Attach_1_-_Dobbins_ISWM_(Refuse)_PWS_20_Dec_16.pdf

PDF 265 KB Posted

Attached to
Solid Waste Management (Refuse)) Federal contract opportunity
Solicitation number
FA6703-17-B-0004
Issued by
Department of the Air Force Reserve Command

About this file

Attachment 1 - Performance Work Statement

View the file

Other files for this federal contract opportunity

Other files attached to Solid Waste Management (Refuse)), newest first.
File Type Posted
Attach_3_-_DARB_3.pdf PDF
Attach_2_-_Wage_Determination_2015-4471_Rev._4.pdf PDF
Attach_4_-_Refuse_Bid_Schedule_2017.xlsx XLSX spreadsheet
Attach_5_-_Base_Map_Dumpster_Locations.pdf PDF
Amend_2_-_SF30.pdf PDF
Attach_1_-_Dobbins_(Refuse)_PWS_13_June_2017.pdf PDF
Amendment_1.pdf PDF
Attach_2_-_Wage_Determination_2015-4471_Rev._3.pdf PDF
Attach_4_-_Refuse_Bid_Schedule_2017.xlsx XLSX spreadsheet
Tab_13_-_Solicitation_FA6703-17-B-0004.pdf PDF
Attach_3_-_DARB_3.pdf PDF
Attach_5_-_Base_Map_Dumpster_Locations.pdf PDF
Geo_Report_Mistake_Notice.pdf PDF
GEO_REPORT.pdf PDF
FBO_POST_-_Award_Notice_--70th_Anniversary_Letterhead.pdf PDF
Show all 15

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Dobbins ISWM refuse PWS 12-20-2016

PERFORMANCE WORK STATEMENT

FOR

SOLID WASTE MANAGEMENT

DOBBINS ARB, GA

December 20, 2016

1. DESCRIPTION OF SERVICES. The contractor shall provide all personnel, equipment, tools, materials, vehicles, supervision, and other items and services necessary to perform solid waste management at Dobbins ARB. The contractor shall perform to the standards in the contract as well as all local, state, and federal regulations. Estimated workload factors are in Appendix A and collection areas are in Appendix B.

1.1. COLLECTION REQUIREMENTS.

1.1.1 Main Base

1.1.1.1. Municipal Solid Waste. The contractor shall empty MSW containers/dumpsters based on historical data for the first 30 days of performance or at least weekly. The contractor shall establish initial vehicle routes and collection schedules upon contract award. They are to be submitted to the Contracting Officer (CO) five (5) calendar days prior to start of contract performance. The contractor may propose adjustments to the schedule at any time but as a minimum the Contracting

Officer Representative (COR) and contractor shall monitor fill capacities during the first 30 days of performance and during one other period to be agreed upon during the same performance period, in order to determine if adjustments to container size, routes, or frequencies should be made to provide the minimum number of pickups necessary to maintain a healthy, vector free environment and prevent waste container overflow. No changes are allowed to the schedule or haul route without CO or COR coordination. Historical frequency tables are located at Appendix A, Table

A2. When the contractor completes service at a location there shall be no litter, waste, and recyclable material on the ground within a 10 foot radius of the container.

1.1.1.2. Food Waste. Empty containers used to dispose of food waste as necessary to maintain a healthy, vector free environment. Food Waste containers and pickup days are identified in

Appendix A.

1.1.2. RESERVED

1.1.3. Over and Above Requirements. The following services shall be priced separately in accordance with the cost contained in Exhibit A. The contractor shall be compensated IAW the price specified on Exhibit A of the bid schedule for that service.

1.1.3.1. Unscheduled Pickup and Special Events. In addition to the scheduled solid waste collections, the CO or COR may request the contractor make unscheduled collections and disposals. For unscheduled events, the contractor shall respond within one business day of notification from the CO or COR. For special events, the contractor shall also provide (or re-position as directed) solid waste containers. These containers shall be placed in locations for a length of time designated by the CO or COR. The CO shall notify the contractor in writing at least

7 days in advance of the special event date. See Appendix A Table A-1 for workload data.

1.1.3.2. Construction and Demolition Debris (C&D). When requested by the CO or COR, the contractor shall provide roll-off containers for collection of C&D and various landscape debris

(grass trimmings, tree branches, etc.). The contractor shall place containers at the designated site within one business day of notification by the CO or COR. The contractor shall recycle or dispose of all C&D/landscape debris at a recycling facility or permitted landfill. Clean (uncontaminated) concrete and asphalt may be transported to the base clean fill site as an alternative to off-base recycling or landfill facilities. Contractor shall provide weight tickets of all roll-off containers to the COR. Contractor shall be on an “on call” basis within one business day of notification by the

CO or COR.

1.1.3.3. RESERVED

1.1.3.4. RESERVED

1.1.3.5. RESERVED

1.1.3.6. Additional Pickups: In the event unusual conditions cause a container to require pickup before the scheduled time, the CO or COR may request in writing (email/ Fax sufficient) pickup within 24 hours and the contractor will be compensated at a unit rate based on the container size.

1.1.3.7. Container Relocations: The Government may request relocation of containers. The request will be made in writing and the container will be relocated within 72 hours.

1.1.4. Inclement Weather Schedule. The contractor shall collect MSW and recyclable material during periods of inclement weather. In cases of severe weather, the CO or COR may authorize exceptions. When exceptions are granted all missed collections shall be performed within 24 hours after the severe weather has terminated, unless the CO authorizes additional time.

1.1.5. Route Parameters. The contractor shall propose routes to the base through Gate 2 to the

CO and COR for acceptance. Collection shall be made between the hours of 0730 – 1500.

Collection outside these hours shall require prior coordination of the CO or COR.

1.1.6. Points of Collection. Collection stations for MSW and recyclable materials are shown in

Appendix B. The contractor shall position bulk containers for customer ease in depositing MSW.

The contractor shall also position containers to minimize interference with adjacent parking areas, sidewalks, roadways, overhead utilities, trees, storm drains, and other potential obstructions.

1.1.7. Cubic Yard Capacity. Proposed capacity of containers is indicated in Appendix A, Table

A2. The contractor is encouraged to identify changes to the capacity of containers and/or pickup frequency to improve the overall efficiency of MSW and recycling removal, and to submit these changes to the CO or COR. No changes shall be made until the proposed change is coordinated with the CO or COR.

1.1.8. Government-Approved Containers. Collection of MSW materials in all areas shall be from contractor-provided, CO or COR accepted containers.

1.1.9. Maintaining Containers and Collection Area. The contractor shall return all MSW and recycling containers to their original location after servicing, in an upright position with the lids securely in place (closed). The contractor is responsible for cleaning up any spills, debris, etc., on the ground within ten feet of the container when servicing a location. The contractor shall collect debris placed at collection stations; for example, tree branches, sacks, cartons, boxes, cans, tied bundles, or other containers. It is intended that the majority of debris will be placed in containers.

The contractor shall notify the COR of locations where debris is frequently placed outside of containers so the COR may notify facility managers and, if necessary, the contractor can adjust the container size or pickup frequency with CO or COR approval. The contractor shall be responsible for keeping collection areas free of solid waste and debris. The contractor shall also notify the COR if it is discovered that a particular receptacle is being utilized for the wrong material.

1.1.10. Vehicle Weighing. All vehicles used to collect MSW and C&D materials shall be weighed on state certified vehicle scales prior to any base collections and weighed again after departing the base and prior to making any collections off base. Incoming and outgoing vehicle weights shall be recorded on weigh tickets provided by the operator at the weigh station. The contractor shall submit a monthly report (para 1.5) that includes weight tickets that reflect the disposed tonnage figures, date of disposal, and type of vehicle and cost of landfill tipping fees.

The contractor shall be reimbursed for tipping fees according to submitted invoices.

1.2. RESERVED

1.3. DISPOSAL.

1.3.1. Off-Base Disposal. The contractor shall transport and dispose of all municipal solid waste at a permitted off-base disposal site. A copy of the landfill(s) operating permit that material is transported to shall be provided to the CO. The contractor is responsible for disposal being in accordance with existing local, state, and federal regulations. The contractor shall be responsible for any permit or fees associated with the use of off-base disposal locations and invoice to CLIN

0018 for reimbursement.

1.3.2. RESERVED

1.4. EQUIPMENT MAINTENANCE. The contractor shall furnish containers that match the color scheme of the base (Brown or Green). Additional re-painting must match the approved color scheme. The contractor shall maintain all contractor and government provided containers ensuring they are free of unpleasant odors, dirt, debris, and pests. All containers must remain in good, workable condition, with no leaks. They must remain easily accessible to customers. The contractor shall perform all cleaning, painting, repair and other maintenance tasks off-base. Trucks and trailers used for hauling and collecting shall be free of odor, dirt, debris, and pests. Contractor vehicles and equipment shall not have any waste or equipment leaks such as oil or hydraulic fluid.

Should any contractor vehicles or equipment have any leaks, the contractor is responsible for cleanup.

1.5. REPORTS AND RECORDS. The contractor shall provide a monthly report, by the fifth working day of the month, detailing total tonnage of solid waste (MSW, C&D) collected, landfill tipping fees and weight tickets. Format for these monthly reports shall be coordinated with the CO or COR.

2. SERVICE SUMMARY. The contractor service requirements are summarized into performance objectives that relate directly to mission essential items. The performance threshold describes the minimum acceptable levels of service required for each requirement. The Services

Summary (SS) and the Contractor’s Quality Control Plan provide information on contract requirements, the expected level of Contractor performance, and the expected method of government validation and confirmation of services provided. These thresholds are critical to mission success. Procedures as set forth in the FAR 52.212-4 (a), Contract Terms and Conditions

- Commercial Items, Inspection/Acceptance, will be used to remedy all deficiencies. During the first initial 30 days of the contract, two additional errors on each Performance Objective shall be allowed in an effort to identify normal phase-in problems.

Performance Objective PWS para.

Performance

Threshold

Collect Municipal Solid Waste in accordance with the established schedule.

1.1. No more than 2

Customer

Complaints monthly.

Dispose of Municipal Solid Waste in accordance with the established governing directives.

1.3 0 Deficiencies permitted.

Maintain equipment in good workable condition. Trucks and solid waste containers washed and free of odors.

1.4 No more than 2

Customer

Complaints monthly.

Perform unscheduled collections required by the CO or COR in accordance with paragraph 1.1.

1.1.3.1 0 Deficiencies permitted.

Submit monthly report to COR 1.5 0 Deficiencies permitted.

Submit copy of the landfill operating permit at contract start.

1.3.1 0 Deficiencies permitted.

2.1. QUALITY CONTROL. The contractor shall develop and maintain a quality program to ensure integrated solid waste management is performed in accordance with commonly accepted commercial practices. The contractor shall develop and implement procedures to identify, prevent, and ensure non- recurrence of defective services. As a minimum the contractor shall develop quality control procedures addressing the areas identified in paragraph 2, Service Summary.

2.2. QUALITY ASSURANCE. The Government shall inspect and evaluate the Contractor’s performance to ensure services are received in accordance with requirements set forth in this PWS.

The contractor shall provide work schedules to the COR in accordance with paragraph 4.3 of this

PWS. The COR shall inspect by validating actual work performance, physically checking an attribute of the completed task, checking a management information report, investigating customer complaints, conferring with facility managers, or otherwise inspecting the task or its results to determine whether or not performance meets the standards contained in this PWS. The COR will use the Contractor’s work schedule or modified version thereof, to record validation results.

Results of the validation then become the official Air Force record of the Contractor’s performance. When a performance threshold has not been met or Contractor performance has not been accomplished, the COR will initiate and provide the CO a Contract Discrepancy Report

(CDR) DD Form 2772 for issuance to the Contractor. The Contractor shall respond to the CDR

IAW instructions provided and return it to the CO within 10 calendar days of receipt.

2.3 PERFORMANCE ASSESSMENT

2.3.1. Periodic Validations. This method requires the COR to employ a “spot check” style of evaluation based on the Contractor’s schedule. Periodic validations will be conducted on a scheduled basis (daily, weekly, monthly, quarterly, semi-annual or annually) and may be adjusted, based on quality trends.

2.3.2. Unsatisfactory Performance. Any unsatisfactory inspection (defect) result shall be recorded, and the Contractor shall re-perform the service after notification by the COR. Failing to meet the performance threshold as outlined in the SS for any of these performance objectives in any one month period shall result in a warning or letter of concern from the CO. Failing to meet the performance threshold as outlined in the SS of these performance objectives in any combination for any two, or more consecutive or non-consecutive months during a contract period shall constitute an immediate Progress Meeting with the Multi-functional Team. All remedies shall be in accordance with the FAR 52.212-4 (a), Contract Terms and Conditions - Commercial

Items, Inspection/Acceptance.

2.4. PERIODIC PROGRESS MEETINGS

2.4.1. Meetings. The CO, Functional Commander, COR, QRP Manager and/or Solid Waste

Manager, other government personnel as appropriate, and the Contractor shall periodically meet to discuss the Contractor’s performance. The following issues shall be discussed: opportunities to improve the contract, required contract modification(s), unsatisfactory inspections and trends against each performance objective observed, positive performance and steps taken by the

Contractor to prevent unsatisfactory occurrences in the future. The Contractor shall provide a summation of unsatisfactory inspections and customer complaints and provide insight into any identified trends.

2.4.2. Meeting Minutes. The minutes of these meetings will be reduced to writing, signed by the

CO, and any other signatures as deemed appropriate, distributed to the functional area and the

Contractor. Should the Contractor not concur with the minutes, the Contractor shall provide a written notification to the CO identifying areas of non-concurrence for resolution.

3. GOVERNMENT FURNISHED PROPERTY AND SERVICES: NONE

3.1. RESERVED

4. GENERAL INFORMATION.

4.1. MISSION. The overall Civil Engineer mission at Dobbins ARB is to plan, maintain, operate, and protect the infrastructure, facilities, and environment for assigned Airmen, families, and civilian employees.

4.2. RESERVED

4.3. HOURS OF OPERATION. Perform integrated solid waste management services during normal duty hours and be available (by phone, pager, cell phone, text message or fax) during the

Government Program Office’s hours (7:30 a.m. to 3:30 p.m., Monday through Friday) and for after-hours response to refuse/recycling problems or emergencies. This excludes federal holidays, unless otherwise required in the contract or approved by the CO. There may be situations that require the Contractor to work at times other than normal duty hours. When the

Contractor’s work schedule conflicts with an Air Force mission requirement, advise the CO and reschedule the work to minimize disruption.

4.4. HOLIDAYS & CLOSURES.

4.4.1. Recognized Federal Holidays. There may be federal holidays when the Contractor is not required to perform service, except in emergency situations or to support specific mission needs.

The holidays are:

New Year's Day January 1

Birthday of Martin Luther King, Jr. Third Monday in January

Washington’s Birthday Third Monday in February

Memorial Day Last Monday in May

Independence Day July 4

Labor Day First Monday in September

Columbus Day Second Monday in October

Veterans Day November 11

Thanksgiving Day Fourth Thursday in November

Christmas Day December 25

If a holiday falls on a Saturday, the preceding Friday will be observed. If a holiday falls on Sunday, the following Monday will be observed. If a holiday falls on a scheduled service day, the

Contractor will be responsible for rescheduling services for the first day after the holiday observance.

4.4.2. Other Base Closures. Work scheduled but not accomplished because of base closure due to exercises or real-world events will be accomplished as soon as possible after base reopening.

4.5. PERFORMANCE OF SERVICE DURING CRISIS OR HEIGHTENED SECURITY

The services under this contract are not essential for performance during crisis. The CO will determine circumstances which constitute a crisis based on direction from Security Forces and base leadership.

4.6. CONTRACTOR WORK SCHEDULE

4.6.1. Schedule Submission and Approval. The Contractor shall submit a schedule for all services described in this PWS and Appendices to the CO for approval at the post-award conference. The schedule shall include routes, pickup points, times, and days that pickups will occur. The Contractor shall not deviate from the approved schedule without prior approval from the CO or COR. Permanent changes to the schedule must be submitted 10 days before implementation and receive CO approval before the Government will allow the proposed changes.

The schedule must be submitted electronically using a file format compatible with Government software.

4.6.2. Schedule Changes. Occurrence based (non-permanent) schedule changes due to customer requests or base exercises shall be submitted to the COR and do not require CO approval.

4.7. CONTRACT PERSONNEL

4.7.1. Contract Manager. The contractor shall establish and maintain an office through which the contract manager or alternate(s) can be contacted during work hours. The contract manager or alternate shall be available during normal duty hours to meet on the installation within 1 hour with the government personnel designated by the CO to discuss problem areas. The contractor shall provide the CO telephone number(s) where validation results and complaints can be reported. The contractor shall also provide to the CO the names and phone numbers of contractor POCs for after business hours including nights, weekends, and holidays. This information will be kept updated by the contractor whenever personnel changes occur. The contract manager or alternate shall have full authority to act for the contractor on all contract matters relating to the daily operation of this contract.

4.7.2. Personnel. Contractor personnel shall present a neat appearance. Contractor personnel shall be easily recognizable while on the installation in conjunction with this contract. This shall be accomplished through the wear of distinctive clothing, overcoats, or hats, bearing the company name or logo. The coloring or design of the items selected should be such that identifies personnel easily and quickly for reasons of safety and personal protection.

4.7.3. Employee Restrictions. The government is authorized to restrict employment under the contract of any contractor employee or prospective contractor employee who is identified as a potential threat to the health, safety, security, general well-being, or operational mission of the installation and its population.

4.8. CONTRACTOR MANPOWER REPORTING

The Contractor shall report all contractor labor hours (including sub-contractor labor hours) required for performance of services provided under this contract for “U.S. Air Force” via a secure data collection site. The Contractor is required to completely fill in all required data fields using the following web address http://www.ecmra.mil. Reporting inputs will be for the labor executed during the period of performance during each government fiscal year (FY), which runs October 1 through September 30. While inputs may be reported any time during the FY, all data shall be http://www.ecmra.mil/ reported no later than October 31 of each calendar year. Contractors may direct questions to the electronic Contractor Manpower Reporting Application (eCMRA) help desk.

4.9. SECURITY REQUIREMENTS.

Contractor employees shall comply with Dobbins ARB security requirements imposed by the

Installation Commander at all times while on Dobbins ARB premises. The Contractor shall obtain all necessary passes, decals, badges, or other items required for access to perform contract services at Dobbins ARB. The Contractor is responsible for accountability of all such media, which shall be surrendered to the Security Forces Squadron Pass and Registration Section upon completion or termination of the contract or upon termination of an individual’s employment for the Contractor.

The Contractor shall comply with all Dobbins ARB policies regarding entry to the installation, rules of the road, contingency operations compliance, and photography prohibitions. Contractor employees are authorized entry to the installation for the purpose of work under this contract only, and are not authorized in other facilities or areas without prior government authorization. Due to safety/security requirements, Contractor personnel shall be required to fluently speak, comprehend, read, and write English.

4.9.1. Base Access. The Contractor must be aware that entry requirements are subject to change due to installation and world situations. All employees may be subject to a background check through the FBI for base access.

4.9.2. Main Base Access. Current security access requires all contractor vehicles to enter through

Gate 2 only. Contractor vehicles may be subject to search prior to gaining base entry. The

Contractor should plan and allow for delays as a result of increased and ever-changing security procedures. Driver must present a valid driver’s license and any passengers must present a valid picture ID.

4.9.3. Security Requirements. The Security Forces Pass & Registration office, located at the

Main Gate Entrance to Dobbins ARB, is open from 7:30 to 3:30, Monday through Friday, and

UTA weekends from 6:30 to 3:30 on Saturday and 7:00 to 3:00 Sunday. The office is closed on

Federal Holidays. During normal duty hours all base access and vehicle passes must be obtained at this office prior entering the base. After hours passes may be obtained from the gate personnel.

Requirements for Contractor Credentials:

• Must present a current state or government identification card or driver’s license issued by their state of residence or an alien card (green card).

• DARB Form 5: this form must be filled out completely prior to proceeding to the Pass &

Registration office. The contractor shall complete Blocks 1, 3, 5, 6, 7, 8, 9, 10, 11, 12, 13, 15, and

16. The Contractor or authorized representative must also sign Block 7a. Upon completion of the form by the contractor, the DARB Form 5’s must be signed by the Contracting Officer before being issued a pass from Security Forces. (NOTE: No individual should sign Block 20 until they receive their ID Card from the Security Force individual processing the request.)

4.9.4. Restricted/Controlled Areas. Contractor performance within restricted/controlled areas shall require Contractor compliance with various levels of security and established personnel security entry control procedures. The Contractor shall ensure all contractor employees performing services in secured areas are processed for a controlled area, limited access, or visitor badge by the Entry Controller of the restricted/controlled area.

4.9.4.1. Access Coordination. The facility manager/user/occupant/requester will be responsible for providing access, escorts, or temporary visitor access badges for contractor personnel while performing ISWM duties. The Contractor shall be responsible for scheduling access/escorts/badges by contacting the facility manager/requester at the Entry Control Point of the restricted/controlled area.

4.9.4.2. Escorts. At all times while in restricted/controlled areas, contractor employees shall be under direct surveillance of a person from that facility who is cleared to wear a controlled area badge and perform escort duties. Visitor badges shall be returned to the Entry Controller each time the employee completes the duties and leaves the area. This requirement is waived for contractor personnel who have unescorted access privileges and display a controlled area badge for the restricted/controlled areas.

4.9.5. Employee Background Checks. All Contractor employees who do not have a current security investigation acceptable to the Security Forces, and who require a National Agency Check

(NAC) for the performance of their duties, shall complete an Electronic Personnel Security

Questionnaire (EPSQ), SF 85P, Questionnaire for Public Trust Positions, in three copies (original and two photocopies); and an AF Form 2583, Request for Personnel Security Action. For all employees requiring local area network (LAN) access (if applicable), the Contractor shall submit the following information: full name, date and place of birth, social security account number, affirmation of United States citizenship, and any current security investigation data. Information shall be in writing, on company letterhead, and submitted to Security Forces through the CES

Security Manager.

4.9.5.1. Pre-approval Coordination. The CES Security Manager is the source for the necessary forms and will provide instructions for receiving, preparing, and processing these forms. The

Contractor shall coordinate with all required facilities to process all necessary paperwork. After forms have been properly completed, the CES Security Manager will make an appointment for contractor employee(s) to go to the Security Forces for submittal of paperwork and fingerprinting.

Appointments will be scheduled within two weeks of request.

4.9.5.2. Badge Issuance. A minimum of 180 days is required to process contractor employee

NACs. Additional time will be required if the NAC is unfavorable and may result in denial of entry to restricted/controlled areas or denial of base LAN access. The CES Security Manager will notify the Contractor of any NAC results. After completion of a favorable NAC, each eligible employee shall report to the CES Security Manager for processing of AF Form 2586, Unescorted

Entry Authorization Certificate. The CES Security Manager will schedule appointments for issuance of badges.

4.9.5.3. Access Revocation. The Dobbins ARB Installation Commander reserves the right to deny restricted area entry to any contractor employee whose NAC is unfavorable, and the right to terminate the entry of any employee upon disclosure of information indicating the individual’s continued entry to a secure area is not in the best interest of national security.

4.9.5.4. Badge Validity. Controlled area badges will be valid only for the actual period of employment or the term of the contract, whichever occurs first. Contractor employees must display the controlled area badge on their outer garment above waist level, and must, upon request, surrender the badge to any DoD member for identification verification. Violations or deviations from established security procedures by contractor employees may result in confiscation of controlled area badges and denial of future entry to restricted areas.

4.9.5.5. Contract Personnel Requirements. The Contractor shall not employ persons for work on this contract who are identified to the Contractor by the CO as a potential threat to the health, safety, security, general well-being, or operational mission of the installation and its population.

4.9.6. Contractor Vehicles. Contractor vehicles must be maintained in a safe and operational condition at all times while on Dobbins ARB.

4.9.7. For Official Use Only (FOUO). The contractor shall comply with DoD 5400-7-R, DoD

Freedom of Information Act (FOIA) Program requirements. This regulation sets policy and procedures for the disclosure of records to the public and for marking, handling, transmitting, and safeguarding FOUO material.

4.9.8. Reporting Requirements. Contractor personnel shall report to an appropriate authority any information or circumstances of which they are aware may pose a threat to the security or well-being of DoD personnel, contractor personnel, resources, and classified or unclassified defense information.

4.9.9. Physical Security. The contractor shall be responsible for safeguarding all government property and controlled forms provided for contractor use. At the end of each work period, all government facilities, equipment, and materials shall be secured.

4.9.10. Key Control. The contractor shall establish and implement methods of making sure all keys/combinations issued to the contractor by the government are not lost or misplaced and are not used by unauthorized persons. The contractor shall not duplicate any keys issued by the government. The contractor shall immediately report to the COR or CO any occurrences of lost or duplicated keys. In the event keys other than master keys are lost or duplicated, the contractor may be required, upon written direction of the CO, to re-key or replace the affected lock or locks without cost to the government. The government may, however, at its option, replace the affected lock or locks or perform re-keying and deduct the cost of such from the monthly payment due the contractor. In the event a master key is lost or duplicated, the government shall replace all locks and keys for that system, and the total cost will be deducted from the monthly payment due the contractor.

4.10. SAFETY REQUIREMENTS AND REPORTS. The contractor shall perform work in a safe manner as required by OSHA Safety and Health Requirements. Provide a verbal report to the

CO as soon as possible of each occurrence of damage to Government property or an accident resulting in death, injury, occupational disease, or adverse environmental impact. Provide a completed copy of required Accident Investigation Reports to the CO within five calendar days of each occurrence.

4.11. SPECIAL QUALIFICATIONS. None

4.12. CONTRACTING OFFICER AND CONTRACTING OFFICER REPRESENTATIVE.

(QUALITY ASSURANCE PERSONNEL) The Contracting Officer will appoint a primary and alternate representative for management of the day to day activities of the contract. The identity, title, and authority of this representative will be provided in writing to the contractor after contract award.

4.13. MULTI-FUNCTIONAL TEAM. The Senior Leadership may require a multi-functional team be established between the government and the contractor to ensure joint cooperation and a sound customer focus of all parties involved in the execution of this contract.

4.14. PARTNERING AGREEMENT

The CO may require a partnering agreement, or multi-functional team, between the Government and Contractor to facilitate joint cooperation and a sound partnership of all parties involved in the execution of this contract. Partnering is the creation of a Government-Contractor relationship that promotes achievement of mutually beneficial goals. It involves an agreement in principal to share the risk involved in completing the project and to establish and promote a nurturing partnership environment. Representatives from each organization are encouraged to participate in developing a partnering agreement. The partnering agreement that results may be formal or informal. If formal, it should be reduced to writing and signed by the parties involved.

4.15. DAMAGES TO GOVERNMENT BUILDINGS, EQUIPMENT, OR VEGETATION

Damages to government buildings, equipment, or vegetation are addressed in FAR 52.237-2, Protection of Government Buildings, Equipment, and Vegetation.

5. APPENDICES.

A. Estimated Workload Data

B. Maps and/or Site Plans

APPENDIX A

TABLE A1 - ESTIMATED WORKLOAD DATA

ITEM/

CLIN

REF

NAME

ANNUAL

ESTIMATED

QUANTITY

0001 Municipal Solid Waste/Food Waste 485 Tons

0008 Unscheduled/Special Event Container Placements 12 Each

0008 Bulk Container Relocations 6 Each

0009 Construction and Demolition (C&D) Container

Placements

12 Each

0009 Construction and Demolition (C&D) Debris 24 Tons

ONE WAY

NOTE Distance To Disposal Site 7.8 Miles

TABLE A2 - TASKS & ESTIMATED FREQUENCIES

94 AW estimated workload

SCHEDULE

A COLLECTION STATION ADDRESS

MAP

LOCATION SIZE TYPE FREQUENCY

Quantity

5 Hangar 5 800 Dobbins Patrol Rd 10 8 Solid Tue & Fri 1

1 401 VOQ 1135 Ridenour Pl 1 8 Solid Tue & Fri

1 415 REOT 1085 Readiness Rd 1 8 Solid Tue & Fri

1 467 TCC Complex 1420 Ridenour Dr. 1 8 Solid Tue & Fri

1 486 Gym 1220 Gym Rd 2 6 Solid Tue & Fri

1 501 Civil Engineering 884 Industrial Dr. 2 8 Solid Tue & Fri

1 516 Motor Pool 926 Industrial Dr. 2 8 Solid Tue & Fri

3 530 Base Exchange 1074 Industrial Dr. 2 8 Solid Tue & Fri

1 531 POL 865 Atlantic Ave 2 4 Solid Tue & Fri

1 537 Lakeside Picnic Area 1256 Lake Cir 3 4 Solid Tue & Fri

1 537 Picnic Area 1257 Lake Cir 3 8 Solid Tue & Fri

1 537 FAM Camp 1258 Lake Cir 3 8 Solid Tue & Fri

1 557 Radar 1143 Fourth St 3 4 Solid Tue & Fri

1 558 MWR 1335 Dozer Cir 3 8 Solid Tue & Fri

1 550 Clinic 1175 Fourths St 3 4 Solid Tue & Fri

1 560 Recycle 1164 Fourth St 3 4 Solid Tue

1 600 Flight Simulator 1195 Atlantic Ave 3 8 Solid Tue & Fri

1 700 Communications 1356 Atlantic Ave 4 8 Solid Tue & Fri

1 727 Services 1342 Dobbins Pl 5 8 Solid Tue & Fri

1 729 22 Air Force 1364 Chennault Cir 5 8 Solid Tue & Fri

1 731 Fuel Systems Maint 1408 Dobbins Pl 5 8 Solid Tue & Fri

1 733 A/Port Training Facility 1436 Hobart 5 8 Solid Tue & Fri

1 745 Fire Station 1483 Refueling Rd 4 8 Solid Tue & Fri

2 800 Lodging 1295 Barrack Ct 6 8 Solid Tue & Fri

2 802 Lodging 1295 Barrack Ct 6 8 Solid Tue & Fri

1 806 Consolidated Club 1537 Atlantic Ave 6 8 Food Tue & Fri

2 812 Supply 1538 Atlantic Ave 5 8 Solid Tue & Fri

1 823 ATCALS 1572 Warehouse Rd 5 8 Solid Tue & Fri

1 827 Finance 1392 Second St 5 8 Solid Tue & Fri

1 838 94 Wing HQ 1430 First St 7 8 Solid Tue & Fri

1 922 Multi Use Building First St 7 8 Solid Tue & Fri

1 1005 Rifle Range 2123 Munitions Rd 8 5 Solid Tue & Fri

1 1030 Fire Training Pit Munitions Rd @ Gate 8 8 Solid Tue & Fri

1 1040 Munitions Area 1581 Munitions Rd 9 4 Solid Tue & Fri

Unscheduled

Pick-up

Exchange of Dumpster

1537 Atlantic Ave

Solid

* = as needed

501 C.E. Complex 884 Industrial Dr. 2 20 Solid *

Army National Guard estimated workload

1 554 ARNG Armory 956 Atlantic Ave 2 8 Solid Tue & Fri

1 555 ARNG Armory 900 Atlantic Ave 2 8 Solid Tue & Fri

APPENDIX B

MAPS AND/OR SITE PLANS

BASE STREET MAP and MUNICIPAL SOLID WASTE COLLECTION

FREQUENCY MAP see Appendix A Table A2

File details come from the government source that posted it. Updated .