ASHE_16_1019P1_Addendum___1.pdf
PDF 96 KB Posted
- Attached to
- ASHE 16-1019P1 REPAIR HVAC CONTROLS MULTI Federal contract opportunity
- Solicitation number
- FA5682-15-R-0013
About this file
ASHE 161019P1 ADDENDUM 1
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Bldg_1484_Add_1_Drawings.pdf | ||
| FA5682-15-R-0013_Amend_2.pdf | ||
| 02._ASHE_16-1019P1_Tec_Spec_13May15.pdf | ||
| Amendment_1_15-R-0013.pdf | ||
| MASTER_TECHNICAL_SPECIFICATIONS_2009.zip | ZIP file | |
| 15._ASHE_16-1091P1_blank_CCB.xlsx | XLSX spreadsheet | |
| FA5682-15-R-0013.pdf | ||
| 01._AS_BUILT_1420.pdf | ||
| 02._ASHE_16-1019P1_Tec_Spec.pdf | ||
| 01._AS_BUILT_B1409.pdf | ||
| 01._AS_BUILT_B1484.pdf |
Show all 11
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ADDENDUM # 1
to
Project ASHE161019P1
REPAIR HVAC CONTROLS, MULTI, AREAF AVIANO AIR BASE, AVIANO ITALY
BLDG 1484-Visiting Quarter :
The additional 5 drawings referring to existing condition, listed below, are added to project statement of work.
M 3.1 CHILLED AND HOT WATER FLOW DIAGRAM
M 4.2 AHU 1 & 2-CONTROL DIAGRAM
M 4.3 MAU 1 & 2 CONTROL DIAGRAM
M 4.5 M405 FANCOILS 1&4 CONTROL DIAGRAM
M 5.1 SCHEDULES
File details come from the government source that posted it. Updated .