Munitions_-_Bid_Schedule.pdf
PDF 79 KB Posted
- Attached to
- CONSTRUCTION MUNITIONS MAINTENANCE & INSPECTION FACILITY Federal contract opportunity
- Solicitation number
- FA6712-17-B-0003
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Sign_In_Sheet_17B0003.pdf | ||
| JLSS_12-0011B_Construct_Munitions_Maintenance_&_Inspection_Facility_20160922_-_Drawings.pdf | ||
| General_Wage_Decision_18_Aug_2017.pdf | ||
| Updated_JLSS_12-0011_Bid_Specs,_Oct_2016.pdf | ||
| FA6712-17-B-0003_-_Munitions_IFB.PDF |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
BID SCHEDULE
CONSTRUCT MUNITIONS MAINTENANCE & INSPECTION FACILITY
JLSS 12-0011
CLIN UNIT
ITEM DESCRIPTION QTY UNIT PRICE TOTAL
Provide all administration, facilities, materials, labor, and equipment and perform all operations necessary to complete construction as identified in the contract documents, to include, but not limited to specifications and drawings identified herein.
1. Repair Work. “Repair Work” shall represent all costs to relocate and install the new electrical underground distribution system (outside of the new inspection building). Also included in this item is all costs to provide temporary electrical power to the apron lighting, and costs to relocate/install the new outside transformer. “Repair Work” also includes all costs to relocate the existing storm water line around the new munitions building. The contractor shall also include costs to prepare the Erosion and Sediment (E&S) Control plan and maintain/inspect/etc the E&S measures in this bid line item. The contractor shall also include their overall project management (including site superintendent, office staff, paperwork, etc) costs in the “Repair Work” line item bid.
1 JOB $ $ .
2. New Work. “New Work” shall include all other costs associated with this project (not included in “Repair Work”). This includes costs to prepare the E&S Control plan and maintain/inspect/etc the E&S measures. The contractor shall include their overall project management (including site superintendent, office staff, paperwork, etc) costs in the “New Work” line item bid
1 JOB $ $ .
TOTAL PRICE $ .
File details come from the government source that posted it. Updated .