QA_Spreadsheet_5.4.16.pdf

PDF 84 KB Posted

Attached to
Inclement Weather Shelter Federal contract opportunity
Solicitation number
FA8051-16-T-0014
Issued by
Department of the Air Force Materiel Command Installation and Mission Support Center Installation Contracting Agency

View the file

Other files for this federal contract opportunity

Other files attached to Inclement Weather Shelter, newest first.
File Type Posted
QA_Spreadsheet.pdf PDF
SF_1449_Solicitation_Rev.1.pdf PDF
SF_1449_Solicitation.pdf PDF
DARS_252_209-7991_Unpaid_Deliquent_Tax_Liability.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

QUESTION # RFP QUESTIONS

DOCUMENT

REFERENCE

DATE RCVD OPR GOV'T RESPONSE

DOCUMENT

REFERENCE

RESPONSE

DATE

Will this solicitation fall under the requirements of the ‘Berry

Amendment’?

SF1449 22-Apr-16 N/A

Yes, an amendment has been made to the solicitaion to include DFARS

252.225-7001 and DFARS 252.225-7002.

SF1449 28-Apr-16

2 Are the Plan available for project SF 1449? N/A 25-Apr-16 N/A No, the requirement is for an open ended inclement weather training shelter that is IAW the salient characteristics.

SF1449 28-Apr-16

Is the shelter to be totally enclosed? Or do you want the ends open and the sides down to grade?

N/A 26-Apr-16 N/A The shelter shall be open ended as stated in the solicitation. SF1449 28-Apr-16

4 What is the existing surface? N/A 4-May-16 N/A Compacted base course foundation. N/A 4-May-16

5 What type of foundation is requested? N/A 4-May-16 N/A Compacted base course foundation with Helical screw type anchors. N/A 4-May-16

6 Is a soils report available for foundation design? N/A 4-May-16 N/A No, the foundation was established by Pavement and Equipment Operator

Instructors.

N/A 4-May-16

Is the Berry Amendment applicable? Is Canadian fabric and U.S.

steel permitted?

N/A 4-May-16 N/A Yes, see Response to Question 1 N/A 4-May-16

Are local building code requirements applicable or is there a specific standard to be used on the base?

N/A 4-May-16 N/A

No, this is not a permanent structure and the Directorate of Public Works office did not have specific building codes or standards for Fort Leonard

Wood.

N/A 4-May-16

Please clarify correcting defective portions of the shelter under repair work within 2 weeks of notification.

SF1449 4-May-16 N/A

If a portion of the shelter under warranty is defective than the vendor shall be able to make the repairs within 2 weeks of notification.

SF1449 4-May-16

10 What is the requested completion date? N/A 4-May-16 N/A No Later Than 1 Oct 2016. N/A 4-May-16

Inclement Weather Shelter, FA8051-16-T-0014, Due Date: 6 May 2016