Questions for RFQ.docx
DOCX document 13 KB Posted
- Attached to
- Moron AB EOC Upgrade Federal contract opportunity
- Solicitation number
- FA557520QDK01
- Issued by
- Department of the Air Force
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Questions for RFQ.docx | DOCX document | |
| QUUG201600001 SOO Premise Wire for Bldg 1411.pdf | ||
| FA557520QDK01.pdf | ||
| QUUG201600001 SOO Premise Wire for Bldg 1411.pdf | ||
| Attachment 2 - Price Schedule.xls | XLS spreadsheet | |
| FA557520QDK01.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Do you have cable measurements, list of equipments, switches, racks or any other information?
RED ZONE
In the Red zone there are 136 network points, so you need at least 3 switch of 48 ports to connect the entire network. We should know the characteristics of the switches that need to be offered.
There are a total of 15 rooms in the red zone, whose network connections have to be centralized in room 159, where the cabinet, patchpanels and 3 switches must be supplied.
• Question 1: To install the cabinet in room 159, are there any specifications for switches, patchpanel and rack cabinet?
We understand that we would have to supply the following equipment :
• 1 x Rack
• 3 x Switch 48 POE ports
• 6 x 24-port PatchPanel
• Metal gutters to carry the cables to the rack.
• Question 2: The new cabinet to be installed in room 159 must be connected with fiber optic cable to the cabinet in room 113. 4 fiber lines are required to connect the room 159 cabinet with the room closet 113. Are those 4 fiber optic lines are the only ones that have to be installed between the two rooms?
OUT OF THE RED ZONE
Outside the red zone, there are 336 mains outlets, which have to be wired from room 119, which is where the Rack, Switch and Patchpanel are located. Currently, network cables from all rooms of the building arrive in this room: 106, 107, 115, 116, 117, 118, 120, 122, 125, 132, 133, 136, 137, 143, 144, 142, 147, 148, 152, 153, 156, 157, 158, 159, 160, 161, 164.
• Question 3: Room 111, has its own closet, which is connected by fiber optic cable to the rack of room 113. Will the sockets in that room be wired to that closet or do they have to go to room 119?
• Question 4: Room 119 has centralized all network points in the building. towards this room should go all the outlets of the rooms that are outside the red zone marked on the plane. Therefore, we would have to remove the old wiring to incorporate the new one and use the same hardware that they currently have, (Switch, PAtchPanel, cabinets, etc). At least 7 switches extra are required to manage the 336 network sockets of all wired rooms, The extra hardware needed will be provided by you?
GENERAL QUESTIONS
• Question 5: Do we have to remove all old wiring , or we can leave it unusable?
• Question 6: Can we install new cable trays through the ceiling to get to those areas where they currently do not exist?