENTS
1.6. SPECIAL TOOLS AND TEST EQUIPMENT
1.7. PRECIOUS METALS RECOVERY PROGRAM
1.8. NUCLEAR HARDNESS REQUIREMENTS
1.9. PARTS CONTROL PROGRAM
1.10. OZONE DEPLETING SUBSTANCES
1.11. TECHNICAL ORDER MAINTENANCE
1.12. CONTRACTOR EMPLOYEES
1.13. SAFETY AND HEALTH STATEMENT
SECTION 2 DESCRIPTION OF WORK
2.1. GENERAL
2.2. SPECIFIC WORK REQUIREMENTS
2.3. DELIVERY SCHEDULE
SECTION 3 APPLICABLE DOCUMENTS
3.1. APPLICABLE TECHNICAL ORDERS
3.2. OTHER PUBLICATIONS FOR INFORMATION PURPOSES ONLY
3.3. CONTRACTOR DOCUMENTS
SECTION 4: GOVERNMENT PROPERTY
4.1. GOVERNMENT PROPERTY
ii
4.2. DISPOSITION OF GOVERNMENT PROPERTY
4.3. OTHER
SECTION 5: SERVICE SUMMARY
5.1. SERVICE SUMMARY
SECTION 6: CONSUMABLE PARTS REPLACEMENT REQUIREMENTS
6.1. 100% CONSUMABLE PART REPLACEMENT REQUIREMENTS
iii
PREFACE SHEET
END ITEM
RECEIVED AS
END ITEM
TO BE DELIVERED AS
LINE
ITEM
NUMBER
NATIONAL
STOCK NUMBER
PART
NUMBER
NATIONAL
STOCK NUMBER
PART
NUMBER
0001 1650-01-160-5527 721602A 1650-01-160-5527 721602A iv
REVISION SHEET
When a revision is received, it should be inserted into this Performance Work Statement (PWS).
The superseded pages should be retained as a record.
NOTE: The portion of the text of this document affected by the current revision is indicated by a black underscore for figures, words, or phrases within a given paragraph, and by a black vertical line in the outer margin where the change constitutes a whole paragraph.
After the revised pages have been inserted into the PWS, the revised title page should be inserted in front of the existing title page. This revision page is placed under the basic title page.
DATES OF ISSUE FOR ORIGINAL AND CHANGED PAGES ARE:
SECTION 1 GENERAL INFORMATION
1.1. DEFINITIONS
1.1.1. The following definitions are applicable to this PWS:
a. Administrative Contracting Officer (ACO): A contracting officer assigned the responsibility for the post award functions related to the administration of a Government contract in the field. The ACO is normally located in the Defense Contract Management Agency (DCMA). The ACO is responsible for ensuring the Contractor performs in accordance with the terms of the contract.
b. Consumable Part: Piece parts that are not typically reused during the repair or overhaul process.
c. Defect: A characteristic that does not conform to the specified requirements.
d. End Item: An end item is a complete piece of Government equipment as listed in Government supply catalogs and suitable for Government storage and issue.
End items may contain one or more Shop Replaceable Unit (SRUs). End items are also referred to as Line Replaceable Units (LRUs). End items covered by work under this PWS are listed on the preface sheet.
e. Initial Production Evaluation (IPE): An IPE is a planned Government review of early production items and processes to evaluate a Contractor’s ability to complete the work in accordance with (IAW) the contract, applicable technical orders, and other guidance required by this PWS.
f. Overhaul: The process of significantly or completely disassembling an item to its individual components; reworking, rehabilitating, or replacing worn or damaged components; reassembly; and test such that the item is returned to its original life expectancy (i.e. reliability), or nearly so.
g. Procuring Contracting Officer (PCO): The individual authorized to enter into contracts for supplies on behalf of the Government by formal advertising or negotiation and who is responsible for overall procurement of the contract.
h. Product Quality Deficiency: Any defect or nonconforming condition. Included are deficiencies in design, specification, material, manufacturing, and workmanship.
i. Product Quality Deficiency Report (PQDR): The SF 368 form or format used to record and transmit product quality deficiency data.
j. Recoverable Component: Accountable, non-expendable part or sub-assembly of an end item. Also referred to as a Shop Replaceable Unit (SRU). SRUs may be re-installed in an end item after inspection/repair and deemed serviceable. If applicable to the scope of this SOW, SRUs will be listed on the preface sheet.
k. Repair: An end item repair is the action taken to return the end item to a serviceable condition by replacing all exposed consumable items and only the damaged recoverable parts that do not meet the specified inspection criteria.
Repair consists of end item testing to determine deficiencies, disassembly as required to support maintenance actions required, thorough cleaning, refurbishment or replacement of all disturbed components not meeting inspection criteria, replacement of all soft parts (seals, gaskets, etc.) exposed during repair, re-assembly of assemblies and subassemblies, performance of all adjustments and alignments, test and calibration of subassemblies and end items, and final inspection (e.g. safety wiring, painting, affixing decals) IAW the applicable publication and approved test documentation.
l. Re-usable Component: Non-accountable, expendable part or assembly that may be re-installed in an end item after inspection/repair and deemed serviceable.
m. Serviceable: An item is considered serviceable if it is capable of meeting the functional and test requirements for which designed or modified.
n. Special Tooling (ST): Special tooling refers to all specialized jigs, dies, fixtures, molds, patterns, taps, gauges, other equipment and manufacturing aids and replacements designed for a specific project and cannot be used otherwise without substantial modification or alteration. Some Technical Orders generically refer to this tooling as support equipment.
o. Special Test Equipment (STE): STE consists of interconnected/interdependent items or equipment assemblies, including standard or general purpose items or components, brought together to become a new functional entity for special test purposes. They are single or multipurpose integrated test units engineered, designed, fabricated, or modified to accomplish special purpose testing in the direct performance of contract maintenance. It does not include consumable property, special tooling, buildings, materiel, special test facilities (except foundations and similar improvements necessary for installing special test equipment, plant equipment items, or similar capital items used for general plant testing purposes). Some Technical Orders generically refer to this test equipment as support equipment.
p. Technical Order (TO): An Air Force publication that gives specific technical directives and information with respect to the inspection, storage, operation, modification, and maintenance of Government equipment. Technical orders contain approved process and piece part information that must be followed to ensure the item retains its qualification status.
1.2. PRE-AWARD SURVEY REQUIREMENTS
1.2.1. A Pre-Award Survey (PAS) shall be required but may be waived by the Government at the time of award.
1.2.2. At the time of the PAS the prospective Contractor shall meet the following technical requirements (additionally, there are many other business capabilities that may be evaluated) IAW contract requirements. Failure to do so shall result in PAS disapproval and disapproval of the prospective Contractor for this procurement action.
a. Provide data to include Contractor facility capabilities, all subcontractor facility capabilities (if subcontracting is proposed), and an explanation of how Contractor and subcontractor facilities will fulfill the Government’s requirements.
b. Prior to PAS, the prospective Contractor shall provide a list of all ST/STE required and shall comply with the requirements detailed in paragraph 1.6.
c. Prior to PAS, the prospective Contractor shall provide a test plan for each end item as specified in the preface sheet. The test plan shall include all testing required by the applicable acceptance test procedure and will detail how the testing will be accomplished utilizing the prospective Contractor’s STE.
d. The prospective Contractor shall provide the above to the PCO via email in the form of a word processing document or spreadsheet, viewable by Microsoft Office programs.
1.3. INITIAL PRODUCTION EVALUATION REQUIREMENTS
1.3.1. IPE shall be completed within sixty (60) calendar days of receipt of first delivery order. The IPE requirement may be waived by the Government at the time of contract award.
1.3.2. The IPE shall be conducted on three (3) units of each line item. The condition of the items at IPE will be as follows: one (1) each ready to be disassembled to follow the entire overhaul procedure; one (1) each fully disassembled, cleaned, and ready for assembly and testing; and one (1) each assembled and ready for functional testing. The Contractor shall furnish written notice to the PCO through the ACO within fifteen (15) business days after the required quantity of end items are available for the IPE.
1.3.3. The PCO shall notify the Contractor of the projected dates that the Government IPE Evaluation Team will arrive at the Contractor’s facilities to conduct the IPE. The Contractor shall permit entrance to the Evaluation Team into its facilities. This includes access to Contractor telephones and other communication devices that will allow the Evaluation Team to consult with appropriate Government personnel in the accomplishment of the IPE evaluation.
1.3.4. Under no circumstances shall the Contractor accomplish overhaul on any quantity of items on order or through any Induction-at-Risk/Early Induction contractual provision, other than the three (3) IPE units that will be evaluated by the Evaluation Team prior to the accomplishment of the IPE. Only after the approval notice from the PCO shall the Contractor proceed with overhaul on the remaining items on order or items under Induction-at-Risk/Early Induction provisions. The Government’s delivery schedule shall be held in abeyance until approval of the IPE by the Evaluation Team.
1.4. REPORTING REQUIREMENTS
1.4.1. Data requirements are specified in the Contract Data Requirements List (CDRL DD Form 1423) found in Part 1, Section B, The Schedule.
1.4.2. In addition, the Contractor shall maintain for five years a document package containing the following documentation for each end item produced:
a. Maintenance Data Sheet
b. Test Data Sheet
c. Quality Acceptance Review Documentation
d. Parts replaced listed by each serial numbered end item overhauled
1.5. QUALITY PROGRAM AND INSPECTION SYSTEM REQUIREMENTS
1.5.1. The Contractor shall establish, document, and maintain a quality system as a means of ensuring that the end item conforms to specified requirements. The quality system shall be in accordance with contract requirements.
1.5.2. When a Deficiency Report is received for an end item overhauled under the terms of this contract, the Contractor shall comply with the ACO’s directions. Guidance is provided in TO 00-35D-54, USAF Deficiency Reporting, Investigation, and Resolution.
1.5.3. The Contractor shall report any Government furnished material, for the work accomplished as outlined in this PWS, that is damaged or otherwise unsuitable for use to the ACO using a Supply Discrepancy Report (SDR), SF Form 364.
1.5.4. The Contractor shall support quality audits as required by the ACO. These audits could require that one or more end items be removed from the production line and subjected to any combination of inspection, testing, disassembly, or assembly to determine that the standards of performance and technical conformance meet the requirements of this PWS. The Contractor shall be required to correct a deficient process to eliminate the cause(s) of any defects as directed by the ACO.
1.5.5. The Contractor shall support quality assurance reviews to be conducted at the site of overhaul at the request of the Government throughout the contract period.
1.5.6. The Contractor shall support a quality acceptance review by the DCMA representative at the site of work as specified in this PWS for each end item worked under the terms of this contract.
1.5.7. Requests for deviation/waiver shall be submitted to the PCO through the ACO.
Work shall not be initiated on assemblies/components affected by deviation/waiver pending approval/disapproval. Requests shall include the contract number, NSN, and part number (P/N) of the end item and lowest part/assembly affected, effect on cost/price and delivery schedule, description of deviation waiver, justification for deviation/waiver, and proposed corrective action taken.
1.6. SPECIAL TOOLS AND TEST EQUIPMENT
1.6.1. The ST/STE required to accomplish the scope of work to be completed on end items under this contract are listed in the specified overhaul technical documents listed in section 3 of this PWS. If the equipment specified in the applicable technical documentation are not designated as Government furnished in this contract, the Contractor is responsible for furnishing part number identical or substitute ST/STE from commercial sources.
1.6.2. If the Contractor intends to substitute ST/STE, a list of the proposed substitute ST/STE shall be provided to the PCO with the proposal. At the time of the PAS conference, the Contractor shall demonstrate to the PAS team that suitable substitute SE can be acquired and meets the standards stipulated in the technical data by the following actions:
a. Displaying drawings, schematics, or specifications which illustrate that the prospective Contractor understands the exact nature of the work to be performed and the ST/STE required to perform the tasks.
b. Explaining the capabilities of substitute ST/STE to ensure that it is adequate to perform the specified testing requirements.
c. Defining how substitute ST/STE will be designed, built, and calibrated without assistance from the Government, by an internal engineering capability, or the services of a recognized outside engineering agency as approved by the cognizant engineering activity.
1.6.3. The equipment shall be in possession of the Contractor prior to the IPE team visit.
1.6.4. The Contractor shall show documentation certifying the accuracy of all calibrated ST/STE to the ACO prior to work performed as outlined in this PWS.
1.6.5. Support Equipment Calibration Requirements. The Contractor shall ensure documentation certifying the accuracy of all calibrated ST/STE is made available to the ACO prior to work being performed. The Contractor shall ensure ST/STE calibration is maintained throughout performance of this contract. Upon request, the Contractor shall show calibration data to the ACO for each ST/STE item as follows:
a. ST/STE part number and serial number
b. Date calibrated
c. Calibration due date
d. Calibration source
e. Calibration procedure used
f. Is and Was data
g. Facsimile of the current stamped calibration sticker affixed to ST/STE item
h. Verification of full performance compliance IAW this PWS for ST/STE items not requiring calibration
i. Traceability to the National Institute of Standards and Technology
1.7. PRECIOUS METALS RECOVERY PROGRAM
1.7.1. The Precious Metals Recovery Program is not applicable to this PWS. The handling and control of precious metals shall be IAW AFI 23-101, Air Force Materiel Management, if necessary.
1.8. NUCLEAR HARDNESS REQUIREMENTS
1.8.1. The Contractor shall notify the PCO if the work degrades the nuclear hardness of the item within one (1) business day of determination. The Contractor shall not continue maintenance actions until Government approval is obtained from the PCO.
1.9. PARTS CONTROL PROGRAM
1.9.1. The Contractor shall establish, document, and maintain a parts control program for the work associated with this PWS.
1.9.2. The Contractor shall establish the parts control program for an end item from the applicable technical documentation specified in SECTION 3.
1.9.3. Approval from the PCO is required for the Contractor to use any parts not contained in the Government approved parts list. The Contractor shall maintain configuration of items worked under the scope of this contract as identified in the Government approved parts list or this PWS. If Government provided technical data is utilized, the Contractor shall notify the PCO in writing of any configuration discrepancies noted between the applicable IPB, engineering drawings, and the current configuration of the end item. The Contractor shall obtain written authorization from the cognizant engineering activity via the PCO for configuration deviations prior to implementation.
1.9.4. The IPB shall serve as the current baseline for an end item or system unless otherwise stated in this PWS.
1.9.5. The Contractor shall only use replacement parts purchased directly from the end item OEM or purchased from DLA. In the event that parts are not available from either of these two sources for a pending overhaul operation, the Contractor shall request permission to utilize an alternate source. The cognizant engineering authority shall provide written authorization via the PCO for any deviations from the aforementioned sources. In the instance that surplus components are available, the cognizant engineering activity reserves the right to approve or disapprove the material. Written authorization for surplus material use shall be obtained from the cognizant engineering activity via the
PCO.
1.9.6. The Contractor shall keep records to allow traceability of sourcing of replacement parts for each end item overhauled by serial number. These records shall be furnished for inspection upon Government request.
1.9.7. The Contractor shall be required to perform work as specified by this PWS for all end items unless written disposition instructions are provided by the PCO through the ACO. Requests for condemnation shall be submitted by the Contractor in writing through the ACO to the PCO.
1.10. OZONE DEPLETING SUBSTANCES
1.10.1. This PWS is not explicitly requiring the use of a Class 1 ozone depleting substance (ODS) in the performance of this contract. The Contractor is authorized to use a suitable substitute for any Class 1 ODS which may be required by the engineering or technical data specified by this PWS. The Contractor shall immediately identify the substitute in writing to the PCO when a substitute has been determined.
1.11. TECHNICAL ORDER MAINTENANCE
1.11.1. If Government provided technical data is used to accomplish the work specified in this PWS, the Contractor shall maintain all TOs and other technical directives applicable to the work requirements in an updated and current status according to TO 00- 5-1, Technical Order System, and TO 00-5-3, Technical Order Life Cycle Management.
1.11.2. In the event of a TO change during the contract, the Contractor shall evaluate the impact of the change on the Contractor’s performance. The Contractor shall consider the impact of this change on costs, schedules, and any other pertinent factors. The Contractor shall provide a written evaluation, along with specific justification/applicable data documenting the impact on the Contractor’s performance, to the PCO within ten (10) business days after receipt of the change. The Contractor shall not incorporate these technical order changes until approved by the PCO.
1.12. CONTRACTOR EMPLOYEES
1.12.1. Contractor employees shall identify themselves by introducing themselves or being introduced as Contractor personnel and displaying distinguishing badges or other visible identification for meeting with Government personnel. In addition, Contractor personnel shall appropriately identify themselves as Contractor employees in telephone conversations and in formal and informal written correspondence.
1.13. SAFETY AND HEALTH STATEMENT
1.13.1. While performing work under this contract the contractor shall comply with all applicable federal, state and local regulations regarding occupational safety and health.
The contractor shall notify the PCO, within eight (8) hours of any damage to government property where the dollar value exceeds $500,000.00 and within two (2) workdays, for any damage to government property less than $500,000.00 during the execution of the contract. Mishap notifications shall contain, as a minimum, the following information:
a. Contractor, contract number, name and title of person(s) reporting
b. Date, time and exact location of accident/incident
c. Brief narrative of accident/incident (events leading to accident/incident)
d. Cause of accident/incident, if known
e. Estimated cost of accident/incident (material and labor to repair/replace)
f. Nomenclature of equipment and personnel involved in accident/incident
g. Corrective actions (taken or proposed)
h. Other pertinent information
1.13.2. If requested by the designated PCO, the contractor shall immediately secure the mishap scene/damaged property and impound pertinent maintenance and training records, until released by the Procuring Safety Office. Contractors will not dispose of contract data related to a mishap until notified to do so by the PCO.
1.14. CONTRACTOR MANPOWER REPORTING
1.14.1. The Contractor shall report all Contractor labor hours (including subcontractor labor hours) required for performance of services provided under this contract for the USAF via a secure data collection site. The Contractor is required to completely fill in all required data fields at https://afcmra.dmdc.osd.mil. Reporting inputs will be for the labor executed during the period of performance for each Government fiscal year (FY), which runs 1 October through 30 September. While inputs may be reported any time during the FY, all data shall be reported no later than 31 October1 of each calendar year. Contractors may direct questions to the CMRA help desk.
1.14.2. Uses and Safeguarding of Information. Information from the secure website is considered to be proprietary in nature when the contract number and Contractor identity are associated with the direct labor hours and direct labor dollars. At no time will any data be released to the public with the Contractor name and contract number associated with the data.
1.14.3. User Manuals. Data for Air Force service requirements must be input at the Air Force CMRA link. However, user manuals for Government personnel and Contractors are available at the Army CMRA link at https://afcmra.osd.mil.
1 Reporting period: Contractors are required in input data by 31 October of each year.
SECTION 2 DESCRIPTION OF WORK
2.1. GENERAL
2.1.1. The work performed under this contract is to overhaul the end item(s) specified in the PREFACE SHEET of this PWS. The work shall be accomplished IAW documents specified in SECTION 3. In the event that a situation develops where these instructions conflict with the documents listed in SECTION 3, this PWS shall take precedence. The work encompasses the disassembly, cleaning, inspection, rehabilitation, re-assembly, testing, and finishing actions required to return the end item to a serviceable condition
2.1.2. When a particular end item (recipient end item) is constrained for lack of materials that are not and will not be immediately available, the Contractor may request authorization to remove components or subassemblies from other inducted assets (the donor) prior to full disassembly in order to expedite the overhaul process. Component removal requests shall be subject to review and approval/disapproval by the cognizant engineering activity. Such component removal actions should only be considered upon exhaustion of all other sources of materials. The Contractor shall not initiate any component removal actions from donor items unless such action shall satisfy all material requirements for the recipient end item. The Contractor shall not remove any material from serviceable units. At the Contractor’s expense, the Contractor shall replace all removed donor subassemblies with new subassemblies and all component parts with new component parts. The Contractor shall ensure the contract delivery schedule is not negatively affected by the removal of any components or subassemblies from any donor items. The Contractor shall not condemn donor end items or subassemblies.
2.1.3. Tinker AFB 423SCMS/GUEAA engineering is performing a verification effort of T.O. 9H7-3-18-3, 9H7-3-18-4, 9H2-4-259-3, 9H2-4-259-4, and 9H10-2-10-3 during the IPE period of this contract at the contractor’s facility. Two to four personnel including an engineer and equipment specialist will be present from Tinker AFB 423SCMS organization to review AF technical orders during incoming inspection, disassembly, cleaning, in-process inspection, assembly, and test during the contractors processing of these contract units. The contractor will be required to support such an event with the technicians and supporting staff.
2.2. SPECIFIC WORK REQUIREMENTS
2.2.1. Basic overhaul requirements. The end item shall be disassembled, cleaned, components inspected, assembled, and tested according to the applicable technical documents. If any component part does not meet inspection requirements as specified in the applicable technical documents, or if there is any doubt as to its serviceability or longevity, the Contractor shall replace the component if it cannot be restored to the original life expectancy, or nearly so. The Contractor is advised to include the cost of replacing a percentage of re-usable and recoverable components, as identified above, in their overhaul cost proposal. Certain parts shall be replaced one-hundred percent (100%) of the time during each overhaul event and are specified in SECTION 5. The pricing for these items shall be included in the overhaul cost.
NOTE: If the Contractor desires to replace or modify an existing overhaul process with a Contractor developed process, the Contractor shall provide to the PCO all technical data or other information related to the proposed change for review and approval by the cognizant engineering authority. The Contractor must receive written authorization from the cognizant engineering authority via the PCO prior to making any process change or modification.
2.2.2. Over and Above shall only be considered for missing components or for components damaged due to causes unrelated to the normal use of the end item necessary to return the item to a serviceable condition as specified in this PWS. Identification of missing and/or damaged components must be revealed within two (2) business days after the asset is removed from the shipping container and reported to the PCO through the ACO in the form of an SDR. Approval from the PCO shall be obtained prior to performing any over and above work. The Government shall be the sole authority to determine whether over and above is appropriate.
2.2.3. End Item Identification and Marking. Permanently and legibly mark each overhauled end item with the Contractor’s CAGE and date of overhaul. This identification shall be permanently affixed to the end item by stamp, stencil, or similar means.
2.2.4. Quality Acceptance and Processing.
a. Quality acceptance of each end item shall be performed prior to packaging and transportation. Quality acceptance shall be performed by DCMA at the overhaul site. Quality acceptance documentation for each end item shall be maintained by the Contractor as part of the item document package.
b. Each end item identified as serviceable shall be delivered to the Government defect free.
c. Following quality acceptance by DCMA, the Contractor shall notify the Production Management Specialist (PMS) in writing of the completion of overhaul process. The PMS will provide shipping instructions to the Contractor in writing for each end item produced. Within one (1) business day of shipment, the Contractor shall provide proof of shipment through delivery of an accepted WAWF Receiving Report to the PMS. The Receiving Report shall include the carrier and tracking number.
2.2.5. Shipping Documentation.
a. The Contractor shall ensure the appropriate tag is attached to each serviceable end item generated.
i. Serviceable tags/labels are DD 1574/1574-1 (Yellow)
ii. Unserviceable (repairable) tags/labels are DD 1577-2/1577-3 (Green)
iii. Unserviceable (condemned) tags/labels are DD 1577/1577-1 (Red)
iv. Suspended tags/labels are DD 1575/1575-1 (Brown)
b. Shipments under this contract shall be by Commercial Bill of Lading (CBL) by the fastest traceable means.
c. Items overhauled as a result of a quality deficiency shall be shipped at the Contractor’s expense.
2.3. DELIVERY SCHEDULE
2.3.1. One hundred percent (100%) of end items listed in the preface sheetPREFACE SHEET shall be delivered IAW the contractual delivery schedule. The Contractor shall meet the delivery schedule.
SECTION 3 APPLICABLE DOCUMENTS
3.1. APPLICABLE TECHNICAL ORDERS
3.1.1. Specific Technical Orders
PART NUMBER REMANUFACTURE
MANUAL/TO
NUMBER
TITLE/REVISION AND/OR OTHER
DIRECTIVES (AFTO FORM 252)
721602A 9H7-3-18-3 Overhaul Instruction 721602A TS2507 Acceptance Test Specification 721602A 9H7-3-18-4 Illustrated Parts Breakdown 735433A 9H2-4-259-4 Illustrated Parts Breakdown 735433A 9H2-4-259-3 Overhaul Instruction Servo Valve Assy 5904622 9H10-2-10-3 Overhaul Instruction with Illustrated Parts
Breakdown Hydraulic Motor
3.1.2. General Technical Orders
TO NUMBER DATE TITLE
00-5-1 14 JUN 2016 AF TECHNICAL ORDER SYSTEM
00-5-3 1 APR 2016 AF TECHNICAL ORDER LIFE CYCLE
MANAGEMENT
00-35D-54 1 SEP 2015 USAF DEFICIENCY REPORTING,
INVESTIGATION AND RESOLUTION
3.2. OTHER PUBLICATIONS FOR INFORMATION PURPOSES ONLY
NOTE: These publications are for information purposes only.
3.2.1. Air Force Manuals
DOCUMENT NUMBER DATE TITLE
AFI 23-101 12 DEC 2016 AIR FORCE MATERIAL
MANAGEMENT
3.2.2. DoD/Air Force Forms
FORM NUMBER TITLE
SF 364 REPORT OF DISCREPANCY
SF 368 QUALITY DEFICIENCY REPORT
DD1574
DD1574-1
SERVICEABLE TAG – MATERIEL
SERVICEABLE LABEL – MATERIEL
DD1577-2
DD1577-3
UNSERVICEABLE (REPAIRABLE) TAG – MATERIEL
UNSERVICEABLE (REPAIRABLE) LABEL – MATERIEL
DD1577
DD1577-1
UNSERVICEABLE (CONDEMNED) TAG – MATERIEL
UNSERVICEABLE (CONDEMNED) LABEL – MATERIEL
DD1575
DD1575-1
SUSPENDED TAG – MATERIEL
SUSPENDED LABEL – MATERIEL
AFMC FORM 158 PACKAGING REQUIREMENTS
3.3. CONTRACTOR DOCUMENTS
PART NUMBER DRAWING
NUMBER
TITLE AND DATE
N/A N/A N/A
SECTION 4: GOVERNMENT PROPERTY
4.1. GOVERNMENT PROPERTY
4.1.1. The Contractor shall furnish all material, support equipment, special tools, special test equipment, and services. Government Furnished Equipment (GFE) will not be provided.
4.2. DISPOSITION OF GOVERNMENT PROPERTY
4.2.1. These instructions apply to all Government owned property. Within ninety (90) business days prior to contract expiration, the Contractor shall submit a letter to the managing ALC requesting disposition instructions in the transfer of Government furnished property (GFP). A list identifying GFP shall include the NSN, part number/CAGE, noun, quantity, condition code, and dollar value shall be submitted through the ACO to the PMS for disposition instructions.
4.2.2. If a follow-on contract is being awarded or is in the negotiation or solicitation stage, the existing GFP may be retained to the extent required to support the current contract and/or follow-on contract.
4.2.3. The Contractor shall comply with preservation, packaging, and packing instructions as specified in the basic contract and/or on the AFMC Form 158, Packaging Requirements.
4.3. OTHER
4.3.1. The Contractor shall not obtain GFP through the utilization of requisition codes assigned exclusively to this contract for any other contracts.
4.3.2. The Contractor shall not transfer GFP charged to this contract to any other contract, Contractor, or activity without the advance approval of the PMS through the
PCO.
4.3.3. The Government reserves the right to withdraw any GFP in possession of the Contractor to supply other urgent USAF requirements. If any item so removed by the Government is still required to complete the contract, the Contractor shall take appropriate action to replace the removed item.
SECTION 5: SERVICE SUMMARY
5.1. SERVICE SUMMARY
5.1.1. Contractor performance shall be measured and assessed using the Performance Objectives listed in Table 5-1. The Contractor service requirements are summarized into performance objectives that relate directly to the mission essential items. The performance threshold describes the minimum acceptable levels of service for each requirement. In the event the performance objective is not met, the Contractor will be given a reasonable time after notification to correct the unacceptable performance, if such correction is possible. The Contractor shall immediately take corrective action IAW the performance threshold(s). In cases where the Contractor fails to implement corrective action, The PCO will take appropriate measures
5.1.2. Service Summary (SS) Requirements. The Contractor shall ensure the performance objectives and thresholds are achieved as identified in Table 5-1.
5.1.3. Performance Objectives and Thresholds. The Contractor shall achieve performance thresholds identified in Table 5-1.
NOTE: The PMS, DCMA Quality Assurance Representative (QAR), and PCO will exercise surveillance over the performance thresholds. The absence of any contract requirement from the SS shall not detract from this enforceability nor limit the rights or remedies of the Government under any other provision of the contract.
5.1.4. Surveillance Methods. The Contractor shall support the PMS, DCMA QAR, and PCO surveillance methods as identified below:
a. Periodic Inspections of Process or Output
b. Random Sampling of Recurring Service Output
c. One-Hundred Percent (100%) Inspection of Output
d. Customer Observations or Complain
NOTE 1: The method of surveillance may include one or more of the methods specified above.
NOTE 2: The Government will use the methods contained in the Surveillance Plan (SP) to evaluate the Contractor’s performance for the listed program objectives. The PMS, DCMA QAR, and/or PCO will monitor Contractor performance to determine if it meets the contract thresholds as set forth in the performance measures and this PWS.
Table 5-1: SERVICE SUMMARY TABLE
Performance Objective Reference / Paragraph (Para.)
Performance Threshold
SS-1 Quality Product:
Each end-item identified as serviceable shall be delivered to the Government defect free.
PWS para. 2.2.4 100% of end-items delivered shall be defect free.
SS-2 Delivery Performance:
The Contractor shall meet the contract delivery schedule.
PWS Para. 2.3 100% of end-items shall be delivered IAW the contractual delivery schedule.
5.1.5. Contractor Performance Evaluation. The Contractor shall be aware that the evaluation of performance will occur when the PMS evaluates the service of the Contractor to determine whether or not it meets the performance measures of the contract.
a. SS-1: The Contractor’s failure to meet the requirement for this item shall result in the possibility of an unsatisfactory or marginal rating under the Contractor Performance Assessment Review (CPAR) and remedies as allowed under FAR 52.246-4, Inspection of Services – Fixed Price.
b. SS-2: The Contractor’s failure to meet the requirement for this item shall result in the possibility of an unsatisfactory or marginal rating under the CPAR and remedies as allowed under FAR 52.246-4, Inspection of Services – Fixed Price.
SECTION 6: CONSUMABLE PARTS REPLACEMENT REQUIREMENTS
6.1. 100% CONSUMABLE PART REPLACEMENT REQUIREMENTS
5.1.1. At a minimum, these consumable parts shall be replaced at one-hundred percent (100%) during overhaul with new parts. Other components shall be replaced/repaired IAW TO procedures.
END ITEM:
NSN: 1650-01-160-5527 P/N: 721602A
REPLACEMENT PARTS:
PART NUMBER NOUN
ANA380-2-2
58472-1 58533 M83248/1-904 722789 738176 58386 58387 722015
CA40908
58328-5 58394 58399 723632 58326-2 58408 58390 58389 58392 58391 723633 58622 58328 722027 722057 722046 722023
MS21209 C1-20
Pin, Cotter Seal, T-section Seal Packing, Preformed Gasket Shims Bearing, Ball Bearing, Ball Stop, Valve Stop, Valve Seal, Rotating Seal, Lip Bearing, Ball Shims Roller, Needle Bearing, Ball Bearing, Needle Bearing, Ball Bearing, Needle Bearing, Needle Shims Spring, Disk Seal, Rotating Thrust Washer Thrust Washer Thrust Washer Thrust Washer Insert, Screw Thread
MS21209 C1-15
MS21209 C4-20
MS21209 C4-15
MS21209 C08-20
MS21209 C02-20
61724 54755 54761 67650 54752 20849 M83248/1-014 6239302
MS21209 F1-15
62393-13 66873 6688001 67659 58472-4 5903752 735774
CA45378-001
M83461/1-009
MS21209 F1-20
M83461/1-119 58438 M83461/1-114 58328-12 735446 737154 M83461/1-111 58434 58472-2 58472-3 5900708-7 M83461/1-012
Insert, Screw Thread Insert, Screw Thread Insert, Screw Thread Insert, Screw Thread Insert, Screw Thread Seal-Plain, Encased Seal, Nose Packing Spring Cup Seal Spring, Helical Packing, Preformed Seal, Ring Insert, Screw Thread Seal Race, Bearing Bearing, Barrel Spring, Helical Seal, T-Section Bearing, Ball Hub, Bearing Hub, Bearing Packing, Preformed Insert, Screw Thread Packing, Preformed Seal Packing, Preformed Seal, Rotating Housing, Seal Spacer, Seal Packing, Preformed Seal Seal, T-Section Seal, T-Section Seal, Ring Packing, Preformed
File details come from the government source that posted it.