FA568218R0023_0001.pdf
PDF 330 KB Posted
- Attached to
- SUSTAIN HVAC CONTROLS Federal contract opportunity
- Solicitation number
- FA568218R0023
About this file
AMENDMENT 0001 TO SOLICITATION FA568218R0023
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Applicable_Master_Specs.pdf | ||
| 1446_PAHA_mech_&_electr_sys_existing_1-100pg.pdf | ||
| 1446_PAHA_mech_&_electr_sys_existing_204-406_pg.pdf | ||
| 1446_PAHA_mech_&_electr_sys_existing_101-203pg.pdf | ||
| ASHE_18-1011_Tec_Spec_Rev_2_9_Mar_18.pdf | ||
| 116_YAC_mec_and_electr_sys_existing.pdf | ||
| 1307_RAPCON_mech_&_electr_sys_existing.pdf | ||
| ASHE_18-1011_CCEB.xlsx | XLSX spreadsheet | |
| Additional_Requirements,_May_2018.doc | DOC document | |
| FA568218R0023.pdf | ||
| ASHE_18-1011_Tec_Spec_Rev_1.pdf |
Show all 11
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
F1F3A28031A002
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83)
Prescribed by GSA
FAR (48 CFR) 53.243
The purpose of this amendment is to make changes as indicated below and in the follow ing pages:
Section J/Attachment 1: Correct the project title.
Technical Specif ications Rev. 2, page 3 of 60, Master Specif ication 01101/R is changed to read “01101”.
Section J/Attachment 4: Replace the Master Specif ications w ith the Master Specif ications applicable to project ASHE 18-1011
Section L, provision 52.236-27 Alt I: change the site visit day from Thursday to Tuesday
Section L, provision L-01 Offer Preparation Instructions, paragraph 1(c): change the Attachment number
Section M, provision M-01, paragraph b: Correct the project title
1. CONTRACT ID CODE PAGE OF PAGES
J 1 4
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 11-May-2018
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X FA568218R0023
X 9B. DATED (SEE ITEM 11)
09-May-2018
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE
RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
11-May-2018
CODE
31 CONS/LGC
VIA PORDENONE, AREA "E" EDIF. 600
BASE AEREA DI AVIANO
33081 AVIANO (PN)
FA5682 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
FA568218R0023
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION J - LIST OF DOCUMENTS, EXHIBITS AND OTHER ATTACHMENTS
The following have been modified:
LIST OF ATTACHMENTS – CONSTRUCTION CONTRACTS
The following documents are an integral part of this contract:
a. Attachment 1:
Technical Specifications for Project ASHE 18-1011 Repair HVAC Controls Multi Area F Aviano Air Base, Aviano, Italy Rev. 2 dated 09 Mar 2018 and marked ASHE 18-1011 REV 2 09 March 2018
- 61 pages including cover page
b. Attachment 2:
Drawings
- 586 sheets
c. Attachment 3:
Additional Requirements dated May 2018
- 5 pages
d. Attachment 4:
Master Specifications for Construction Projects Aviano Air Base applicable to project ASHE 18-1011 indicated at page 3 of the Technical Specifications Rev. 2
- 52 pages
SECTION L - INSTRUCTIONS, CONDITIONS AND NOTICES TO BIDDERS
L-01. OFFER PREPARATION INSTRUCTIONS
To assure timely and equitable evaluation of offers, offerors must follow the instructions contained herein. Offerors are required to meet all solicitation requirements.
The following documents constitute the offer, failure to submit any of the below documents may be cause for rejection of the offer:
1. PRICE OFFER
(a) Complete blocks 14, 15, 16, 19 (only if amendments are issued) and 20A through 20C of the Section A, SF1442.
In doing so, the offeror accedes to the contract terms and conditions as written in the solicitation Sections A through
K. These sections constitute the model contract.
(b) Insert proposed unit and extended prices in Section B for each Contract Line Item Number (CLIN) using the amount resulting from the completion of the Construction Cost Estimate Breakdown forms. The extended amount must equal the whole Euro unit price multiplied by the number of units.
(c) Complete the necessary fill-ins and certifications in Sections I through K, including Section J, Attachment 3, "Additional Requirements”.
(d) The entire solicitation Sections A through M as well as the form Construction Cost Estimate Breakdown shall be returned in their entirety.
2. QUALIFICATION CERTIFICATION
Submit current SOA certification for category OG11 and classification adequate to cover offeror’s amount for projects performance.
3. EXPERIENCE
Submit offeror’s experience with the same work/trades and complexity as the instant requirements. The offeror must submit evidence of at least two (2) similar projects performed within the last three (3) years from the date of offer where the offeror was solely responsible for the entire project performance that involved substantially the same work and principal trades, magnitude and complexity as the instant requirement.
52.236-27 SITE VISIT (CONSTRUCTION) (FEB 1995) – ALTERNATE I (FEB 1995)
(a) The clauses at 52.236-2, Differing Site Conditions, and 52.236-3, Site Investigations and Conditions Affecting the Work, will be included in any contract awarded as a result of this solicitation. Accordingly, offerors or quoters are urged and expected to inspect the site where the work will be performed.
(b) An organized site visit has been scheduled for--
Tuesday, 15 May 2018 – 0930hrs local
(c) Participants will meet at--
Parking Area of Gate #8, LVIS Gate (Contractors Entry Gate)
Area F Flightline
Aviano, Air Base, Italy
(End of provision)
SECTION M - EVALUATION FACTORS FOR AWARD
M0001
M-01 SELECTION
a. Basis for Contract Award
This solicitation is subject to the Simplified Acquisition Procedures (SAP) of the Federal Acquisition Regulation
(FAR) 13, Simplified Acquisition Procedures, as supplemented by the Defense Federal Acquisition Regulation
Supplement (DFARS), the Air Force Federal Acquisition Regulation Supplement (AFFARS). These regulations are available electronically at the Air Force (AF) FAR Site, http://farsite.hill.af.mil.
The Government will select the offer of the responsible vendor whose offer represents the best value after evaluation in accordance with the factors indicated in paragraph M-02 below.
b. Number of Contracts to be Awarded
The Government intends to award one contract for the performance of Project ASHE 18-1011 Repair HVAC
Controls Multi Area F Aviano Air Base, Aviano, Italy Rev. 2.
c. Solicitation Requirements, Terms and Conditions
Offerors are required to meet all solicitation requirements. Failure to comply with the terms and conditions of the solicitation may result in the offeror being ineligible for award.
(End of Summary of Changes)
File details come from the government source that posted it.