Request for Proposal
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Appendix_D-_FR_Inspection_Checklist.pdf | ||
| Appendix_C-_FR_Surface_Danger_Zone.pdf | ||
| Appendix_A-_Firing_Range_Complex.pdf | ||
| Appendix_F-_ETL_11-18.pdf | ||
| Appendix_B-_Site_Photos.pdf | ||
| Appendix_E-_AF_Indr_SA_FR_Std_Des.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
IMPORTANT - The "offer" section on the reverse must be fully completed by offeror.
4. CONTRACT NUMBER 5. REQUISITION/PURCHASE REQUEST NUMBER 6. PROJECT NUMBER
7. ISSUED BY CODE 8. ADDRESS OFFER TO
9. FOR INFORMATION
CALL:
a. NAME b. TELEPHONE NUMBER (Include area code) (NO COLLECT CALLS)
SOLICITATION
NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid and "bidder".
10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS (Title, identifying number, date)
11. The contractor shall begin performance within calendar days and complete it within calendar days after receiving award, notice to proceed. This performance period is mandatory negotiable. (See ).
13. ADDITIONAL SOLICITATION REQUIREMENTS:
a. Sealed offers in original and copies to perform the work required are due at the place specified in Item 8 by (hour) local time (date). If this is a sealed bid solicitation, offers will be publicly opened at that time. Sealed envelopes containing offers shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.
b. An offer guarantee is, is not required.
c. All offers are subject to the (1) work requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.
d. Offers providing less than calendar days for Government acceptance after the date offers are due will not be considered and will be rejected.
STANDARD FORM 1442 (REV. 8/2014)
Prescribed by GSA - FAR (48 CFR) 53.236-1(d)
12a. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?
(If "YES", indicate within how many calendar days after award in Item 12b.)
12b. CALENDAR DAYS
YES NO
SOLICITATION, OFFER,
AND AWARD
(Construction, Alteration, or Repair)
1. SOLICITATION NUMBER 2. TYPE OF SOLICITATION
SEALED BID (IFB)
NEGOTIATED (RFP)
3. DATE ISSUED PAGE OF PAGES
AMOUNTS
OFFER (Must be fully completed by offeror)
14. NAME AND ADDRESS OF OFFEROR (Include ZIP Code) 15. TELEPHONE NUMBER (Include area code)
16. REMITTANCE ADDRESS (Include only if different than Item 14.)
CODE FACILITY CODE
17. The offeror agrees to perform the work required at the prices specified below in strict accordance with the terms of this solicitation, if this offer is accepted by the Government in writing within calendar days after the date offers are due. (Insert any number equal to or greater than the minimum requirement stated in Item 13d. Failure to insert any number means the offeror accepts the minimum in Item 13d.)
18. The offeror agrees to furnish any required performance and payment bonds.
19. ACKNOWLEDGMENT OF AMENDMENTS
(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)
AMENDMENT
NUMBER
DATE.
20a. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN OFFER (Type or print) 20b. SIGNATURE 20c. OFFER DATE
21. ITEMS ACCEPTED:
AWARD (To be completed by Government)
CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE
28. NEGOTIATED AGREEMENT (Contractor is required to sign this document and return copies to issuing office.) Contractor agrees to furnish and deliver all items or perform all work requirements identified on this form and any continuation sheets for the consideration stated in this contract. The rights and obligations of the parties to this contract shall be governed by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certifications, and specifications incorporated by reference in or attached to this contract.
29. AWARD (Contractor is not required to sign this document.) Your offer on this solicitation is hereby accepted as to the items listed. This award consummates the contract, which consists of (a) the Government solicitation and your offer, and (b) this contract award. No further contractual document is necessary.
30a. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED TO SIGN (Type or print)
31a. NAME OF CONTRACTING OFFICER (Type or print)
30b. SIGNATURE 30c. DATE 31b. UNITED STATES OF AMERICA
BY
31c. DATE
STANDARD FORM 1442 (REV. 8/2014) BACK
22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA
24. SUBMIT INVOICES TO ADDRESS SHOWN IN
(4 copies unless otherwise specified)
ITEM 25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO
10 U.S.C. 2304(c) ( ) 41 U.S.C. 3304(a) ( )
26. ADMINISTERED BY 27. PAYMENT WILL BE MADE BY
FA557019RA001
Section A - Solicitation/Contract Form
Section B - Supplies or Services and Prices/Cost
Additional Information/Notes
Item Supplies/Service Quantity Unit Unit Price Amount
0001 The contractor shall provide repairs at RAF Molesworth Firing Range per the Statement of Work Product Service Code: Z2JZ Firm Fixed Price
1.0 Lot
DFARS Clauses Incorporated by Reference
Number Title Effective Date 252.229-7006 Value Added Tax Exclusion (United Kingdom) 2011-12 252.229-7007 Verification of United States Receipt of Goods. 1997-06
Section C - Description/Specifications/Statement of Work
STATEMENT OF WORK FOR
Firing Range Repairs, B613
AT RAF MOLESWORTH, UNITED KINGDOM
14 February 2019
1.0 Proposal
During the pre-proposal site visit, contractors shall visit the site and become familiar with the project requirements. The project location map is provided as Appendix A. Relevant informational documents are provided as Appendices A-F. The appendices do not represent current existing conditions. The contractor shall verify all existing conditions and validated during the pre-proposal site visit. The contractor shall submit in writing all questions arising during the site visit to the Contracting Officer.
The Contracting Officer will respond to all questions in writing to all Offerors within a reasonable time period after the site visit.
The contractor shall furnish all labor, personnel, equipment, supplies, transportation, tools, materials, supervision, and other items necessary to perform the refurbishment of the firing range at RAF Molesworth, UK. Work shall be completed as defined in this SOW and within the terms and conditions of the contract.
2.0 Hazardous Materials
There is no hazardous materials survey accomplished for this project. The contractor shall verify the presence of hazardous materials during the site survey. The contractor shall include the cost for testing/sampling, abatement/remediation, handling and disposal of all suspected hazardous materials (if applicable). All hazardous materials shall be handled, tracked, and disposed per local regulations.
General Note: All materials, products, and systems used on this project shall be non-toxic, certified to be asbestos free, containing lead only under the provisions of the Code of Federal Regulations (CFR) Part 1303- Ban of Lead Containing Paint and Certain Consumer Products Bearing Lead- Containing Paint, and complying with local regulations.
3.0 Scope
The following is a summary of the project and is provided solely for the purpose of revealing the general nature of the work involved. Contractor shall use the most current applicable codes/standards at time of award. For any discrepancies between the various codes/standards, the most stringent requirements shall apply. The contractor shall verify all colors of all elements with Contracting Officer through the submittal process, prior to performing work.
The place of performance shall be at RAF Molesworth, Building 613, Huntingdon, United Kingdom.
A. Items of Work:
1. Renovate firing lanes
a. Remove all damaged timbers to include all timber from around each post and two layers of 8' by 4' ply sheets from the top baffles along each firing points and lanes.
b. Supply and install replacement fire resistant treated timber on 26 firing points and lanes as required, this is to be installed as per Appendix F para 7.5.5.2 to include small headed nails and limited visibility to reduce ricochet.
c. Replace damaged concrete where required including patching concrete using render applied to bare post before all timber and steel is reattached around posts.
d. Remove and replace damaged steelwork on 26 firing points around the third from rear row columns. The steel must be 10 mm thick with a nominal 500 BHN, welded into position per applicable industry standards in Appendix F paragraph 4.7.
Welding must conform to AWS D1.1 Structural Welding Code- Steel and will cover from and side areas and have straps welded to the rear to provide self-support.
e. Steel to the rear high level baffles is to be removed and replaced with 10 mm thick 500 BHN galvanized steel sheeting along entire rear area this is to be covered with one sheet of 19 mm and one sheet of 11mm plywood. Plywood must meet the requirements specified in Appendix F paragraph 7.5.5.2.
f. Replace front side of rear columns with 10 mm thick 500 BHN sheet steel to additionally protect upright columns.
g. Provide and install target hangers on 26 firing points, these are to be specifically interchangeable along each firing point so that targets can be easily carried from front to rear of lanes to change shooting scenarios. Robust hooks to support cord mounted to the rear of the 26 firing will also be provided.
h. Dispose timber offcuts throughout rubber granular beds. Rubber granules will be pushed back up to the white lines and supply granules where required and leveled. Carbineer clips will support each cross beam to prevent from falling. All cross beams shall be painted to approve colors. Each cross beam is to be supported using carabineer clips at the firing line to prevent them from falling on shooters while firing, these are also to be repainted in suitable colors throughout.
i. Remove toe boards along firing points.
j. Rubber granulate pushed back and increased to the level that is painted on the top of the backstop.
k. Reface wood between the 15 m line and the backstop for ricochet absorption.
l. The new bullet trap shall be in ballistic steel AR500 quality minimum thickness 10 mm with Brinnell Hardness Number (BHN) greater or equal to 500. Remove baffle over existing bullet trap and install new baffle with new bullet trap. Remove and replace all damaged timber.
2. Control Tower
a. Remove existing glass and reduce window frame thickness to 1/4 inch to 3/4 inch whichever is the thinnest width possible.
The goal is to increase the view range of personnel inside the control tower. The new glass must be shatterproof and match the new dimensions of the new frame.
b. Elevate seating position by 200 mm to increase the visual perspective of personnel inside the tower. The tower has the following dimensions: 178 cm front width, 264 cm front height, and 60 cm depth.
c. The paint color for the tower must be Van Dyke brown.
3. Firing range floor
a. Provide 100t of pea gravel and spread evenly throughout all firing lanes leading up to the butts at the rear. The pea gravel must be 6 inches deep with less than 10 % of the gravel exceeding 3/8 inch in diameter and does the pea gravel extend from the firing line to the backstop. Gravel delivery trucks must be rigid and moved via mechanical equipment.
b. All yellow (Ready line) and red lines (Firing line) on the floor will be repainted. Both lines must be 100 mm wide and adhere to Appendix F paragraphs 7.1.5.7.3, 7.5.8., and 7.1.5.9.
4. Firing range ceiling
a. Provide sound deadening acoustic foam throughout the shooting area. Provide sound deadening acoustic foam on the ceiling above firing points and along the lip that hangs down in front of the ceiling beyond the red firing line. All noise reducing materials and its installation must conform to the requirements on Appendix F paragraphs 7.2.9 and its applicable subparagraphs.
5. Firing range netting
a. Install wire netting with small holes capable of preventing pass-through of 5.56 mm rounds under the firing benches. The wire can be no wider than 1/4 of an inch and must fit the width of each firing point's bench and fitted with a handle so they can be pulled out by hand and emptied.
6. Firing range lighting
a. Replace all existing lighting with 52, 30 watt, and 2,200 lumens LED lights to illuminate each lane on two rows. The contractor shall provide a new wiring system if not available. The switch for all lighting must be installed inside the control tower. The contractor can re-utilize existing lighting fixtures. If an existing lighting fixture cannot be re-utilized the contract must install a new lighting fixture.
b. Provide controls to vary lighting intensity throughout the range to accommodate subdued-light training requirements. All lighting work must adhere to Appendix F paragraph 7.2.11.3.
7. Communication system
a. Replace existing public announcement (PA) system with a digital 480 watt system capable of broadcasting voice announcements throughout the entire firing range. The current system has eight speakers mounted throughout the inside of the firing range area. All communication system work must comply with Appendix F paragraph 7.2.11.2.
B. Site Restoration
The contractor shall protect existing grasses, trees, shrubs, and landscaping from damage due to construction activities. All damaged vegetation shall be restored to its original condition. The contractor is responsible for notifying the contracting officer of any vegetation that interferes with contractor's work area prior to removing it.
4.0 General Conditions
A. Project Management Plan The contractor shall provide and maintain a quality control program to ensure work is performed in accordance with the SOW.
The contractor's quality control plan will identify a contractor representative who will manage the project and ensure quality standards are met. The contractor must identify in writing their project manager and submit to the Contracting Officer.
B. Period of Performance The period of performance for each phase and the overall project shall not exceed the number of calendar days shown in the solicitation. The performance period shall be broken down into three phases. A Notice to Proceed (NTP) will be issued for each performance period. Phases are as follows:
a. Phase I is identified as the material submittal phase and to complete any additional hazardous material survey (if applicable), prepare, submit, and receive government acceptance on all material submittals.
b. Phase II is Physical work. NTP for Phase II shall be issued upon the Government's acceptance of all Phase I requirements.
Work Restrictions: the following work restrictions shall apply:
1. Working hours shall be between the hours of 7:30 am and 4:30 pm, Monday - Friday (excluding federal holidays). Any work requests outside the working hours must be sent to the contracting officer for approval.
2. Any planned disruptions of utilities shall be coordinated with the government a minimum of 7 days in advance of work.
3. The government will make a determination prior to end of Phase II, after a joint contractor/government inspection of the contractor's punch list items, whether Phase II is substantially complete.
4. The Contractor's warranty shall not apply until completion and acceptance of the finished work.
5. Scissor and boom lifts are permitted, but must be left in the "down" position during non-working hours.
C. Phase III is closeout. NTP for Phase III (Closeout Phase), the third and final phase of this project, shall be issued upon acceptance of Phase II. The contractor shall manage all requirements for the closeout phase throughout the total contract performance period. The contractor shall finalize all requirements, allow for government review, and receive Contracting Officer approval of the receivables. The NTP for Phase III shall identify the due date for completion of the Closeout requirements.
D. Contractor Identification- prior to commencement of contract performance, the contractor shall furnish a list of all personnel identified for work under the contract. The list must have the name and address of each employee, identification document (ID) or driving license number, and the private and commercial vehicles which will be used with make of vehicle, model and year of manufacture, and license plate number.
E. Utilities- The contractor shall be provided access to existing utilities available on site. All temporary connections shall be coordinated with the government. The connections shall comply with pertinent US and local safety standards. All temporary connections shall be restored to original conditions at the completion of works.
5.0 SOW Appendix
A) Firing Range Complex B) Site Photos C) Firing Range Surface Danger zone D) Firing Range Inspection checklist E) Air Force Indoor Small Arms Firing Range Facility F) Engineering Technical Letter 11-18: Small Arms Range Design and Construction
Requirements Statement of Work - Firing Range Repairs
Section D - Packaging and Marking
Section E - Inspection and Acceptance
FAR Clauses Incorporated by Reference
Number Title Effective Date 52.246-12 Inspection of Construction. 1996-08 0001 Inspection and Acceptance Location
Both Destination Instructions: See DFARS 252.232-7006 WAWF Payment Instructions
DoDAAC: F3B7DK Cage:
DunsNumber:
Duns4Number:
CountryCode: USA
423 SPS SPTA RAF ALCONBURY
UNIT 5555 BOX 9
AF BPN NO MILSBILLS PROCESSES
, APO AE 09469
United States
OfficeCode:
David Tate Telephone: +44 (0) 1480843331 Email: david.tate.2.gb@us.af.mil
Section F - Deliveries or Performance
0001 Delivery Schedule Ship To Address
Place of Performance
DoDAAC: F3B7DK Cage:
DunsNumber:
Duns4Number:
CountryCode: USA
423 SPS SPTA RAF ALCONBURY
UNIT 5555 BOX 9
AF BPN NO MILSBILLS PROCESSES
, APO AE 09469
United States
OfficeCode:
David Tate Telephone: +44 (0) 1480843331 Email: david.tate.2.gb@us.af.mil
Period of Performance From
02 MAY 2019
to
01 JUL 2019
FAR Clauses Incorporated by Reference
Number Title Effective Date 52.242-17 Government Delay of Work. 1984-04
FAR Clauses Incorporated by Full Text
52.211-10 Commencement, Prosecution, and Completion of Work. 1984-04 As prescribed in 11.404(b), insert the following clause in solicitations and contracts when a fixed-price construction contract is contemplated. The clause may be changed to accommodate the issuance of orders under indefinite-delivery contracts for construction. Commencement, Prosecution, and Completion of Work (Apr 1984) The Contractor shall be required to (a)commence work under this contract within __see NTP letter__ calendar days after the date the Contractor receives the notice to proceed, (b) prosecute the work diligently, and (c) complete the entire work ready for use not later than __60 days__. The time stated for completion shall include final cleanup of the premises. The Contracting Officer shall specify either a number of days after the date the contractor receives the notice to proceed, or a calendar date.
DFARS Clauses Incorporated by Full Text
252.247-7023 Transportation of Supplies by Sea. 2014-04 Basic. As prescribed in 247.574(b) and (b)(1), use the following clause: TRANSPORTATION OF SUPPLIES BY SEABASIC (APR 2014) (a) Definitions. As used in this clause Components means articles, materials, and supplies incorporated directly into end products at any level of manufacture, fabrication, or assembly by the Contractor or any subcontractor. Department of Defense (DoD) means the Army, Navy, Air Force, Marine Corps, and defense agencies. Foreign-flag vessel means any vessel that is not a U.S.-flag vessel. Ocean transportation means any transportation aboard a ship, vessel, boat, barge, or ferry through international waters. Subcontractor means a supplier, materialman, distributor, or vendor at any level below the prime contractor whose contractual obligation to perform results from, or is conditioned upon, award of the prime contract and who is performing any part of the work or other requirement of the prime contract. Supplies means all property, except land and interests in land, that is clearly identifiable for eventual use by or owned by the DoD at the time of transportation by sea.
(i) An item is clearly identifiable for eventual use by the DoD if, for example, the contract documentation contains a reference to a DoD contract number or a military destination. (ii) Supplies includes (but is not limited to) public works; buildings and facilities; ships; floating equipment and vessels of every character, type, and description, with parts, subassemblies, accessories, and equipment; machine tools; material; equipment; stores of all kinds; end items; construction materials;
and components of the foregoing. U.S.-flag vessel means a vessel of the United States or belonging to the United States, including any vessel registered or having national status under the laws of the United States. (b)(1) The Contractor shall use U.S.-flag vessels when transporting any supplies by sea under this contract. (2) A subcontractor transporting supplies by sea under this contract shall use U.S.-flag vessels if (i) This contract is a construction contract; or (ii) The supplies being transported are (A) Noncommercial items; or (B) Commercial items that (1) The Contractor is reselling or distributing to the Government without adding value (generally, the Contractor does not add value to items that it subcontracts for f.o.b.
destination shipment); (2) Are shipped in direct support of U.S. military contingency operations, exercises, or forces deployed in humanitarian or peacekeeping operations; or (3) Are commissary or exchange cargoes transported outside of the Defense Transportation System in accordance with 10 U.S.C. 2643. (c) The Contractor and its subcontractors may request that the Contracting Officer authorize shipment in foreign-flag vessels, or designate available U.S.-flag vessels, if the Contractor or a subcontractor believes that (1) U.S.-flag vessels are not available for timely shipment; (2) The freight charges are inordinately excessive or unreasonable; or (3) Freight charges are higher than charges to private persons for transportation of like goods. (d) The Contractor must submit any request for use of foreign-flag vessels in writing to the Contracting Officer at least 45 days prior to the sailing date necessary to meet its delivery schedules. The Contracting Officer will process requests submitted after such date(s) as expeditiously as possible, but the Contracting Officer's failure to grant approvals to meet the shipper's sailing date will not of itself constitute a compensable delay under this or any other clause of this contract.
Requests shall contain at a minimum (1) Type, weight, and cube of cargo; (2) Required shipping date; (3) Special handling and discharge requirements; (4) Loading and discharge points; (5) Name of shipper and consignee; (6) Prime contract number; and (7) A documented description of efforts made to secure U.S.-flag vessels, including points of contact (with names and telephone numbers) with at least two U.S.-flag carriers contacted. Copies of telephone notes, telegraphic and facsimile message or letters will be sufficient for this purpose. (e) The Contractor shall, within 30 days after each shipment covered by this clause, provide the Contracting Officer and the Maritime Administration, Office of Cargo Preference, U.S.
Department of Transportation, 400 Seventh Street SW, Washington, DC 20590, one copy of the rated on board vessel operating carrier's ocean bill of lading, which shall contain the following information: (1) Prime contract number; (2) Name of vessel; (3) Vessel flag of registry; (4) Date of loading; (5) Port of loading; (6) Port of final discharge; (7) Description of commodity; (8) Gross weight in pounds and cubic feet if available; (9) Total ocean freight in U.S. dollars; and (10) Name of steamship company. (f) If this contract exceeds the simplified acquisition threshold, the Contractor shall provide with its final invoice under this contract a representation that to the best of its knowledge and belief (1) No ocean transportation was used in the performance of this contract; (2) Ocean transportation was used and only U.S.-flag vessels were used for all ocean shipments under the contract; (3) Ocean transportation was used, and the Contractor had the written consent of the Contracting Officer for all foreign-flag ocean transportation; or (4) Ocean transportation was used and some or all of the shipments were made on foreign-flag vessels without the written consent of the Contracting Officer. The Contractor shall describe these shipments in the following format: | || ITEM DESCRIPTION || CONTRACT LINE ITEMS || QUANTITY || || __See schedule__ || ____ || ____ || TOTAL || ____ || ____ || ____ | (g) If this contract exceeds the simplified acquisition threshold and the final invoice does not include the required representation, the Government will reject and return it to the Contractor as an improper invoice for the purposes of the Prompt Payment clause of this contract. In the event there has been unauthorized use of foreign-flag vessels in the performance of this contract, the Contracting Officer is entitled to equitably adjust the contract, based on the unauthorized use. (h) In the award of subcontracts, for the types of supplies described in paragraph (b)(2) of this clause, including subcontracts for commercial items, the Contractor shall flow down the requirements of this clause as follows: (1) The Contractor shall insert the substance of this clause, including this paragraph (h), in subcontracts that exceed the simplified acquisition threshold in part 2 of the Federal Acquisition Regulation. (2) The Contractor shall insert the substance of paragraphs (a) through (e) of this clause, and this paragraph (h), in subcontracts that are at or below the simplified acquisition threshold in part 2 of the Federal Acquisition Regulation.
Section G - Contract Administration Data
DFARS Clauses Incorporated by Reference
Number Title Effective Date 252.232-7003 Electronic Submission of Payment Requests and Receiving Reports. 2018-12 252.232-7008 Assignment of Claims (Overseas). 1997-06
DFARS Clauses Incorporated by Full Text
252.232-7006 Wide Area WorkFlow Payment Instructions. 2018-12 As prescribed in 232.7004(b), use the following clause: WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (DEC 2018)
(a) Definitions. As used in this clause- Department of Defense Activity Address Code (DoDAAC) is a six position code that uniquely identifies a unit, activity, or organization. Document type means the type of payment request or receiving report available for creation in Wide Area WorkFlow (WAWF). Local processing office (LPO) is the office responsible for payment certification when payment certification is done external to the entitlement system. Payment request and receiving report are defined in the clause at 252.232-7003, Electronic Submission of Payment Requests and Receiving Reports. (b) Electronic invoicing. The WAWF system provides the method to electronically process vendor payment requests and receiving reports, as authorized by Defense Federal Acquisition Regulation Supplement (DFARS) 252.232-7003, Electronic Submission of Payment Requests and Receiving Reports. (c) WAWF access. To access WAWF, the Contractor shall- (1) Have a designated electronic business point of contact in the System for Award Management at https://www.sam.gov; and (2) Be registered to use WAWF at https://wawf.eb.mil/ following the step-by-step procedures for self-registration available at this web site. (d) WAWF training. The Contractor should follow the training instructions of the WAWF Web-Based Training Course and use the Practice Training Site before submitting payment requests through WAWF. Both can be accessed by selecting the Web Based Training link on the WAWF home page at https://wawf.eb.mil/ (e) WAWF methods of document submission.
Document submissions may be via web entry, Electronic Data Interchange, or File Transfer Protocol. (f) WAWF payment instructions. The Contractor shall use the following information when submitting payment requests and receiving reports in WAWF for this contract or task or delivery order: (1) Document type. The Contractor shall submit payment requests using the following document type(s): (i) For cost-type line items, including labor-hour or time-and-materials, submit a cost voucher. (ii) For fixed price line items (A) That require shipment of a deliverable, submit the invoice and receiving report specified by the Contracting Officer. ____ (Contracting Officer: Insert applicable invoice and receiving report document type(s) for fixed price line items that require shipment of a deliverable.) (B) For services that do not require shipment of a deliverable, submit either the Invoice 2in1, which meets the requirements for the invoice and receiving report, or the applicable invoice and receiving report, as specified by the Contracting Officer. ____ (Contracting Officer: Insert either Invoice 2in1 or the applicable invoice and receiving report document type(s) for fixed price line items for services.) (iii) For customary progress payments based on costs incurred, submit a progress payment request. (iv) For performance based payments, submit a performance based payment request. (v) For commercial item financing, submit a commercial item financing request. (2) ) Fast Pay requests are only permitted when Federal Acquisition Regulation (FAR) 52.213-1 is included in the contract. (f) [Note: The Contractor may use a WAWF combo document type to create some combinations of invoice and receiving report in one step.] (3) Document routing. The Contractor shall use the information in the Routing Data Table below only to fill in applicable fields in WAWF when creating payment requests and receiving reports in the system. Routing Data Table* | Field Name in WAWF || Data to be entered in WAWF || Pay Official DoDAAC || ____ || Issue By DoDAAC || ____ || Admin DoDAAC || ____ || Inspect By DoDAAC || ____ || Ship To Code || ____ || Ship From Code || ____ || Mark For Code || ____ || Service Approver (DoDAAC) || ____ || Service Acceptor (DoDAAC) || ____ || Accept at Other DoDAAC || ____ || LPO DoDAAC || ____ || DCAA Auditor DoDAAC || ____ || Other DoDAAC(s) || ____ | (*Contracting Officer: Insert applicable DoDAAC information. If multiple ship to/acceptance locations apply, insert See Schedule or Not applicable.) (**Contracting Officer: If the contract provides for progress payments or performance-based payments, insert the DoDAAC for the contract administration office assigned the functions under FAR 42.302(a)(13).) (4) Payment request. The Contractor shall ensure a payment request includes documentation appropriate to the type of payment request in accordance with the payment clause, contract financing clause, or Federal Acquisition Regulation 52.216-7, Allowable Cost and Payment, as applicable. (5) Receiving report. The Contractor shall ensure a receiving report meets the requirements of DFARS Appendix F. (g) WAWF point of contact. (1) The Contractor may obtain clarification regarding invoicing in WAWF from the following contracting activitys WAWF point of contact. ____ (Contracting Officer: Insert applicable information or Not applicable.) (2) Contact the WAWF helpdesk at 866-618-5988, if assistance is needed. (End of clause)
Section H - Special Contract Requirements
Section I - Contract Clauses
FAR Clauses Incorporated by Reference
Number Title Effective Date 52.204-13 System for Award Management Maintenance. 2018-10 52.204-18 Commercial and Government Entity Code Maintenance. 2016-07 52.209-10 Prohibition on Contracting with Inverted Domestic Corporations. 2015-11 52.209-11 Representation by Corporations Regarding Delinquent Tax Liability or a
Felony Conviction under any Federal Law.
2016-02
52.211-5 Material Requirements. 2000-08 52.223-18 Encouraging Contractor Policies to Ban Text Messaging While Driving. 2011-08 52.233-3 Protest after Award. 1996-08 52.236-5 Material and Workmanship. 1984-04 52.236-7 Permits and Responsibilities. 1991-11 52.242-14 Suspension of Work. 1984-04 52.243-1 Changes-Fixed-Price. 1987-08 52.243-5 Changes and Changed Conditions. 1984-04 52.249-1 Termination for Convenience of the Government (Fixed-Price) (Short
Form).
1984-04
DFARS Clauses Incorporated by Reference
Number Title Effective Date 252.203-7000 Requirements Relating to Compensation of Former DoD Officials 2011-09 252.203-7002 Requirement to Inform Employees of Whistleblower Rights. 2013-09 252.204-7003 Control of Government Personnel Work Product. 1992-04 252.204-7015 Notice of Authorized Disclosure of Information for Litigation Support. 2016-05 252.222-7002 Compliance with Local Labor Laws (Overseas). 1997-06 252.223-7006 Prohibition on Storage, Treatment, and Disposal of Toxic or Hazardous
Materials.
2014-09
252.225-7041 Correspondence in English. 1997-06 252.225-7048 Export-Controlled Items. 2013-06 252.229-7008 Relief from Import Duty (United Kingdom). 2011-12 252.232-7010 Levies on Contract Payments. 2006-12 252.233-7001 Choice of Law (Overseas). 1997-06 252.243-7001 Pricing of Contract Modifications. 1991-12
AFFARS Clauses Incorporated by Reference
Number Title Effective Date 5352.223-9001 Health and Safety on Government Installations 11/1/2012
FAR Clauses Incorporated by Full Text
52.232-5 Payments under Fixed-Price Construction Contracts. 2014-05 As prescribed in 32.111(a)(5), insert the following clause: Payments under Fixed-Price Construction Contracts (May 2014)
(a) Payment of price. The Government shall pay the Contractor the contract price as provided in this contract. (b) Progress payments. The Government shall make progress payments monthly as the work proceeds, or at more frequent intervals as determined by the Contracting Officer, on estimates of work accomplished which meets the standards of quality established under the contract, as approved by the Contracting Officer. (1) The Contractor's request for progress payments shall include the following substantiation: (i) An itemization of the amounts requested, related to the various elements of work required by the contract covered by the payment requested. (ii) A listing of the amount included for work performed by each subcontractor under the contract. (iii) A listing of the total amount of each subcontract under the contract. (iv) A listing of the amounts previously paid to each such subcontractor under the contract. (v) Additional supporting data in a form and detail required by the Contracting Officer. (2) In the preparation of estimates, the Contracting Officer may authorize material delivered on the site and preparatory work done to be taken into consideration. Material delivered to the Contractor at locations other than the site also may be taken into consideration if- (i) Consideration is specifically authorized by this contract; and (ii) The Contractor furnishes satisfactory evidence that it has acquired title to such material and that the material will be used to perform this contract. (c) Contractor certification. Along with each request for progress payments, the Contractor shall furnish the following certification, or payment shall not be made: (However, if the Contractor elects to delete paragraph(c)(4) from the certification, the certification is still acceptable.) I hereby certify, to the best of my knowledge and belief, that- (1) The amounts requested are only for performance in accordance with the specifications, terms, and conditions of the contract; (2) All payments due to subcontractors and suppliers from previous payments received under the contract have been made, and timely payments will be made from the proceeds of the payment covered by this certification, in accordance with subcontract agreements and the requirements of Chapter39 of Title31, United States Code; (3) This request for progress payments does not include any amounts which the prime contractor intends to withhold or retain from a subcontractor or supplier in accordance with the terms and conditions of the subcontract; and (4) This certification is not to be construed as final acceptance of a subcontractor's performance. ____ (Name) ____ (Title) ____ (Date) (d) Refund of unearned amounts. If the Contractor, after making a certified request for progress payments, discovers that a portion or all of such request constitutes a payment for performance by the Contractor that fails to conform to the specifications, terms, and conditions of this contract (hereinafter referred to as the unearned amount), the Contractor shall- (1) Notify the Contracting Officer of such performance deficiency; and (2) Be obligated to pay the Government an amount (computed by the Contracting Officer in the manner provided in paragraph(j) of this clause) equal to interest on the unearned amount from the 8thday after the date of receipt of the unearned amount until- (i) The date the Contractor notifies the Contracting Officer that the performance deficiency has been corrected; or (ii) The date the Contractor reduces the amount of any subsequent certified request for progress payments by an amount equal to the unearned amount. (e) Retainage. If the Contracting Officer finds that satisfactory progress was achieved during any period for which a progress payment is to be made, the Contracting Officer shall authorize payment to be made in full. However, if satisfactory progress has not been made, the Contracting Officer may retain a maximum of 10percent of the amount of the payment until satisfactory progress is achieved. When the work is substantially complete, the Contracting Officer may retain from previously withheld funds and future progress payments that amount the Contracting Officer considers adequate for protection of the Government and shall release to the Contractor all the remaining withheld funds. Also, on completion and acceptance of each separate building, public work, or other division of the contract, for which the price is stated separately in the contract, payment shall be made for the completed work without retention of a percentage. (f) Title, liability, and reservation of rights. All material and work covered by progress payments made shall, at the time of payment, become the sole property of the Government, but this shall not be construed as- (1) Relieving the Contractor from the sole responsibility for all material and work upon which payments have been made or the restoration of any damaged work; or (2) Waiving the right of the Government to require the fulfillment of all of the terms of the contract. (g) Reimbursement for bond premiums. In making these progress payments, the Government shall, upon request, reimburse the Contractor for the amount of premiums paid for performance and payment bonds (including coinsurance and reinsurance agreements, when applicable) after the Contractor has furnished evidence of full payment to the surety. The retainage provisions in paragraph(e) of this clause shall not apply to that portion of progress payments attributable to bond premiums. (h) Final payment. The Government shall pay the amount due the Contractor under this contract after- (1) Completion and acceptance of all work; (2) Presentation of a properly executed voucher; and (3) Presentation of release of all claims against the Government arising by virtue of this contract, other than claims, in stated amounts, that the Contractor has specifically excepted from the operation of the release. A release may also be required of the assignee if the Contractor's claim to amounts payable under this contract has been assigned under the Assignment of Claims Act of1940 (31 U.S.C.3727 and 41 U.S.C.6305). (i) Limitation because of undefinitized work. Notwithstanding any provision of this contract, progress payments shall not exceed 80percent on work accomplished on undefinitized contract actions. A contract action is any action resulting in a contract, as defined in FARsubpart 2.1, including contract modifications for additional supplies or services, but not including contract modifications that are within the scope and under the terms of the contract, such as contract modifications issued pursuant to the Changes clause, or funding and other administrative changes. (j) Interest computation on unearned amounts. In accordance with 31 U.S.C.3903(c)(1), the amount payable under paragraph(d)(2) of this clause shall be- (1) Computed at the rate of average bond equivalent rates of 91-day Treasury bills auctioned at the most recent auction of such bills prior to the date the Contractor receives the unearned amount; and (2) Deducted from the next available payment to the Contractor. (End of clause)
52.232-27 Prompt Payment for Construction Contracts. 2017-01 As prescribed in 32.908(b), insert the following clause: Prompt Payment for Construction Contracts (Jan 2017) Notwithstanding any other payment terms in this contract, the Government will make invoice payments under the terms and conditions specified in this clause. The Government considers payment as being made on the day a check is dated or the date of an electronic funds transfer. Definitions of pertinent terms are set forth in sections2.101, 32.001, and 32.902 of the Federal Acquisition Regulation. All days referred to in this clause are calendar days, unless otherwise specified.
(However, see paragraph(a)(3) concerning payments due on Saturdays, Sundays, and legal holidays.) (a) Invoice payments-
(1) Types of invoice payments. For purposes of this clause, there are several types of invoice payments that may occur under this contract, as follows: (i) Progress payments, if provided for elsewhere in this contract, based on Contracting Officer approval of the estimated amount and value of work or services performed, including payments for reaching milestones in any project. (A) The due date for making such payments is 14days after the designated billing office receives a proper payment request. If the designated billing office fails to annotate the payment request with the actual date of receipt at the time of receipt, the payment due date is the 14thday after the date of the Contractor's payment request, provided the designated billing office receives a proper payment request and there is no disagreement over quantity, quality, or Contractor compliance with contract requirements. (B) The due date for payment of any amounts retained by the Contracting Officer in accordance with the clause at 52.232-5, Payments Under Fixed-Price Construction Contracts, is as specified in the contract or, if not specified, 30days after approval by the Contracting Officer for release to the Contractor. (ii) Final payments based on completion and acceptance of all work and presentation of release of all claims against the Government arising by virtue of the contract, and payments for partial deliveries that have been accepted by the Government (e.g.,each separate building, public work, or other division of the contract for which the price is stated separately in the contract). (A) The due date for making such payments is the later of the following two events: (1) The 30thday after the designated billing office receives a proper invoice from the Contractor. (2) The 30thday after Government acceptance of the work or services completed by the Contractor. For a final invoice when the payment amount is subject to contract settlement actions (e.g.,release of claims), acceptance is deemed to occur on the effective date of the contract settlement. (B) If the designated billing office fails to annotate the invoice with the date of actual receipt at the time of receipt, the invoice payment due date is the 30thday after the date of the Contractor's invoice, provided the designated billing office receives a proper invoice and there is no disagreement over quantity, quality, or Contractor compliance with contract requirements. (2) Contractor's invoice. The Contractor shall prepare and submit invoices to the designated billing office specified in the contract. A proper invoice must include the items listed in paragraphs(a)(2)(i) through (a)(2)(xi) of this clause. If the invoice does not comply with these requirements, the designated billing office must return it within 7days after receipt, with the reasons why it is not a proper invoice. When computing any interest penalty owed the Contractor, the Government will take into account if the Government notifies the Contractor of an improper invoice in an untimely manner. (i) Name and address of the Contractor.
(ii) Invoice date and invoice number. (The Contractor should date invoices as close as possible to the date of mailing or transmission.) (iii) Contract number or other authorization for work or services performed (including order number and line item number). (iv) Description of work or services performed. (v) Delivery and payment terms (e.g.,discount for prompt payment terms). (vi) Name and address of Contractor official to whom payment is to be sent (must be the same as that in the contract or in a proper notice of assignment). (vii) Name (where practicable), title, phone number, and mailing address of person to notify in the event of a defective invoice. (viii) For payments described in paragraph(a)(1)(i) of this clause, substantiation of the amounts requested and certification in accordance with the requirements of the clause at 52.232-5, Payments Under Fixed-Price Construction Contracts. (ix) Taxpayer Identification Number (TIN). The Contractor shall include its TIN on the invoice only if required elsewhere in this contract. (x) Electronic funds transfer (EFT) banking information. (A) The Contractor shall include EFT banking information on the invoice only if required elsewhere in this contract. (B) If EFT banking information is not required to be on the invoice, in order for the invoice to be a proper invoice, the Contractor shall have submitted correct EFT banking information in accordance with the applicable solicitation provision (e.g., 52.232-38, Submission of Electronic Funds Transfer Information with Offer), contract clause (e.g., 52.232-33, Payment by Electronic Funds Transfer-System for Award Management, or 52.232-34, Payment by Electronic Funds Transfer-Other Than System for Award Management), or applicable agency procedures. (C) EFT banking information is not required if the Government waived the requirement to pay by EFT. (xi) Any other information or documentation required by the contract. (3) Interest penalty. The designated payment office will pay an interest penalty automatically, without request from the Contractor, if payment is not made by the due date and the conditions listed in paragraphs(a)(3)(i) through (a)(3)(iii) of this clause are met, if applicable. However, when the due date falls on a Saturday, Sunday, or legal holiday, the designated payment office may make payment on the following working day without incurring a late payment interest penalty. (i) The designated billing office received a proper invoice. (ii) The Government processed a receiving report or other Government documentation authorizing payment and there was no disagreement over quantity, quality, Contractor compliance with any contract term or condition, or requested progress payment amount. (iii) In the case of a final invoice for any balance of funds due the Contractor for work or services performed, the amount was not subject to further contract settlement actions between the Government and the Contractor. (4) Computing penalty amount. The Government will compute the interest penalty in accordance with the Office of Management and Budget prompt payment regulations at 5CFR Part1315. (i) For the sole purpose of computing an interest penalty that might be due the Contractor for payments described in paragraph(a)(1)(ii) of this clause, Government acceptance or approval is deemed to occur constructively on the 7thday after the Contractor has completed the work or services in accordance with the terms and conditions of the contract. If actual acceptance or approval occurs within the constructive acceptance or approval period, the Government will base the determination of an interest penalty on the actual date of acceptance or approval. Constructive acceptance or constructive approval requirements do not apply if there is a disagreement over quantity, quality, or Contractor compliance with a contract provision. These requirements also do not compel Government officials to accept work or services, approve Contractor estimates, perform contract administration functions, or make payment prior to fulfilling their responsibilities. (ii) The prompt payment regulations at 5CFR1315.10(c) do not require the Government to pay interest penalties if payment delays are due to disagreement between the Government and the Contractor over the payment amount or other issues involving contract compliance, or on amounts temporarily withheld or retained in accordance with the terms of the contract. The Government and the Contractor shall resolve claims involving disputes, and any interest that may be payable in accordance with the clause at FAR52.233-1, Disputes. (5) Discounts for prompt payment. The designated payment office will pay an interest penalty automatically, without request from the Contractor, if the Government takes a discount for prompt payment improperly. The Government will calculate the interest penalty in accordance with the prompt payment regulations at 5CFR Part1315. (6) Additional interest penalty. (i) The designated payment office will pay a penalty amount, calculated in accordance with the prompt payment regulations at 5CFR Part1315 in addition to the interest penalty amount only if- (A) The Government owes an interest penalty of $1 or more; (B) The designated payment office does not pay the interest penalty within 10days after the date the invoice amount is paid; and (C) The Contractor makes a written demand to the designated payment office for additional penalty payment, in accordance with paragraph(a)(6)(ii) of this clause, postmarked not later than 40days after the date the invoice amount is paid. (ii) (A) The Contractor shall support written demands for additional penalty payments with the following data. The Government will not request any additional data.