Visio-B500_-_B410_Conduit_run_(distance).pdf
PDF 96 KB Posted
- Attached to
- Construct Walmore Road Gate Redesign Federal contract opportunity
- Solicitation number
- FA6670-17-R-0002
About this file
Visio-B500 - B410 Conduit run (distance)
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Walmore_Gate_-_Site_Visit_Sign_In_Sheet.pdf | ||
| Walmore_Gate_-_Amend_3.pdf | ||
| Attachment_3_-_Heavy_and_Highway_-_3_March_2017.pdf | ||
| Walmore_Gate_-_Amend_2.pdf | ||
| Walmore_Gate_-_Amendment_1.pdf | ||
| Walmore_Gate_2017_-_Q_and_A's_-__17_Feb_2017.pdf | ||
| Attachment_3_-_Heavy_and_Highway_-_17_Feb_2017.pdf | ||
| Attachment_1_-_Walmore_Gate_-_Spec_-_3_June_2016.pdf | ||
| Attachment_6_-Walmore_Gate_-_Past_Performance_Questionnaire.pdf | ||
| Attachment_2_-_Walmore_Gate_-_Drawings_-_sheets_1-12_-_3_June_2016.pdf | ||
| Attachment_3_-_Heavy_and_Highway_-_6_Jan_2017.pdf | ||
| Attachment_5_-_Walmore_Gate_-_EAL_-_Ctr_template.pdf | ||
| FA6670-17-R-0002_-_Walmore_Gate.pdf | ||
| Attachment_4_-_Walmore_Gate_-_Insurance_Cert.pdf |
Show all 14
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
90'CC
347' CC
470' CC
155' CC
265' CC
654' CC433' CC
432' CC
210' CC
263' CC
105' CC
All distances labeled were marked Center to Center of the manholes. This is the purpose for the footage and the “CC”.
Total distance from Bldg. 410 termination to Building 500 Entrance is: 3,424 Feet. This does not include service loop in each manhole and from building entrance to termination location.
File details come from the government source that posted it. Updated .