QA_Spreadsheet_5.4.16.pdf
PDF 84 KB Posted
- Attached to
- Inclement Weather Shelter Federal contract opportunity
- Solicitation number
- FA8051-16-T-0014
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| QA_Spreadsheet.pdf | ||
| SF_1449_Solicitation_Rev.1.pdf | ||
| SF_1449_Solicitation.pdf | ||
| DARS_252_209-7991_Unpaid_Deliquent_Tax_Liability.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
QUESTION # RFP QUESTIONS
DOCUMENT
REFERENCE
DATE RCVD OPR GOV'T RESPONSE
DOCUMENT
REFERENCE
RESPONSE
DATE
Will this solicitation fall under the requirements of the ‘Berry
Amendment’?
SF1449 22-Apr-16 N/A
Yes, an amendment has been made to the solicitaion to include DFARS
252.225-7001 and DFARS 252.225-7002.
SF1449 28-Apr-16
2 Are the Plan available for project SF 1449? N/A 25-Apr-16 N/A No, the requirement is for an open ended inclement weather training shelter that is IAW the salient characteristics.
SF1449 28-Apr-16
Is the shelter to be totally enclosed? Or do you want the ends open and the sides down to grade?
N/A 26-Apr-16 N/A The shelter shall be open ended as stated in the solicitation. SF1449 28-Apr-16
4 What is the existing surface? N/A 4-May-16 N/A Compacted base course foundation. N/A 4-May-16
5 What type of foundation is requested? N/A 4-May-16 N/A Compacted base course foundation with Helical screw type anchors. N/A 4-May-16
6 Is a soils report available for foundation design? N/A 4-May-16 N/A No, the foundation was established by Pavement and Equipment Operator
Instructors.
N/A 4-May-16
Is the Berry Amendment applicable? Is Canadian fabric and U.S.
steel permitted?
N/A 4-May-16 N/A Yes, see Response to Question 1 N/A 4-May-16
Are local building code requirements applicable or is there a specific standard to be used on the base?
N/A 4-May-16 N/A
No, this is not a permanent structure and the Directorate of Public Works office did not have specific building codes or standards for Fort Leonard
Wood.
N/A 4-May-16
Please clarify correcting defective portions of the shelter under repair work within 2 weeks of notification.
SF1449 4-May-16 N/A
If a portion of the shelter under warranty is defective than the vendor shall be able to make the repairs within 2 weeks of notification.
SF1449 4-May-16
10 What is the requested completion date? N/A 4-May-16 N/A No Later Than 1 Oct 2016. N/A 4-May-16