Part_8,_Schedule_of_Material_Submittals.xlsx

XLSX spreadsheet 48 KB Posted

Attached to
ATFP SUS Airfield Perimeter Ditch Federal contract opportunity
Solicitation number
FA5575-18-R-0004
Issued by
Department of the Air Force United States Air Forces in Europe - Air Forces Africa

About this file

Schedule of Material Submittals

View the file

Other files for this federal contract opportunity

Show all 14

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Material Submittals Schedule

SCHEDULE OF MATERIAL SUBMITTALSPROJECT NUMBERS
QUUG 18-1007PROJECT TITLES

ATFP SUS AIRFIELD PERIMETER DITCH

SOLICITATION / CONTRACT NO.

(To be completed by Project Engineer)(To be completed by Contract Administrator)
NUMBER OF COPIES REQUIRED
LINE NUMBERITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE, TYPE OF SUBMITTALCERTIFICATION OF COMPLIANCESHOP DRAWINGSSAMPLESCOLOR SELECTIONMANUFACTURER'S RECOMMENDATIONMANUFACTURER'S WARRANTYCATALOG DATAOPERATING INSTRUCTIONSSCHEDULES, LISTINGS, REPORTS, PLANSTECHNICAL DATATEST REPORTSFIELD REPORTSREQUIRED SUBMISSION DATE

fergusog: Enter the due date from the Contractor (MM/DD/YY)

DATE RECEIVED IN CONTRACTING

fergusog: Enter the date received from the Contractor. (MM/DD/YY)

DATE TO CIVIL ENGINEERING

fergusog: Enter the date submittal was given to CE for review. (MM/DD/YY)

RETURN SUSPENSE DATE

fergusog: Enter the date the submittal is due back from CE

(MM/DD/YY)

SUBMITTAL NUMBERS

fergusog: Enter the Submittal Number

DATE CONTRACTOR NOTIFIED CONTRACTOR RESUBMITTAL

fergusog: Enter Resubmittal Number

FINAL APPROVAL

fergusog: Enter the submittal final approval date

(MM/DD/YY)

REMARKS

fergusog: Enter any comments pertaining to the submittal

APPROVED

fergusog: Enter date the Contractor was notified of submittal approval

(MM/DD/YY)

fergusog: Enter Resubmittal Number

DISAPPROVED

fergusog: Enter date the Contractor was notified of submittal disapproval

(MM/DD/YY)

fergusog: Enter the submittal final approval date fergusog: Enter any comments pertaining to the submittal

SECTION 01 11 00

SCOPE OF WORK, DRAWINGS AND SPECIAL CONDITIONS

01Construction Schedule1CNTP+7
02Work Plan1CNTP+7
03Government furnished material request1Work-15
04Inventory of the excess supplies, materials and equipment imported free duty1Prior to FI
05Classification certificate1DNTP+30
06Quality certificate1DNTP+30
07Environment certificate1DNTP+30
08Asphalt batch plant certificate1DNTP+30
09Quarry certificate1DNTP+30
10Concrete batch plant certificate1DNTP+30
11Laboratory certificate1DNTP+30
12Request of training about vehicle operations on the aerodrome1DNTP+15
SECTION 01 11 01

GENERAL CONDITIONS

13Warranty letter1Acceptance+15
14Work Clearance Request1CNTP+5
15Base utility connection/disconeection request1CNTP+15
16Base utility outage request1Work-15
17Welding work request1Work-15
18Transit control plan1Work-10
19Access route plan1CNTP+10
20Progress Schedule1CNTP+10
21Mobility Plan1CNTP+15
22Project Sign1CNTP+15
23Quality Control Plan1CNTP+15
24Pre-final inspection request1Date-15
25Final inspection request1Date-15
26Environmental protection plan1CNTP+15
27Waste & construction debris management certificate1Acceptance+15
28As-Built drawings1Acceptance+15
29Spatial Data1As-Built+10
30Key Personnel1DNTP+15
31Personnel Listing1DNTP+15
32Health and safety program1CNTP+15
SECTION 01 32 16.00 20
33Design-Build Schedule1DNTP+10
34Monthly Updates1Every 1st of month
Contractor shall complete list of submittals when developping final constructiohn specifications, including those outlined in the Performance Technical Specifications provided with the SOW

&"Arial,Bold"&8Schedule of Material Submittals, Feb 05 (SAF/AQCP) Page &P of &N

MSS Spanish

RESUMEN MUESTRAS DE MATERIALNÚMEROS PROYECTO:
QUUG 18-1007TÍTULOS DE PROYECTO:
ATFP MANTENER CUNETA PERIMETRAL DEL AERÓDROMOSOLICITACIÓN / CONTRATO NO.
(A cumplimentar por el ingeniero del proyecto)(A cumplimentar por administrador del contrato)
NUMBER OF COPIES REQUIRED
LÍNEA NÚMEROPARTIDA O DESCRIPCIÓN DE PARTIDA, REFERENCIA DEL CONTRATO, TIPO DE PRESENTACIÓNCERTIFICADO DE CUMPLIMIENTOPLANOS DE TALLERMUESTRASSELECCIÓN DE COLORRECOMENDACIONES DEL FABRICANTEGARANTÍA DEL FABRICANTEDATOS DE CATÁLOGOINSTRUCCIONES DE FUNCIONAMIENTOPROGRAMAS, LISTADOS, INFORMES, PLANESDATOS TÉCNICOSPRUEBASINFORMES DE TRABAJOS DE CAMPOFECHA DE ENTREGA REQUERIDA

fergusog: Enter the due date from the Contractor (MM/DD/YY)

FECHA RECEPCIÓN EN CONTRATACIÓN

fergusog: Enter the date received from the Contractor. (MM/DD/YY) FECHA EN INGENIERíA CIVIL fergusog: Enter the date submittal was given to CE for review. (MM/DD/YY)

FECHA LÍMITE DE DEVOLUCIÓN

fergusog: Enter the date the submittal is due back from CE

(MM/DD/YY)

NÚMERO DE MUESTRA

fergusog: Enter the Submittal Number

FECHA NOTIFICACIÓN A CONTRATISTA SEGUNDA PRESENTACIÓN DEL CONTRATISTA

fergusog: Enter Resubmittal Number

APROBACIÓN FINAL

fergusog: Enter the submittal final approval date

(MM/DD/YY)

OBSERVACIONES

fergusog: Enter any comments pertaining to the submittal

APROBADO

fergusog: Enter date the Contractor was notified of submittal approval

(MM/DD/YY)

fergusog: Enter Resubmittal Number

DESAPROBADO

fergusog: Enter date the Contractor was notified of submittal disapproval fergusog: Enter the submittal final approval date fergusog: Enter any comments pertaining to the submittal

SECCIÓN 01 11 00

OBJETO DEL TRABAJO, PLANOS Y CONDICIONES ESPECIALES

01Programa de obra1CNTP+7
02Plan de obra1CNTP+7
03Solicitud de material suministrado por el Gobierno1Trabajo-15
04Inventario del excedente de suministros, materiales y equipos importados libre de impuestos1Antes de IF
05Certificado de clasificación1DNTP+30
06Certificado de calidad1DNTP+30
07Certificado de medioambiente1DNTP+30
08Certificado de la planta de asfalto1DNTP+30
09Certificado de la cantera1DNTP+30
10Certificado de la planta de hormigón1DNTP+30
11Laboratorio1DNTP+30
12Solicitud de entrenamiento de operaciones de vehículos en el aeródromo1DNTP+15
SECCIÓN 01 11 01

CONDICIONES GENERALES

13Carta de garantía1Recepción+15
14Permiso de excavación1CNTP+5
15Petición de conexión a servicios de la base1CNTP+15
16Solicitud de cortes de servicios de la base1Trabajo-15
17Solicitud de trabajo de soldadura1Trabajo-15
18Plan de control de tránsito1Trabajo-10
19Plan de rutas de acceso1CNTP+10
20Programa de avance de obras1CNTP+10
21Plan de movilización1CNTP+15
22Cartel de proyecto1CNTP+15
23Plan de control de calidad1CNTP+15
24Solicitud de inspección pre-final1Fecha-15
25Solicitud de inspección final1Fecha-15
26Plan de protección medioambiental1CNTP+15
27Certificado de gestión de residuos y escombros1Recepción+15
28Planos As-Builts1Recepción+15
29Datos espaciales1As-Built+10
30Personal clave1DNTP+15
31Listado de personal1DNTP+15
32Plan de salud y seguridad1CNTP+15
SECCIÓN 01 32 16.00 20
32Cronograma de Diseñoy Construcción1DNTP+10
33Actualizaciones mensuales1Cada día 1 de mes
El Contratista completará el listado de presentaciones cuando desarrolle las especificaciones finales de construcción, incluyendo aquellas presentaciones apuntadas en el Pliego de Condiciones Técnicas suministradas con este OdT.

&"Arial,Bold"&8Resumen de muestras de material, Feb 05 (SAF/AQCP) Página &P de &N

File details come from the government source that posted it.